Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “waste management system”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

1,013 records · Page 57

Sensor Development for Liquid Water Detection in Dry Storage Casks: FY 2023 Status

Modeling efforts were undertaken in fiscal year (FY) 2023 to evaluate the feasibility and capability for sensing of liquid water inside canister-based dry cask storage systems (DCSSs). The focus was on the development of full-scale finite element models (FEMs) of ultrasound propagation through DCSS canister components. For these initial investigations, simulation of the baseplate component was targeted, envisioning water collection at the bottom of a vertically oriented canister. The effects of internal canister components (i.e., fuel basket, fuel assemblies) on ultrasound propagation in the baseplate component were evaluated in these efforts. The environment inside a DCSS confinement is intended to be inert and free of water to prevent potential corrosion of used fuel cladding or other internal hardware. Spent fuel assemblies are dried, after storage in water pools, to make sure water has been removed from assembly cavities. However, there is some uncertainty about the amount of residual water potentially left behind in a DCSS after drying processes, because water can become trapped in cavities or other small crevices in the surfaces formed by the fuel cladding, fuel assemblies, and other internal hardware components. Considering the complex space- and time-dependent temperature profiles in DCSSs, water may be in a liquid or gas phase depending on its location in the cask and how long the cask has been in storage. Evacuating most water and oxidizing agents contained within a canister is recommended by NUREG-1536 (NRC 2010), which covers DCSSs. As summarized by Salazar et al. (2020), existing guidance typically relies on achievable vacuum pumping pressures sustained over a hold period as a signal of dryness and water removal. However, time series data about water removal from full-scale commercial drying procedures are lacking (Hanson and Alsaed 2019). A review of drying specifications from several vendors led to the conclusion that if the specifications are followed correctly, the residual moisture in DCSSs should present an insignificant risk of cladding degradation (Knoll and Gilbert 1987). A more recent analysis concluded that much larger quantities of residual water could remain in DCSSs, but the amount would still not be expected to lead to significant corrosion of fuel cladding or other internal components (Jung et al. 2013). Industry drying procedures are mostly prescriptive in nature, and operational issues arising during the process could result in incomplete drying. A summary of operational issues and potential negative effects of residual water is provided by Salazar et al. (2019). Experimental efforts are ongoing to validate the extent of water removal in a DCSS based on drying procedures used at nuclear power plants through well-designed investigations of drying process efficacy and water retention (Durbin et al. 2021; Pulido et al. 2022a, Pulido et al. 2022b). This has been approached by simulating limited portions of a DCSS internal volume and fuel assemblies. So far, these efforts have focused on the effects of potential water trapping in the dashpot region of control rod guide tubes but are expected to be expanded to include the effects of other internal hardware features and failed fuel rod cladding. A method for detection and measurement of liquid water (Meyer et al. 2022; Meyer et al. 2021), in tandem with the drying information gained through experimental investigations, provides comprehensive bases for understanding the internal conditions of DCSSs and provides technical information to support licensing decisions.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Characterization and CST Batch Contact Equilibrium Testing of Modified Tank 9H Process Supernate Samples in Support of TCCR

