Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “transmissive”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,027 records · Page 57

Assessing the Accuracy of Balanced Power System Models in the Presence of Voltage Unbalance

Traditional models of electric power systems represent distribution systems with unbalanced three-phase network models and transmission systems with balanced single-phase-equivalent network models. This distinction poses a challenge for coupled models of transmission and distribution systems, which are becoming more prevalent due to the growth of distributed energy resources connected to distribution systems. In order to maintain a balanced network representation, transmission system models typically assume that the voltage phasors at the interface to the distribution system are balanced. Inaccuracies resulting from this assumption during unbalanced operation can lead to erroneous values for line currents in the transmission system model. This paper empirically quantifies the accuracy of this balanced operating assumption during unbalanced operating conditions for both a simple two-bus system along with a more complex transmission and distribution co-simulation. This paper also characterizes the performance of different methods for translating the unbalanced voltage phasors into a balanced representation in order to give recommendations for modeling coupled transmission and distribution systems.

power distribution↗

Performance Evaluation of Peer-to-Peer Distributed Microgrids Coordination for Voltage Regulation

This paper presents the performance evaluation of a peer-to-peer microgrids coordination algorithm for sub-transmission systems. As distributed energy resources (DERs) in distribution system start to show negative impact to the bulk power system, a paradigm shift is needed for transmission planning and operation. Because distribution substations are located far from the sub-transmission system, and it is hard to use traditional centralized control for real-time control and coordination. Thus, distributed control is a natural choice because it requires less communication and central computation. In this paper, each distribution substation is treated as a microgrid, and the peer-to-peer distributed microgrids control is formulated as a real-time optimal power flow problem to reduce the negative impact in sub-transmission systems. A distributed primal-dual optimization algorithm is adopted to solve the problem. Validation of the peer-to-peer algorithm is performed through the simulation of a real-world sub-transmission system composing of many distribution systems with high renewable penetration. Simulation results show that the peer-to-peer algorithm can achieve satisfactory performance (e.g., voltage regulation) in sub-transmission system by coordinating and controlling DERs in distribution systems.

distributed control↗

AGGREGATE: dAta-driven modelinG preservinG contRollable dEr for outaGe mAnagemenT and rEsiliency (Final Report)

The AGGREGATE project team successfully developed and validated various modules for outage management. Brief summaries of each module are provided to showcase their strength for outage management and restoration for a distribution system with a high penetration of connected distribution energy resources (DERs). In recent years, inverter-based DERs have been widely deployed in distribution system. A most of behind-the-meter (BTM) solar power generation is not visible to the utility. The data-driven DER and load estimation modules are using machine learning (ML) and artificial intelligence (AI) to manage this issue, which provides an opportunity for distribution system operators (DSOs) to operate systems and make decisions in real-time for a distribution system with a high penetration of DERs deployed. Also, the estimated DER and true load can be further leveraged in network aggregation and cold-load pick up estimation for reducing the computing complexity and providing for fast restoration. After load demand and DER power generations have been estimated, the information will support topology and state estimation (SE). The topology estimation module demonstrated the viability of mixed integer linear programming (MILP) formulation to estimate the most likely operational radial topology and outage sections using power flow measurements, historical/estimated load and DERs data and smart meter ping measurements. Formulation includes continuous (power flow, load and DERs data) and binary measurements (smart meter ping measurements) in a single formulation. Errors in continuous data and binary data are modeled as normal distribution and Bernoulli distribution, respectively. In the future distribution grid, the power injection from controllable DERs will be essential for efficient and resilient grid operation. However, determining the optimal DER injections and restoration actions is dependent on knowledge of the system states. State estimation (SE), already the cornerstone of transmission energy management systems, will become commonplace in distribution management systems as more measurements become available from deployment of automated metering infrastructure (AMI). Observability analysis is the first step in SE, as it determines the sufficiency of the available measurements for accurately estimating the current system states. A new type of pseudo-measurement called a Correlational Measurement (CM) is introduced in this module, to enhance the observability of the system to enable more accurate SE. CMs encapsulate knowledge of correlation between demand patterns for similar classes of loads as well as injection patterns for same-technology renewable DERs. During grid contingency scenarios, DERs have been traditionally disconnected, without any fault ride-through capabilities. However, with new regulations and better technology, it is feasible for these resources to contribute to the grid’s restoration after an adverse event and hence enhance resilience. The controllability module proposes a two-step restoration scheme for the power system restoration process by leveraging additional degrees of freedom in power electronics interfaced DERs for mitigating voltage problems. In a resilience mode without the utility system, the distribution grid relies on DERs to serve critical load. In such a severe event with multiple faults on the distribution feeders, actuation of various protective devices (PDs) divides the distribution system into electrical islands. The undetected actuated PDs due to fault current contributions from DERs can delay the restoration process, thereby reducing the system resilience. The Advanced Outage Management (AOM) and the Advanced Feeder Restoration (AFR) modules developed in this project provide improved system resilience with multiple DERs. AOM identifies the faulted sections and actuated PDs in a distribution system with DERs by incorporating smart meter data. The most credible outage scenario including fault locations, PD actuations, and fault indicator (FI) failures is identified by a set of binary integer linear programming incorporating hypotheses. The AFR module serves to restore a distribution system with available energy resources taking into consideration the availability of utility sources and DERs. By partitioning the system into islands, critical load will be served with the available generation resources within islands based on the solution of a MILP. When the utility systems become available, the optimal path will be determined by a spanning tree search algorithm that reconnects these islands back to substations and restores the remaining load. The transmission and distribution (T&D) co-simulation module was used to validate the effect of a control action performed on the distribution side assets as it propagates to the transmission side. This ensures that the control action performed results in a feasible operating point on both the transmission and the distribution system. In addition to validation, the team used the T&D co-simulation module to demonstrate how distribution system assets can be used to mitigate issues on the transmission system. Specifically, the team demonstrated that appropriate switching operations on the distribution side can alleviate the line overload condition on the transmission side without causing new operational constraint violations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

