Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “upgrading”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,027 records · Page 57

Distribution Grid Impact Study in Highland Park, Michigan: Understanding Rooftop Solar, Behind-the-Meter Energy Storage, Electric Vehicle Charging, and Building Electrification [Slides]

Through the Communities LEAP (Local Energy Action Program) Pilot, the National Renewable Energy Laboratory (NREL) engaged the Highland Park Stakeholder Coalition to scope four technical assistance work areas to address their energy needs and goals. This slide deck addresses the highlighted tasks under work area "B" related to policy analysis, due diligence, and case studies for removing barriers and providing best practices for local clean energy development. Highland Park community members face frequent, long-duration power interruptions due largely to the aging distribution system serving the area and the legacy design standards used in its construction. While degrading physical infrastructure such as poles, crossarms, and transformers can result in this substandard reliability, another notable characteristic of this legacy system is the lower, 4.8 kV, voltage class. This is a legacy construction standard which many utilities, DTE included, are phasing out in favor of higher, 15 or 25 kV, voltage classes instead. The existing 4.8 kV distribution system serving Highland Park may limit significant adoptions of clean-energy technologies like high percentages of building electrification or electric vehicle adoption. The following analysis seeks to quantify these limitations under a variety of clean-energy technology adoption scenarios. It compares the overall system risks of the present system to those of a hypothetical, upgraded 13.2 kV system, using NREL-developed risk metrics and offers upgrade cost considerations. The legacy 4.8 kV voltage class serving Highland park is not, as we have modeled it, a major limitation to the widespread adoption of cost-optimal rooftop solar and/or behind-the-meter energy storage. Within our modeling framework, these technologies namely impact secondary, low-voltage assets, which may be remedied without the need for a system-wide upgrade to a 13.2 kV voltage class. Our model of the current 4.8kV system indicates it is not capable of supporting community-wide electrification efforts. Widespread building electrification, and the resulting large increase in wintertime load, dramatically increases the prevalence of voltage violations and thermal overloading on the current 4.8 kV distribution system. These impacts illustrate the need for system-wide upgrades to a 13.2 kV voltage class to accommodate these technologies. Low to Moderate DER adoption does not adversely impact the grid but does improve undervoltage and asset overloading issues. However, these benefits are insufficient to defer grid upgrades. Higher DER penetration is shown to increase overvoltage and asset overloading in future electrification scenarios.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Toward Rational Design of Supported Vanadia Catalysts of Lignin Conversion to Phenol

In sustainable chemical engineering, catalytic upgrading of lignocellulosic biomass has recently gained attention for producing renewable platform chemicals. To achieve maximal biomass utilization, upgrading the underutilized lignin components is essential. Among various catalysts for lignin upgrading, supported vanadia (V2O5) catalysts are promising because of their cost-effectiveness and tunability of either dopant metals or catalyst supports. Here, computational studies are conducted to derive rational design guidelines of supported V2O5 catalysts for accomplishing the high catalytic activity of lignin upgrading to phenol, a key compound for producing bioplastics and biofuel blendstocks. Guaiacol was used as the model compound since it comprises the highest portion of depolymerized lignin. Computational mechanistic studies for the catalytic guaiacol conversion to phenol were performed for the V2O5 catalysts on Titania (TiO2) and silica (SiO2) to explain higher experimental phenol yields on V2O5/SiO2 than V2O5/TiO2. The hydrogen migration from the methoxy group to the aryl ring was identified as a rate-determining step, and the overall activation energies on the two catalysts were compared. A structural analysis was carried out for the catalysts and rate-determining transition states to gain further insights from mechanistic studies. It was concluded that the tilt angle of the aryl group in the hydrogen migration transition state is a key descriptor determining the catalytic activity of phenol formation. These features correlate well with activation energies and experimental phenol yields, indicating that they provide design guidelines for supported metal catalysts for lignin upgrading before experiments.

BIOMASS FUELS,INORGANIC, ORGANIC, PHYSICAL, AND AN↗

Distribution Grid Impacts of Community Solar [Slides]

Community solar (CS) projects often face uncertain interconnection costs and fees associated with distribution grid infrastructure upgrades required to connect the project. These costs can determine the economic viability of a CS project, but they are difficult to assess. Cost uncertainty can discourage new projects and prevent communities from accessing the benefits of community solar projects. At the same time, CS deployment strategies hold potential to defer or avoid some distribution costs due to new loads. To mitigate CS interconnection costs, it is important to find least-cost combinations of distribution system infrastructure solutions (transformer upgrades, reconductoring, voltage regulators, storage), and to understand how location of CS projects within a feeder impact distribution grid upgrade costs. This study aims to quantify CS impacts on the distribution grid and provide policy and regulatory insights and CS deployment strategies to address them. It is the first analysis that has systematically studied the technical impacts of community solar projects on a wide range of distribution feeders using state-of-the-art optimization and power flow tools. The analysis employs Berkeley Lab’s novel Least-cost Optimal Distribution Grid Expansion (LODGE) model, a deterministic version of the REPAIR model, that optimally upgrades hundreds or even thousands of distribution circuits or feeders. This is the first application of the LODGE model. LODGE finds the least-cost portfolio of traditional distribution system upgrades to integrate CS in combination with alternative solutions, such as utility-owned storage and downsizing CS capacity. Working with a set of least-cost solutions per feeder allows us to benchmark, compare and find techno-economic trends in CS interconnection.

