Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “2012”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,045 records · Page 58

NASA Microgravity Combustion Science Research Plans for the ISS

A peer-reviewed research program in Microgravity Combustion Science has been chartered by the Physical Sciences Research Division of the NASA Office of Biological and Physical Research. The scope of these investigations address both fundamental combustion phenomena and applied combustion research topics of interest to NASA. From this pool of research, flight investigations are selected which benefit from access to a microgravity environment. Fundamental research provides insights to develop accurate simulations of complex combustion processes and allows developers to improve the efficiency of combustion devices, to reduce the production of harmful emissions, and to reduce the incidence of accidental uncontrolled combustion (fires, explosions). Through its spacecraft fire safety program, applied research is conducted to decrease risks to humans living and working in space. The Microgravity Combustion Science program implements a structured flight research process utilizing the International Space Station (ISS) and two of its premier facilities- the Combustion Integrated Rack of the Fluids and Combustion Facility and the Microgravity Science Glovebox - to conduct space-based research investigations. This paper reviews the current plans for Microgravity Combustion Science research on the International Space Station from 2003 through 2012.

Sutliff, Thomas J.↗

Application of Probabilistic Risk Assessment (PRA) During Conceptual Design for the NASA Orbital Space Plane (OSP)

In order to meet the space transportation needs for a new century, America's National Aeronautics and Space Administration (NASA) has implemented an Integrated Space Transportation Plan to produce safe, economical, and reliable access to space. One near term objective of this initiative is the design and development of a next-generation vehicle and launch system that will transport crew and cargo to and from the International Space Station (ISS), the Orbital Space Plane (OSP). The OSP system is composed of a manned launch vehicle by an existing Evolved Expendable Launch Vehicle (EELV). The OSP will provide emergency crew rescue from the ISS by 2008, and provide crew and limited cargo transfer to and from the ISS by 2012. A key requirement is for the OSP to be safer and more reliable than the Soyuz and Space Shuttle, which currently provide these capabilities.

Rogers, James H.↗

Next Generation Geostationary Operational Environmental Satellite (GOES-R Series): A Space Segment Overview

The next-generation National Oceanic and Atmospheric Administration (NOAA) Geostationary Operational Environmental Satellite (GOES-R series) is currently being developed by NOAA in cooperation with the National Aeronautics and Space Administration (NASA). The GOES-R series satellites represents a significant improvement in spatial, temporal, and spectral observations (several orders of magnitude) over the capabilities of the currently operational GOES-1 series and the about to be launched GOES-N series satellite. The GOES-R series will incorporate technically advanced third-generation instruments and spacecraft enhancements to meet evolving observational requirements of forecasting for the era 2012-2025. The GOES-R instrument complement being developed includes a Advanced Baseline Imager (ABI), a Hyperspectral Environmental Suite (HES), a GEO Lighting Mapper (GLM), a Solar Imaging Suite (SIS) and a Space Environment In-Situ Suite (SEISS). Also, candidates for a number of GOES-R Pre-Planned Product Improvements (P(sup 3)Is) includes a Geo microwave Sounder, a Coronograph, a Hyperspectral Imager, and a Solar Irradiance Sensor. Currently, the GOES-R Space Segment architecture is being evaluated as part of a GOES-R system end-to-end architecture study. The GOES-R notional baseline architecture is a constellation of two satellites (A-sat and B-sat) each nominally located at 75 degrees west longitude and at 135 degrees west longitude at geostationary altitude, 0 degrees inclination. The primary mission of the A-sat is to provide imaging from the ABI. The A-sat will also contain the SIS and the GLM. The primary mission of the B-sat is to provide sounding of the hemispherical disk of the earth from the HES. The B-sat also contains the SEISS. Both satellites have mesoscale capabilities for severe weather sounding or imaging. This paper overviews the GOES-R Space Segment development including satellite constellation trade-off, improvements and differences between the current and future instrument and spacecraft capabilities, and technology infusion.