High-Voltage DC MULTI-terminal SIMulation (HVDC MULTISIM): Technical Program Summary

Expansion of the power grid in the USA is essential to fulfilling the rising energy demand of the country. In particular, the transmission grid, a network of electrical energy corridors that enable the flow of large amounts of energy from the point of generation to the point of consumption, needs significant expansion to cater to this growth of electrification. The current infrastructure is also dated, and any new transmission corridor should be based on a vision of building a modern infrastructure that is futureproof. High voltage DC (HVDC) transmission technology falls in this category: it is the most economical way to build large transmission lines and relies on sophisticated electronics and flexible controls, rather than just passive components like switchgear and transformers. This project is aimed at establishing the technical and economic feasibility of a network of HVDC lines that are interconnected to form a multi-terminal DC network. HVDC transmission is not a new technology and United States has a number of such lines; however, these are point to point transmissions and do not form a DC grid. Modeling and analyzing DC grids is challenging since there are no established modeling tools and the traditional ways of modeling AC grids fall short of providing the fidelity required the fast dynamics of the DC grid. This project aims to build a software-in-the-loop simulator for a multi-terminal HVDC grid, called MULTISIM and, establish new control and protection algorithms to operate such a connected DC system. NLR, a key partner, established the core framework of the MULTISIM simulator and validated its functionality. The GE Vernova team, created a full-scale model of a four-terminal HVDC network using PSCAD (Power Systems Computer Aided Design) software and established the baseline performance of the system during normal and fault operation. The project was started on 10/12024 with a kick-off meeting held on 12/11/2024 and ran through two quarters till termination. All the tasks, milestones and deliverables during this period were met. Several interim reports detailing the various tasks were submitted. The following sections provide details on the completed tasks till the project pause and termination after Q2.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Performance Evaluation of Peer-to-Peer Distributed Microgrids Coordination for Voltage Regulation: Preprint

This paper presents the performance evaluation of a peer-to-peer microgrids coordination algorithm for sub-transmission systems. As distributed energy resources (DERs) in distribution system start to show negative impact to the bulk power system, a paradigm shift is needed for transmission planning and operation. Because distribution substations are located far from the sub-transmission system, and it is hard to use traditional centralized control for real-time control and coordination. Thus, distributed control is a natural choice because it requires less communication and central computation. In this paper, each distribution substation is treated as a microgrid, and the peer-to-peer distributed microgrids control is formulated as a real-time optimal power flow problem to reduce the negative impact in sub-transmission systems. A distributed primal-dual optimization algorithm is adopted to solve the problem. Validation of the peer-to-peer algorithm is performed through the simulation of a real-world sub-transmission system composing of many distribution systems with high renewable penetration. Simulation results show that the peer-to-peer algorithm can achieve satisfactory performance (e.g., voltage regulation) in sub-transmission system by coordinating and controlling DERs in distribution systems.

