Gas Generation Testing of Crystalline Silicotitanate Ion Exchange Media

The Direct Feed Low-Activity Waste (DFLAW) process has been proposed to support early production of immobilized low-activity waste (LAW) at the Hanford site. As planned, Hanford tank waste would be sent to the Tank Side Cesium Removal (TSCR) system for solids removal (by filtration) and cesium removal (by ion exchange) during the initial phase of the DFLAW process. The resultant treated waste would be delivered to the LAW Vitrification Facility at the Hanford Tank Waste Treatment and Immobilization Plant (WTP) for immobilization. The ongoing technology maturation of TSCR system components is being conducted by Washington River Protection Solutions, LLC (WRPS). The ion exchange process in the TSCR system will use columns of crystalline silicotitanate (CST) to remove cesium from the LAW. This report describes gas generation testing of the crystalline silicotitanate ion exchange media that was conducted to strengthen the technical basis of the media for use in the TSCR system. Specifically, the described study will inform the safety basis of both the operation of the TSCR system and the interim storage condition of the TSCR ion exchange columns after loading. Previous data on gas generation of CST are limited to a handful of studies using CST or similar media under unrepresentative conditions and durations. The safety basis underlying operation and storage of the CST columns needs to consider the rate and extent of radiolytic flammable gas generation. No existing studies provide a comprehensive set of gas generation data for column operating and storage conditions representative of those expected for TSCR. To address the data gap, this study was conducted under the following conditions (each in duplicate): (1) CST in water at 25°C tested to 300 Mrad total dose, (2) wet CST (soaked in water, then free-drained) at 25°C tested to both 300 Mrad and 900 Mrad total dose, (3) dry CST (air-dried, free-flowing material equilibrated to laboratory conditions) at 25°C tested to both 300 Mrad and 900 Mrad total dose, (4) CST in 5.6M Na simulant at 25°C tested to 300 Mrad total dose, and (5) CST in 5.6M Na simulant with 1%(w/w) total organic carbon as Na3-HEDTA at 25°C and 70°C tested to 300 Mrad total dose. For each of the listed conditions, the generation of the following gas species was measured: hydrogen, oxygen, nitrous oxide, and methane. The test data was used to determine the amount of gas generated (total and on a per component basis), gas generation rates normalized to the CST bed volume tested, and G-values for each gas species. The reported results illustrate that the CST in water condition bounds the gas generation rate (at 25°C) of all other conditions, but there is some variability in the hydrogen G-value, depending on the lot of CST tested and the amount of residual moisture present at the start of the test.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development and Bench-Scale Testing of a Novel Biphasic Solvent-Enabled Absorption Process for Post-Combustion Carbon Capture (Final Technical Report)

A new class of biphasic solvents was developed, and the concept of the enabled carbon dioxide (CO 2 ) absorption process was tested for post-combustion carbon capture in our previous lab-scale research. The primary goals of this project were to advance the development of the novel biphasic CO 2 absorption process (BiCAP) and validate its technical advantages by testing the integrated technology at a 40 kWe bench-scale with actual coal-derived flue gas in a power plant environment. The project was led by the University of Illinois at Urban-Champaign (UIUC), and Trimeric Corporation served as a sub-awardee providing support in basic design and techno-economic studies. To achieve the project goals and objectives, solvent management studies, process modeling and optimization, bench-scale equipment design, construction and testing, and technical, economic and environmental assessments have been conducted. The two top-performing biphasic solvents developed in our previous research were used in this project. Biphasic solvent emissions and control were investigated in the laboratory. The emissions of the biphasic solvents from the absorber were comparable to or lower than the reference 30 wt% monoethanolamine (MEA) solution, while they could be more effectively removed in the water wash column. Lab-scale testing of solvent degradation reclamation has revealed that vacuum distillation was feasible for biphasic solvent reclamation. Aspen Plus models were used to optimize the BiCAP, and a CO 2 stripping configuration introducing a secondary cold solvent feed to the stripper was identified to be the most energy efficient. A 40 kWe bench-scale, integrated BiCAP system was successfully designed, fabricated, and installed at the UIUC’s Abbott Power Plant. Parametric testing with synthetic flue gas has demonstrated that the two biphasic solvents required a more than 40% lower heat duty for CO 2 desorption as compared to the reference MEA tested on the same bench-scale skid. Slipstream testing with actual coal flue gas for a total of 31 days in two test campaigns has further demonstrated stable operation of the bench-scale skid. During the first campaign targeting 90% CO 2 removal, the heat duty averaged at 2,183 MJ/tonne of CO 2 captured and during the second campaign targeting 95% removal, the heat duty averaged at 2,450 MJ/tonne of CO 2 captured. A techno-economic analysis has revealed that for integration of the BiCAP into a 650-MWe pulverized coal-fired power plant, the parasitic power loss was reduced by ~20%, and the cost of CO 2 capture was reduced by ~21% ($36.3/tonne on a December 2018 dollar basis) compared to the U.S. Department of Energy (DOE)’s baseline Case B12B. As progression from this bench-scale development effort, a new project “Engineering-Scale Testing of the Biphasic Solvent Based CO 2 Absorption Capture Technology at a Covanta Waste-to-Energy Facility” was awarded by the DOE, launched in February 2023, to allow the team to further test the technology and demonstrate its technical and economic advantages at a pilot scale.

