Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “system reliability”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,027 records · Page 57

National Ignition Facility. Facility and Infrastructure Systems Maintenance Plan

Ensuring the reliability of the NIF, including its support systems, laser systems, target diagnostic systems, and utilities, is essential to the availability of the NIF in its support of NNSA missions. NIF is a key capability in the DOE Stockpile Stewardship Program and supports high energy physics experiments for nuclear weapons, energy, and astrophysics applications. High system reliability provides opportunities for shots and scientific discoveries with opportunities to enhance and upgrade capabilities. This Maintenance Plan (MP) identifies the policies and procedures used to perform and support asset management of the NIF Facility and Infrastructure Systems (FInS), NIF Lasers & Alignment (LASE), NIF Target Experimental Operations (TOPS), NIF Target Area Science and Engineering (TASE), and NIF&PS Control Systems (NCS). The FInS systems include the facility, HVAC, contamination control, beampath, and Line Replaceable Units (LRUs) as well as utilities which create the beampath environments, such as vacuum, argon, or clean dry air. The LASE systems are Programmatic systems which include laser diagnostics, alignment, power conditioning, pulsed power, and input laser systems. The TOPS and TASE systems are also Programmatic systems which include target and diagnostic delivery systems and positioners, many different insertable and fixed target diagnostics, and cryogenic and target gas fill systems. Finally, the NCS systems include both software and hardware for industrial and shot operation control systems. Policies governing administrative and operational practices related to maintenance of FInS, LASE, TOPS, TASE, and NCS systems are described in this plan. In addition, the plan provides processes and procedures for managing, tracking, and documenting the work. This document, the NIF Operations Management Plan, NIF-5020544 (Ref. 1), and NIF Shot Operations Plan, NIF-5018506 (Ref. 2), together satisfy the requirements of the Conduct of Operations. Duties, responsibilities, and reporting requirements of the various positions associated with FInS, LASE, and TOPS maintenance are detailed in this plan. The FInS systems include both Real Property systems with asset management requirements specified in DOE Order 430.1C (Ref. 3) and Programmatic systems. In addition, for FInS, there is a list of the System Level Maintenance Plans (SLMPs) in NIF-1007419198 (Ref. 4) which provide the system descriptions and maintenance plan and schedule. In addition, the list includes the Reliability Centered Maintenance (RCM) and Experience Centered Maintenance (ECM) evaluations that have been performed for applicable FInS systems as well as reliability criticality per Section 3.5. The -AM version of the NIF Maintenance Plan focuses on the reliability program for FInS, LASE, TOPS, TASE, and NCS within the context of the overall NIF Reliability, Availability, and Maintainability (RAM) program and incorporates changes since the -AL version from August 2011 and has been updated to be fully consistent with the updates to Ref. 1. It also includes asset management considerations, updates to the Work Order (WO) process within the NIF Computerized Maintenance Management System (CMMS) which is EAM infor® System Maintenance and Reliability Tracking (SMaRT) (Ref. 5), and updates to metrics and key performance indicators (KPIs).

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Decomposition in reliability analysis of fault-tolerant systems

The existing approaches to reliability modeling are briefly reviewed. An examination of the limitations of the existing approaches in modeling ultrareliable fault-tolerant systems illustrates the need to use decomposition techniques. The notion of behavioral decomposition is introduced for dealing with reliability models with a large number of states, and a series of examples is presented. The CARE (computer-aided reliability estimation) and HARP (hybrid automated reliability predictor) approaches to reliability are discussed.

Trivedi, K. S.↗

Space Shuttle Program Primary Avionics Software System (PASS) Success Legacy - Quality and Reliability Date

Thsi slide presentation reviews the avionics software system on board the space shuttle, with particular emphasis on the quality and reliability. The Primary Avionics Software System (PASS) provides automatic and fly-by-wire control of critical shuttle systems which executes in redundant computers. Charts given show the number of space shuttle flights vs time, PASS's development history, and other charts that point to the reliability of the system's development. The reliability of the system is also compared to predicted reliability.