The Tank Closure Cesium Removal (TCCR) system uses ion exchange columns filled with crystalline silicotitanate (CST) media to process radioactive waste solutions for the removal of ¹³⁷Cs. TCCR currently focuses on dissolving Savannah River Site (SRS) radioactive tank waste (primarily sodium saltcake solids) within Tank 10H followed by at-tank ion exchange column treatment. Two supernate batches from Tank 10H have been processed through the TCCR unit and processing of a third batch is expected soon. After processing of this supernate batch, plans are to replace the CST columns and process dissolved salt solution from Tank 9H through Tank 10H and then through the new CST columns installed in the TCCR unit. The new columns are expected to contain either a media similar to an archived CST batch (IE-911) or the R9120-B CST media used in the current TCCR columns (the two materials are fundamentally the same; just different specifications, product names, and preconditioning steps). Samples of Tank 9H dissolved saltcake were received at the Savannah River National Laboratory (SRNL) and characterized. The Tank 9H supernate contained a high sodium concentration (~9.6 M Na⁺) and will require dilution to near 6 M [Na⁺] prior to processing through the TCCR unit. The cesium concentration in Tank 9H is currently significantly higher than was observed with Tank 10H. Three dilutions of the Tank 9H supernate were conducted to mimic possible dilutions that could be conducted in the tank farm prior to TCCR processing using inhibited water, sodium hydroxide, and sodium nitrate solutions. Dilution #1 was prepared by diluting the Tank 9H supernate by a factor of 1.6 with inhibited water, Dilution #2 was prepared by diluting the Tank 9H supernate by a factor of 3.7 with a mixed sodium hydroxide/sodium nitrate diluent, and Dilution #3 was prepared by also diluting by a factor of 3.7 but with sodium hydroxide only. All three dilutions have similar Na⁺ concentrations (~6 M), but Dilutions #2 and #3 contain significantly less cesium. Major and key minor components of the diluted Tank 9H supernate samples are provided in Table ES-1. Batch contact equilibrium tests were conducted with the Tank 9H dilutions and the two different CST media batches being considered for use in the new TCCR columns. Results are summarized in Table ES-2 and compared to ZAM model predictions. The highest cesium distribution coefficient and percent removal were observed with Dilution #3. IE-911 CST (an archived CST media batch) was more effective at removing cesium than the more recently prepared R9120-B CST media, though both media samples removed >88% of the cesium and the differences may not be statistically different considering the overall uncertainty. Based on the results, maximum cesium loadings were calculated for each CST media type and Tank 9H dilution. In general, maximum cesium loadings from dilutions of this supernate batch are quite high (approaching 0.1 mmol total Cs⁺/g CST for Dilution #1). The highest calculated maximum ¹³⁷Cs loading for the Tank 9H dilutions using the ZAM model with input of the tank compositions and batch contact results was 207 Ci/kg CST (Dilution #1 with IE-911 CST). In all cases, higher maximum cesium loading values were predicted for IE-911 CST versus R9120-B, although the differences varied considerably between the dilutions. The maximum loading value for IE-911 CST with Tank 9H Dilution #1 was only 7% higher than the maximum loading for R9120-B. The maximum loading value for IE-911 CST with Dilution #3 was 24% higher than the maximum loading for R9120-B. Dilution #2 was intermediate between these values. Note that these maximum loading values are the theoretical calculated values, and actual operating conditions will cause differences. A CST binder dilution (correction) factor near 0.7 (relative to pure powder CST) was required for each batch contact test with IE-911 engineered CST using the three Tank 9H dilutions. Correction factors calculated for R9120-B CST ranged from 0.56 to 0.66 for the three dilutions. Following the batch contact tests, the CST samples were isolated from the Tank 9H solution, washed, dried, and digested in acid following established procedures. The analysis results are provided in Table ES-3. Total cesium loading values determined by CST digestion were similar to the calculated loading values based on solution analysis (Table ES-2) for all samples. In addition, the CST was observed to load calcium (R9120-B sample only), iron, strontium, lead, uranium, and plutonium after contact with the waste supernate, as has been observed previously.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Pilot-Scale Testing of an Integrated Circuit for the Extraction of Rare Earth Minerals and Elements from Coal and Coal Byproducts Using Advanced Separation Technologies

