Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Control Systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,045 records · Page 58

System for controller area network payload decoding

A system for decoding an unknown automotive controller area network (“CAN”) message definitions. CAN data vehicle signal mappings are typically held in secret and varied by automotive model and year. Without knowledge of the mappings, the wealth of real-time vehicle data hidden in the automotive CAN packets is uninterpretable—impeding research, after-market tuning, efficiency and performance monitoring, fault diagnosis, and privacy-related technologies. This system can ascertain the CAN signals' boundaries (start bit and length), endianness (byte ordering), signedness (binary-to-integer encoding) from raw CAN data. This allows conversion of CAN data to time series. Interpreting the translated CAN data's physical meaning and finding a linear mapping to standard units (e.g., knowing the signal is speed and scaling values to represent units of miles per hour) can be achieved for many signals by leveraging diagnostic standards to obtain real-time measurements of in-vehicle systems. The system can be integrated into lightweight hardware enabling an OBD-II plugin for real-time in-vehicle CAN decoding or run on standard computers. The system can output a standard DBC file with the signal definition information.

Verma, Kiren E.↗

Validation and Verification of TEDS Facility HYBRID Modeling

The HYBRID modeling repository is an in-house developed library of models for selected integrated energy systems (IES) modelling. HYBRID models have been developed since 2015 to describe the physical operation of tightly coupled thermal systems including power generators, thermal transport systems, thermal storage, thermal-to-electric conversion systems, and other thermal applications. Here, validation and verification (V&V) capabilities are demonstrated using the Thermal Energy Distribution System (TEDS) at INL. Building upon prior work, the TEDS model has been updated and verified so that it better represents the installed system configuration and the operating control system. The model control system was changed to allow replication of actual experimental procedures. Experimental operations focusing primarily on thermocline tank performance were devised and performed. Several anomalies were found in the operation data of the experiment facility. V&V activities calibrating a selected input parameter are demonstrated on a single component as well as with a single parameter within the thermocline. Calibrating is then demonstrated on multiple components and a multi-parameter metric for the entire system. The validation methodology is successfully applied to validate the model with experimental data. It is also used to confirm a hypothesis behind one of the anomalies in experimental performance.

25 ENERGY STORAGE↗

Using an operator training simulator in the undergraduate chemical engineering curriculim

An operator training simulator (OTS) is to the chemical engineer what a flight simulator is to the aerospace engineer. The basis of an OTS is a high-fidelity dynamic model of a chemical process that allows an engineer to simulate start-up, shut-down, and normal operation. It can also be used to test the skill and ability of an engineer or operator to respond and control some unforeseen situation(s) through the use of programmed malfunctions. West Virginia University (WVU) is a member of the National Energy Technology Laboratory’s Regional University Alliance (NETL-RUA). Working through the NETL-RUA, the authors have spent the last four years collaborating on the development of a high-fidelity OTS for an Integrated Gasification Combined Cycle (IGCC) power plant with CO{sub 2} capture that is the cornerstone of the AVESTARTM (Advanced Virtual Energy Simulation Training And Research) Center with sister facilities at NETL and WVU in Morgantown, WV. This OTS is capable of real-time dynamic simulation of IGCC plant operation, including start-up, shut-down, and power demand load following. The dynamic simulator and its human machine interfaces (HMIs) are based on the DYNSIM and InTouch software, respectively, from Invensys Operations Management. The purpose of this presentation is to discuss the authors’ experiences in using this sophisticated dynamic simulation-based OTS as a hands-on teaching tool in the undergraduate chemical engineering curriculum. At present, the OTS has been used in two separate courses: a new process simulation course and a traditional process control course. In the process simulation course, concepts of steady-state and dynamic simulations were covered prior to exposing the students to the OTS. Moreover, digital logic and the concept of equipment requiring one or more permissive states to be enabled prior to successful operation were also covered. Students were briefed about start-up procedures and the importance of following a predetermined sequence of actions in order to start-up the plant successfully. Student experience with the dynamic simulator consisted of a six-hour training session in which the Claus sulfur capture unit of the IGCC plant was started up. The students were able to operate the simulator through the InTouch-based HMI displays and study and understand the underlying dynamic modeling approach used in the DYNSIM-based simulator. The concepts learned during the training sessions were further reinforced when students developed their own DYNSIM models for a chemical process and wrote a detailed start-up procedure. In the process control course, students learned how the plant responds dynamically to changes in the manipulated inputs, as well as how the control system impacts plant performance, stability, robustness and disturbance rejection characteristics. The OTS provided the opportunity to study the dynamics of complicated, “real-life” process plants consisting of hundreds of pieces of equipment. Students implemented ideal forcing functions, tracked the time-delay through the entire plant, studied the response of open-loop unstable systems, and learned “good practices” in control system design by taking into account the real-world events where significant deviations from the “ideal” or “expected” response can occur. The theory of closed-loop stability was reinforced by implementing limiting proportional gain for stability limits of real plants. Finally, students were divided into several groups where each group was tasked to control a section of the plant within a set of operating limits in the face of disturbances and simulated process faults. At the end of this test, they suggested ways to improve the control system performance based on the theory they learned in class and the hands-on experience they earned while working on the OTS.

