Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “subsystem design”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,027 records · Page 57

Materials, Processes and Manufacturing in Ares 1 Upper Stage: Integration with Systems Design and Development

Ares I Crew Launch Vehicle Upper Stage is designed and developed based on sound systems engineering principles. Systems Engineering starts with Concept of Operations and Mission requirements, which in turn determine the launch system architecture and its performance requirements. The Ares I-Upper Stage is designed and developed to meet these requirements. Designers depend on the support from materials, processes and manufacturing during the design, development and verification of subsystems and components. The requirements relative to reliability, safety, operability and availability are also dependent on materials availability, characterization, process maturation and vendor support. This paper discusses the roles and responsibilities of materials and manufacturing engineering during the various phases of Ares IUS development, including design and analysis, hardware development, test and verification. Emphasis is placed how materials, processes and manufacturing support is integrated over the Upper Stage Project, both horizontally and vertically. In addition, the paper describes the approach used to ensure compliance with materials, processes, and manufacturing requirements during the project cycle, with focus on hardware systems design and development.

Bhat, Biliyar N.↗

Performance and Life Tests of a Regenerative Blower for EVA Suit Ventilation

Ventilation fans for future space suits must meet demanding performance specifications, satisfy stringent safety requirements for operation in an oxygen atmosphere, and be able to increase output to operate in buddy mode. A regenerative blower is an attractive choice due to its ability to meet these requirements at low operating speed. This paper describes progress in the development and testing of a regenerative blower designed to meet requirements for ventilation subsystems in a future space suit Portable Life Support Systems (PLSS). The blower assembly includes a custom-designed motor that has significantly improved in efficiency during this development effort. The blower was tested at both nominal and buddy mode operating points and head/flow performance and power consumption were measured. The blower was operated for over 1000 hours to demonstrate safe operation in an oxygen test loop at prototypical pressures. In addition, the blower demonstrated operation with the introduction of simulated lunar dust.

Izenson, Mike↗

Carbon Mineralization by Aqueous Precipitation for Beneficial Use of CO2 from Flue Gas

The objective of this project is to demonstrate an innovative process to mineralize CO2 from flue gas directly to reactive carbonates and maximize the value and versatility of its beneficial use products. The program scope includes the design, construction, and testing of a CO2 Conversion to Material Products (CCMP) Pilot Demonstration Plant utilizing CO2 from the flue gas of a power production facility in Moss Landing, CA. This topical report covers Subphase 2a which is the design phase of pilot demonstration subsystems. Materials of construction have been selected and proven in both lab scale and prototype testing to be acceptable for the reagent conditions of interest. The target application for the reactive carbonate material has been selected based upon small-scale feasibility studies and the design of a continuous fiber board production line has been completed. The electrochemical cell architecture and components have been selected based upon both lab scale and prototype testing. The appropriate quality control and diagnostic techniques have been developed and tested along with the required instrumentation and controls. Finally the demonstrate site infrastructure, NEPA categorical exclusion, and permitting is all ready for the construction and installation of the new units and upgrades.

Devenney, Martin↗

Earth observation system: Spacecraft design

The Earth Observation Satellite (EOS) was a study funded by NASA Langley Research Center. The study was a system investigation of the total spacecraft integration with its major subsystems and sensors. Mission optimization and ranking using various sensors was also an objective of the contract. Integrating the spacecraft and major subsystems with the large microwave radiometer was done, essentially making the radiometer a free-flyer without an external spacecraft. Another program objective was to provide design and analysis data on microwave radiometer satellites augmented with additional Earth, ocean, and atmospheric sensors. A top-down systems approach resulted in a detailed design integrating subsystems and sensors into the microwave support structure. An important objective of the program was to identify technology needs for Earth observation satellites. The definition and understanding of these design drivers are critical in order to set priorities for future EOS work.