The primary objective of this project was to develop and demonstrate an integrated pilot-scale circuitry for recovering high-value rare earth elements (REEs) from coal and coal byproducts. The target performance was to produce a mixed REE product with content of at least two percent by weight on a dry mass basis in a cost-effective and environmentally benign manner. During the first nine months of the project period (Phase 2 Budget Period 2), pilot plant construction was completed including all field site startup activities such as permitting, engineering design, procurement/bidding, unit fabrication, site construction, equipment installation, module assembly, safety training, and circuit shakedown. During the remaining 21 months of project period (Phase 2 Budget Period 3), detailed field-testing activities were performed including feedstock sample collection and preparation, exploratory testing, circuit modification, detailed parametric study, and performance optimization. A detailed techno-economic analysis was performed based on the pilot plant testing findings which provided various scenarios for REE production. The project successfully accomplished the proposed target performance by producing mixed rare earth oxide (REO) with greater than 90% purity by weight in a continuous pilot scale operation from two distinctly different coarse refuse materials (i.e., West Kentucky No. 13 and Fire Clay coal seams), and at least three secondary sources (i.e., heap leach process and naturally formed acid mine drainage system). Project partners included the University of Kentucky, Virginia Tech, West Virginia University, Alliance Coal, Blackhawk Mining, Mineral Refining Company, and Mineral Separation Technologies. The pilot scale test facility was constructed at a former mining complex owned by Alliance Natural Resource Partners (Alliance Coal). The site was rehabilitated to accommodate the equipment installation, construction and fabrication, electrical power requirement, water line management and containment. The process units constructed and installed included X-ray sorting unit, crushing and grinding unit, physical separation unit, acid leaching unit, solvent extraction unit, and wastewater management unit. A rare earth mineral concentration unit was constructed as a standalone unit for flexible operation. A detailed environmental assessment and control plan was carried out to identify and quantify any potential impacts of the pilot-scale processing circuitry on the human and eco-system health and well-being. Corresponding mitigation strategies and control measures were provided. A conceptual flowsheet was developed to effectively remove thorium and uranium from high purity rare earth oxide mix or any potential radionuclide enriched stream. The two distinct feedstock materials were secured from the Blackhawk Mining Complex in eastern Kentucky where the Fire Clay (Hazard No. 4) seam is processed. The West Kentucky No. 13 (Baker) coarse refuse material was collected from an active process stream at an Alliance coal preparation plant located in western Kentucky. Characterization analysis indicated that both of feed materials generated from the two sources contained >300 ppm of TREEs on a dry whole mass basis which met the requirements for a qualified feed stock. The two feedstocks were further upgraded using a dual x-ray sorter to prepare the feed material for hydrometallurgical circuit. Thermal treatment on feed material prior to leaching was found to: 1) improve the leaching recovery of REEs, 2) increase the leaching kinetics, and 3) allow the leaching reaction to occur at lower acidity. Roasting at 600°C was selected as the pre-treatment condition for both West Kentucky No. 13 and Fire Clay coarse refuse material. Over 40% of leaching recovery was achieved by roasting West Kentucky No. 13 material having a top particle size of 3 mm in the pilot scale operation using 1.2M sulfuric acid leaching at 75OC. Initial pilot scale testing involved continuous operation of the pilot plant for 94 hours. The leaching unit was operated at solid-to-liquid ratio of 1 to 10 (w/v) using 0.5M sulfuric acid solution at a temperature of 75°C. The continuous solvent extraction circuit utilized rougher and cleaner units with DEHPA and TBP as the extractants. An innovative stripping circuit was developed to accumulate the REE concentration in the stripping solution to a level above 600 ppm. A bleed stream from the recycled strip solution was treated using oxalic acid precipitation which produced a high grade rare earth oxalate. The oxalate product was roasted to remove the oxalate which produced a rare earth oxide product having a purity greater 90%. Due to high concentrations of contaminant ions in the pregnant leach solution (PLS), a modified flowsheet was developed that involved pre-concentration of the REEs using multiple stages of precipitation and redissolution. The advantage of this process was improved removal of contamination before the downstream purification process and a significant cost reduction relative to the circuit that utilized the solvent extraction process. The modified circuitry included processes involving leaching, multistage precipitation, redissolution, and oxalate