97 MATHEMATICS AND COMPUTING↗

Some Problems of Distributed and Boundary Control for Systems with Integral Aftereffect

We consider the problem of exact control for a system described by an equation with integral “memory.” It is shown that, under certain conditions, this system can be brought to rest in finite time by distributed control bounded in absolute value, and, in a special one-dimensional case, by control applied to an end-point of the interval. We consider different types of kernels in the integral term of the equation and describe some relationships between problems of controllability of some hyperbolic and parabolic systems.

97 MATHEMATICS AND COMPUTING↗

Greenidge Multi-Pollutant Control Project

The Greenidge Multi-Pollutant Control Project was conducted as part of the U.S. Department of Energy's Power Plant Improvement Initiative to demonstrate an innovative combination of air pollution control technologies that can cost-effectively reduce emissions of SO{sub 2}, NO{sub x}, Hg, acid gases (SO{sub 3}, HCl, and HF), and particulate matter from smaller coal-fired electric generating units (EGUs). There are about 400 units in the United States with capacities of 50-300 MW that currently are not equipped with selective catalytic reduction (SCR), flue gas desulfurization (FGD), or mercury control systems. Many of these units, which collectively represent more than 55 GW of installed capacity, are difficult to retrofit for deep emission reductions because of space constraints and unfavorable economies of scale, making them increasingly vulnerable to retirement or fuel switching in the face of progressively more stringent environmental regulations. The Greenidge Project sought to confirm the commercial readiness of an emissions control system that is specifically designed to meet the environmental compliance requirements of these smaller coal-fired EGUs by offering a combination of deep emission reductions, low capital costs, small space requirements, applicability to high-sulfur coals, mechanical simplicity, and operational flexibility. The multi-pollutant control system includes a NO{sub x}OUT CASCADE{reg_sign} hybrid selective non-catalytic reduction (SNCR)/in-duct SCR system for NO{sub x} control and a Turbosorp{reg_sign} circulating fluidized bed dry scrubbing system (with a new baghouse) for SO{sub 2}, SO{sub 3}, HCl, HF, and particulate matter control. Mercury removal is provided as a co-benefit of the in-duct SCR, dry scrubber, and baghouse, and by injection of activated carbon upstream of the scrubber, if required. The multi-pollutant control system was installed and tested on the 107-MW{sub e}, 1953-vintage AES Greenidge Unit 4 by a team including CONSOL Energy Inc. as prime contractor, AES Greenidge LLC as host site owner, and Babcock Power Environmental Inc. as engineering, procurement, and construction contractor. About 44% of the funding for the project was provided by the U.S. Department of Energy, through its National Energy Technology Laboratory, and the remaining 56% was provided by AES Greenidge. Project goals included reducing high-load NO{sub x} emissions to {le} 0.10 lb/mmBtu; reducing SO{sub 2}, SO{sub 3}, HCl, and HF emissions by at least 95%; and reducing Hg emissions by at least 90% while the unit fired 2-4% sulfur eastern U.S. bituminous coal and co-fired up to 10% biomass. This report details the final results from the project. The multi-pollutant control system was constructed in 2006, with a total plant cost of $349/kW and a footprint of 0.4 acre - both substantially less than would have been required to retrofit AES Greenidge Unit 4 with a conventional SCR and wet scrubber. Start-up of the multi-pollutant control system was completed in March 2007, and the performance of the system was then evaluated over an approximately 18-month period of commercial operation. Guarantee tests conducted in March-June 2007 demonstrated attainment of all of the emission reduction goals listed above. Additional tests completed throughout the performance evaluation period showed 96% SO{sub 2} removal, 98% mercury removal (with no activated carbon injection), 95% SO{sub 3} removal, and 97% HCl removal during longer-term operation. Greater than 95% SO{sub 2} removal efficiency was observed even when the unit fired high-sulfur coals containing up to 4.8 lb SO{sub 2}/mmBtu. Particulate matter emissions were reduced by more than 98% relative to the emission rate observed prior to installation of the technology. The performance of the hybrid SNCR/SCR system was affected by problems with large particle ash, ammonia slip, and nonideal combustion characteristics, and high-load NO{sub x} emissions averaged 0.14 lb/mmBtu during long-term operation. Nevertheless, the system has reduced the unit's overall NO{sub x} emissions by 52% on a lb/mmBtu basis. The commercial viability of the multi-pollutant control system was demonstrated at AES Greenidge Unit 4. The system, which remains in service after the conclusion of the project, has enabled the unit to satisfy its permit requirements while continuing to operate profitably. As a result of the success at AES Greenidge Unit 4, three additional deployments of the Turbosorp{reg_sign} technology had been announced by the end of the project.