Krimchansky, Alexander↗

Traveling Wave Tube (TVT) RF Power Combining Demonstration for use in the Jupiter Icy Moons Orbiter (JIMO)

The Jupiter Icy Moons Orbiter (JIMO) is set to launch between the years 2012 and 2015. It will possibly utilize a nuclear reactor power source and ion engines as it travels to the moons of Jupiter. The nuclear reactor will produce hundreds of kilowatts of power for propulsion, communication and various scientific instruments. Hence, the RF amplification devices aboard will be able to operate at a higher power level and data rate. The initial plan for the communications system is for an output of 1000 watts of RF power, a data rate of at least 10 megabits a second, and a frequency of 32 GHz. A higher data rate would be ideal to fully utilize the instruments aboard JIMO. At NASA Glenn, one of our roles in the JIMO project is to demonstrate RF power combining using multiple traveling wave tubes (TWT). In order for the power of separate TWT s to be combined, the RF output waves from each must be in-phase and have the same amplitude. Since different tubes act differently, we had to characterize each tube using a Network Analyzer. We took frequency sweeps and power sweeps to characterize each tube to ensure that they will behave similarly under the same conditions. The 200 watt Dornier tubes had been optimized to run at a lower power level (120 watts) for their extensive use in the ACTS program, so we also had to experiment with adjusting the voltage settings on several internal components (helix, anode, collector) of the tubes to reach the full 200 watt potential. from the ACTS program. Phase shifters and power attenuators were placed in the waveguide circuit at the inputs to the tubes so that adjustments could be made individually to match them exactly. A magic tee was used to route and combine the amplified electromagnetic RF waves on the tube output side. The demonstration of 200 watts of combined power was successful with efficiencies greater than 90% over a 500 MHz bandwidth. The next step will be to demonstrate the use of three amplifiers using two magic tees by adding a 200 watt Dornier tube to the Varian and Logimetrics combined setup for a total of 400 watts. After that we will use two 200 watt Dorniers for 400 watts and eventually four 200 watt Dornier tubes to demonstrate 800 watts. After demonstrating the success of power combining, we will need to verify the integrity of a modulated signal sent through the combined tubes. The purpose will be to see what effects separating and recombining will have on the modulated signal and also what effect it will have on combining efficiency. A Bit Error Rate (BER) will be determined by a Bit Error Rate Tester (BERT) by comparing the random information it transmits to what it receives back. The process began with two 100 watt tubes, a Varian and a Logimetrics, salvaged