Orr, James K.↗

A two-stage service restoration method for electric power distribution systems

Improving the reliability of power distribution systems is critically important for both utilities and customers. This calls for an efficient service restoration module within a distribution management system to support the implementation of self-healing smart grid networks. Although the emerging smart grid technologies, including distributed generators (DGs) and remote-controlled switches, enhance the self-healing capability and allow faster recovery, they still pose additional complexity to the service restoration problem, especially under cold load pickup (CLPU) conditions. Herein, a novel two-stage restoration framework is proposed to generate a restoration solutions with a sequence of control actions. The first stage generates a restoration plan that supports both the traditional service restoration using feeder reconfiguration and the grid-forming DG-assisted intentional islanding methods. The second stage generates an optimal sequence of switching operations to bring the outaged system quickly to the final restored configuration. The problem is formulated as a mixed-integer linear program that incorporates system connectivity, operating constraints, and the CLPU models. It is demonstrated that on using a multi-feeder test case, the proposed framework is effective in utilizing all available resources to quickly restore the service and generate an optimal sequence of switching actions to be used by the operator to reach the desired optimal configuration.

24 POWER TRANSMISSION AND DISTRIBUTION↗

ICAROUS - Integrated Configurable Algorithms for Reliable Operations Of Unmanned Systems

NASA's Unmanned Aerial System (UAS) Traffic Management (UTM) project aims at enabling near-term, safe operations of small UAS vehicles in uncontrolled airspace, i.e., Class G airspace. A far-term goal of UTM research and development is to accommodate the expected rise in small UAS traffic density throughout the National Airspace System (NAS) at low altitudes for beyond visual line-of-sight operations. This paper describes a new capability referred to as ICAROUS (Integrated Configurable Algorithms for Reliable Operations of Unmanned Systems), which is being developed under the UTM project. ICAROUS is a software architecture comprised of highly assured algorithms for building safety-centric, autonomous, unmanned aircraft applications. Central to the development of the ICAROUS algorithms is the use of well-established formal methods to guarantee higher levels of safety assurance by monitoring and bounding the behavior of autonomous systems. The core autonomy-enabling capabilities in ICAROUS include constraint conformance monitoring and contingency control functions. ICAROUS also provides a highly configurable user interface that enables the modular integration of mission-specific software components.

Consiglio, María↗

Automatic documentation system extension to multi-manufacturers' computers and to measure, improve, and predict software reliability

The DOMONIC system has been modified to run on the Univac 1108 and the CDC 6600 as well as the IBM 370 computer system. The DOMONIC monitor system has been implemented to gather data which can be used to optimize the DOMONIC system and to predict the reliability of software developed using DOMONIC. The areas of quality metrics, error characterization, program complexity, program testing, validation and verification are analyzed. A software reliability model for estimating program completion levels and one on which to base system acceptance have been developed. The DAVE system which performs flow analysis and error detection has been converted from the University of Colorado CDC 6400/6600 computer to the IBM 360/370 computer system for use with the DOMONIC system.

Simmons, D. B.↗

Space Station Freedom power - A reliability, availability, and maintainability assessment of the proposed Space Station Freedom electric power system

A preliminary reliability, availability, and maintainability (RAM) analysis of the proposed Space Station Freedom electric power system (EPS) was performed using the unit reliability, availability, and maintainability (UNIRAM) analysis methodology. Orbital replacement units (ORUs) having the most significant impact on EPS availability measures were identified. Also, the sensitivity of the EPS to variations in ORU RAM data was evaluated for each ORU. Estimates were made of average EPS power output levels and availability of power to the core area of the space station. The results of assessments of the availability of EPS power and power to load distribution points in the space stations are given. Some highlights of continuing studies being performed to understand EPS availability considerations are presented.

Turnquist, S. R.↗

A three-failure-tolerant computer system.