14 SOLAR ENERGY↗

Hydropower Black Start: A Guidebook for Retrofitting Grid Dependent Hydropower

Not all United States (US) hydropower plants were designed to provide black start, but they are increasingly needed to uphold resilience in the evolving electric grid. This guidance is designed to help understand the minimal retrofits required for grid dependent hydropower (GDH) plants behind the point of interconnection (POI). For distribution connected hydropower plants or those with dedicated cranking paths, such upgrades can be sufficient for the plant to provide black start. For others, more coordination with the transmission system operator will be needed. This guidebook answers a number of questions relevant to retrofitting hydropower plants with black start capabilities. For example, the guidebook answers: • How flexible do the wicket gate controls need to be? • Who needs to do hydro governor model validation, why, and how? • How robust and flexible do the excitation and AVR controls need to be? • What protection settings need to be adjusted? • What relay(s) will need to be bypassed or overridden and at what risk? • What is the electrical energy demand of the station load or auxiliary power systems? • What should the strategy to energize transformer(s) along cranking path to address inrush currents be? • How should the critical load restoration be sequenced? In addition to outlining the specifications that hydropower plants need to meet for each component to be able to perform black start, this guidebook provides a set of case studies for specific upgrades needed at actual plants. Between the case studies of plants that have already performed black start retrofits and the examples of how this guidebook can be applied to scope future retrofits, five key themes have been identified for retrofit needs. 1. Protection needs “black start” mode: hydropower plants that are not designed with black start capabilities will have protections that prevent them from interconnecting to a “dead bus.” These protections will need to be overridden in every retrofit case and a separate black start mode should be established so that operators can safely switch between black start and grid connected modes, minimizing the risk to the plant. 2. Wicket gates need modern controls: digital governors accelerate the parameter tuning process and gate position sensors improve controllability, so plants with mechanical governors should be upgraded. Furthermore, a black start and islanding mode should be established for controls to maximize plant performance. 3. Robust excitation support: the DC system or excitation generator needs to be reliable enough to form and sustain the rotor electromagnetic field. These systems are typically undersized in plants that were not designed for black start, so they will need to be upgraded. 4. Turbine-governor model validation and operator training: validation of a standard hydro governor model is needed to characterize the dynamic response (i.e., inertial and primary frequency response) of the GDH. This is required for control development and old hydropower plants often have outdated or incorrect models. Operator training is also typically required to ensure the hardware retrofits are utilized correctly during the black start process. 5. Transformer and cranking path energization: any upgradation and control adjustment in front of the POI will depend upon the existing interconnection. Coordination with the transmission or distribution operator may be required.

13 HYDRO ENERGY↗

Advancing Grid Resilience through Smart Charge Management: Findings from Maryland’s Pilot

This report presents research findings from a four-year Smart Charge Management (SCM) pilot program conducted by Maryland’s largest electric utilities—Baltimore Gas and Electric (BGE), Potomac Electric Power Company (Pepco), and Delmarva Power & Light (DPL)—to evaluate strategies for optimizing electric vehicle (EV) charging loads and enhancing grid stability. Supported by the U.S. Department of Energy (DOE), Argonne National Laboratory collaborated with all project partners and examined the effectiveness of Time-of-Use (TOU) and Load Balancing (LB) strategies in managing peak demand, deferring costly infrastructure upgrades, and reducing grid constraints at the feeder level. Using charging data from over 4,600 EV drivers, the study analyzed SCM’s impact on the distribution systems of BGE and Pepco, which consists of over 2000 feeders. Unlike prior research that focused on system-wide trends or synthetic feeders, this analysis offers granular, feeder-level insights based on real-world operational data. It highlights how transformer density, load profiles, and infrastructure constraints influence smart charging performance. Results show feeder-level conditions play a crucial role in SCM effectiveness, with most feeders benefiting more from LB, while TOU-based SCM may be sufficient for others. By 2035, LB reduced peak charging loads by 27% on average, compared to 23% under TOU-based SCM, though some feeders saw reductions exceeding 35%, while others experienced minimal impact. Feeders with higher transformer utilization and limited capacity benefited more from LB, which more effectively distributed charging demand during off-peak hours. Beyond reducing grid constraints, SCM offers long-term operational and financial benefits. By shifting EV charging demand strategically, utilities can optimize asset utilization, delay infrastructure investments, and enhance grid performance. In terms of infrastructure upgrade deferrals, at the feeder level, LB consistently reduced peak charging loads and resulting infrastructure upgrade costs, particularly in high EV enrollment areas, decreasing the number of overloaded transformers by up to 35%, while TOU-based SCM achieved 20-30% reductions depending on feeder characteristics. At the system level, LB has the potential to defer total upgrade costs by $\$$186 million for BGE, compared to $\$$159 million under TOU-based SCM. For Pepco, TOU-based SCM performed slightly better, deferring upgrade costs by $\$$30 million, compared to $\$$29 million under LB. Section 4.5 reviews some of the system differences between BGE and Pepco. However, as EV adoption scales, TOU-based SCM will introduce secondary peak charging loads, reinforcing the need for more advanced, adaptive SCM approaches to prevent new grid challenges. As EV adoption continues to grow, feeder-level managed charging strategies will be essential for mitigating grid stress, improving infrastructure efficiency, and maintaining energy affordability for consumers. This report provides critical insights for utilities, Public Utility Commissions (PUCs), and state agencies on the role of feeder-specific smart charging in infrastructure planning, policy development, and grid modernization. The findings underscore the importance of tailored, data-driven SCM solutions that align with local grid conditions, ensuring a resilient, cost-effective transition to increasing EV adoption while safeguarding distribution system performance.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Ka-band (32-GHz) performance of 70-meter antennas in the Deep Space Network