01 COAL, LIGNITE, AND PEAT↗

Fermilab's controls development with virtual accelerator

Control Systems development is often the last thing considered when designing and building new equipment, e.g. a new detector or superconducting RF LINAC; however when the new equipment is installed, it is the first thing desired to be operational for testing. Due to frequent delays in building new equipment and project deadlines, control system development and testing is often curtailed. A way to alleviate this problem is to simulate the control system, though this will be challenging for complex systems.The Fermilab PIP-II (proton improvement plan - II) project is being constructed at Fermilab to deliver $800\,MeV$ protons of $>1\,MW$ beam power to replace the present LINAC for the remainder of the existing accelerator complex. The new LINAC consists of a warm front end (WFE), 23 superconducting RF cryomodules (of 5 types), and a beam transfer line (BTL) to the existing complex.The accelerator physics group has a parallel project to create a digital twin (DT) of the PIP-II accelerator. We have coupled the EPICS controls to this DT and are developing both the DT and EPICS software in parallel. This will allow us to develop the EPICS software framework, the HMIs, sequences, high level physics applications, and other services for use in a fully functional control system.This presentation will detail the work that we have performed to date and show demonstrations of controlling and monitoring the status of the accelerator, as well as future plans for this work.

Hanlet, Pierrick [Fermilab]↗

Embedded EPICS server for PowerPMAC motion controllers

An embedded server layer of Experimental Physics and Industrial Control System (EPICS) for PowerPMAC motion controllers has been developed and deployed at two undulator beamlines of the National Institute of General Medical Sciences and the National Cancer Institute (GM/CA) Structural Biology Facility at the Advanced Photon Source (APS). This compact, open source solution makes the power and versatility of PowerPMAC motion controls directly accessible to distributed EPICS clients. At GM/CA the system controls about 200 servo and stepper motors — both encoded and unencoded — and multiple digital and analog I/O accessories. The server stack comprises two sublayers: a lower-level driver and database that communicates directly with PowerPMAC, and a facility-specific soft sublayer built on top. The paper describes installing EPICS on PowerPMAC, the implementation of both layers and client examples, including on-the-fly scanning.