Downey, Joseph A.↗

Solar Power System Evaluated for the Human Exploration of Mars

The electric power system is a crucial element of any mission for the human exploration of the Martian surface. The bulk of the power generated will be delivered to crew life support systems, extravehicular activity suits, robotic vehicles, and predeployed in situ resource utilization (ISRU) equipment. In one mission scenario, before the crew departs for Mars, the ISRU plant operates for 435 days producing liquefied methane and oxygen for ascent-stage propellants and water for crew life support. About 200 days after ISRU production is completed, the crew arrives for a 500-day surface stay. In this scenario, the power system must operate for a total of 1130 days (equivalent to 1100 Martian "sols"), providing 400 MW-hr of energy to the ISRU plant and up to 18 kW of daytime user power. A photovoltaic power-generation system with regenerative fuel cell (RFC) energy storage has been under study at the NASA Glenn Research Center at Lewis Field. The conceptual power system is dominated by the 4000- m2 class photovoltaic array that is deployed orthogonally as four tent structures, each approximately 5 m on a side and 100-m long. The structures are composed of composite members deployed by an articulating mast, an inflatable boom, or rover vehicles, and are subsequently anchored to the ground. Array panels consist of thin polymer membranes with thin-film solar cells. The array is divided into eight independent electrical sections with solar cell strings operating at 600 V. Energy storage is provided by regenerative fuel cells based on hydrogen-oxygen proton exchange membrane technology. Hydrogen and oxygen reactants are stored in gaseous form at 3000 psi, and the water produced is stored at 14.7 psi. The fuel cell operating temperature is maintained by a 40-m2 deployable pumped-fluid loop radiator that uses water as the working fluid. The power management and distribution (PMAD) architecture features eight independent, regulated 600-Vdc channels. Power management and distribution power cables use various gauges of copper conductors with ethylene tetrafluoroethylene insulation. To assess power system design options and sizing, we developed a dedicated Fortran code to predict detailed power system performance and estimate system mass. This code also modeled the requisite Mars surface environments: solar insolation, Sun angles, dust storms, dust deposition, and thermal and ultraviolet radiation. Using this code, trade studies were performed to assess performance and mass sensitivities to power system design parameters (photovoltaic array geometry and orientation) and mission parameters (landing date and landing site latitude, terrain slope, and dust storm activity). Mission analysis cases were also run. Power results are shown in this graph for an analysis case with a September 1, 2012, landing date; 18.95 North latitude landing site; two seasonal dusts storms; and tent arrays. To meet user load requirements and the ISRU energy requirement, an 8-metric ton (MT) power system and 4000-m2 photovoltaic array area were required for the assumed advanced CuInS2 thin-film solar cell technology. In this figure, the top curve is the average daytime photovoltaic array power, the middle curve is average daytime user load power, and the bottom curve is nighttime power. At mission day 1, daytime user power exceeds 120 kW before falling off to 80 kW at the end of the mission. Throughout the mission, nighttime user power is set to the nighttime power requirement. In this analysis, "nighttime" is defined as the 13- to 15-hr period when array power output is below the daytime power requirement. During dust storms, power system capability falls off dramatically so that by mission day 900, a daily energy balance cannot be maintained. Under these conditions, the ISRU plant is placed in standby mode, and the regenerative fuel cell energy storage is gradually discharged to meet user loads.

Kerslake, Thomas W.↗

Solar Sailing Kinetic Energy Interceptor (KEI) Mission for Impacting/Deflecting Near-Earth Asteroids

A solar sailing mission architecture, which requires a t least ten 160-m, 300-kg solar sail spacecraft with a characteristic acceleration of 0.5 mm/sqs, is proposed as a realistic near- term option for mitigating the threat posed by near-Earth asteroids (NEAs). Its mission feasibility is demonstrated for a fictional asteroid mitigation problem created by AIAA. This problem assumes that a 200-m asteroid, designated 2004WR, was detected on July 4, 2004, and that the expected impact will occur on January 14, 2015. The solar sailing phase of the proposed mission for the AIAA asteroid mitigation problem is comprised of the initial cruise phase from 1 AU t o 0.25 AU (1.5 years), the cranking orbit phase (3.5 years), and the retrograde orbit phase (1 year) prior to impacting the target asteroid at its perihelion (0.75 AU from the sun) on January 1, 2012. The proposed mission will require at least ten kinetic energy interceptor (KEI) solar sail spacecraft. Each KEI sailcraft consists of a 160- m, 150-kg solar sail and a 150-kg microsatellite impactor. The impactor is to be separated from a large solar sail prior to impacting the 200-m target asteroid at its perihelion. Each 150-kg microsatellite impactor, with a relative impact velocity of at least 70 km/s, will cause a conservatively estimated AV of 0.3 cm/s in the trajectory of the 200-m target asteroid, due largely to the impulsive effect of material ejected from the newly-formed crater. The deflection caused by a single impactor will increase the Earth-miss-distance by 0.45Re (where Re denotes the Earth radius of 6,378 km). Therefore, at least ten KEI sailcraft will be required for consecutive impacts, but probably without causing fragmentation, to increase the total Earth-miss-distance by 4.5Re. This miss-distance increase of 29,000 km is outside of a typical uncertainty/error of about 10,000 km in predicting the Earth-miss- distance. A conventional Delta I1 2925 launch vehicle is capable of injecting at least two KEI sailcraft into an Earth escaping orbit. A 40-m solar sail is currently being developed by NASA and industries for a possible flight validation experiment within 10 years, and a 160-m solar sail is expected to be available within 20 years.

