Chromium Plume at LANL - From Conceptual Site Model to Development of Complex Remediation Strategies - 18682
A hexavalent chromium plume is present in deep groundwater beneath Los Alamos National Laboratory (LANL or the Laboratory). The plume originated from releases of potassium dichromate from cooling towers from 1956 - 1972. Estimates are that up to 72,000 kg of chromium was released during that period. Data from surface water-balance studies, core-hole and groundwater characterization, geomorphic investigations and geology and geophysics provide the basis for an evolved conceptual model that chromium initially traveled rapidly via an effluent-supported stream for several kilometers, then infiltrated through a stratigraphically complex 275-300 meters thick vadose zone and eventually into a deep (regional) aquifer that is the water supply for the Laboratory and surrounding municipality. The travel time from the release point to the regional aquifer is estimated at 5-10 years based on modeling and contaminant tracers. Monitoring data from two-screen wells and piezometers within the regional aquifer, and data derived from stratified sampling conducted during sonic coring and from analysis of sonic core indicate that the chromium contamination occurs within the upper 23 meters of the highly stratified regional aquifer. Different geologic units at the water table and structural dip of depositional bedding appear to have little effect on chromium migration and plume shape and thickness which instead appear to be a manifestation of multiple breakthrough locations, interconnectedness of preferential hydraulic strata, and a negligible vertical gradient. Recent monitoring data indicate that the down-gradient plume edge (as defined by the New Mexico groundwater standard of 50 μg/L) may be advancing near the Laboratory's boundary with a neighboring Indian reservation. The Laboratory is addressing the increasing concentrations with a regulatory-driven interim measure that uses hydraulic control to manage plume migration. The interim measure involves limited-duration (2-3 years) pumping, treatment, and injection to rapidly establish and maintain the 50 μg/L plume edge within the Laboratory boundary while a final remediation strategy is developed and approved by the State regulator. A final remediation strategy will depend heavily on the ability to cost-effectively access the deep aquifer. (authors)