Two models are provided of the Deep Space Network (DSN) 70 m antenna performance at Ka-band (32 GHz) and, for comparison purposes, one at X-band (8.4 GHz). The baseline 70 m model represents expected X-band and Ka-band performance at the end of the currently ongoing 64 m to 70 m mechanical upgrade. The improved 70 m model represents two sets of Ka-band performance estimates (the X-band performance will not change) based on two separately developed improvement schemes: the first scheme, a mechanical approach, reduces tolerances of the panels and their settings, the reflector structure and subreflector, and the pointing and tracking system. The second, an electronic/mechanical approach, uses an array feed scheme to compensate fo lack of antenna stiffness, and improves panel settings using microwave holographic measuring techniques. Results are preliminary, due to remaining technical and cost uncertainties. However, there do not appear to be any serious difficulties in upgrading the baseline DSN 70 m antenna network to operate efficiently in an improved configuration at 32 GHz (Ka-band). This upgrade can be achieved by a conventional mechanical upgrade or by a mechanical/electronic combination. An electronically compensated array feed system is technically feasible, although it needs to be modeled and demonstrated. Similarly, the mechanical upgrade requires the development and demonstration of panel actuators, sensors, and an optical surveying system.

Imbriale, W. A.↗

Modeling preparation costs for space missions by using major cost drivers

A model is suggested for making long range planning cost estimates for Deep Space Network (DSN) support of future space missions. The model is a function of major mission cost drivers, such as maintenance and operations, downlink frequency upgrade, uplink frequency upgrade, telemetry upgrade, antenna gain/noise temperature, radiometric accuracy upgrade, radio science upgrade, and very long baseline interferometry. The model is derived from actual cost data from three space missions: Voyager (Uranus), Voyager (Neptune), and Magellan. The model allows one to estimate the total cost and the cost over time of a similar future space mission. The model was back tested against the three projects and gave cost estimates that range from 17 pct. below to 19 pct. above actual mission preparation costs. The model was also compared with two other independent projects: Mariner Jupiter/Saturn (MJS later became Voyager) and Viking. The model gave total preparation cost estimates that range from 15 pct. above to 4 pct. below actual total preparation costs for MJS and Viking, respectively.

Sherif, J. S.↗

Re-Engineering the ISS Payload Operations Control Center During Increased Utilization and Critical Onboard Events

With an increase in the utilization and hours of payload operations being executed onboard the International Space Station (ISS), upgrading the NASA Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) ISS Payload Control Area (PCA) was essential to gaining efficiencies and assurance of current and future payload health and science return. PCA houses the Payload Operations Integration Center (POIC) responsible for the execution of all NASA payloads onboard the ISS. POIC Flight Controllers are responsible for the operation of voice, stowage, command, telemetry, video, power, thermal, and environmental control in support of ISS science experiments. The methodologies and execution of the PCA refurbishment were planned and performed within a four month period in order to assure uninterrupted operation of ISS payloads and minimal impacts to payload operations teams. To vacate the PCA, three additional HOSC control rooms were reconfigured to handle ISS realtime operations, Backup Control Center (BCC) to Mission Control in Houston, simulations, and testing functions. This involved coordination and cooperation from teams of ISS operations controllers, multiple engineering and design disciplines, management, and construction companies performing an array of activities simultaneously and in sync delivering a final product with no issues that impacted the schedule. For each console operator discipline, studies of Information Technology (IT) tools and equipment layouts, ergonomics, and lines of sight were performed. Infusing some of the latest IT into the project was an essential goal in ensuring future growth and success of the ISS payload science returns. Engineering evaluations led to a state of the art media wall implementation and more efficient ethernet cabling distribution providing the latest products and the best solution for the POIC. These engineering innovations led to cost savings for the project. Constraints involved in the management of the project included executing over 450 crew-hours of ISS real-time payload operations including a major onboard communications upgrade, SpaceX un-berth, a Soyuz launch, roll-out of ISS live video and interviews from the POIC, annual BCC certification and hurricane season, and ISS simulations and testing. Continuous ISS payload operations were possible during the PCA facility modifications with the reconfiguration of four control rooms and standup of two temporary control areas. Another major restriction to the project was an ongoing facility upgrade that included a NASA Headquarters mandated replacement of all electrical and mechanical systems and replacement of an external generator. These upgrades required a facility power outage during the PCA upgrades. The project also encompassed console layout designs and ordering, amenities selections and ordering, excessing of old equipment, moves, disposal of old IT equipment, camera installations, facility tour re-schedules, and contract justifications. These were just some of the tasks needed for a successful project.