Wie, Bong↗

Forecasting the Impact of an 1859-calibre Superstorm on Satellite Resources

We have assembled a database of operational satellites in orbit as of 2004, and have developed a series of simple models to assess the economic impacts to this resource caused by various scenarios of superstorm events possible during the next sunspot cycle between 2010 and 2014. Despite the apparent robustness of our satellite assets against the kinds of storms we have encountered during the satellite era, our models suggest a potential economic loss exceeding $10(exp 11) for satellite replacement and lost profitability caused by a once a century single storm similar to the 1859 superstorm. From a combination of power system and attitude control system (the most vulnerable) failures, we estimate that 80 satellites (LEO, MEO, GEO) may be disabled as a consequence of a superstorm event. Additional consequences may include the failure of many of the GPS, GLONASS and Galileo satellite systems in MEO. Approximately 98 LEO satellites that normally would not have re-entered for many decades, may prematurely de-orbit in ca 2021 as a result of the temporarily increased atmospheric drag caused by the superstorm event occurring in 2012. The $10(exp 11) International Space Station may lose at least 15 kilometers of altitude, placing it in critical need for re-boosting by an amount that is potentially outside the range of typical Space Shuttle operations during the previous solar maximum in ca 2000, and at a time when NASA plans to decommission the Space Shuttle. Several LEO satellites will unexpectedly be placed on orbits that enter the ISS zone of avoidance, requiring some action by ground personnel and ISS astronauts to avoid close encounters. Radiation effects on astronauts have also been considered and could include a range of possibilities from acute radiation sickness for astronauts inside spacecraft, to near-lethal doses during EVAs. The specifics depends very sensitively on the spectral hardness of the accompanying SPE event. Currently, the ability to forecast extreme particle events and coronal mass ejections, or predict their fluences and geo-severity in the 24-hrs prior to the event, appears to be no better than 50/50. If the events of the 1859 superstorm serve as a guide, the scope of a contemporary superstorm will most certainly be an awesome event, but one that the vast majority of our other satellite resources may reasonably be expected to survive.

Odenwald, Sten↗

A Forecast of Reduced Solar Activity and Its Implications for NASA

The "Solar Dynamo" method of solar activity forecasting is reviewed. Known generically as a 'precursor" method, insofar as it uses observations which precede solar activity generation, this method now uses the Solar Dynamo Amplitude (SODA) Index to estimate future long-term solar activity. The peak amplitude of the next solar cycle (#24), is estimated at roughly 124 in terms of smoothed F10.7 Radio Flux and 74 in terms of the older, more traditional smoothed international or Zurich Sunspot number (Ri or Rz). These values are significantly smaller than the amplitudes of recent solar cycles. Levels of activity stay large for about four years near the peak in smoothed activity, which is estimated to occur near the 2012 timeflame. Confidence is added to the prediction of low activity by numerous examinations of the Sun s weakened polar field. Direct measurements are obtained by the Mount Wilson Solar Observatory and the Wilcox Solar Observatory. Further support is obtained by examining the Sun s polar faculae (bright features), the shape of coronal soft X-ray "holes," and the shape of the "source surface" - a calculated coronal feature which maps the large scale structure of the Sun s field. These features do not show the characteristics of well-formed polar coronal holes associated with typical solar minima. They show stunted polar field levels, which are thought to result in stunted levels of solar activity during solar cycle #24. The reduced levels of solar activity would have concomitant effects upon the space environment in which satellites orbit. In particular, the largest influences would affect orbit determination of satellites in LEO (Low Earth Orbit), based upon the altered thermospheric and exospheric densities. A decrease in solar activity would result in smaller satellite decay rates, as well as fewer large solar events that can destroy satellite electronic functions. Other effects of reduced solar activity upon the space environment include enhanced galactic cosmic rays and more space debris at low altitudes (from the decay of old satellite parts, etc.). The reasons are well known: namely, solar activity serves to sweep the inner heliosphere of galactic cosmic rays, and lower exospheric densities result in decreased drag on LEO debris, allowing longer lifetimes.