Herbert, J. J.↗

Communications systems checkout study

The results and conclusions of an engineering study of Space Station communications subsystem checkout are reported. The primary purpose of the study is to recommend specific guidelines and constraints for the design and utilization of the communications subsystem leading to a practical and effective means of onboard checkout implementation. Major study objectives are as follows: (1) identify candidate communications subsystem checkout concepts, (2) determine implementation impacts of feasible concepts, (3) evaluate practicality and effectiveness of alternative concepts, (4) propose baseline modifications to accommodate preferred concepts, and (5) recommend areas for additional investigation. In addition, study results are interpreted, where appropriate, in terms of their applicability to checkout of Shuttle-Orbiter communications subsystem.

Ginter, W. G.↗

Definition and preliminary design of the LAWS (Laser Atmospheric Wind Sounder). Volume 1, phase 2: Executive summary

The objective of phase 1 of the LAWS study was to define and perform a preliminary design for the Laser Atmospheric Wind Sounder (LAWS) instrument. The definition phase consisted of identifying realistic concepts for LAWS and analyzing them in sufficient detail to be able to choose the most promising one for the LAWS application. System and subsystem configurations were then developed for the chosen concept. The concept and subsequent configurations were to be compatible with two prospective platforms--the Japanese Polar Orbiting Platform (JPOP) and as an attached payload on the Space Station Freedom. After a thorough and objective concept selection process, we chose a heterodyne detection Doppler lidar using a CO2 laser transmitter operating at 9.1 microns over a 2.1 micron solid state system. The choice of the CO2 approach over solid-state reflects the advanced state of development of CO2 lasers, its maturity in ground-based systems and the eased subsystem requirements associated with the longer wavelength. The CO2 lidar concept was then analyzed in detail to arrive at a configuration for the instrument and its major subsystems. Our approach throughout the configuration design was to take a systems perspective and trade requirements between subsystems, wherever possible, to arrive at configurations which made maximum use of existing, proven technology or relatively straightforward extensions to existing technology to reduce risk and cost. At the conclusion of Phase 1 we arrived at a configuration for LAWS which meets the performance requirements, yet which is less complex than previous designs of space-based wind sensors (e.g. Windsat), employs lightweight technologies to meet its weight goals (less than 800kg) and sufficiently flexible to offer various operational scenarios with power requirements from about 2 kW to 3 kW. The Phase 1 Final Report was released in March 1990. The 21-month Phase 2 began in October 1990. The requirement to accommodate LAWS as an attached payload on Space Station Freedom was deleted and the orbit altitude for the Japanese polar orbiting platform was changed from 824 km to 705 km. The power allocated to LAWS was reduced to 2.2 kW from 3 kW. Subsequently the availability of a Japanese Polar Orbiting Platform was called into question and LAWS accommodation studies were continued using a conceptual, ATLAS-launched platform supplied by MSFC. In March 1991 a modification to the original contracts was funded to provide a LAWS laser breadboard which could demonstrate all the performance requirements of the LAWS laser. Also funded as part of the same contract extension was a lifetest demonstration using an existing laser at STI. The breadboard extension was an eighteen month effort and the period of performance was therefore extended to September 30, 1992.

Source record↗

The kinematic Stirling engine as an energy conversion subsystem for paraboloidal dish solar thermal plants

The potential of a suitably designed and economically manufactured Stirling engine as the energy conversion subsystem of a paraboloidal dish-Stirling solar thermal power module was estimated. Results obtained by elementary cycle analyses were shown to match quite well the performance characteristics of an advanced kinematic Stirling engine, the United Stirling P-40, as established by current prototypes of the engine and by a more sophisticated analytic model of its advanced derivative. In addition to performance, brief consideration was given to other Stirling engine criteria such as durability, reliability, and serviceability. Production costs were not considered here.