Two basic factors influence the design of highly reliable computer systems: the amount of failures required to be tol erated and the reliability or MTBF required. A computer system designed to tolerate any three single failures in a fail-operational-fail-operational-fail-safe manner for a real-time control application is presented. The design approach uses adaptive majority voting in both hardware and software with a four-level redundant system. Various methods of performing the adaptive majority voting functions were evaluated with the selected approach using a special module termed a voter-comparator switch (VCS). The VCS module allows the computer system to be operated in a variety of redundant modes, depending on the failure tolerance required at any particular time.

Koczela, L. J.↗

Bridging the gap: Deploying AI-based Models in Real-Time Fusion Plasma Control Systems

Achieving reliable real-time control in fusion plasma experiments requires strict timing guarantees across entire control algorithms. In earlier work by Abbate et al. (2023), we demonstrated the feasibility of neural-network-based control algorithms on the DIII-D tokamak using the internally developed open-source Keras2C library for model conversion into C (Conlin et al. (2021)). However, the initial implementations relied on data buffering and branching logic outside the neural network code, causing variability in execution times. Subsequent deployments on DIII-D and KSTAR—including the RTCAKENN algorithm for kinetic profile reconstruction—proved that minimizing branching and buffering throughout the pipeline yields consistent millisecond-level cycle times under real experimental conditions (Shousha et al. (2023)). However, keeping pace with rapidly evolving AI frameworks (e.g. PyTorch) is challenging. Finally, we, therefore, propose a community-driven open-source effort to expand the tool, enabling real-time deployment across diverse systems that require strictly bounded execution times.

AI-based models↗

Can economic drivers enable an affordable, reliable, and resilient energy system in rural Alaska?

Price subsidies, such as the Alaska Power Cost Equalization (PCE) program, are intended to provide affordable energy. However, these economic drivers may be barriers to a clean energy transition and economic development, especially in rural Alaska. Reliable and affordable energy, a challenge in rural Alaska, is the foundation for individual and community security and economic development. Addressing the climate change crisis requires a sustainable transition to decarbonized energy systems that are more equitable, reliable, and affordable.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

System Architectural Considerations on Reliable Guidance, Navigation, and Control (GN and C) for Constellation Program (CxP) Spacecraft

This final report summarizes the results of a comparative assessment of the fault tolerance and reliability of different Guidance, Navigation and Control (GN&C) architectural approaches. This study was proactively performed by a combined Massachusetts Institute of Technology (MIT) and Draper Laboratory team as a GN&C "Discipline-Advancing" activity sponsored by the NASA Engineering and Safety Center (NESC). This systematic comparative assessment of GN&C system architectural approaches was undertaken as a fundamental step towards understanding the opportunities for, and limitations of, architecting highly reliable and fault tolerant GN&C systems composed of common avionic components. The primary goal of this study was to obtain architectural 'rules of thumb' that could positively influence future designs in the direction of an optimized (i.e., most reliable and cost-efficient) GN&C system. A secondary goal was to demonstrate the application and the utility of a systematic modeling approach that maps the entire possible architecture solution space.

Dennehy, Cornelius J.↗

Investigation of Pearl River data collection system

The reliability of employing NASA developed remote sensing for in situ near real time monitoring of water quality in the Pearl River is evaluated. The placement, operation and maintenance of a number of NASA developed data collection platforms (DCP's) on the Pearl River are described. The reception, processing, and retransmission of water quality data from an ERTS satellite to the Mississippi Air and Water Pollution Control Commission (MAWPCC) via computer linkup are assessed.

Source record↗

Fault-tolerant computer system

More reliable computers could be assembled by connecting four proposed VSLI "building block" circuits with built-in error detection to standard microprocessors and memory devices to form self checking computer module. Each building block detects its own malfunctions and single bit errors found in memory.