Marsh, Angela L.↗

GEOS S2S-2_1 File Specification: GMAO Seasonal and Sub-Seasonal Forecast Output

The NASA GMAO seasonal (9 months) and subseasonal (45 days) forecasts are produced with the Goddard Earth Observing System (GEOS) Atmosphere-Ocean General Circulation Model and Data Assimilation System Version S2S-2_1. The new system replaces version S2S-1.0 described in Borovikov et al (2017), and includes upgrades to many components of the system. The atmospheric model includes an upgrade from a pre-MERRA-2 version running on a latitude-longitude grid at approx. 1 degree resolution to a current version running on a cubed sphere grid at approximately 1/2 degree resolution. The important developments are related to the dynamical core (Putman et al., 2011), the moist physics (''two-moment microphysics'' of Barahona et al., 2014) and the cryosphere (Cullather et al., 2014). As in the previous GMAO S2S system, the land model is that of Koster et al (2000). GMAO S2S-2_1 now includes the Goddard Chemistry Aerosol Radiation and Transport (GOCART, Colarco et al., 2010) single moment interactive aerosol model that includes predictive aerosols including dust, sea salt and several species of carbon and sulfate. The previous version of GMAO S2S specified aerosol amounts from climatology, which were used to inform the atmospheric radiation only. The ocean model includes an upgrade from MOM4 to MOM5 (Griffies 2012), and continues to be run on the tripolar grid at approximately 1/2 degree resolution in the tropics with 40 vertical levels. As in S2S-1.0, the sea ice model is from the Los Alamos Sea Ice model (CICE4, Hunke and Lipscomb 2010). The Ocean Data Assimilation System (ODAS) has been upgraded from the one described in Borovikov et al., 2017 to one that uses a modified version of the Penny, 2014 Local Ensemble Transform Kalman Filter (LETKF), and now assimilates along-track altimetry. The ODAS also does a nudging to MERRA-2 SST and sea ice boundary conditions. The atmospheric data assimilation fields used to constrain the atmosphere in the ODAS have been upgraded from MERRA to a MERRA-2 like system. The system is initialized using a MERRA-2-like atmospheric reanalysis (Gelaro et al. 2017) and the GMAO S2S-2_1 ocean analysis. Additional ensemble members for forecasts are produced with initial states at 5-day intervals, with additional members based on perturbations of the atmospheric and ocean states. Both subseasonal and seasonal forecasts are submitted to the National MultiModel Ensemble (NMME) project, and are part of the US/Canada multimodel seasonal forecasts (http://www.cpc.ncep.noaa.gov/products/NMME/). A large suite of retrospective forecasts (''hindcasts'') have been completed, and contribute to the calculation of the model's baseline climatology and drift, anomalies from which are the basis of the seasonal forecasts.

Seasonal Forecast↗

Configuration and Projected Capabilities of the Common Habitat Medical Care Facility

The Common Habitat is a large, long-duration habitat being explored as part of a conceptual study (not an active NASA program) that uses an SLS core stage Liquid Oxygen (LOX) tank as its primary structure. It is intended for use on the Moon as part of a permanently occupied outpost, on Mars as part of an outpost that will be occupied for hundreds of days at a time, and in deep space as part of the Deep Space Exploration Vehicle where it will support crewed missions up to 1200 days in duration. A study of internal orientation and crew size resulted in a Common Habitat configuration sized for a crew of eight with a three-deck horizontal orientation. Additional work outside the scope of this paper is developing a vertical translation system, a crew mobility aids system based on wearable gecko-derived grippers, and a crew seating/restraint system. These systems are all assumed for use in conjunction with the Medical Care Facility, which is needed to maintain crew well-being during these missions, where distance from Earth precludes the possibility of evacuation to Earth. This paper describes recent improvements in the Common Habitat Medical Care Facility and associated benefits for crew survivability in long duration missions beyond Earth orbit. These improvements were made with the assistance of a NASA Pathways intern whose experience includes a tour of duty in Afghanistan as an Army combat medic with the 691st GHOST-T, attached to the 1st and 7th US Special Forces Groups as part of Operation Freedom’s Sentinel, where he helped provide far-forward surgical capabilities in austere combat environments. The initial baseline Medical Care Facility was developed working in conjunction with University of Houston Space Architecture graduate students. The facility was placed on the upper deck of the Common Habitat in a location that provided privacy, operational volume, and was close to the vertical translation pathway. The notional outfitting repurposed component CAD models from unrelated studies and notionally indicated a level of care roughly equivalent to that aboard the International Space Station. The CAD modeling provided notional stowage volumes, a deployable surface, some fixed equipment, an ultrasound, and a potentially reconfigurable treatment table. While this facility is clearly a competent arrangement, it was desired to leverage available expertise and upgrade the station given the vast distances from Earth to be experienced by the Common Habitat. Key driving requirements applied to the upgrade included to provide Medical Level of Care V, offer enhanced telemedicine capabilities, provide patient physical accommodation, provide caregiver access to the patient from all sides, include sliding pocket doors for access to hygiene and to the Vertical Translation System, and to add any additional capability possible for the best achievable medical care. The first step in the facility upgrade was to quantify the current medical inventory on the International Space Station and ensure that sufficient stowage volume was present for this purpose. To that end, the ISS medical kits were reviewed, and eight full size mid deck lockers were placed in the facility. A number of additional devices were also added, based on the intern’s combat medic experience. Also, two fixed shelves and one horizontal work surface were added to the Medical Care Facility, with the shelves providing storage space for the additional devices and the work surface providing a location for the caregiver to work or stage equipment. Four display monitors were added to the wall above the horizontal work surface, supporting data display, telemedicine, conferencing, or other needs. The existing treatment table was replaced with a mobile surgical stretcher-chair. Two additional doors were added to the Medical Care Facility. One leads directly to the hygiene compartment, allowing it to support medical operations in addition to providing galley/wardroom support. The other door leads directly into the Vertical Translation System. The wall adjacent to the subsystems bay was moved, adding additional volume to the Medical Care Facility. This improved caregiver access to the patient and allowed for a larger number of caregivers to be present. It also provided options for relocation of support equipment relative to the patient as needed. In the upgraded Medical Care Facility, the Surgical Stretcher-Chair and the Vertical Translation System can work together to provide incapacitated crew member transport from a site of injury on any deck of the Common Habitat to the Medical Care Facility. It can also support patient treatment in a variety of positions including a variety of sitting postures and a supine posture at a variety of pitch angles. The facility can also support caregiver office work for review of examination results, private consultation, inventory and maintenance, and a variety of other purposes. A forward activity will be to conduct evaluations of the Medical Care Facility with different medical scenarios. Additionally, ambient and task lighting selections remain as forward work. The eight mid deck lockers can be augmented to use as portable equipment carts, similar to a manner in which maintenance facility stowage was used as portable carts during the NASA Desert Research and Technology Studies in the Constellation Program. Trash accommodation will also need forward work to assess, including provision for wet trash, dry trash, and biological waste. It will be important to assess a redesign of the surgical stretcher-chair. The commercial version used in the upgrade can only enable vertical translation in the seated configuration, requiring the patient to bend both hips and knees. A possible redesign of the chair will allow for vertical translation without requiring any bending at the hip or knees. Also, the commercial version is wheeled, making it mobile in gravity but unanchored in microgravity. Work will be needed to adapt the chair for gravity-independent performance. The hygiene compartment can be redesigned for dual-use medical scrub and galley handwash facility. Pending sufficient volume, it may also be possible to place sanitation equipment in this location to clean medical tools. Finally, most space architectures have never allowed for more than one incapacitated crew member, but several scenarios could potentially injure two or more crew in the same incident. This facility could be assessed to determine its present ability to address two or more injured crew in parallel and determine the potential upper limit for number of treatable crew in a multi-crew injury scenario, or to treat polytrauma of a single patient.