distributed control↗

The Value of Increased HVDC Capacity Between Eastern and Western U.S. Grids: The Interconnections Seam Study

The Interconnections Seam Study examines the potential economic value of increasing electricity transfer between the Eastern and Western Interconnections using high-voltage direct-current (HVDC) transmission and cost-optimizing both generation and transmission resources across the United States, proposing, assessing, justifying, and illustrating a major infrastructure change involving two of the worlds largest power grids. The study conducted a multi-model analysis that used co-optimized generation and transmission expansion planning and production cost modeling. Four transmission designs under eight scenarios were developed and studied to estimate costs and potential benefits. The results show benefit-to-cost ratios that reach as high as 2.5, indicating significant value to increasing the transmission capacity between the interconnections under the cases considered, realized through sharing generation resources and flexibility across regions.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Surface science insight note: Optimizing XPS instrument performance for quantification of spectra

X-ray photoelectron spectroscopy (XPS) provides quantitative information from photoemission peaks and shapes observed within the background due to the inelastic scattering of photoelectrons. To quantify the signal, both photoemission peaks and background in spectra must be adjusted for instrumental transmission variations that are a consequence of changes in efficiency when recording electrons with different kinetic energy. While it is generally assumed that correcting spectroscopic data for transmission is a necessary part of quantification by XPS, there are consequences for the quantification of spectra measured using an instrument for which transmission has significant curvature. In this Insight, the implications of curvature in transmission characteristics are discussed and a method based on XPS microscopy is proposed that ensures the transmission response of an instrument is free from significant curvature. An example of an instrument for which a flat transmission response is presented is achieved through collecting spectra using lens modes designed to measure stigmatic images.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Preliminary design overview and performance assessment of the ITER low-field side reflectometer

The design of the ITER low-field side reflectometer (LFSR) has matured to a complete end-to-end preliminary design. LFSR will supply three key plasma measurements: (1) electron density profile, (2) electron density fluctuations, and (3) poloidal rotation. Simultaneous measurements of the three quantities are enabled by an array of six monostatic antennas which inject from an equatorial port on the outboard side of the ITER vessel. Low-loss transmission lines, consisting of corrugated, overmoded waveguide and miter bends, transmit the 30–165 GHz, O- and X-mode signals to and from the ITER plasma. Integrated transmission-line components serve a range of purposes, such as protection from high-power stray radiofrequency radiation, accommodation of transmission-line displacement, and simultaneous measurement of reference and plasma phases during the discharge. Broadband transmission signals are realized by full-band microwave transceivers combined with quasi-optical multiplexing. A field-programmable gate array (FPGA) processor demodulates the profile reflectometer signals, enabling real-time density profile measurements for plasma control system feedback. A full-scale transmission line test facility provides an integrated environment to assess the performance of critical LFSR components. Theoretical modeling together with insertion loss measurements provide the basis for a comprehensive power budget, which accounts for transmitted output power, transmission-line losses, antenna coupling, and plasma effects. Results indicate that high signal-to-noise ratios are achievable with the current design. A synthetic reflectometer model, using real design parameters and baseline ITER profiles, has been developed to estimate the return signal. With evolving microwave and data acquisition technologies, full-band, ultrafast sweeps (<1 μs) will be realizable for ITER.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

EMT data generation

The integration of inverter-based resources (IBRs) in power systems is accelerating, bringing with it significant benefits such as reduced greenhouse gas emissions, improved grid resilience, and increased energy independence. Despite these advantages, the widespread adoption of IBRs introduces several challenges, including issues related to grid stability, increased operational complexity, and the need for updated regulatory frameworks. To address these challenges, IEEE released Standard 2800 in 2022, which sets forth the necessary interconnection capabilities and performance criteria for IBRs connected to transmission and sub-transmission systems. This standard outlines the performance requirements to ensure the reliable integration of IBRs into the bulk power system. Furthermore, in 2023, the North American Electric Reliability Corporation (NERC) published a reliability guideline for electromagnetic transient (EMT) modeling of BPS-connected IBRs. This guideline provides recommendations for developing EMT model requirements, performing model quality checks, and implementing verification practices specifically for EMT models representing BPS-connected inverter-based resources in reliability studies conducted by transmission planners and planning coordinators. These standards and guidelines have a profound impact on EMT studies for transmission networks, influencing system stability analyses, grid recovery and resynchronization processes, fault ride-through evaluations, protection and coordination strategies, advanced control methodologies, and the inclusion of IBRs in transient models of transmission networks. As a result, the generation of EMT data is crucial for conducting various transient-based studies to understand the impact of IBRs. EMT data generation use cases serve as the basis for scenarios in event detection and identification use cases, providing comprehensive details about EMT data generation for transmission grids with inverter-based resources. These use cases supply sufficient training and validation datasets for subsequent EMT analysis algorithms.

