Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Cost Model”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,045 records · Page 58

NASA Human Spaceflight Scenarios - Do All Our Models Still Say No?

Historically, NASA human spaceflight planning has included healthy doses of life cycle cost analysis. Planners put projects and their cost estimates in a budget context. Estimated costs became expected budgets. Regardless, real budgets rarely matched expectations. So plans would come and go as NASA canceled projects. New projects would arise and the cycle would begin again. Repeatedly, NASA schedule and performance ambitions come up against costs growing at double-digit rates while budgets barely rise a couple of percent a year. Significant skepticism greets proposed NASA programs at birth, as cost estimates for new projects are traditionally very high, and worse, far off the mark for those carried forward. In this environment the current "capability driven framework" for NASA human spaceflight evolved, where long term life cycle cost analysis are even viewed as possibly counter-productive. Here, a space exploration project, for example the Space Launch System, focuses on immediate goals. A life cycle is that of a project, not a program, and for only that span of time to a near term milestone like a first test launch. Unfortunately, attempting to avoid some pitfalls in long-term life cycle cost analysis breeds others. Government audits have noted that limiting the scope of cost analysis "does not provide the transparency necessary to assess long-term affordability" making it difficult to understand if NASA "is progressing in a cost-effective and affordable manner." Even in this short-term framework, NASA realizes the importance of long-term considerations, that it must "maximize the efficiency and sustainability of the Exploration Systems development programs", that this is "critical to free resources for re-investment...such as other required deep space exploration capabilities." Assuming the value of long-term life cycle cost analysis, where due diligence meets reconnaissance, and accepting past shortcomings, the work here approaches life cycle cost analysis for human spaceflight differently. 1) If costs have traditionally been so high that adding them up is discouraging, are there any new facts on the ground offering paths to significantly lower costs? 2) If NASA's spaceflight budget and process is an over-arching constraint, with its planning limitations favoring short-term outlooks, is there a way to step outside the budget box? 3) If life cycle answers have historically been too uncertain to be useful, is there a process where stakeholders gain valuable insights merely from emphasizing a common understanding around questions? We analyze the potential life cycle cost of assorted NASA human spaceflight architectures - an architecture as a sum of individual systems, working together. With the prior questions of high costs, limited budgets and uncertainties in mind, public private partnerships are central in these architectures. The cost data for current commercial public private partnerships is encouraging, as are cost estimates for future partnership approaches beyond low Earth orbit. Private capital, directly or indirectly, an ingredient of public private partnerships, may be a significant factor in finding a path around the limits of the NASA spaceflight budget. Also, understanding and reviewing the pros, cons and uncertainties of assorted architectures can assist in developing a common understanding around key questions as important if not more so than the numbers and answers. Lastly, a scenario planning technique is briefly explored that can mature a common understanding about the agencies situation at hand and how diverse stakeholders can go forward together. Scenario planning, rather than focusing on answers, places emphasis on stakeholders developing a common understanding about the future. Putting aside costs, this is especially true of questions about sustainability and growth, results, benefits and expectations. While efficiency exercises or analysis look to reduce resources in one place to apply them elsewhere, moving around slices in a pie, scenario planning can get at the heart of the matter, growing the pie, transforming it, and making the pieces relevant. Especially important is the question of sustainability for different scenarios in the broad sense of the word - not just the narrow ability to survive or continue, but also the ability to adapt, prosper and grow.

space systems life cycle costs↗

Techno-Economic Wind Blade Manufacturing Model to Identify Opportunities for Cost Improvements Phase II IACMI Project 4.6/4.8