Bowyer, J. M.↗

Additive Manufacture of Plasma Diagnostic Components Final Report Phase II

There is now a well-established set of plasma diagnostics (see e.g. [3]), but these remain some of the most expensive assemblies in fusion systems since for every system they have to be custom built, and time for diagnostic development can pace the project. Additive manufacturing (AM) has the potential to decrease production cost and significantly lower design time of fusion diagnostic subsystems, which would realize significant cost reduction for standard diagnostics. In some cases, these basic components can be additively manufactured for less than 1/100th costs of conventional manufacturing.In our DOE Phase II SBIR, we examined the impact that AM can have on plasma diagnostic cost by taking 15 separate diagnostics through an engineering design using Conventional Manufacturing (CM) techniques, then optimizing the design to exploit the benefits of AM. The impact of AM techniques on cost is found to be in several areas. First, the cost of materials falls because AM parts can be manufactured with little to no waste, and engineered to use less material than CM. Next, the cost of fabrication falls for AM parts relative to CM since the fabrication time can be computed exactly, and often no post-processing is required for the part to be functional. We find that AM techniques are well suited for plasma diagnostics since typical diagnostic complexity comes at no additional cost. Cooling channels, for example, can be builtin to plasma-facing components at no extra cost. Fabrication costs associated with assembly are lower for AM parts because many components can be combined and printed as monoliths, thereby mitigating the need for alignment or calibration. Finally, the cost of engineering is impacted by exploiting AM design tools that allow standard components to be customized through web-interfaces. Furthermore, we find that concept design costs can be impacted by scripting interfaces for online engineering design tools.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Methods for the development of a bioregenerative life support system

Presented here is a rudimentary approach to designing a life support system based on the utilization of plants and animals. The biggest stumbling block in the initial phases of developing a bioregenerative life support system is encountered in collecting and consolidating the data. If a database existed for the systems engineer so that he or she may have accurate data and a better understanding of biological systems in engineering terms, then the design process would be simplified. Also addressed is a means of evaluating the subsystems chosen. These subsystems are unified into a common metric, kilograms of mass, and normalized in relation to the throughput of a few basic elements. The initial integration of these subsystems is based on input/output masses and eventually balanced to a point of operation within the inherent performance ranges of the organisms chosen. At this point, it becomes necessary to go beyond the simplifying assumptions of simple mass relationships and further define for each organism the processes used to manipulate the throughput matter. Mainly considered here is the fact that these organisms perform input/output functions on differing timescales, thus establishing the need for buffer volumes or appropriate subsystem phasing. At each point in a systematic design it is necessary to disturb the system and discern its sensitivity to the disturbance. This can be done either through the introduction of a catastrophic failure or by applying a small perturbation to the system. One example is increasing the crew size. Here the wide range of performance characteristics once again shows that biological systems have an inherent advantage in responding to systemic perturbations. Since the design of any space-based system depends on mass, power, and volume requirements, each subsystem must be evaluated in these terms.

Goldman, Michelle↗

Hardware design and testing of the generic rear transition module for the global trigger subsystem of ATLAS Phase-II Upgrade

Abstract In the framework of the ATLAS experiment’s Phase-II Upgrade at the High-Luminosity Large Hadron Collider (HL-LHC), new and improved trigger hardware and algorithms will be implemented onto a single-level, 10 μs-latency architecture. The Global Trigger is a new subsystem which will bring event-filter capabilities by performing offline-like algorithms on full-granularity calorimeter data. The implementation of the functionality is firmware-focused and composed of several processing nodes, which are hosted on identical hardware, made up of an Advanced Telecommunications Computing Architecture (ATCA) front board, called Global Common Module (GCM), and a rear transition module (RTM), called Generic RTM (GRM). The GRM, which was developed to mitigate the risks deriving from the complex design and power management of the GCM, features an advanced Xilinx Versal Prime system-on-chip and can handle communication with the GCM and Front-End Link eXchange (FELIX) subsystem and trigger processors through 124 25.8 Gb/s transceiver links, for readout and control. Additionally, the GRM mounts a Low-Power GigaBit Transceiver (lpGBT) chip which enables emulation of the detector front-ends for integration tests. This paper presents the GRM hardware design and its testing.