20 FOSSIL-FUELED POWER PLANTS↗

Verification and Regression Testing of a Physically Stabilized Layered Solid Element Formulation in DYNA3D/Paradyn

Recent modeling of filament-wound composite structures drove the need for a new element type within the finite element code DYNA3D/Paradyn. This new layered solid element was implemented and designed to capture the kinematics and constitutive be havior of various lamina layers defined with arbitrary orientations and volume fractions within the element to accurately model a laminated composite material. The new el ement uses a single integration point in each of the lamina layers defined to capture the constitutive behavior, and a novel physical stabilization routine is used to prevent hourglassing while mitigating shear and volumetric locking. This report documents the verification testing and the regression tests added to the DYNA3D/Paradyn software quality assurance test suite to assess the proper implementation of the new layered solid element. There were a total of 27 tests added the DYNA3D test suite, which consist of problems using the layered solid element with a single layer or multiple layers for isotropic and orthotropic material models. These tests are a combination of simple kinematically driven patch tests, beam bending tests, plate bending tests, and more complicated problems. Ultimately, the testing done verifies that the element behaves as expected and is implemented correctly.

42 ENGINEERING↗

Hydraulic Testing of the Lost Lake Aquifer Near Recovery Wells RWM 6 and RWM 7

Hydrologic tests were conducted on the Lost Lake Aquifer Zone (LLAZ) at recovery wells RWM 6 and RWM 7 in accordance with the approved test plan (Dixon, 2023). The objective of the testing was to determine well performance parameters of RWM 6 and aquifer hydraulic properties near RWM 6 and RWM 7. Tests at RWM 6 consisted of a step-drawdown test to determine well performance parameters, a constant rate pump test to determine aquifer hydraulic properties, and an aquifer recovery test also used to determine aquifer hydraulic properties. Well performance parameters determined included specific capacity, well efficiency, and head loss coefficients. Prior to testing at RWM 6, a constant rate pump test was conducted at RWM 7. Data from this testing was used to determine aquifer hydraulic properties near RWM 7.

42 ENGINEERING↗

Compositional Variation Tests on DuraMelter 100 with LAW Sub-Envelope B1 Feed in Support of the LAW Pilot Melter, VSL-02R62N0-5, Rev. 0 (May 2003)

The principal objective of the DM100 tests was to demonstrate the robustness of the vitrification process with respect to feed and glass compositional changes resulting from variations in the simulant-to-additive ratio. The DM100-WV unit was selected for these tests; this melter was used for all of the Part B 1 tests on LAW Envelopes A, B, and C sulfate incorporation that were used to support the subsequent tests on the Pilot Melter as well as for the more recent LAW Sub-Envelope Al, A2, A3 and Cl tests. The same melter was selected for the present tests in order to maintain comparisons between the data sets. In addition, the somewhat smaller glass volume for the same melt surface area as compared to the DM100-BL melter means that more glass turnovers are achieved for a given test duration. The DM100 tests used nominal feed and feed with a 15% surplus in waste simulant. Previous Pilot Melter tests on Envelope A with 10% variations (but with sulfate removal) showed significant impacts on glass production rates that were ultimately corrected by adjustments in the sugar additions. Consequently, robustness with respect to throughput as well as sulfate tolerance are important motivations for these tests.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Testing Capabilities for Superconducting Magnets at Fermilab