In IACMI Project 4.6 and IACMI Project 4.8, an Excel-based Techno-Economic Model (TEM) of the manufacturing process for composite wind turbine blades and a DELMIA Factory Flow Simulation of a generic wind blade manufacturing facility was developed. Together, these two tools provide a combined economic modeling capability that accounts for the material, labor, overhead and full-lifecycle operating costs associated with wind blade manufacturing as well as the impact of process flow and factory layout on overall manufacturing efficiency. The tools provide a novel means of detailed comparative analysis of the economic feasibility of proposed technologies and process changes for blade manufacturing. The modeling tools were developed with close support from members of industry and visits to multiple blade manufacturing facilities. With industry oversight, a detailed generalized manufacturing process plan and facility layout were developed with manufacturing parameters, material costs and economic factors based on historical data. Dassault Systèmes and the University of Texas at Dallas (UTD) contributed to the development of the Techno-Economic Model by providing macros to enable the generation of Bill of Material (BOM) data from a 3D blade design in either CATIA or NuMAD format, respectively. The TEM was built with the capability to directly import a Bill of Materials for economic analysis, and with the addition of the macros provided by Dassault and UTD, the TEM can directly import blade designs from both CATIA and NuMAD file formats. The modeling tools developed in Project 4.6 were used to investigate four wind blade manufacturing concepts in detail and select one to explore with laboratory-scale experimentation in Project 4.8. The four manufacturing concepts that were investigated were down-selected by the full project team from a larger list of concepts. The selections were made based on a number of criteria ranking viability and level of interest for each concept. The ‘One-Step Close’ manufacturing concept was ultimately selected for investigation in Project 4.8 and the demonstration was performed at the NREL CoMET facility. The TPI advanced manufacturing facility in Warren, RI contributed the production of several prototype components, the designs for which were developed by Janicki Industries. The demonstration project provided clear indication of the viability of the One-Step Close manufacturing concept for blade manufacturing and good validation of the Techno-Economic Model’s prediction of its economic impact.

17 WIND ENERGY↗

Preliminary design, analysis, and costing of a dynamic scale model of the NASA space station

The difficulty of testing the next generation of large flexible space structures on the ground places an emphasis on other means for validating predicted on-orbit dynamic behavior. Scale model technology represents one way of verifying analytical predictions with ground test data. This study investigates the preliminary design, scaling and cost trades for a Space Station dynamic scale model. The scaling of nonlinear joint behavior is studied from theoretical and practical points of view. Suspension system interaction trades are conducted for the ISS Dual Keel Configuration and Build-Up Stages suspended in the proposed NASA/LaRC Large Spacecraft Laboratory. Key issues addressed are scaling laws, replication vs. simulation of components, manufacturing, suspension interactions, joint behavior, damping, articulation capability, and cost. These issues are the subject of parametric trades versus the scale model factor. The results of these detailed analyses are used to recommend scale factors for four different scale model options, each with varying degrees of replication. Potential problems in constructing and testing the scale model are identified, and recommendations for further study are outlined.

Gronet, M. J.↗

A Spatial-Economic Cost-Reduction Pathway Analysis for U.S. Offshore Wind Energy Development from 2015-2030

The potential for cost reduction and economic viability for offshore wind varies considerably within the United States. This analysis models the cost impact of a range of offshore wind locational cost variables across more than 7,000 potential coastal sites in the United States' offshore wind resource area. It also assesses the impact of over 50 technology innovations on potential future costs between 2015 and 2027 (Commercial Operation Date) for both fixed-bottom and floating wind systems. Comparing these costs to an initial assessment of local avoided generating costs, this analysis provides a framework for estimating the economic potential for offshore wind. Analyzing economic potential within this framework can help establish a refined understanding across industries of the technology and site-specific risks and opportunities associated with future offshore wind development. The findings from the original report indicate that under the modeled scenario, offshore wind can be expected to achieve significant cost reductions and may approach economic viability in some parts of the United States within the next 15 years.

17 WIND ENERGY↗

The critical role of conversion cost and comparative advantage in modeling agricultural land use change

The theoretical difference in land use modeling approaches is an important uncertain factor in evaluating future climate scenarios in global economic and integrated assessment models. In this study, we compared several widely used land use modeling approaches including constrained optimization, constant elasticity of transformation (CET), the additive form of constant elasticity of transformation (ACET), logit, and Ricardian. We demonstrated that the approaches differ not only by the extent of parameter uses but also by the definition of conversion cost and the consideration of comparative advantage implied by land heterogeneity. We developed a generalized hybrid approach by incorporating ACET/logit and Ricardian to consider both conversion cost and comparative advantage. The hybrid approach was used to estimate future climate impacts on agriculture. The results indicated a welfare loss of 20 – 24 percent of crop value. It also demonstrated that ignoring land heterogeneity or land conversion cost would underestimate climate impacts on agriculture.