Habitat↗

Configuration and Projected Capabilities of the Common Habitat Medical Care Facility

The Common Habitat is a large, long-duration habitat being explored as part of a conceptual study (not an active NASA program) that uses an SLS core stage Liquid Oxygen (LOX) tank as its primary structure. It is intended for use on the Moon as part of a permanently occupied outpost, on Mars as part of an outpost that will be occupied for hundreds of days at a time, and in deep space as part of the Deep Space Exploration Vehicle where it will support crewed missions up to 1200 days in duration. A study of internal orientation and crew size resulted in a Common Habitat configuration sized for a crew of eight with a three-deck horizontal orientation. Additional work outside the scope of this paper is developing a vertical translation system, a crew mobility aids system based on wearable gecko-derived grippers, and a crew seating/restraint system. These systems are all assumed for use in conjunction with the Medical Care Facility, which is needed to maintain crew well-being during these missions, where distance from Earth precludes the possibility of evacuation to Earth. This paper describes recent improvements in the Common Habitat Medical Care Facility and associated benefits for crew survivability in long duration missions beyond Earth orbit. These improvements were made with the assistance of a NASA Pathways intern whose experience includes a tour of duty in Afghanistan as an Army combat medic with the 691st GHOST-T, attached to the 1st and 7th US Special Forces Groups as part of Operation Freedom’s Sentinel, where he helped provide far-forward surgical capabilities in austere combat environments. The initial baseline Medical Care Facility was developed working in conjunction with University of Houston Space Architecture graduate students. The facility was placed on the upper deck of the Common Habitat in a location that provided privacy, operational volume, and was close to the vertical translation pathway. The notional outfitting repurposed component CAD models from unrelated studies and notionally indicated a level of care roughly equivalent to that aboard the International Space Station. The CAD modeling provided notional stowage volumes, a deployable surface, some fixed equipment, an ultrasound, and a potentially reconfigurable treatment table. While this facility is clearly a competent arrangement, it was desired to leverage available expertise and upgrade the station given the vast distances from Earth to be experienced by the Common Habitat. Key driving requirements applied to the upgrade included to provide NASA’s Medical Level of Care V, offer enhanced telemedicine capabilities, provide patient physical accommodation, provide caregiver access to the patient from all sides, include sliding pocket doors for access to hygiene and to the Vertical Translation System, and to add any additional capability possible for the best achievable medical care. The first step in the facility upgrade was to quantify the current medical inventory on the International Space Station and ensure that sufficient stowage volume was present for this purpose. To that end, the ISS medical kits were reviewed, and eight full size mid deck lockers were placed in the facility. A number of additional devices were also added, based on the co-author’s combat medic experience. Also, two fixed shelves and one horizontal work surface were added to the Medical Care Facility, with the shelves providing storage space for the additional devices and the work surface providing a location for the caregiver to work or stage equipment. Four display monitors were added to the wall above the horizontal work surface, supporting data display, telemedicine, conferencing, or other needs. The existing treatment table was replaced with a mobile surgical stretcher-chair. Two additional doors were added to the Medical Care Facility. One leads directly to the hygiene compartment, allowing it to support medical operations in addition to providing galley/wardroom support. The other door leads directly into the Vertical Translation System. The wall adjacent to the subsystems bay was moved, adding additional volume to the Medical Care Facility. This improved caregiver access to the patient and allowed for a larger number of caregivers to be present. It also provided options for relocation of support equipment relative to the patient as needed. In the upgraded Medical Care Facility, the Surgical Stretcher-Chair and the Vertical Translation System can work together to provide incapacitated crew member transport from a site of injury on any deck of the Common Habitat to the Medical Care Facility. It can also support patient treatment in a variety of positions including a variety of sitting postures and a supine posture at a variety of pitch angles. The facility can also support caregiver office work for review of examination results, private consultation, inventory and maintenance, and a variety of other purposes. A forward activity will be to conduct evaluations of the Medical Care Facility with different medical scenarios. Additionally, ambient and task lighting selections remain as forward work. The eight middeck lockers can be augmented to use as portable equipment carts, similar to a manner in which maintenance facility stowage was used as portable carts during the NASA Desert Research and Technology Studies in the Constellation Program. Trash accommodation will also need forward work to assess, including provision for wet trash, dry trash, and biological waste. It will be important to assess a redesign of the surgical stretcher-chair. The commercial version used in the upgrade can only enable vertical translation in the seated configuration, requiring the patient to bend both hips and knees. A possible redesign of the chair will allow for vertical translation without requiring any bending at the hip or knees. Also, the commercial version is wheeled, making it mobile in gravity but unanchored in microgravity. Work will be needed to adapt the chair for gravity-independent performance. The hygiene compartment can be redesigned to serve both as a medical scrub facility and for galley hand washing. Pending sufficient volume, it may also be possible to place sanitation equipment in this location to clean medical tools. Finally, most space architectures have never allowed for more than one incapacitated crew member, but several scenarios could potentially injure two or more crew in the same incident. This facility could be assessed to determine its present ability to address two or more injured crew in parallel and determine the potential upper limit for number of treatable crew in a multi-crew injury scenario, or to treat polytrauma of a single patient.