Instruments & Instrumentation↗

Preliminary thermal design of the COLD-SAT spacecraft

The COLD-SAT free-flying spacecraft was to perform experiments with LH2 in the cryogenic fluid management technologies of storage, supply and transfer in reduced gravity. The Phase A preliminary design of the Thermal Control Subsystem (TCS) for the spacecraft exterior and interior surfaces and components of the bus subsystems is described. The TCS was composed of passive elements which were augmented with heaters. Trade studies to minimize the parasitic heat leakage into the cryogen storage tanks are described. Selection procedure for the thermally optimum on-orbit spacecraft attitude was defined. TRASYS-2 and SINDA'85 verification analysis was performed on the design and the results are presented.

Arif, Hugh↗

Preliminary thermal design of the COLD-SAT spacecraft

The COLD-SAT free-flying spacecraft was to perform experiments with LH2 in the cryogenic fluid management technologies of storage, supply and transfer in reduced gravity. The Phase A preliminary design of the Thermal Control Subsystem (TCS) for the spacecraft exterior and interior surfaces and components of the bus subsystems is described. The TCS was composed of passive elements which were augmented with heaters. Trade studies to minimize the parasitic heat leakage into the cryogen storage tanks are described. Selection procedure for the thermally optimum on-orbit spacecraft attitude was defined. TRASYS-2 and SINDA'85 verification analysis was performed on the design and the results are presented.

Arif, Hugh↗

Evolving Reliability and Maintainability Allocations for NASA Ground Systems

This paper describes the methodology that was developed to allocate reliability and maintainability requirements for the NASA Ground Systems Development and Operations (GSDO) program's subsystems. As systems progressed through their design life cycle and hardware data became available, it became necessary to reexamine the previously derived allocations. Allocating is an iterative process; as systems moved beyond their conceptual and preliminary design phases this provided an opportunity for the reliability engineering team to reevaluate allocations based on updated designs and maintainability characteristics of the components. Trade-offs in reliability and maintainability were essential to ensuring the integrity of the reliability and maintainability analysis. This paper will discuss the value of modifying reliability and maintainability allocations made for the GSDO subsystems as the program nears the end of its design phase.

allocations↗

Development of a preprototype times wastewater recovery subsystem

A three-man wastewater recovery preprototype subsystem using a hollow fiber membrane evaporator with a thermoelectric heat pump to provide efficient potable water recovery from wastewater on extended duration space flights was designed, fabricated, and tested at one-gravity. Low power, compactness and gravity insensitive operation are featured in this vacuum distillation subsystem. The tubular hollow fiber elements provide positive liquid/gas phase control with no moving parts, and provide structural integrity, improving on previous flat sheet membrane designs. A thermoelectric heat pump provides latent energy recovery. Application and integration of these key elements solved problems inherent in all previous reclamation subsystem designs.

Roebelen, G. J., Jr.↗

Receiver-exciter controller design

A description of the general design of both the block 3 and block 4 receiver-exciter controllers for the Deep Space Network (DSN) Mark IV-A System is presented along with the design approach. The controllers are designed to enable the receiver-exciter subsystem (RCV) to be configured, calibrated, initialized and operated from a central location via high level instructions. The RECs are designed to be operated under the control of the DMC subsystem. The instructions are in the form of standard subsystem blocks (SSBs) received via the local area network (LAN). The centralized control provided by RECs and other DSCC controllers in Mark IV-A is intended to reduce DSN operations costs from the Mark III era.