land use modeling, land heterogeneity, conversion ↗

U.S. Solar Photovoltaic System Cost Benchmark: Q1 2017

NREL has been modeling U.S. photovoltaic (PV) system costs since 2009. This year, our report benchmarks costs of U.S. solar PV for residential, commercial, and utility-scale systems built in the first quarter of 2017 (Q1 2017). Costs are represented from the perspective of the developer/installer, thus all hardware costs represent the price at which components are purchased by the developer/installer, not accounting for preexisting supply agreements or other contracts. Importantly, the benchmark this year (2017) also represents the sales price paid to the installer; therefore, it includes profit in the cost of the hardware, along with the profit the installer/developer receives, as a separate cost category. However, it does not include any additional net profit, such as a developer fee or price gross-up, which are common in the marketplace. We adopt this approach owing to the wide variation in developer profits in all three sectors, where project pricing is highly dependent on region and project specifics such as local retail electricity rate structures, local rebate and incentive structures, competitive environment, and overall project or deal structures.

14 SOLAR ENERGY↗

U.S. Solar Photovoltaic System Cost Benchmark: Q1 2017

NREL has been modeling U.S. photovoltaic (PV) system costs since 2009. This year, our report benchmarks costs of U.S. solar PV for residential, commercial, and utility-scale systems built in the first quarter of 2017 (Q1 2017). Costs are represented from the perspective of the developer/installer, thus all hardware costs represent the price at which components are purchased by the developer/installer, not accounting for preexisting supply agreements or other contracts. Importantly, the benchmark this year (2017) also represents the sales price paid to the installer; therefore, it includes profit in the cost of the hardware, along with the profit the installer/developer receives, as a separate cost category. However, it does not include any additional net profit, such as a developer fee or price gross-up, which are common in the marketplace. We adopt this approach owing to the wide variation in developer profits in all three sectors, where project pricing is highly dependent on region and project specifics such as local retail electricity rate structures, local rebate and incentive structures, competitive environment, and overall project or deal structures.

14 SOLAR ENERGY↗

Pajarito Aerosol Couplings to Ecosystems (PACE) Field Campaign Report

Laboratory (LANL) worked on the Pajarito Aerosol Couplings to Ecosystems (PACE) intensive operational period (IOP). PACE’s primary goal was to demonstrate routine Mobile Aerosol Observing System (MAOS) field operations and improve instrumental and operational performance. LANL operated the instruments efficiently and effectively with remote guidance by the instrument mentors. This was the first time a complex suite of instruments had been operated under the ARM model and it proved to be a very successful and cost-effective model to build upon.

54 ENVIRONMENTAL SCIENCES↗

Scalable and Highly-Efficient Microbial Electrochemical Reactor for Hydrogen Generation from Wastes

The overall goal of this project was to develop a scalable and highly efficient hybrid microbial electrochemical reactor for hydrogen recovery from waste streams at a cost of less than $\$$2/kg H₂. The specific objectives were: (1) to design and fabricate a scalable and highly efficient microbial electrochemical cell (MEC) reactor, and (2) to determine the techno-economic feasibility of the system for H₂ generation from organic-rich waste streams. We achieved the first objective by (a) developing low-cost electrode materials, (b) synthesizing a highly efficient cathode catalyst in a scalable manner, (c) evaluating and validating the developed electrode material and catalyst in MEC reactors, and (d) designing and fabricating a larger reactor that incorporates (a) to (c). We met the second objective by (a) identifying the impacts of wastewater composition and operational conditions on H₂ production, and (b) developing a cost-performance model that identified critical parameters affecting the system's performance and cost, providing a pathway for further improvement.

08 HYDROGEN↗

Integrated risk/cost planning models for the US Air Traffic system

A prototype network planning model for the U.S. Air Traffic control system is described. The model encompasses the dual objectives of managing collision risks and transportation costs where traffic flows can be related to these objectives. The underlying structure is a network graph with nonseparable convex costs; the model is solved efficiently by capitalizing on its intrinsic characteristics. Two specialized algorithms for solving the resulting problems are described: (1) truncated Newton, and (2) simplicial decomposition. The feasibility of the approach is demonstrated using data collected from a control center in the Midwest. Computational results with different computer systems are presented, including a vector supercomputer (CRAY-XMP). The risk/cost model has two primary uses: (1) as a strategic planning tool using aggregate flight information, and (2) as an integrated operational system for forecasting congestion and monitoring (controlling) flow throughout the U.S. In the latter case, access to a supercomputer is required due to the model's enormous size.