Common Habitat↗

NASA Standing Review Board Handbook

This handbook provides guidance based on best practices for the planning, preparation, review, reporting, and closeout of Standing Review Board (SRB) activities. Revision C updates the Revision B version of the SRB Handbook published in 2016 to incorporate updates to NASA Procedural Requirements (NPR) 7120.5F, NASA Space Flight Program and Project Management Requirements. These updates include: - Changing the Dissenting Opinion process to the Formal Dissent process, which retains the current process augmented with an expedited escalation path. - Updates to requirements for establishing an Agency Baseline Commitment (ABC) and for performing Joint Cost and Schedule Confidence Level (JCL) analyses for tightly coupled programs. - Additional requirements for performing a JCL analysis for single-project programs and projects over $1B Life-Cycle Cost (LCC). - Use of initial capability cost estimates instead of LCC estimates in specific, identified instances for single-project programs and projects that plan continuing operations and production, including integration of capability upgrades, with an unspecified Phase E end point. These single-project programs and projects define an initial capability during Phase A and develop an initial capability cost that establishes the ABC at Key Decision Point (KDP) C. Initial capability is the first operational mission flight (or as defined in the KDP B Review Plan) and is documented in the KDP B Decision Memorandum. Initial capability cost includes operations cost for the initial capability. The Phase E cost estimate for continuing operations and production is established separately as part of the Operational Readiness Review (ORR) and KDP E for the 5 years after initial capability and subsequently updated and documented annually for the next 5-year period. Upgrades during Phase E that meet the Agency criteria for a major project for external reporting are treated as projects for the purposes of establishing their own development ABC outside the Phase E cost estimate. The Phase E cost estimate is updated to include production and operations costs associated with these upgrades. Development, production, and operations costs of other (i.e., non-major) upgrades are included in the Phase E cost estimate. (See NPR 7120.5, Sections 2.4.1.5 and 2.4.1.6 and the NASA Space Flight Program and Project Management Handbook (PM Handbook), Section 5.5.4 for additional information.) The scope of the SRB’s assessment with respect to initial capability, Phase E cost estimate, and major upgrades for these single-project programs and projects is defined in the Terms of Reference (ToR).

Kevin Michael Gilligan↗

Updating the Thermal Vacuum Chambers at the NASA Johnson Space Center

Chambers A and B are two large thermal vacuum chambers at Johnson Space Center which enable space simulation for unmanned and human-rated missions, respectively. With the resurgence in deep space missions for scientific research and various private commercial ventures, these chambers are expected to be used frequently for at least the next decade. For qualifying the James Webb Space Telescope, upgrades to Chamber A were performed which included the addition of a 12.5 kW refrigeration system with helium shrouds capable of simulating deep space environment and an efficient and reliable LN2 natural flow thermosiphon system for the thermal shield. Continuous improvements since then have focused on ensuring operational readiness by modernizing the data acquisition, recording, controls, and visualization systems for both chambers and clean room. These upgrades will be the focus of this paper. Controlling the Cryochambers was enhanced by moving from a 32-bit SCADA system to a 64-bit architected system. Infrastructural changes involved installing redundant power circuits, adding new servers, network switches, and including load balancing with fail-over between servers to minimize downtime. Instead of distributed servers, 3 redundant servers are used to share configurations. Configurations are now kept in a shared SQL instance making it easy to deploy and maintain. During this upgrade process many sub-systems (PLCs and NI PXI interfaces to sensors) were upgraded from the prior OPC-DA to the more secure OPC-UA protocol. Cryo-system PLCs were updated to allow Ganni cycle floating pressure calculations from any cold box to be sent to any compressor. During the project, the team recreated over 70,000 live data points, 50000 historical data points, and 4000 alarms. Finally, the graphical interfaces were upgraded to support HTML 5 in conjunction shared pages were implemented reducing the total number of webpages by over 75%. These system updates reinvigorated the previous SCADA system which had reached its end of life. The same look and feel was maintained while providing operators with an updated interface to control, troubleshoot, and record. The new system architecture is more robust and easier to maintain creating a path forward to address remaining problem points and implement additional features.