This presentation will focus on the current testing capabilities for superconducting magnets at Fermilab, highlighting existing systems, recent upgrades, and future plans. The Vertical Magnet Test Facility (VMTF) remains a cornerstone for testing superconducting magnets in R&D applications, maintaining its established capabilities. Stand 4 continues to support the Hi-Lumi AUP production line of magnets in cryostats and has achieved significant improvements through a redesign of lead connections, resolving issues with liquid helium levels and resistance, culminating in a successful endurance test without interruption. Similarly, Stand 7 underwent commissioning and a lead redesign to reduce heat load, while its core testing capabilities remain unchanged. Looking forward, Stand 3 is undergoing a redesign, with plans to restart and begin commissioning by the end of 2025, introducing new features such as background magnetic field testing and upgraded power supplies. Fermilab is also advancing the High Field Vertical Magnet Test Facility (HFVMTF), designed to support the fusion and magnet R&D program, with commissioning scheduled for 2025 and critical components, including the cryostat and power supplies, being delivered. Enhancing all operations, the newly commissioned IB1 cryoplant now offers automated overnight helium production and efficient transfer to a 10,000-liter dewar, streamlining support across all test stands. This talk will provide a comprehensive overview of testing capabilities, and showcasing how Fermilab is advancing its capabilities to meet the evolving demands of superconducting magnet testing.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Reversible Bending Fatigue Testing on Zry-4 Surrogate Rods

Testing high-burnup spent nuclear fuel (SNF) presents many challenges in areas such as specimen preparation, specimen installation, mechanical loading, load control, measurements, data acquisition, and specimen disposal because these tasks are complicated by the radioactivity of the test specimens. Research and comparison studies conducted at Oak Ridge National Laboratory (ORNL) resulted in a new concept in 2010 for a U-frame testing setup on which to perform hot-cell reversible bending fatigue testing. Subsequently, the three-dimensional finite element analysis and the engineering design of components were completed. In 2013 the ORNL team finalized the upgrade of the U-frame testing setup and the integration of the U-frame setup into a Bose dual linear motor test bench to develop a cyclic integrated reversible-bending fatigue tester (CIRFT). A final check was conducted on the CIRFT test system in August 2013, and the CIRFT was installed in the hot cell in September 2013 to evaluate both the static and dynamic mechanical response of SNF rods under simulated loads. The fatigue responses of Zircaloy-4 (Zry-4) cladding and the role of pellet pellet and pellet clad interactions are critical to SNF vibration integrity, but such data are not available due to the unavailability of an effective testing system. While the deployment of the developed CIRFT test system in a hot cell will provide the opportunity to generate the data, the use of a surrogate rod has proven quite effective in identifying the underlying deformation mechanism of an SNF composite rod under an equivalent loading condition. This paper presents the experimental results of using surrogate rods under CIRFT reversible cyclic loading. Specifically, monotonic and cyclic bending tests were conducted on surrogate rods made of a Zry-4 tube and alumina pellet inserts, both with and without an epoxy bond.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