Mulvey, J. M.↗

A unified approach for composite cost reporting and prediction in the ACT program

The Structures Technology Program Office (STPO) at NASA Langley Research Center has held two workshops with representatives from the commercial airframe companies to establish a plan for development of a standard cost reporting format and a cost prediction tool for conceptual and preliminary designers. This paper reviews the findings of the workshop representatives with a plan for implementation of their recommendations. The recommendations of the cost tracking and reporting committee will be implemented by reinstituting the collection of composite part fabrication data in a format similar to the DoD/NASA Structural Composites Fabrication Guide. The process of data collection will be automated by taking advantage of current technology with user friendly computer interfaces and electronic data transmission. Development of a conceptual and preliminary designers' cost prediction model will be initiated. The model will provide a technically sound method for evaluating the relative cost of different composite structural designs, fabrication processes, and assembly methods that can be compared to equivalent metallic parts or assemblies. The feasibility of developing cost prediction software in a modular form for interfacing with state of the art preliminary design tools and computer aided design (CAD) programs is assessed.

Freeman, W. Tom↗

Validated Feasibility Study of Integrally Stiffened Metallic Fuselage Panels for Reducing Manufacturing Costs: Cost Assessment of Manufacturing/Design Concepts

The objective of the Integral Airframe Structures (IAS) program was to demonstrate, for an integrally stiffened structural concept, performance and weight equal to "built-up" structure with lower manufacturing cost. This report presents results of the cost assessment for several design configuration/manufacturing method combinations. The attributes of various cost analysis models were evaluated and COSTRAN selected for this study. A process/design cost evaluation matrix was developed based on material, forming, machining, and assembly of structural sub-elements and assembled structure. A hybrid design, made from high-speed machined extruded frames that are mechanically fastened to high-speed machined plate skin/stringer panels, was identified as the most cost-effective manufacturing solution. Recurring labor and material costs of the hybrid design are up to 61 percent less than the current built-up technology baseline. This would correspond to a total cost reduction of $1.7 million per ship set for a 777-sized airplane. However, there are important outstanding issues with regard to the cost of capacity of high technology machinery, and the ability to cost-effectively provide surface finish acceptable to the commercial aircraft industry. The projected high raw material cost of large extrusions also played an important role in the trade-off between plate and extruded concepts.

Metschan, S.↗

High Reliability at Minimum Cost

This paper investigates the minimum cost of improving the reliability of complex technical systems. The two major methods to improve reliability are redesigning the system for higher reliability or providing redundant components to replace failed elements. The costs of redesign for reliability or adding redundancy are estimated. The most cost-effective combination for high reliability can be identified. The cost of increasing the intrinsic reliability of a system can be modeled as cost proportional to 1/(system failure rate) a , where the exponent “a” measures the difficulty of increasing reliability. The “a” exponent can vary from 0.25 to about 2.5. Operational reliability can also be increased by using redundant systems. The failure rate for N parallel redundant units is (system failure rate) N . The cost of redundancy is N times the system cost. The total redundant system cost is proportional to N/(system failure rate) a . The cost of redundancy increases as N gets larger, but larger N allows a higher system failure rate, which reduces the system design cost. There is a certain N, a certain level of redundancy, that has the minimum cost to achieve the required overall redundant system failure rate. The minimum cost for the redundant system is achieved at the optimum level of redundancy. The N for minimum cost is equal to -a ln (redundant system failure rate). The minimum cost of the N redundant systems is proportional to N * (original system failure rate) a . The optimum redesigned individual system failure rate is proportional to exp (-1/a), so the greater the difficulty, the higher the optimum individual system failure rate. Increasing the intrinsic reliability of a system encounters diminishing returns and at some point it becomes more cost-effective to add redundancy. The difficulty of increasing intrinsic system reliability determines the optimum design for high reliability at minimum cost.