Schatten, Kenneth↗

GOES-R STATIONKEEPING AND MOMENTUM MANAGEMENT

The NOAA Geostationary Operational Environmental Satellites (GOES) fire thrusters to remain within a 1deg longitude-latitude box and to dump accumulated angular momentum. In the past, maneuvers have disrupted GOES imaging due to attitude transients and the loss of orbit knowledge. If the R-series of spacecraft to be launched starting in 2012 were to follow current practice, maneuvers would still fail to meet Image Navigation and Registration (INR) specifications during and after thruster firings. Although maneuvers and recovery take only one percent of spacecraft lifetime, they sometimes come at inopportune times, such as hurricane season, when coverage is critical. To alleviate this problem, thruster firings small enough not to affect imaging are being considered. Eliminating post-maneuver recovery periods increases availability and facilitates autonomous operation. Frequent maneuvers also reduce 1ongitudeAatitude variation and allow satellite co-location. Improved orbit observations come from a high-altitude GPS receiver, and improved attitude control comes from thruster torque compensation. This paper reviews the effects of thruster firings on position knowledge and pointing control and suggests that low-thrust burns plus GPS and feedforward control offer a less disruptive approach to GOES-R stationkeeping and momentum management.

Chu, Donald↗

Greatly enhanced deep space mission data return using verv large DSN arrays

The purposes of the Array System are: To fulfill the mission needs for higher data rates in the post-2010 era - Reduce the cost per data bit by two orders of magnitude. Specific Goal: Achieve a factor of 10 increase in DSN reception capability per decade from 2012 through 2027 (an average of 1 dB per year).

array↗

GeoSTAR : developing a new payload for GOES satellites

The Geostationary Synthetic Thinned Aperture Radiometer (GeoSTAR) is a new concept for a microwave sounder, intended to be deployed on NOAA's next generation of geostationary weather satellites, the GOES-R series - due to first launch in 2012. This will fill a serious gap in OW remote sensing capabilities of long standing - a key capability that NOAA is book keeping at the top of its list of 'pre-planned product improvements' for GOES-R - i.e. the most urgently needed additional payload, which will be added as soon as funding has been allocated and programmatic issues resolved. Although real-aperture GEO microwave sounders have been proposed over the years, only GeoSTAR is capable of meeting the measurement requirements and is therefore now the leading candidate.

microwave↗

NASA's J-2X Engine Builds on the Apollo Program for Lunar Return Missions

In January 2006, NASA streamlined its U.S. Vision for Space Exploration hardware development approach for replacing the Space Shuttle after it is retired in 2010. The revised CLV upper stage will use the J-2X engine, a derivative of NASA s Apollo Program Saturn V s S-II and S-IVB main propulsion, which will also serve as the Earth Departure Stage (EDS) engine. This paper gives details of how the J- 2X engine effort mitigates risk by building on the Apollo Program and other lessons learned to deliver a human-rated engine that is on an aggressive development schedule, with first demonstration flight in 2010 and human test flights in 2012. It is well documented that propulsion is historically a high-risk area. NASA s risk reduction strategy for the J-2X engine design, development, test, and evaluation is to build upon heritage hardware and apply valuable experience gained from past development efforts. In addition, NASA and its industry partner, Rocketdyne, which originally built the J-2, have tapped into their extensive databases and are applying lessons conveyed firsthand by Apollo-era veterans of America s first round of Moon missions in the 1960s and 1970s. NASA s development approach for the J-2X engine includes early requirements definition and management; designing-in lessons learned from the 5-2 heritage programs; initiating long-lead procurement items before Preliminary Desi& Review; incorporating design features for anticipated EDS requirements; identifying facilities for sea-level and altitude testing; and starting ground support equipment and logistics planning at an early stage. Other risk reduction strategies include utilizing a proven gas generator cycle with recent development experience; utilizing existing turbomachinery ; applying current and recent main combustion chamber (Integrated Powerhead Demonstrator) and channel wall nozzle (COBRA) advances; and performing rigorous development, qualification, and certification testing of the engine system, with a philosophy of "test what you fly, and fly what you test". These and other active risk management strategies are in place to deliver the J-2X engine for LEO and lunar return missions as outlined in the U.S. Vision for Space Exploration.