Cody Schaefer↗

Updating the Thermal Vacuum Chambers at the NASA Johnson Space Center

Chambers A and B are two large thermal vacuum chambers at Johnson Space Center which enable space simulation for unmanned and human-rated missions, respectively. With the resurgence in deep space missions for scientific research and various private commercial ventures, these chambers are expected to be used frequently for at least the next decade. For qualifying the James Webb Space Telescope, upgrades to Chamber A were performed which included the addition of a 12.5 kW refrigeration system with helium shrouds capable of simulating deep space environment and an efficient and reliable LN2 natural flow thermosiphon system for the thermal shield. Continuous improvements since then have focused on ensuring operational readiness by modernizing the data acquisition, recording, controls, and visualization systems for both chambers and clean room. These upgrades will be the focus of this paper. Controlling the Cryochambers was enhanced by moving from a 32-bit SCADA system to a 64-bit architected system. Infrastructural changes involved installing redundant power circuits, adding new servers, network switches, and including load balancing with fail-over between servers to minimize downtime. Instead of distributed servers, 3 redundant servers are used to share configurations. Configurations are now kept in a shared SQL instance making it easy to deploy and maintain. During this upgrade process many sub-systems (PLCs and NI PXI interfaces to sensors) were upgraded from the prior OPC-DA to the more secure OPC-UA protocol. Cryo-system PLCs were updated to allow Ganni cycle floating pressure calculations from any cold box to be sent to any compressor. During the project, the team recreated over 70,000 live data points, 50000 historical data points, and 4000 alarms. Finally, the graphical interfaces were upgraded to support HTML 5 in conjunction shared pages were implemented reducing the total number of webpages by over 75%. These system updates reinvigorated the previous SCADA system which had reached its end of life. The same look and feel was maintained while providing operators with an updated interface to control, troubleshoot, and record. The new system architecture is more robust and easier to maintain creating a path forward to address remaining problem points and implement additional features.

Cody Schaefer↗

Pyrolysis Vapor and Bio-Oil Preconditioning via Ex Situ Hydrodeoxygenation and Alkylation Using a Heteropolyacid Catalyst

Ex situ catalytic preconditioning of biomass pyrolysis vapors (partial deoxygenation) has the potential for both reducing the oxygen content and beneficially influencing the oxygen speciation of condense bio-oils for enhancement of downstream condensed phase upgrading processes. Here, condensed phase upgrading processes may refer to both coprocessing and hydroprocessing with vacuum gas-oil (VGO). Reduction of oxygen content to produce bio-oils with greater hydrophobicity can enhance VGO-solubility while tailoring of oxygen speciation by removal of reactive carbonyls (e.g., acetic acid) can lessen catalytic deactivation via coking reactions. 1,2 Furthermore, enhanced VGO-solubility and reduced coking leads to greater biogenic carbon incorporation in end-products from condensed phase upgrading processes. By leveraging the hydrodeoxygenation and alkylation activity of a titania-supported molybdenum-heteropolyacid (Mo-HPA/TiO2) catalyst, pyrolysis vapors and resulting condensed bio-oils were effectively preconditioned for downstream upgrading. 3 Data regarding the use of Mo-HPA/TiO2 for pyrolysis vapor preconditioning will be presented on, including method of employment, catalyst characterization, and impacts on bio-oil in relation to downstream condensed phase upgrading processes. Our approach is to: Compare Mo-HPA/TiO2 product distribution to HZSM-5; Investigate Mo-HPA/TiO2 regeneration and characterize changes in acid site character; Assess product differences in terms of enhanced VGO-solubility.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Performance Before and After Irradiation of Pixelated 3D Silicon Sensors for the HL-LHC CMS Tracker