EPICS↗

Greenridge Multi-Pollutant Control Project Preliminary Public Design Report

The Greenidge Multi-Pollutant Control Project is being conducted as part of the U.S. Department of Energy's Power Plant Improvement Initiative to demonstrate an innovative combination of air pollution control technologies that can cost-effectively reduce emissions of SO{sub 2}, NO{sub x}, Hg, acid gases (SO{sub 3}, HCl, and HF), and particulate matter from smaller coal-fired electrical generating units (EGUs). The multi-pollutant control system includes a hybrid selective non-catalytic reduction (SNCR)/in-duct selective catalytic reduction (SCR) system to reduce NOx emissions by {ge}60%, followed by a Turbosorp{reg_sign} circulating fluidized bed dry scrubber system to reduce emissions of SO{sub 2}, SO{sub 3}, HCl, and HF by {ge}95%. Mercury removal of {ge}90% is also targeted via the co-benefits afforded by the in-duct SCR, dry scrubber, and baghouse and by injection of activated carbon upstream of the scrubber, as required. The technology is particularly well suited, because of its relatively low capital and maintenance costs and small space requirements, to meet the needs of coal-fired units with capacities of 50-300 MWe. There are about 440 such units in the United States that currently are not equipped with SCR, flue gas desulfurization (FGD), or mercury control systems. These smaller units are a valuable part of the nation's energy infrastructure, constituting about 60 GW of installed capacity. However, with the onset of the Clean Air Interstate Rule, Clean Air Mercury Rule, and various state environmental actions requiring deep reductions in emissions of SO{sub 2}, NO{sub x}, and mercury, the continued operation of these units increasingly depends upon the ability to identify viable air pollution control retrofit options for them. The large capital costs and sizable space requirements associated with conventional technologies such as SCR and wet FGD make these technologies unattractive for many smaller units. The Greenidge Project aims to confirm the commercial readiness of an emissions control system that is specifically designed to meet the environmental compliance requirements of these smaller coal-fired EGUs. The multi-pollutant control system is being installed and tested on the AES Greenidge Unit 4 (Boiler 6) by a team including CONSOL Energy Inc. as prime contractor, AES Greenidge LLC as host site owner, and Babcock Power Environmental Inc. as engineering, procurement, and construction contractor. All funding for the project is being provided by the U.S. Department of Energy, through its National Energy Technology Laboratory, and by AES Greenidge. AES Greenidge Unit 4 is a 107 MW{sub e} (net), 1950s vintage, tangentially-fired, reheat unit that is representative of many of the 440 smaller coal-fired units identified above. Following design and construction, the multi-pollutant control system will be demonstrated over an approximately 20-month period while the unit fires 2-4% sulfur eastern U.S. bituminous coal and co-fires up to 10% biomass. This Preliminary Public Design Report is the first in a series of two reports describing the design of the multi-pollutant control facility that is being demonstrated at AES Greenidge. Its purpose is to consolidate for public use all available nonproprietary design information on the Greenidge Multi-Pollutant Control Project. As such, the report includes a discussion of the process concept, design objectives, design considerations, and uncertainties associated with the multi-pollutant control system and also summarizes the design of major process components and balance of plant considerations for the AES Greenidge Unit 4 installation. The Final Public Design Report, the second report in the series, will update this Preliminary Public Design Report to reflect the final, as-built design of the facility and to incorporate data on capital costs and projected operating costs.

01 COAL, LIGNITE, AND PEAT↗

Designing Monte Carlo Simulation and an Optimal Machine Learning to Optimize and Model Space Missions

This paper investigates applying artificial intelligence (AI) algorithms to attitude control system of satellites to optimally tune the controller using high performance computing. This methodology is applied to the Virtual Telescope for X-ray Observation mission, which is a precise formation of two separate spacecraft observing multiple objects in the space in the X-ray domain. The mission is divided into phases based on the instrumentation and the mission goal. To reach an stable precise formation robust to stochastic slew and slew rate (i.e., Euler angles and angular velocities) in a minimal constrained time T , consumed energy of the attitude control system, denoted as E, and root-mean-square state error of attitude control system, denoted as e, are minimized. Monte-Carlo simulation is used for the sensitivity analysis of optimization and designing a controller. Deep neural networks (DNN), Gaussian processes (GP), and support vector regression (SVR) learn this optimization as a surrogate model, while their hyperparameters are optimized in a novel approach. THETA supercomputer at Argonne Leadership Computing Facility (ALCF) is used for optimizing the hyperparameters of DNN. The surrogate model meets the requirements of the mission, and it shows a better performance over the optimization and Monte-Carlo. The optimal DNN can satisfy the mission requirements e and T while reducing E for 90% compared to the other given methods.

42 ENGINEERING↗

Demonstration of Intelligent Control and Fan Improvements in Computer Room Air Handlers

This report documents a demonstration of the energy-efficiency improvement provided by a new control system for computer room air handling devices. It also analyzes measured and reported air handling device fan power associated with changing the fan type. A 135,000 square foot commercial data center was used for the demonstration. All air handling units were upgraded with improved efficiency fans, and a control system that automatically adjusts the fan speed for the air handling units was added. Power measurements were collected for a baseline and for a period with the fan speed control system active. Changing the fan type resulted in a savings of 47 percent of energy used by the air handling equipment and associated chiller plant energy needed to cool the air handlers themselves. The addition of the fan speed control resulted in an additional 37 percent savings in the same two categories. The combined savings for the two improvements for the same categories was 66 percent compared to the data center fitted with the original fans without a control system. The energy use reduction provided by the complete air handling device improvement program for the whole data center site is estimated to be 2.9 million kilowatt hours per year—an overall data center site savings of 8.0 percent. The reduced electrical energy use at the site provides a 1.9 million pound yearly reduction of carbon dioxide emissions. This demonstration showed that fan upgrades and a control system addition provide cost-effective improvements for data centers, with a payback reported to be under two years without utility incentives. In addition to the control system providing energy savings, the data collection and visual analysis capabilities provided immediate and long-term benefits. It is recommended that data center operators consider investing in fan upgrades and/or adding fan speed control for computer room air handlers.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Authentication Protocol for ICS without Encryption