LTE Band 13 and Band 14 Interference Test Summary

Introduction Verizon Wireless operates a nationwide commercial LTE system in Band 13 in the United States. FirstNet will deploy a nationwide Public Safety LTE system in the neighboring Band 14 spectrum to provide first responders with much needed broadband data services. The Idaho National Laboratory’s (INL) Wireless Test Bed (WTB) conducted interference testing between LTE Band 13 and Band 14 systems at typical vertical separation distances encountered on towers with co-located systems. The test configuration mimicked a co-location scenario where Band 13 and Band 14 systems are placed on the same tower with a vertical separation distance of 10 feet. The Band 13 and Band 14 interference testing was conducted in an open-air environment in a location off the INL Test Range that does not have RF emissions in either Band 13 or Band 14. A 30-mile area in the Little Lost River Valley in South Central Idaho was identified that is northwest of the INL range that meets that criterion. The GPS coordinates of the test area are 44° 9’ 14.89” N, 113° 21’ 56.58” W. Based on the noise floor measurements, very little RF noise is present in LTE Band 13 and Band 14 in the remote test location in the Little Lost River Valley in Idaho. This RF isolated area provides a great place to conduct testing of LTE Band 13 and Band 14 performance without effecting or being effected by existing LTE Band 13 or Band 14 systems. The Band 13 baseline average overall throughput was 72.0 Mbps which compares to an overall average throughput of 73.7 Mbps when both Band 13 and Band 14 were transmitting with a typical 10 foot vertical separation. This separation is also required for the antennas to be isolated from each other and not interfere with each other [2]. The Band 14 baseline average overall throughput was 65.2 Mbps which compares to an overall average throughput of 65.9 Mbps when both Band 13 and Band 14 were transmitting with a typical 10 foot vertical separation. These results indicate neither Band 13 nor Band 14 was affected by adjacent channel interference in a co-location scenario with 10 foot vertical separation between radiation centers. Horizontal separation testing should be conducted to verify interference would not exist in a nearby site scenario where Band 13 and Band 14 systems are placed on either adjacent towers or on rooftops of adjacent buildings in close proximity to each other. Interference testing should also be conducted between LTE Band 14 systems and the adjacent Public Safety Narrowband LMR systems. The 1 MHz guard band between LTE Band 14 and the LMR band may not be sufficient enough to prevent interference between these disparate systems. The LMR handsets transmit up to 5W in narrowband channels as narrow as 6.25 kHz bandwidth, which could de-sensitize the Band 14 eNodeB receivers especially in a near-far scenario.

42 ENGINEERING↗

Multilateral Testing Workshop on Relocatable Portal Monitors

The procurement and deployment of radiation detection equipment is a multi-faceted challenge across the globe. Knowledge sharing of the testing methods used to evaluate equipment for deployment scenarios helps improve the understanding of deployed systems by the global community. The United States Department of Energy’s Nuclear Smuggling Detection and Deterrence Office (NSDD) performed a series of characterization measurements in 2019, focused on radiation detection systems that could function as relocatable portal monitors. The capstone activity for this project was a multilateral and cross-disciplinary workshop demonstrating, performing, and refining the techniques used in the characterization measurements with International Atomic Energy Agency (IAEA) and global partners. A group of technical experts including representatives from nine countries, the IAEA, and NSDD gathered at Sandia National Laboratories in Albuquerque, NM during September of 2019 for the Operational and Performance Testing and Evaluation of Relocatable Portals Workshop. Over the course of a week, the group discussed the necessity for and process of developing operational and performance requirements, challenges related to deploying radiation detection systems for the countries in attendance, use cases for deploying relocatable radiation detection equipment, and considerations related to testing equipment for appropriate deployment scenarios. All participants were given the opportunity to have hands-on experience with eleven relocatable systems in executing a limited scope characterization test comprised of six test scenarios. At the conclusion of testing, participants reviewed and presented their findings, and the group as a whole compared and contrasted their experiences. Suggested revisions to the test methods and ideas for further collaborations were discussed. This report discusses the logistical and planning considerations for bringing together experts across disciplines in a multilateral workshop on testing of radiation detectors, as well as presenting the testing methods performed, results, and paths forward. Success of workshops related to technical knowledge transfer and improvement of test methods is key to global technical and scientific support of radiation detection deployments.

Erchinger, Jennifer L.↗

Status of LEU U-10Mo Monolithic Fuel Testing and Qualification Efforts to Support US High Performance Research Reactor Conversions

The US High Performance Research Reactor Project has begun a new phase of fuel testing and post irradiation examination (PIE) of plate-type low-enriched uranium (LEU) U-10Mo Monolithic fuel. The testing campaigns are intended to first confirm that the fuel performance behavior of commercially produced fuel matches that of the lab-scale fabricated fuel tested during development, followed by qualification of the U-10Mo monolithic fuel system through the US Nuclear Regulatory Commission. Planned tests include miniature-plate, full-size plate, and fuel element irradiations, during which fuel test specimens fabricated with qualified processes will be irradiated under conditions that bound the NRC-regulated reactors in order to demonstrate that the fuel meets the overarching fuel performance requirements of 1) maintaining mechanical integrity 2) maintaining geometric stability and 3) exhibiting stable and predictable behavior. The MP-1 test, with the objective of confirming fuel performance behavior, is currently undergoing irradiation in the Advanced Test Reactor and PIE in INL hot cells. Status of upcoming qualification and licensing test design activities and highlights of initial as-fabricated characterization and testing results from the MP-1 test will be provided.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Actual-Waste Tests of Enhanced Chemical Cleaning for Retrieval of SRS HLW Sludge Tank Heels and Decomposition of Oxalic Acid - 12256