Avizienis, A. A.↗

Low-Cost, Easy-To-Integrate and Reliable Grid Energy Storage System with 2 nd Life Lithium Batteries

Batteries retired from electric vehicles have the potential to extend their service as low-cost stationary energy storage systems. However, disperse battery state of health (SOH) and nonuniform battery characters often lead to compromised battery performance and reliability, which greatly hinder their adoption. A Heterogenous Unifying Battery (HUB) system is proposed to stage 2 nd life battery bricks for a period, and enable them to attain improved SOH uniformity, performance, and reliability before being sold for 2 nd life applications, while simultaneously providing grid services. It may offer a technically and economically advantageous solution for the broad utilization of 2 nd use batteries. The goal of this project was to develop the hardware and software that enables the key functions of the HUB system. The first achievement of the project was the development of a 1kW scale proof-of-concept (POC) system, which comprises (i) a modular plug-n-play DC-DC power converter matrix with isolated series output connections to achieve fully independent control of energy flow to each of the connected battery units at low voltage; (ii) enhanced model based control that drives each batteries’ SOH towards uniformity while collectively providing grid energy storage services; and (iii) comprehensive procedures to perform battery diagnostics and prognostics. The second achievement was the development of a 100kW scale HUB system and demonstrated its performance of re-establishing battery SOH uniformity through a period of battery cycling operation. The final HUB system incorporates six DC-DC power converter matrices paired with six battery bricks. Hot swapping of a single battery brick while maintaining consistent system power was demonstrated and system operation was validated to be capable of implementing the approved grid duty cycle and of balancing and conditioning the battery bricks. Through the course of the project, the team optimized the building-block design, form-factors, and adjusted life balancing control. An up-sized 250kW Scale was developed and deployed in October 2022 with pack-level battery form factors, see photo in Figure 1 The third achievement of the project was to perform a techno-economic analysis in order to better understand the cost and revenue potentials in this new “recondition-then-resell" value proposition. The final TEA quantified the economics of new Li-ion batteries as well as second-life batteries processed via reconditioning and traditional binning. Results showed the reconditioned second-life batteries in this project to be economically favorable and viable in grid energy storage markets. The TEA results were published in the Applied Energy journal. The fourth achievement of the project was to deliver a tech-to-market plan for the HUB system that includes funding, IP, and manufacturing strategies. The final T2M plan outlines a business strategy in which the HUB provides a B2B service to EV companies as an alternative to battery recycling that can prepare batteries for 2nd life applications. A company named Smartville Inc. was founded to carry on the commercialization, funding, and technical IP licensing activities of the OPEN project.

25 ENERGY STORAGE↗

Blueprinting Electrified Transit System Implementation

To achieve a more affordable and reliable transportation system, we need to smartly upgrade our power systems and install a large number of charging stations, but conventional planning methods are not up to the task. By applying advanced simulation and optimization tools, we can design a smarter, more cost-effective electric transportation network. The initial focus was on public transit systems, demonstrating how this approach can deliver broader economic, reliability, and air quality benefits nationwide.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Deep Reinforcement Learning Based Control of Wind Turbines for Fast Frequency Response

In order to fulfill vital auxiliary grid services, such as load regulation, spin and non-spin reserve provision, and frequency support during emergencies, there is often a requirement for certain wind farms to operate in de-loaded modes. Leveraging the swift response capabilities of wind farms, this study demonstrates that reserving power in de-loaded modes can significantly enhance power grid stability and reliability during system contingencies. Controlling wind farms optimally for frequency support is intricate due to the nonlinearity of models and controllers and the complexity of wind farm interactions with power systems. Here, to address this challenge, this paper introduces a novel approach that integrates wind turbines into reinforcement learning-based solutions for frequency response. This innovative methodology utilizes the state-of-the-art reinforcement learning algorithm known as the surrogate-gradient-based evolutionary strategy. The proposed learning-based algorithm provides continuous control of wind farm output to rapidly stabilize system frequency and prevent unnecessary trips of under-frequency load shedding relays. To facilitate efficient training, parallel computing techniques are employed. The proposed methodology is evaluated on a modified IEEE-39 bus system, and simulation results reveal its efficacy in reliably supporting power system frequency and preventing the need for unnecessary load shedding.

Gao, Wei [Argonne National Laboratory (ANL), Argon↗