Jansma, P. A.↗

Low Cost Rapid Response Spacecraft, (LCRRS): A Research Project in Low Cost Spacecraft Design and Fabrication in a Rapid Prototyping Environment

The Low Cost Rapid Response Spacecraft (LCRRS) is an ongoing research development project at NASA Ames Research Center (ARC), Moffett Field, California. The prototype spacecraft, called Cost Optimized Test for Spacecraft Avionics and Technologies (COTSAT) is the first of what could potentially be a series of rapidly produced low-cost satellites. COTSAT has a target launch date of March 2009 on a SpaceX Falcon 9 launch vehicle. The LCRRS research system design incorporates use of COTS (Commercial Off The Shelf), MOTS (Modified Off The Shelf), and GOTS (Government Off The Shelf) hardware for a remote sensing satellite. The design concept was baselined to support a 0.5 meter Ritchey-Chretien telescope payload. This telescope and camera system is expected to achieve 1.5 meter/pixel resolution. The COTSAT team is investigating the possibility of building a fully functional spacecraft for $500,000 parts and $2,000,000 labor. Cost is dramatically reduced by using a sealed container, housing the bus and payload subsystems. Some electrical and RF designs were improved/upgraded from GeneSat-1 heritage systems. The project began in January 2007 and has yielded two functional test platforms. It is expected that a flight-qualified unit will be finished in December 2008. Flight quality controls are in place on the parts and materials used in this development with the aim of using them to finish a proto-flight satellite. For LEO missions the team is targeting a mission class requiring a minimum of six months lifetime or more. The system architecture incorporates several design features required by high reliability missions. This allows for a true skunk works environment to rapidly progress toward a flight design. Engineering and fabrication is primarily done in-house at NASA Ames with flight certifications on materials. The team currently employs seven Full Time Equivalent employees. The success of COTSATs small team in this effort can be attributed to highly cross trained engineering team. The engineers on the team are capable of functioning in two to three engineering disciplines which allows highly efficient interdisciplinary engineering collaboration. NASA Ames is actively proposing mission concepts to use the COTSAT platform to accomplish science. If the COTSAT team validates this approach, it will allow the possibility for remote sensing missions to produce a high science yield for minimal cost and reduced schedule. Another aim of this approach is to yield an accelerated pathway from a Phase A study to mission launch. Leaders in the aerospace industry have shown interest in this methodology. Several visits and tours have been given in the lab. Although the concept of low-cost development is initially met with skepticism from some within the prohibitive aerospace industry, the project's efforts have been highly praised for the accomplishments met within a limited time and budget. Overall the development has progressed tremendously well and the team is answering critical questions for current and future low-cost small satellite developments. COTSAT subsystems are not limited to a specific weight class and could be adapted to produce smaller platforms and to fit various launch vehicles.

Spremo, Stevan↗

Evolving Reliability and Maintainability Allocations for NASA Ground Systems

This paper describes the methodology and value of modifying allocations to reliability and maintainability requirements for the NASA Ground Systems Development and Operations (GSDO) program’s subsystems. As systems progressed through their design life cycle and hardware data became available, it became necessary to reexamine the previously derived allocations. This iterative process provided an opportunity for the reliability engineering team to reevaluate allocations as systems moved beyond their conceptual and preliminary design phases. These new allocations are based on updated designs and maintainability characteristics of the components. It was found that trade-offs in reliability and maintainability were essential to ensuring the integrity of the reliability and maintainability analysis. This paper discusses the results of reliability and maintainability reallocations made for the GSDO subsystems as the program nears the end of its design phase.

allocations↗

Evolving Reliability and Maintainability Allocations for NASA Ground Systems

This paper describes the methodology and value of modifying allocations to reliability and maintainability requirements for the NASA Ground Systems Development and Operations (GSDO) programs subsystems. As systems progressed through their design life cycle and hardware data became available, it became necessary to reexamine the previously derived allocations. This iterative process provided an opportunity for the reliability engineering team to reevaluate allocations as systems moved beyond their conceptual and preliminary design phases. These new allocations are based on updated designs and maintainability characteristics of the components. It was found that trade-offs in reliability and maintainability were essential to ensuring the integrity of the reliability and maintainability analysis. This paper discusses the results of reliability and maintainability reallocations made for the GSDO subsystems as the program nears the end of its design phase.

reliability↗