precipitation followed by roasting of the oxalate product. The circuit produced a mixed REO that was 92.96% pure from the initial test. A detailed parametric test plan was carried out which involved varying key parameters including solids feed rate, acid flowrate, acid concentration, multistage precipitation pH, redissolution pH, oxalate precipitation dosage and pH. The response variables included REE recovery, contaminant recovery, REO product grade and overall chemical consumption. Test results indicated that the acid-to-solid ratio is the key parameter to leaching efficiency as performance deteriorated with an increase in solids concentration. The optimal pH determined for REE precipitation and redissolution was 6.5 and 2.5, respectively. Additional tests were conducted to further improve the flowsheet. Recirculating a portion of the PLS to the feed of the leach tanks improved the leaching performance by lowering the pH of the leaching system and reducing the contamination recovery by shortening the residence time. Moreover, the removal of Al prior to REE precipitation significantly reduced the oxalic acid consumption in the oxalate precipitation circuit. The modified circuit produced over 90% grade REO by weight from both West Kentucky No. 13 and Fire Clay coarse refuse material in pilot scale continuous test programs. A case analysis model was developed to project the REE and major contaminants concentration in each PLS stream based on the leaching condition, pH cut point, and oxalic acid dosage. A correlation was established using empirical and semi-empirical models. Using the models, chemical consumption required for each stage was predicted based on the projected performance of the hydrometallurgy circuit. After identifying the optimum conditions, validation tests were carried out for the treatment of both West Kentucky No. 13 and Fire Clay coarse refuse materials in the pilot plant. The actual circuit performance and chemical consumptions were very close to the model predictions. Other than the two coarse refuse sources, several secondary feedstocks were also tested in the pilot plant facility. A “heap leach” system was constructed using the coarse refuse material generated from cleaning the West Kentucky No. 13 seam coal. Using the two stage SX rougher and cleaner circuit, a concentrate with a grade >90% REO was produced while recovering >97% of the REEs from the heap leach PLS. Naturally generated acid mine drainage (AMD) from West Kentucky No.13 mine was processed using the multistage precipitation circuit in the pilot plant in a test conducted for a period of 32 hours. The final grade of the mix RE oxide produced from the AMD was 90.84% with an overall circuit recovery of 64%. The primary source of REE was the selective precipitation steps involving iron and aluminum rejection. The hydrophobic-hydrophilic separation (HHS) process was proven to effectively recover coal from fine waste materials. For REM recovery, the HHS process was able to produce concentrates at grades of approximately 1.8% REE on an ash basis; however, recovery values were typically low, <10%, under the optimal conditions determined in the laboratory-scale testing. Staged testing of the pilot-scale HHS process for coal recovery and semi-continuous laboratory testing for REM testing showed that a total concentration ratio of more than 15x was observed for the REM recovery process. A circuit simulation package was developed for REE extraction and purification using a spreadsheet-based platform (Microsoft Excel). The REESim circuit simulation package is configured to track the mass and volume flows of components passing through a series of unit operations specified and configured by the user. The mass rates can then be utilized by the user to determine important performance indicators such as product mass yields, concentrate purity levels, element-by-element recoveries, and so forth. The techno-economic analysis showed that the roasting and leaching operations were the most expensive capital items, each contributing approximately 30% to the total capital cost. One notable contributor to the high production costs was the low REE recovery observed in the pilot scale trials. The product basket price was shown to have a strong influence on the economic viability of the scenarios, with the scandium price being the most significant influencer. Operating cost was shown to be extremely sensitive to REE recovery, REE feed grade, and leaching acid consumption. An analysis of ten different scenarios for a 500 t/h commercial operation revealed that three were economically favorable, producing internal rates of return varying from 27.7% to 33.1% and payback periods of 4 to 5 years. The project successfully developed and demonstrated a process to recover REEs from coal and coal byproducts in a pilot-plant operation which consistently produced over 90% grade REO mix from varies types of feedstocks. Commercialization analysis showed that the technology readiness level successfully achieved TRL 6 at the end of the project and demonstrated the need and the potential for scaling the process to further advance the technologies toward the goal of providing a domestic supply of REEs at a commercial scale.