Xia, Qianxue↗

Solving the Pulsed-Power Driven Inertial Fusion Energy Standoff Problem (Abbreviated Final Report)

The standoff problem in pulsed-power driven IFE (Inertial Fusion Energy) refers to the problem of electrically connecting a fusion target with the driver in a way that preserves the driver/target interface in the presence of a large fusion energy release (100’s of megajoules to 1000 megajoules). High yield fusion drivers for stockpile stewardship applications have similar concerns, but without the complication of the high repetition rate needed for energy production. All proposed IFE or high yield systems have the challenge of protecting the reactor vessel and driver from the energy release, but pulsed power drivers have the additional challenge of establishing an electrical connection in a way that does not create excessive debris or require costly/massive structures that must be expendable. Fortunately, there are conceptual solutions in the form of very low mass transmission lines, usually in the form of wires or foils, since very little mass is needed to overcome the magnetic forces driving the transmission lines apart or provide a low resistance pathway given the short pulse duration of the driver. Several important aspects of the standoff problem were analyzed in the course of this LDRD project. Conceptual means of introducing the low mass transmission lines into the reactor chamber were proposed, including analysis of methods to retain the power flow gap between the electrodes in the presence of the chamber environment. The energy losses due to ohmic dissipation and magnetic acceleration of the low mass transmission lines were evaluated for candidate driver pulses and different transmission line masses, and the fluence of x-ray and neutron energy on the persistent power flow structures that must survive the pulse of energy were evaluated. Finally, means of rapidly pumping down the chamber were explored as a way to return the system to low pressure following the multi-atmosphere post-pulse pressure rise. The overall conclusion from the analysis is that, while the reactor environment creates stressful conditions for a low mass transmission line standoff system, there are concepts expending 10 kg or less of electrode mass each pulse with the potential to mitigate the stresses and successfully drive fusion targets. Whether such a system could lead to a practical and economical fusion reactor would require extensive research and development beyond the scope of the feasibility study.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Evaluation of Zero-Net-Rate Pumping Tests