Snoddy, Jimmy R.↗

Developmental Flight Instrumentation System for the Crew Launch Vehicle

The National Aeronautics and Space Administration is developing a new launch vehicle to replace the Space Shuttle. The Crew Launch Vehicle (CLV) will be a combination of new design hardware and heritage Apollo and Space Shuttle hardware. The current CLV configuration is a 5 segment solid rocket booster first stage and a new upper stage design with a modified Apollo era J-2 engine. The current schedule has two test flights with a first stage and a structurally identical, but without engine, upper stage. Then there will be two more test flights with a full complement of flight hardware. After the completion of the test flights, the first manned flight to the International Space Station is scheduled for late 2012. To verify the CLV's design margins a developmental flight instrumentation (DFI) system is needed. The DFI system will collect environmental and health data from the various CLV subsystem's and either transmit it to the ground or store it onboard for later evaluation on the ground. The CLV consists of 4 major elements: the first stage, the upper stage, the upper stage engine and the integration of the first stage, upper stage and upper stage engine. It is anticipated that each of CLVs elements will have some version of DFI. This paper will discuss a conceptual DFI design for each element and also of an integrated CLV DFI system.

Crawford, Kevin↗

Development of the J-2X Engine for the Ares I Crew Launch Vehicle and the Ares V Cargo Launch Vehicle: Building on the Apollo Program for Lunar Return Missions

The United States (U.S.) Vision for Space Exploration directs NASA to develop two new launch vehicles for sending humans to the Moon, Mars, and beyond. In January 2006, NASA streamlined its hardware development approach for replacing the Space Shuttle after it is retired in 2010. Benefits of this approach include reduced programmatic and technical risks and the potential to return to the Moon by 2020, by developing the Ares I Crew Launch Vehicle (CLV) propulsion elements now, with full extensibility to future Ares V Cargo Launch Vehicle (CaLV) lunar systems. This decision was reached after the Exploration Launch Projects Office performed a variety of risk analyses, commonality assessments, and trade studies. The Constellation Program selected the Pratt & Whitney Rocketdyne J-2X engine to power the Ares I Upper Stage Element and the Ares V Earth Departure Stage. This paper narrates the evolution of that decision; describes the performance capabilities expected of the J-2X design, including potential commonality challenges and opportunities between the Ares I and Ares V launch vehicles; and provides a current status of J-2X design, development, and hardware testing activities. This paper also explains how the J-2X engine effort mitigates risk by building on the Apollo Program and other lessons lived to deliver a human-rated engine that is on an aggressive development schedule, with its first demonstration flight in 2012.

Snoddy, Jim↗

NASA's Exploration Architecture

A Bold Vision for Space Exploration includes: 1) Complete the International Space Station; 2) Safely fly the Space Shuttle until 2010; 3) Develop and fly the Crew Exploration Vehicle no later than 2012; 4) Return to the moon no later than 2020; 5) Extend human presence across the solar system and beyond; 6) Implement a sustained and affordable human and robotic program; 7) Develop supporting innovative technologies, knowledge, and infrastructures; and 8) Promote international and commercial participation in exploration.