reliability↗

High Reliability at Minimum Cost

This paper investigates the minimum cost of improving the reliability of complex technical systems. The two major methods to improve reliability are redesigning the system for higher reliability or providing redundant components to replace failed elements. The costs of redesign for reliability or adding redundancy are estimated. The most cost-effective combination for high reliability can be identified. The cost of increasing the intrinsic reliability of a system can be modeled as cost proportional to 1/(system failure rate) a , where the exponent “a” measures the difficulty of increasing reliability. The “a” exponent can vary from 0.25 to about 2.5. Operational reliability can also be increased by using redundant systems. The failure rate for N parallel redundant units is (system failure rate) N . The cost of redundancy is N times the system cost. The total redundant system cost is proportional to N/(system failure rate) a . The cost of redundancy increases as N gets larger, but larger N allows a higher system failure rate, which reduces the system design cost. There is a certain N, a certain level of redundancy, that has the minimum cost to achieve the required overall redundant system failure rate. The minimum cost for the redundant system is achieved at the optimum level of redundancy. The N for minimum cost is equal to -a ln (redundant system failure rate). The minimum cost of the N redundant systems is proportional to N * (original system failure rate) a . The optimum redesigned individual system failure rate is proportional to exp (-1/a), so the greater the difficulty, the higher the optimum individual system failure rate. Increasing the intrinsic reliability of a system encounters diminishing returns and at some point it becomes more cost-effective to add redundancy. The difficulty of increasing intrinsic system reliability determines the optimum design for high reliability at minimum cost.

reliability↗

Thermal Analysis Evaluations Using the Dry Cask Simulator

Different thermal analysis models were developed to simulate the dry cask simulator (DCS). The DCS is an experiment designed to simulate dry storage of a single boiling water reactor fuel assembly under a variety of heat loads and internal pressures. The DCS was set up and tested in both a vertical and horizontal configuration to determine cladding temperatures in vertical and horizontal dry cask storage systems. The models included a detailed STAR-CCM+ model with the fuel assembly geometry explicitly modeled, a porous STAR-CCM+ model with the fuel assembly geometry modeled as porous media region with calculated effective properties, and a COBRA-SFS model. COBRA-SFS is a thermal-hydraulic code developed for steady-state and transient analysis of multi assembly spent-fuel storage and transportation systems. STAR-CCM+ is a commercial computation fluid dynamics (CFD) code. Both a detailed and porous STARCCM+ model were developed to look at the effective thermal conductivity (keff) approach to modeling a fuel assembly. A keff fuel model is typically model in CFD thermal analyses due to its significantly lower computational costs. The models were run for a combination of low and high canister pressures (100 kPa and 800 kPa) and low and high internal heat loads (0.5 kW and 5 kW). Results from all three models were compared against experimental data taken from the DCS for the peak cladding temperature (PCT) and inlet air mass flow.

Suffield, Sarah R.↗

ASCot, the NASA Analogy Software Cost Tool Suite: expanding our estimation horizons

The NASA Analogy Software Costing Tool Suite (ASCoT) consists of a cluster-based analogy estimator for estimating software development effort, a K-Nearest Neighbors (KNN) analogy estimator for estimating effort and delivered lines of code, a simple regression-based cost estimating relationship (CER) model that estimates cost in dollars, and a probabilistic version of COCOMO II. In this paper we document the analogy algorithms as well as summarize the results of the performance of the KNN and the principle components (PCA) cluster analogy models. KNN performance is assessed by varying the number of inputs and number of neighbors. Four different clustering methods: K-means, Spectral Clustering, Hierarchical Clustering, and Principle Components Analysis (PCA), and their respective evaluation criterion are described in detail. The comparative performance of all four estimation models is assessed using magnitude of relative error (MRE) measurements.

Menzies, Tim↗

Simple Elasticity Modeling and Failure Prediction for Composite Flexbeams

A simple 2D boundary element analysis, suitable for developing cost effective models for tapered composite laminates, is presented. Constant stress and displacement elements are used. Closed-form fundamental solutions are derived. Numerical results are provided for several configurations to illustrate the accuracy of the model.

Makeev, Andrew↗

Reduced Order Costs for CO 2 Saline Storage for Use in Energy Market Models

This report provides the results of a collaboration between NETL, Los Alamos National Laboratory (LANL) and FECM headquarters personnel. NETL's FECM/NETL CO 2 Saline Storage Cost Model (CO2_S_COM) and LANL's Sequestration of CO 2 Tool (SCO 2 T) model were run with the same assumptions to generate costs for 314 potential storage formations in the U.S. The two models gave similar results. The results from CO2S_COM were then aggregated into a smaller number of costs that can be utilized in energy market models. The report has a companion spreadsheet called red_ord_costs_CO2_S_COM with the reduced order costs. The spreadsheet can be viewed online here: https://www.netl.doe.gov/energy-analysis/details?id=fb6d93df-0702-47aa-8147-59a5ae0c7cfd

54 ENVIRONMENTAL SCIENCES↗