Accurately estimating the distribution of aquifer properties is key to understanding contaminant movement in the subsurface. The distribution of aquifer properties is typically addressed using slug or constant-rate well tests, and the pros and cons of these tests are well known. Slug tests are appealing because they avoid removing contaminated water, but their results are affected by well skin and the small volume of displaced water limits the volume of aquifer that can be evaluated. Constant-rate well tests have the disadvantage of requiring disposal of potentially contaminated water, but they can generate properties that are more representative than slug tests, and they can be used to estimate well efficiency and storativity, which are difficult to characterize using slug tests. Periodic pumping tests are appealing because they have many of the advantages and few of the disadvantages of slug and constant-rate well tests. Periodic pumping tests involve cycling the pumping rate with a regular period and measuring the resulting response in monitoring wells. Some of these tests involve imposing a periodic rate on a constant mean rate. However, other tests involve moving water out and back into the well at rates that are balanced so the net rate after each period is zero. Some zero-net-rate (ZNR) well tests use rates that follow a sinusoidal pattern, whereas others use a square wave pattern that switches between a constant rate of pumping and a constant rate of injection to achieve a zero-net rate. ZNR well tests appear to be a useful compromise between slug and constant rate tests, but methods for conducting and analyzing the results from these tests have received limited evaluation. Periodic pumping tests are typically evaluated through recorded pressure responses to a disturbance source. Recent work has demonstrated that the strain field in the vadose zone shows a response to disturbances in the underlying aquifer. Various instrument designs are available that can record vertical and horizontal strain to very precise resolutions (10-9 ε). Measuring the strain in the vadose zone can present lower costs than measuring pressure in a monitoring well, so using strain could improve the resolution of ZNR tests, as well as make these tests potentially cheaper. A ZNR periodic pumping system was constructed and used to perform tests in the Clemson, South Carolina area. The system was designed to pump and inject with a periodic square-wave, so pumping occurs at a constant rate for half the period and is followed by injection at the same rate for half the period resulting in no net gain or loss of water from the aquifer. The system is designed to generate flow rates from 1 to 3.5 gallons per minute (gpm) with a capacity of 875-gallon per half period. Pressure and strain monitoring points are located in the vicinity of the pumping well. A series of 10 ZNR periodic pumping tests were conducted at the field site, with periods ranging from 2 to 540 minutes. Pressure data were collected and recorded in four monitoring wells in various locations around the pumping well. In addition, vertical and horizontal strain and tilt data were recorded in various locations around the pumping well. Traditional aquifer tests, including slug tests and constant-rate pumping tests were conducted at the field site to provide a baseline of aquifer parameter estimates that are compared the results of ZNR tests. Pressure data measured at monitoring wells during ZNR tests were analyzed utilizing an analytical solution (Streltsova, 1988) that assumes a confined aquifer and estimates hydraulic diffusivity and transmissivity using the time lag and amplitude of the pressure signal. The storativity can be separated out from the hydraulic diffusivity using the transmissivity estimate. The time-lag and amplitude of the pressure signals were estimated using a Fourier transform. The time-lag of the primary period of the pressure increases as a linear function of distance from the pumping well, and it increases as the square root of the period of the ZNR test over a range of periods spanning two orders of magnitudes. The first few harmonics follow similar trends, but the higher frequency harmonics diverge from this trend. Strain and tilt data from various instruments in the vadose and saturated zones are periodic during ZNR tests. The time lags of the strain components increase roughly linearly with distance from the well. Many of the time lags of the strain data from the vadose zone are similar to the time lags observed in the pressure data from a similar distance and pumping period. Theoretical experiments were performed to understand how pressure and strain responds to ZNR periodic pumping. The time-lags of the simulated pressure responses match the field data trends. The results were used to validate the Streltsova (1988) solution for periodic pumping to estimate hydraulic diffusivity. Hydraulic diffusivity was estimated to be 1.8 x 10-2 m2s-1 < Dh < 9.0 x 10-2 m2s-1 using pressure data from all the wells during ZNR tests. Transmissivity was estimated to be 0.8 x 10-4 m2s-1 < T < 4.3 x 10-4 m2s-1. Assuming Storativity = T/Dh gives 1.1 x 10-3 < S < 19 x10-3. Transmissivity is used to estimate the hydraulic conductivity, K, by dividing by the assumed aquifer thickness. Two constant-rate pumping tests were conducted and analyzed using two conceptual models: The Hantush (1961) solution was used to analyze data assuming confined conditions and the Neuman (1974) solution was used to analyze data assuming unconfined conditions. The Hantush (1961) solution estimated transmissivity to be 1.6 x 10-4 m2s-1 < T < 1.8 x 10-4 m2s-1 when using data from all the wells. Storativity was estimated to be 4.4 x 10-3 < S < 8.2 x 10-3. Assuming Dh = T/S gives 0.22 x 10-2 m2s-1 < Dh < 3.6 x 10-2 m2s-1. The Neuman (1974) solution estimated transmissivity to be 0.80 x 10-4 m2s-1 < T < 0.84 x 10-4 m2s-1. Total storativity (S + Sy) was estimated to be 22 x 10-3 < S < 110 x 10-3. Storativity excluding the Sy term was estimated to be 2.2 x 10-3 < S < 2.5 x 10-3. Assuming Dh = T/S gives 0.073 x 10-2 m2s-1 < S < 0.36 x 10-2 m2s-1. Two slug tests were performed on the pumping well, PW-2. The Bouwer and Rice (1976) solution for slug tests was used to analyze the data. This solution works for both confined and unconfined conditions, so both conceptual models were covered through the analysis. Hydraulic conductivity was estimated to be 1.95 x 10-6 ms-1 < K < 2.49 x 10-6 ms-1. Statistical comparison show generally no significant difference in the estimates of Dh, K, or S made using ZNR and conventional pumping tests.. However, the total storage estimated by the Neuman (1974) solution for unconfined settings is larger than that estimate using the Streltsove analysis applied to the ZNR tests. This is likely because the Neuman solution considers delayed yield from storage that the water table, whereas the Streltsova (1988) solution assumes confined conditions. The analysis also indicates that there is a statistically significant difference between parameters estimated with conventional slug tests and those measured with either constant-rate pumping tests or ZNR tests. Hydraulic diffusivity is estimated from the time-lag and the distance from the well. The time-lags of the strain data from the vadose zone are similar to the lags of the pressure data from a similar distance. This indicates that hydraulic diffusivities estimated from the strain data measured in the vadose zone would be similar to the estimates from the pressure data measured in the aquifer. There appear to be sign reversals in some of the strain data that were corrected to estimate the time lag. The dissolved oxygen (CO) concentration was measured during several ZNR tests to evaluate the feasibility of using the procedure to increase contaminant degradation kinetics that are related to DO. The results indicate that DO can be increased during the cycling of ZNR tests in some cases.