01 COAL, LIGNITE, AND PEAT↗

Physics and technology considerations for the deuterium–tritium fuel cycle and conditions for tritium fuel self sufficiency

The tritium aspects of the DT fuel cycle embody some of the most challenging feasibility and attractiveness issues in the development of fusion systems. The review and analyses in this paper provide important information to understand and quantify these challenges and to define the phase space of plasma physics and fusion technology parameters and features that must guide a serious R&D in the world fusion program. We focus in particular on components, issues and R&D necessary to satisfy three 'principal requirements': (1) achieving tritium self-sufficiency within the fusion system, (2) providing a tritium inventory for the initial start-up of a fusion facility, and (3) managing the safety and biological hazards of tritium. A primary conclusion is that the physics and technology state-of-the-art will not enable DEMO and future power plants to satisfy these principal requirements. We quantify goals and define specific areas and ideas for physics and technology R&D to meet these requirements. A powerful fuel cycle dynamics model was developed to calculate time-dependent tritium inventories and flow rates in all parts and components of the fuel cycle for different ranges of parameters and physics and technology conditions. Dynamics modeling analyses show that the key parameters affecting tritium inventories, tritium start-up inventory, and tritium self-sufficiency are the tritium burn fraction in the plasma (f b ), fueling efficiency (η f ), processing time of plasma exhaust in the inner fuel cycle (t p ), reactor availability factor (AF), reserve time (tr) which determines the reserve tritium inventory needed in the storage system in order to keep the plant operational for time t r in case of any malfunction of any part of the tritium processing system, and the doubling time (t d ). Results show that η f f b > 2% and processing time of 1–4 h are required to achieve tritium self-sufficiency with reasonable confidence. For η f f b = 2% and processing time of 4 h, the tritium start-up inventory required for a 3 GW fusion reactor is ~11 kg, while it is <5 kg if η f f b = 5% and the processing time is 1 h. To achieve these stringent requirements, a serious R&D program in physics and technology is necessary. The EU-DEMO direct internal recycling concept that carries fuel directly from the plasma exhaust gas to the fueling systems without going through the isotope separation system reduces the overall processing time and tritium inventories and has positive effects on the required tritium breeding ratio (TBR R ). A significant finding is the strong dependence of tritium self-sufficiency on the reactor availability factor. Simulations show that tritium self-sufficiency is: impossible if AF < 10% for any η f f b , possible if AF > 30% and 1% ≤ η f f b ≤ 2%, and achievable with reasonable confidence if AF > 50% and η f f b > 2%. These results are of particular concern in light of the low availability factor predicted for the near-term plasma-based experimental facilities (e.g. FNSF, VNS, CTF), and can have repercussions on tritium economy in DEMO reactors as well, unless significant advancements in RAMI are made. There is a linear dependency between the tritium start-up inventory and the fusion power. The required tritium start-up inventory for a fusion facility of 100 MW fusion power is as small as 1 kg. Since fusion power plants will have large powers for better economics, it is important to maintain a 'reserve' tritium inventory in the tritium storage system to continue to fuel the plasma and avoid plant shutdown in case of malfunctions of some parts of the tritium processing lines. But our results show that a reserve time as short as 24 h leads to unacceptable reserve and start-up inventory requirements. Therefore, high reliability and fast maintainability of all components in the fuel cycle are necessary in order to avoid the need for storing reserve tritium inventory sufficient for continued fusion facility operation for more than a few hours. The physics aspects of plasma fueling, tritium burn fraction, and particle and power exhaust are highly interrelated and complex, and predictions for DEMO and power reactors are highly uncertain because of lack of experiments with burning plasma. Fueling by pellet injection on the high field side of tokamak has evolved to be the preferred method to fuel a burning plasma. Extrapolation from the DIII-D penetration scaling shows fueling efficiency expected in DEMO to be <25%, but such extrapolations are highly uncertain. The fueling efficiency of gas in a reactor relevant regime is expected to be extremely poor and not very useful for getting tritium into the core plasma efficiently. Gas fueling will nonetheless be useful for feedback control of the divertor operating parameters. Extensive modeling has been carried out to predict burn fraction, fueling requirements, and fueling efficiency for ITER, DEMO, and beyond. The fueling rate required to operate Q = 10 ITER plasmas in order to provide the required core fueling, helium exhaust and radiative divertor plasma conditions for acceptable divertor power loads was calculated. If this fueling is performed with a 50–50 DT mix, the tritium burn fraction in ITER would be ~0.36%, which is too low to satisfy the self-sufficiency conditions derived from the dynamics modeling for fusion reactors. Extrapolation to DEMO using this approach would also yield similarly low burn fraction. Extensive analysis presented shows that specific features of edge neutral dynamics in ITER and fusion reactors, which are different from present experiments, open possibilities for optimization of tritium fueling and thus to improve the burn fraction. Using only tritium in pellet fueling of the plasma core, and only deuterium for edge density, divertor power load and ELM control results in significant increase of the burn fraction to 1.8–3.6%. These estimates are performed with physics models whose results cannot be fully validated for ITER and DEMO plasma conditions since these cannot be achieved in present tokamak experiments. Thus, several uncertainties remain regarding particle transport and scenario requirements in ITER and DEMO. The safety standard requirements for protection of the public and release guidelines for tritium have been reviewed. General safety approaches including minimizing tritium inventories, reducing tritium permeation through materials, and decontaminating material for waste disposal have been suggested.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