Savannah River National Laboratory conducted a series of tests on the Enhanced Chemical Cleaning (ECC) process using actual Savannah River Site waste material from Tanks 5F and 12H. Testing involved sludge dissolution with 2 wt% oxalic acid, the decomposition of the oxalates by ozonolysis (with and without the aid of ultraviolet light), the evaporation of water from the product, and tracking the concentrations of key components throughout the process. During ECC actual waste testing, the process was successful in decomposing oxalate to below the target levels without causing substantial physical or chemical changes in the product sludge. During ECC actual waste testing, the introduction of ozone was successful in decomposing oxalate to below the target levels. This testing did not identify physical or chemical changes in the ECC product sludge that would impact downstream processing. The results from these tests confirm observations made by AREVA NP during larger scale testing with waste simulants. This testing, however, had a decreased utilization of ozone, requiring approximately 5 moles of ozone per mole of oxalate decomposed. Decomposition of oxalates in sludge dissolved in 2 wt% OA to levels near 100 ppm oxalate using ECC process conditions required 8 to 12.5 hours without the aid of UV light and 4.5 to 8 hours with the aid of UV light. The pH and ORP were tracked during decomposition testing. Sludge components were tracked during OA decomposition, showing that most components have the highest soluble levels in the initial dissolved sludge and early decomposition samples and exhibit lower soluble levels as OA decomposition progresses. The Deposition Tank storage conditions that included pH adjustment to approximately 1 M free hydroxide tended to bring the soluble concentrations in the ECC product to nearly the same level for each test regardless of storage time, storage temperature, and contact with other tank sludge material. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The PROMETRA program: plane strain tests on fresh and highly irradiated zircaloy-4, ZIRLO and M5 fuel claddings

In the framework of the PROMETRA program, clad hardening constitutive laws (stress-strain curves) have been already implemented in the SCANAIR code. These laws were derived from uniaxial hoop tensile tests performed on narrow machined ring samples. However, they do not reproduce the conditions of strain multi-axiality acting on cladding during a RIA (Reactivity-Initiated Accident) in a PWR. As a consequence, a new specimen called Plane Strain Tensile (PST) similar to the annular sample developed by Pennsylvania State University has been developed at CEA on a wider notched ring. It aims to accurately predict the cladding failure in more prototypical conditions, close to plane strain hoop tension in the middle of the gage section. This paper details the PST tests implementation and results in the framework of the PROMETRA program on fresh and irradiated claddings. The development of this test has led also to the development of a technique to measure local deformations in the gage section of the PST specimen using 2-D Digital Image Correlation (DIC). Tests performed on fresh Zircaloy-4 and on irradiated Zircaloy-4, M5 and ZIRLO specimens are analyzed relying of post-test examinations and finite element simulations. In the case of tests performed on irradiated Zry-4 and ZIRLO at 280 and 350 Celsius degrees, the presence of a hydride rim favors the crack nucleation on the outer surface. In this case, rupture nucleation occurs preferentially in the vicinity of notches. Such tests are not representative of the rupture of a cladding subjected to plane strain loading. Nevertheless, they give a good representation of the initiation of rupture observed during RIA on irradiated cladding, resulting in a hydride damage. Zry-4 specimens tested at 480 Celsius degrees and M5TM at 280 and 350 C. degrees result in a ductile fracture nucleation in the center of the specimen. This rupture is prototypical of a ductile rupture of an irradiated specimen subjected to a plane strain loading. However, the nucleation on inner surface by shear at the mandrel contact is not prototypical of a clad rupture during the PCMI (Pellet Clad Mechanical Interaction) phase of a RIA (membrane stresses in the clad thickness in RIA). An important lesson learned from this experimental approach is that the PST test is a particularly complex test, both in its implementation and interpretation.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Integrity Assessment of Hanford 242-A Evaporator Facility E-A-1 Re-boiler Vessel via Fluorescein Liquid Tracer Test Methods - 17357