Industrial control systems (ICS) describes the different types of control systems and associated instrumentation, which includes the devices, systems, networks, and controls used to operate and/or automate industrial processes. Depending on the industry, each ICS functions differently and are built to electronically manage tasks efficiently. Historically, industrial plants have included networking, and changes have been made over time without consideration for security. Many ICS devices currently have inadequate security features. Adding encryption in ICS is undesirable because many of the new detection method involves deep packet inspection. Therefore, we propose to develop a method of providing authentication between devices without encrypting the data. This testbed design will allow rapid development and experimentation with Cyber Physical Systems. Modbus connects to a supervisory computer with a Remote Terminal Unit (RTU) in Supervisory Control and Data Acquisition (SCADA) systems. Our project seeks to enhance security in the ICS environment by adding device authentication to the lower levels of the plant floor. This approach was selected as it allows verification of the sender of data from level 1/level 0 devices up to supervisory systems. This addition is desirable as it adds enhanced verification to the integrity of system data without obscuring (via encryption) the data being transmitted across the network. This is important because many ICS systems are real time critical (decryption adds to latency) and many other good security options require deep packet inspection (which encryption completely defeats). To accomplish this, a proof of concept of adding an authentication scheme was designed and will be tested with a common ICS protocol. The setup includes a single serial cable connecting the serial ports on two devices, a Master and a Minion. Authentication will occur in the following methods: - Data layer involving Transport Layer Security/Secure Socket Layer (TLS/SSL); - TCP/IP route implementation; - Key exchange algorithm; - Raspberry Pi programming for authentication. A portion of the setup includes adding Raspberry Pi into the system as the device is handling the authentication for the network traffic. Modbus is the chosen ICS protocol. It is used to transmit signals from instrumentation and control devices back to a main controller or data gathering system. Typically, the device identity is assumed but not verified. For verifying device identity, we constructed a digital signature architecture with TLS. A novel adaptation of this is to use only the digital signature that is provided and not the encryption capability. This allows ICS traffic to flow unobscured while still providing verification for the integrity of the data. Verification of this process will involve adding additional I/O level network devices with spoofed IP addresses and detecting the authenticated versus unauthenticated traffic. Our TLS implementation will have encryption disabled but should still allow for digital signing of data. This will enable our system to distinguish between real end devices and spoofed end devices. This experiment is presently building the test setup. It is focusing on a small setting to identify authenticated and unauthenticated devices on the network. This should allow for scaling to a larger network size after the initial proof of concept. One concern with this scheme is a certificate deployment has a large scale key management. Network size will thus increase the key management task for security. In addition, we believe that further research should be done on exploring the use of this method to defeat man-in-the-middle attacks.

42 ENGINEERING↗

Data-driven Feature Analysis in Control Design for Series-Compensated Transmission Systems

One challenge in power-system control designs is the gap between numerical model-based analysis and complex real-world power systems. With increased data and measurements being collected from power systems, data-driven analysis (e.g., machine learning) may provide an alternative approach to reveal hidden information through learning from the real system data, and provide insights for better control scheme design during the utility planning process. Data-driven feature analysis was performed to evaluate the relationships between series compensation, power generation, and path flows in a real transmission system, as well as temporal patterns. The main data-driven analysis methods, including statistical cross-correlation, multinomial logistical regression, and classification and regression trees, were integrated for feature selection and developing predictive models of series compensation. Analysis results demonstrated the effectiveness of the proposed methodology in feature analysis and the potential to help improve power-system control scheme design.

42 ENGINEERING↗

Network Upgrade for the SLC: PEP II Network

The PEP-II control system required a new network to support the system functions. This network, called CTLnet, is an FDDI/Ethernet based network using only TCP/IP protocols. An upgrade of the SLC Control System micro communications to use TCP/IP and SLCNET would allow all PEP-II control system nodes to use TCP/IP. CTLnet is private and separate from the SLAC public network. Access to nodes and control system functions is provided by multi-homed application servers with connections to both the private CTLnet and the SLAC public network. Monitoring and diagnostics are provided using a dedicated system. Future plans and current status information is included.