Smith-Jones, Austin↗

Decision support for United States—Canada energy integration is impaired by fragmentary environmental and electricity system modeling capacity

The renewable energy transition is leading to increased electricity trade between the United States and Canada, with Canadian hydropower providing firm lower-carbon power and buffering variability of wind and solar generation in the U.S. However, long-term power purchase agreements and transborder transmission projects are controversial, with two of four proposed transmission lines between Quebec, Canada and the northeast U.S. cancelled since 2018. Here, we argue that controversies are exacerbated by a lack of open-source data and tools to understand tradeoffs of new hydropower generation and transmission infrastructure in comparison to alternatives. This gap includes impacts that incremental transmission and generation projects have on the economics of the entire system, for example, how new transmission projects affect exports to existing markets or incentivize new generation. We identify priority areas for data synthesis and model development, such as integrating linked hydropower and hydrologic interactions in energy system models and openly releasing (by utilities) or back-calculating (by researchers) hydropower generation and operational parameters. Publicly available environmental (e.g. streamflow, precipitation) and techno-economic (e.g. costs, reservoir size,) data can be used to parameterize freely usable and extensible models. Existing models have been calibrated with operational data from Canadian utilities that are not publicly available, limiting the range of scientific and commercial questions these tools have been used to answer and the range of parties that have been involved. Studies conducted using highly resolved, national-scale public data exist in other countries, notably, the United States, and demonstrate how greater transparency and extensibility can drive industry action. Improved data availability in Canada could facilitate approaches that (1) increase participation in decarbonization planning by a broader range of actors; (2) allow independent characterizations of environmental, health, and economic outcomes of interest to the public; and (3) identify decarbonization pathways consistent with community values.

13 HYDRO ENERGY↗

Interregional Renewable Energy Zones

A growing number of studies suggest that fundamental changes in the nation’s power sector have major implications for transmission planning (FERC 2022). The changing landscape suggests, among other things, the need for a concerted reexamination of long-distance interregional transmission solutions. Large, long-distance interregional transmission projects have faced institutional obstacles in the past, however (Homer et al. forthcoming). The purpose of this study is to design and test an approach to interregional transmission that can respond both to the evolving needs of the U.S. power system and to the regulatory questions that states and other authorities must consider when approving new investments in transmission.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Mechanical Solutions Scan Report

Power lines, poles, and towers are the backbone of the United States (U.S.) electric-power grid. These transmission and distribution networks route electricity from generator to loads. The characteristics of these routes are rapidly changing -- trending towards decentralized renewable generation, electric heating, vehicle charging, and large data-center loads. Coupled with aging infrastructure and the increased frequency of extreme weather events, there is concern about the future reliability and transmission capacity of conductors and adjacent components. This scan report seeks to provide an overview of mechanical solutions to challenges caused by extreme weather events associated with components of transmission and distribution infrastructure, including conductor heat sag, ice accumulation, wind, and wildfire. Many options could increase transmission capacity or reliability, and these are at various stages of technological readiness. Some have only been lab tested, while some have been widely deployed in the U.S. or overseas for decades. The solution categories and providers featured in this report are intended to be comprehensive at the time of publication and to serve as a reference for decision-makers concerned about transmission and distribution reliability. There are two other categories of large, complex solutions, which are not covered in this report: replacing existing conductors with advanced conductors and implementing digital grid enhancing technologies. A separate scan report titled “Advanced Conductor Scan Report,” which discusses advanced carbon-core conductors, was published by the Idaho National Laboratory (INL) in 2023. Information on digital technologies, such as dynamic line ratings, power-flow controllers, and other power electronics and communications-based devices, can be found on the Grid- Enhancing Technologies landing page. Mechanical grid-enhancing technologies, or solutions covered in this report, often do not require full equipment replacement and do not rely on digital components. Mechanical technologies are overlooked because they may be older, simpler, or seemingly “more obvious” than digital or carbon-core technologies. However, it is wise to consider mechanical solutions in a thorough evaluation of grid enhancing technology solutions.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