The 242-A Evaporator Facility is critical to the United States Department of Energy's (DOE) Hanford Site clean-up mission due to limited space within the existing Double-Shell Tanks (DSTs) used to store nuclear and chemical waste until future processing. The 242-A Evaporator Facility is currently the sole waste volume reduction process used at Hanford, and the E-A-1 Re-boiler is essential to the Evaporator process. Due to the potential for cross-contamination between the Re-boiler tubes through which waste passes and the tube sheets of uncontaminated steam, an assessment of the Re-boiler vessel's integrity is required for continuing operations of the facility. In order to meet these requirements, an independent integrity assessment was designed to use fluorescein liquid tracer (LT) to verify the leak-tightness of the Re-boiler vessel in accordance with Washington River Protection Solutions, LLC (WRPS) tightness test standards, as well as, the ASME Boiler and Pressure Vessel (B and PV) Code, Section III, Division 1, NB-6300. LT test methodologies were evaluated and determined to be appropriate for a vessel with restricted access, such as the E-A-1 Re-boiler, as it provided the needed sensitivity, reliability, and cost; as well as, exceeded the leak-tightness specifications required by both WRPS and ASME B and PV Code standards. The integrity test requires water laced with fluorescein be circulated through the waste processing loop of the 242-A Evaporator and samples of steam condensate be collected and analyzed for traces of fluorescein to determine leak-tightness. Liquid condensate sampling was conducted prior to and during testing and the samples were analyzed for fluorescein tracer to determine the amount of fluorescein that flowed out of the tubes of the Re-boiler into the steam side of the vessel. Given the established criteria for 'leak-tight,' test results determined that the Re-boiler passed the integrity assessment. After further scrutiny of the 2014 test and data results, it was determined that although the Re-boiler was 'leak-tight,' as established by the test criteria, there was concern of future leakage. The DOE and the DOE Office of River Protection (ORP) requested that WRPS repeat the integrity assessment in two and a half years to determine if the potential leak was growing, which could threaten continuing operations of the 242-A Evaporator. The 2017 test has been redesigned using lessons learned from the 2014 test and was modified to account for ergonomic and safety considerations, ease of repeatability, and accuracy of results. The liquid tracer methodology and test plan developed for the Re-boiler will continue to be implemented in 5 year increments to monitor current and future integrity. The method may also prove useful for other aging components across the Hanford Site, where appropriate. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Progress Update on the Waste Treatment and Immobilization Plant Pulse- Jet Mixed Vessel Testing Program - 16286

The Waste Treatment and Immobilization Plant (WTP) is designed to use cylindrical-shaped pulse-jet mixers in the black cell vessels to mix the radioactive waste during process operations. Pulse-jet mixers operate like large turkey basters, using air pressure to suck radioactive waste up into the mixer and eject it back into the vessel at high velocity. Using pulse-jet mixers for keeping waste in process vessels adequately mixed is one of the design features that ensures that there are no mechanical parts inside the black cells that would require maintenance. The WTP Project is conducting a testing program to ensure the pulse-jet mixed vessels can address three design and nuclear safety concerns: 1) pulse jet mixer controls, 2) hydrogen gas generation, and 3) the potential for inadvertent criticality in the vessels. The currently planned pulse-jet mixed vessel testing program is divided into three major test campaigns. The first campaign consists of testing to demonstrate pulse-jet mixed vessel control system design and operating concepts. The second test campaign consisted of informational testing of select prototypic PJM vessel features in a reduced scale facility. This testing informed decision making on selection of different mixing system configurations. This test campaign was completed in March 2015. The third test campaign is planned to test the complete functionality of a pulse-jet mixed vessel at full-scale using a prototype standardized high-solids vessel design. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ORNL Package Testing Program Overview