Tyburski, Timothy↗

Status and Future of the Tropical Rainfall, Measuring Mission (TRMM)

The Tropical Rainfall Measuring Mission (TRMM) will have completed nine years in orbit in November 2006. This successful research mission, a joint U.S./Japan effort, has become a key element in the routine monitoring of global precipitation. The package of rain measuring instrumentation, including the first meteorological radar in space, continues to function perfectly, and with the increase in orbital altitude (from 350 km to 400 km) in August 2001 and the mission extension approval in 2005, the satellite has sufficient station-keeping fuel to potentially last until 2012, or perhaps longer. The status of TRMM algorithms and products will be summarized, including the impact of the altitude boost in 2001, and the plans for the upcoming Version 7 of the products will be outlined. The role of TRMM as part of the constellation of rain-measuring satellites preceding GPM will be discussed, as well as its role in climate analysis using its unique radar/radiometer combination.

Adler, Robert F.↗

Neptune Polar Orbiter with Probes

The giant planets of the outer solar system divide into two distinct classes: the gas giants Jupiter and Saturn, which consist mainly of hydrogen and helium; and the ice giants Uranus and Neptune, which are believed to contain significant amounts of the heavier elements oxygen, nitrogen, and carbon and sulfur. Detailed comparisons of the internal structures and compositions of the gas giants with those of the ice giants will yield valuable insights into the processes that formed the solar system and, perhaps, other planetary systems. By 2012, Galileo, Cassini and possibly a Jupiter Orbiter mission with microwave radiometers, Juno, in the New Frontiers program, will have yielded significant information on the chemical and physical properties of Jupiter and Saturn. A Neptune Orbiter with Probes (NOP) mission would deliver the corresponding key data for an ice giant planet. Such a mission would ideally study the deep Neptune atmosphere to pressures approaching and possibly exceeding 1000 bars, as well as the rings, Triton, Nereid, and Neptune s other icy satellites. A potential source of power would be nuclear electric propulsion (NEP). Such an ambitious mission requires that a number of technical issues be investigated, however, including: (1) atmospheric entry probe thermal protection system (TPS) design, (2) probe structural design including seals, windows, penetrations and pressure vessel, (3) digital, RF subsystem, and overall communication link design for long term operation in the very extreme environment of Neptune's deep atmosphere, (4) trajectory design allowing probe release on a trajectory to impact Neptune while allowing the spacecraft to achieve a polar orbit of Neptune, (5) and finally the suite of science instruments enabled by the probe technology to explore the depths of the Neptune atmosphere. Another driving factor in the design of the Orbiter and Probes is the necessity to maintain a fully operational flight system during the lengthy transit time from launch through Neptune encounter, and throughout the mission. Following our response to the recent NASA Research Announcement (NRA) for Space Science Vision Missions for mission studies by NASA for implementation in the 2013 or later time frame, our team has been selected to explore the feasibility of such a Neptune mission.

Bienstock, Bernard↗

Maximizing the Scientific Return of the Sentinels Mission Using Global MHD Models

The Sentinels mission promises to provide a unique view of the acceleration and transport processes of energetic particles as well as the initiation and evolution of coronal mass ejections (CMEs). A crucial component in understanding the physics associated with these processes lies in the large-scale structure of the corona and heliosphere, particularly during the eruption and propagation of fast CMEs. In this talk we review the current status of our MHD modeling efforts, focusing on Sentinels-specific science, and project forward to envisage what capabilities we may have developed by the time that the Sentinels launch (2012). In conjunction with Solar Orbiter, the farside and near-Earth Sentinels spacecraft will provide simultaneous photospheric magnetograph measurements at multiple longitudes, which will lead to major improvements in our ability to prescribe accurate, time-dependent global boundary conditions. Data returned from the inner heliospheric Sentinels will be used to validate these results. The model results can be used in a variety of ways to interpret the observations. For example, products from the model, such as the properties of CME-driven shocks and CME-associated reconnection sites can be used to interpret complex energetic particle profiles. Also, by tracing along magnetic field lines, the inferred sites of the energetic particles can be connected directly with the in situ measurements at each spacecraft. Perhaps more so than any previous mission, sophisticated models will be required to unravel the broad and disparate measurements returned by the suite of Sentinels spacecraft.

Riley, P.↗