CoDCon Project (Final Report)

The co-decontamination (CoDCon) project was established in FY 2016 with the objectives of (a) evaluating the uncertainty in the uranium (U)/plutonium (Pu) ratio in a mixed U/Pu product from a tributyl phosphate (TBP)–based solvent extraction flowsheet, and (b) developing and demonstrating on-line optical spectroscopy for real-time monitoring of key components (e.g., Pu, U, and HNO 3 concentrations) in the process solutions. We were interested in assessing the accuracy and precision to which a specific uranium-to-plutonium (U/Pu) ratio can be achieved, which for the purposes of this project was set at a U/Pu mass ratio of 7/3. The uncertainty associated with achieving this specific target U/Pu ratio was investigated during five flowsheet tests using laboratory-scale solvent extraction equipment. In addition, optical spectroscopic techniques were incorporated into the CoDCon solvent extraction testing system, allowing real time monitoring of all input and output process streams. Two CoDCon flowsheet tests were performed in FY 2018 using a simple dissolved fuel simulant containing only U (~1 M) and Pu (~15 mM) in nitric acid (HNO 3 ; ~3 M). In FY 2019, two additional flowsheet tests were performed. For the first of these (CoDCon Run 3), the dissolved fuel simulant was similar to that used in the first two tests, with the inclusion of 1 mM neptunium (Np). The second test conducted in FY 2019 (CoDCon Run 4) used a more representative dissolved fuel simulant, including addition of non-radioactive fission product elements. A fifth CoDCon flowsheet test (CoDCon Run 5) was conducted in FY 2020, with the following additional objectives: (1) routing of the technetium (Tc) in the simulated dissolved fuel solution to the solvent extraction raffinate, and (2) routing of the Np in the simulated dissolved fuel solution to the U/Pu product. All tests used a bank of sixteen 2 cm centrifugal contactors. The tests involved first loading the solvent (30 vol% TBP dissolved in n-dodecane) with U and Pu (and Np, for Run 5), then the Pu (and Np) was stripped from the loaded solvent with a U(IV) solution (~50 mM) and the flowsheet conditions were adjusted such that some U partitioned into the Pu-containing product stream. The amount of U accompanying the Pu was monitored in real time using optical spectroscopic techniques coupled with chemometric modeling. Based on the real-time spectroscopic measurement of the U/Pu ratio, adjustments were made to the flowrate of the fresh TBP solvent phase used to scrub U from the aqueous Pu-containing product. This proved to be a very effective way to control the U/Pu mass ratio in the product. This report presents the results of the CoDCon Run 5 test. The flowsheet tested in Run 5 was substantially different than that run in the prior tests, especially the solvent loading section of the flowsheet. Two key changes were made. First, based on the objective to extract all the Np and route it with the U/Pu product, pentavalent vanadium [V(V)] was added to the feed and scrub solutions. The purpose of the V(V) was to convert all the Np to the +6 oxidation state, which is extractable by TBP. Second, a high acid (8 M HNO 3 ) scrub was added to the flowsheet to scrub the Tc from the solvent. This was followed by a low acid scrub (0.05 M HNO 3 ) to reduce the residual HNO 3 concentration in the solvent prior to the Pu stripping step. The output from the low acid scrub was collected separately, rather than routing towards the raffinate. The modifications to the solvent loading part of the flowsheet were only partially successful. The treatment with V(V) was effective at converting the Np to Np(VI). Only 1.3% of the Np remained in the raffinate solution. However, ~40% of the Np stripped out of the solvent in the low acid scrub step; nearly 20% of the Pu also was stripped from the solvent during the low acid scrub. For further development, either modifications to the flowsheet, or concentration and recycle of the low acid stream into the

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