Radioactive materials are widespread in our everyday activities which are used in many different types of industries: Consumer products, Medicine, Industry, Energy, and Defense. In the United States there is about 3 million shipments of radioactive materials per year. With radioactive material being very widespread the number of new applications to ship these quantities increases daily. As such, ensuring the safe and secure transport of these materials is paramount, necessitating stringent packaging, transportation, and certification requirements. Shipments of radioactive materials have been made from Oak Ridge National Laboratory (ORNL) for the past 65 years. Since the 1940s ORNL has been at the forefront of the early development of regulations pertaining to the transport of radioactive shipments and associated regulatory testing. The early involvement resulted in ORNL being one of the leaders in the development of regulations and testing standards pertaining to the testing and design of packages. Today all package testing activities are conducted under the Package Testing Program (PTP) at ORNL at the Package Evaluation Facility (PEF). The PTP develops and evaluates testing solutions – ensuring that they are safe, efficient, and meet regulatory requirements ORNL PTP has extensive experience in the regulatory testing of radioactive material packages, supporting certification of Type A, Type, B, Type AF, and special form packages. The PEF serves as a one-stop-shop for design, testing, and certification of a wide variety of packages needed for shipment of radioactive materials. The facility provides the space, expertise, and equipment necessary to conduct rigorous performance testing under both normal and accident conditions or transport environments including free drop, dynamic crush, puncture, penetration, compression, vibration, water spray, water immersion, and thermal test. The PTP remains a key contributor to the safety and compliance of radioactive material transportation. This presentation will provide an overview of the program’s history, capabilities, and its ongoing role in advancing regulatory standards and transportation safety.

Martinez, Oscar [ORNL] (ORCID:0000000181814046)↗

Vibration Fixture Design and Testing for Rigid - Y Cable Mount on MMRTG F4

INL is responsible for the fueling and testing of Radioisotope Thermoelectric Generators for NASA space missions. For the upcoming NASA mission "DRAGONFLY," INL is tasked with fueling and testing the Multi-Mission Radioisotope Thermoelectric Generator F4 (MMRTG F4). This involves conducting various tests, such as vibration testing and mass properties testing. For these tests, an interface is required between the MMRTG and the testing equipment, provided by cables mounted on a legacy bracket. Due to design changes in the cooling lines, a new cable – the Rigid Y cable – is to be used. The test described in this poster was to verify if the Rigid Y cable would survive the vibration tests. The results will determine the procedure for conducting the vibration tests on the MMRTG F4.

42 - ENGINEERING↗

Resumption of water capsule reactivity-initiated accident testing at TREAT

A series of integral reactivity-initiated accident (RIA) commissioning experiments were completed in a new static water capsule in the Transient Reactor Test Facility (TREAT), marking the first such tests in the U.S. in more than 40 years. The test campaign included a verification test followed by five tests in the Static Environment Rodlet Transient Test Apparatus (SERTTA) capsule. The capsule initial conditions varied from room temperature and pressure up to 200°C and 2.5 MPa, with energy depositions varying between ~500–1100 J/gUO 2 . The series of tests allowed for a number of instrumentation qualifications and demonstrations, including cladding thermometry, rodlet plenum pressure, cladding elongation, and an electro-impedance boiling detector. Post transient examinations such as gamma emission spectroscopy, profilometry, and microscopy were performed to document the end state of the fuel rods. Furthermore, the results from the experiments show that the fuel rodlets behaved very similar to historical tests under similar energy depositions. This paper documents the design of the capsule and highlights some results from the commissioning tests and post-transient examination.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Evaluation of Cavity Collapse and Surface Crater Formation at the Salut Underground Nuclear Test in U20ak, Nevada National Security Site, and the Impact of Stability of the Ground Surface

At the request of Jerry Sweeney, the LLNL Containment Program performed a review of nuclear test-related data for the Salut underground nuclear test in U20ak to assist in evaluating this legacy site as a test bed for application technologies for use in On-Site Inspections (OSI) under the Comprehensive Nuclear Test Ban Treaty. Review of the Salut site is complicated because the test experienced a subsurface, rather than surface, collapse. Of particular interest is the stability of the ground surface above the Salut detonation point. Proposed methods for on-site verification include radiological signatures, artifacts from nuclear testing activities, and imaging to identify alteration to the subsurface hydrogeologogy due to the nuclear detonation. Sweeney's proposal requires physical access at or near the ground surface of specific underground nuclear test locations at the Nevada Nuclear Test Site (NNSS, formerly the Nevada Test Site), and focuses on possible activities such as visual observation, multispectral measurements, and shallow, and deep geophysical surveys.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