The Large Hadron Collider (LHC) particle accelerator at European Center for Nuclear Research (CERN) will be shut down starting in 2026 to achieve the High Luminosity Large Hadron Collider (HL-LHC) upgrade. The upgrade will allow for higher fluences, in order to increase the probability of detecting increasingly rare particles, and to obtain higher precision measurements of known particles. To accommodate the new accelerator conditions, many aspects of the Compact Muon Solenoid (CMS) detector will be upgraded; of particular interest for this thesis are the silicon pixel detectors located in the inner tracker. These will be replaced and upgraded to accommodate the higher fluences of the HL-LHC upgrade, as well as to replace existing sensors which have sustained radiation damage. In order for the new sensors to operate under high luminosity conditions, they must be increasingly radiation hard, and in order to detect rare particles, they must be increasingly more precise. The performance of one Centro Nacional de Microelectronica (CNM) 3D silicon sensor before and after undergoing irradiation at fluences similar to those which will be observed at the HL-LHC was investigated to determine radiation hardness and precision. Data was collected at Fermi National Laboratory (Fermilab), in the Fermi National Laboratory Test Beam Facility (FTBF) silicon tracker telescope, which can be used to determine the number of particles, and tracks made by high energy protons passing through. The sensor was also irradiated at Fermilab in the Irradiation Test Area (ITA). Prior to data collection a tuning procedure is carried out to determine ideal bias voltage operating conditions, mask noisy and dead pixels, adjust to the ideal threshold, and map sensor gain. Data is then collected at the FTBF, where the sensor is installed in the center of the FTBF silicon telescope. Variables, including angle and bias voltage, are varied throughout data collection. Data is then processed using an alignment software to determine the exact telescope geometry, along with the tracks which were observed passing through the sensor and telescope. Sensor performance was found to be comparable before and after irradiation, with irradiated results showing slightly lower efficiencies and cluster sizes. Position resolution is comparable both before and after irradiation, and similar distributions of cluster shape are observed. After irradiation, the sensor shows increasing collected charge with bias, an indication of increased width of the depletion region. Peak charge pre-irradiation is higher than post-irradiation peak charge, indicating the irradiated results are not taken under fully-depleted conditions.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Modernizing the Legacy Fission Wire Measurement System for the Advanced Test Reactor-Critical Facility

Operational lifetime extensions of existing research reactors have emphasized the need for refurbishment, replacements, and upgrades to supporting equipment and instrumentation. The Advanced Test Reactor (ATR) at Idaho National Laboratory (INL), which entered service in 1967, has recently completed the sixth core internals change-out and has scheduled operations until at least 2040. Reactor maintenance and operational risk management is critically important in the research reactor community, however supporting measurement systems sometimes get overlooked when maintenance is planned. The Fission Wire Measurement System (FWMS) is a custom measurement system designed in the 1960s to measure the beta-particle activity of irradiated uranium-aluminum fission wires. This measurement is conducted to determine the fission rate profile of the Advanced Reactor Test Critical (ATR-C) facility. The ATR-C is an open-pool, low-power test reactor that was purpose driven to resemble ATR and is used to qualify experiment configurations and verify core models prior to full-power experiment irradiations in ATR. A power distribution measurement in ATR-C uses uranium-aluminum wires that are distributed throughout the ATR-C core to validate simulation and modeling results. These measurements require 340 to 1500 wires to be irradiated and measured within a 12-hour window. The activity of the wires is measured in the required time with the FWMS, which was put into service in 1965 at the Radiation Measurements Laboratory (RML). The system consists of 4 measurement channels and one reference channel, each with a 2-pi proportional gas flow detector and the measurement channels each have an automated sample changer. This legacy system is crucial to the continued operations of ATR and has undergone some minor hardware upgrades since 1965, however the system presently relies on custom control boards, custom gas ion chambers, analog amplifiers/discriminators, and a user interface (UI) for the system written in outdated code. Much of the equipment and software is custom with no commercial replacements or support and limited documentation. The existing control software requires an operating system that is no longer supported, creating more vulnerabilities to continued operations. A project is underway with a third-party vendor to design, build, and document a new control and data acquisition system (CDAS) for the FWMS. The new upgrade will replace the control system, computer, UI, sample changer motors, and main power supply while maintaining the interface with existing detector hardware. The upgraded system will be operated in parallel with the current hardware and software to conduct validation testing. This equipment upgrade demonstrates the commitment at ATR to ensuring successful operations and potential future research reactors at INL.

46 - INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AN↗

Pilot-scale hydrotreating of catalytic fast pyrolysis biocrudes: process performance and product analysis

Catalytic fast pyrolysis (CFP) is a technology option for producing advanced biofuels from hydrocarbon-rich biocrude intermediates. The relatively high oxygen content of biocrudes compared to petroleum intermediates increases hydrogen consumption and the lower thermal stability accelerates catalyst deactivation and reactor fouling hindering the adaptation of hydrotreating technology for biocrude upgrading into biofuels. In this study, four chemically different biocrude feeds were upgraded in a pilot scale hydroprocessing unit at similar process conditions using a commercial hydrodeoxygenation (HDO) catalyst. The biocrude feeds and hydrotreated products were characterized using standard ASTM procedures and advanced analytical techniques (GCxGC-FID and GCxGC-MS). HDO catalyst activity was monitored by changes in physical properties and chemical composition of the upgraded products as a function of time on stream. Aliphatic acids, ketones, aldehydes, and furan derivatives were completely converted during the hydrotreating tests while the concentration of aromatics, aliphatic hydrocarbons and phenolics increased during the hydrotreating tests. The oxygen content, nitrogen content, specific gravity, viscosity and the heavy end of the boiling point range (determined by simulated distillation) of the upgraded products increased with increasing time on stream during hydrotreating. The deactivation rate was the lowest for the biocrude feed that contained the most aliphatic and aromatic hydrocarbons and was the highest for the biocrude feed that had the most anhydrosugars. Overall, the HDO deactivation rate correlates with the total amount of oxygen in the feed (17 wt% to 29 wt%, on a wet basis).

09 BIOMASS FUELS↗