43 PARTICLE ACCELERATORS↗

Modernizing Fermilab's Accelerator Control Hardware

Modernizing the Fermilab accelerator control system is essential to future operations of the laboratory's accelerator complex. The existing control system has evolved over four decades and uses hardware that is no longer available.The Accelerator Controls Operations Research Network (ACORN) Project will modernize the control system and replace end-of-life power supplies to enable future accelerator complex operations with megawatt particle beams. The ACORN project is planning to replace Fermilab s obsolete CAMAC crate-and-card controls hardware with modern MicroTCA hardware. There are over 2,000 CAMAC cards and over 250 CAMAC crates serving various functions in Fermilab s control system. We will review the existing CAMAC hardware and provide updates on the status of the ACORN project, which includes the conceptual design of the MicroTCA replacement hardware and software tools for supporting the installation of hundreds of MicroTCA crates.

43 PARTICLE ACCELERATORS↗

Wireless Advanced Lighting Controls Retrofit Demonstration

Awareness of the economic costs and environmental consequences of electric energy use in buildings is steadily growing. Implementing energy efficiency measures for reducing energy consumption in buildings can be an effective strategy for managing these impacts. Within commercial buildings in the United States, electricity use for lighting accounts for 26% (around 346 TWh in 2010) and represents a large potential energy savings source. Significant lighting energy savings have already been achieved through the widespread adoption of efficient fluorescent lamps and ballasts in the past several decades. Looking towards efficient lighting operations’ innovations, wireless advanced lighting controls technology represents an increasingly viable option for capturing the next major level of lighting energy savings in new construction and building retrofits. Fundamentally, lighting is the most amenable building end use load for producing deep energy savings because of its dynamic controllability. Advanced lighting controls encompass control strategies from occupancy sensing to continuous dimming, institutional tuning and daylight harvesting. These strategies offer greater flexibility and higher granularity of control than traditional basic control methods. Historically, advanced control systems have required extensive control wiring, which has driven system costs. However, recently developed wireless lighting controls systems can be used to network lighting components, while potentially minimizing installation time and labor costs during retrofit in comparison to wired control systems.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Modernizing Fermilab s Control Hardware

Modernizing the Fermilab accelerator control system is essential to future operations of the laboratory's accelerator complex. The existing control system has evolved over four decades and uses hardware that is no longer available. The Accelerator Controls Operations Research Network (ACORN) Project will modernize the control system and replace end-of-life power supplies to enable future accelerator complex operations with megawatt particle beams. The ACORN project is planning to replace Fermilab’s obsolete CAMAC crate-and-card controls hardware with modern MicroTCA hardware. There are over 2,000 CAMAC cards and over 250 CAMAC crates serving various functions in Fermilab’s control system. We will present an overview of the existing CAMAC hardware and the proposed MicroTCA replacement plan.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Control architecture for predictive and optimal vehicle operations in a single vehicle environment

There is disclosed a cloud computing control system for vehicle speed control and also for control of a vehicle in a platoon. The cloud computing control system determines a speed trajectory and neutral coasting command for a first vehicle of the platoon and a vehicle controller determines a reference speed for the first vehicle in response to the speed trajectory and the neutral coasting command, and is response to one or more vehicle specific factors associated with the first vehicle.

Borhan, Hoseinali↗

Tutorial of Wind Turbine Control for Supporting Grid Frequency through Active Power Control: Preprint

As wind energy becomes a larger portion of the world's energy portfolio and wind turbines become larger and more expensive, wind turbine control systems play an ever more prominent role in the design and deployment of wind turbines. The goals of traditional wind turbine control systems are maximizing energy production while protecting the wind turbine components. As more wind generation isinstalled there is an increasing interest in wind turbines actively controlling their power output in order to meet power setpoints and to participate in frequency regulation for the utility grid. This capability will be beneficial for grid operators, as it seems possible that wind turbines can be more effective at providing some of these services than traditional power plants. Furthermore,establishing an ancillary market for such regulation can be beneficial for wind plant owner/operators and manufacturers that provide such services. In this tutorial paper we provide an overview of basic wind turbine control systems and highlight recent industry trends and research in wind turbine control systems for grid integration and frequency stability.