Multi-Gigawatt Electric Highway

Ultra-Compact Electrical Transmission Lines are a new transmission line technology that uses large, hollow, aluminum beams to carry current instead of thin wires. Capacity is 4.5 times higher, power losses are 3 times lower, and cost per mile is a little lower than conventional lines. Resilience and reliability are higher. The beams are enclosed within concrete walls and out of the weather, protected from high winds, ice storms, fires, and lightning. The 230 kV version is 9 feet high x 11 feet wide and can use existing rights of way next to existing transmission lines or highways. With a little landscaping, these transmission lines are not an eyesore and will be much easier to permit on existing rights of way.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Hierarchical Power Flow Control in Smart Grids: Enhancing Rotor Angle and Frequency Stability with Demand-Side Flexibility

Large-scale integration of renewables in power systems gives rise to new challenges for keeping synchronization and frequency stability in volatile and uncertain power flow states. To ensure the safety of operation, the system must maintain adequate disturbance rejection capability at the time scales of both rotor angle and system frequency dynamics. This calls for flexibility to be exploited on both the generation and demand sides, compensating volatility and ensuring stability at the two separate time scales. This article proposes a hierarchical power flow control architecture that involves both transmission and distribution networks as well as individual buildings to enhance both small-signal rotor angle stability and frequency stability of the transmission network. The proposed architecture consists of a transmission-level optimizer enhancing system damping ratios, a distribution-level controller following transmission commands and providing frequency support, and a building-level scheduler accounting for quality of service and following the distribution-level targets. Furthermore, we validate the feasibility and performance of the whole control architecture through real-time hardware-in-loop tests involving real-world transmission and distribution network models along with real devices at the Stone Edge Farm Microgrid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The Value of Increased HVDC Capacity Between Eastern and Western U.S. Grids: The Interconnections Seam Study

The Interconnections Seam Study examines the potential economic value of increasing electricity transfer between the Eastern and Western Interconnections using high-voltage direct-current (HVDC) transmission and cost-optimizing both generation and transmission resources across the United States. The study conducted a multi-model analysis that used co-optimized generation and transmission expansion planning and production cost modeling. Four transmission designs under eight scenarios were developed and studied to estimate costs and potential benefits. The results show benefit-to-cost ratios that reach as high as 2.9, indicating significant value to increasing the transmission capacity between the interconnections under the cases considered, realized through sharing generation resources and flexibility across regions.

13 HYDRO ENERGY↗

Time-resolved Rotational Velocities in the Upper Atmosphere of WASP-33 b

While steady empirical progress has been made in understanding the structure and composition of hot-planet atmospheres, direct measurements of velocity signatures, including winds, rotation, and jets, have lagged behind. Quantifying atmospheric dynamics of hot planets is critical for a complete understanding of their atmospheres, and such measurements may even illuminate other planetary properties, such as magnetic field strengths. In this manuscript we present the first detection of the Balmer lines Hα and Hβ in the atmosphere of the ultra-hot Jupiter WASP-33 b. Using atmospheric models that include the effects of atmospheric dynamics, we show that the shape of the average Balmer line transmission spectrum is consistent with rotational velocities in the planet’s thermosphere of v{sub rot}=10.1{sub −1.0}{sup +0.8} km s{sup −1}. We also measure a low-significance day- to nightside velocity shift of −4.6{sub −3.4}{sup +3.4} km s{sup −1} in the transmission spectrum, which is naturally explained by a global wind across the planet’s terminator. In a separate analysis the time-resolved velocity centroids of individual transmission spectra show unambiguous evidence of rotation, with a best-fit velocity of 10.0{sub −2.0}{sup +2.4} km s{sup −1}, consistent with the value of v {sub rot} derived from the shape of the average Balmer line transmission spectrum. Our observations and analysis confirm the power of time-resolved transmission spectra with a high signal-to-noise ratio to measure the velocity structures in exoplanet atmospheres. The high rotational and wind velocities we measure highlight the need for more detailed 3D global climate simulations of the rarefied upper atmospheres of ultra-hot gas giants.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