Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “scope”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,027 records · Page 57

Finite Element Modeling of Spent Nuclear Fuel in Dry Storage under Seismic Excitation

Spent nuclear fuel (SNF) is currently stored at independent spent fuel storage installations (ISFSIs) at nuclear power plant sites across the US. The US Department of Energy (DOE) Spent Fuel and Waste Science and Technology (SFWST) program is currently working to understand the response of SNF during a seismic event. This investigation is part of a long-term effort by DOE to quantify the external mechanical loads on SNF. The SFWST program has recently completed campaigns evaluating SNF behavior during normal conditions of transport and in 30 cm package drop scenarios; both campaigns included a combination of testing and modeling. Likewise, the investigation into seismic response of SNF will include full-size shake table tests of a vertical storage overpack containing instrumented surrogate fuel assemblies, as well as pre- and post-test finite element modeling. This work focuses on the development of finite element models simulating the planned test configuration. The seismic response is calculated at two scales: at the package level, and at the fuel level. The package level model evaluates the behavior of the storage overpack and its contents in response to the ground motions of a representative earthquake. The motion of the package is input to the fuel level model, which consists of a detailed finite element model of a 17x17 or 16x16 pressurized water reactor (PWR) fuel assembly or of a 10x10 boiling water reactor (BWR) fuel assembly. The stress and strain on individual components such as fuel rods and guide tubes are extracted from this model. This work details the SNF response to various input ground motions, considering representative earthquakes in the Central and Eastern US under various site conditions. Also discussed is the development of a “reduced scope” finite element model of the SNF, which consists of a single fuel rod while retaining the dynamic response of the entire fuel assembly. This reduced scope model addresses the significant computational expense of modeling the SNF under long-duration input ground motions and facilitates simulating additional parameter variations of the model beyond the as-tested configuration. The modeling results provide important insight that will help to inform future testing and modeling efforts by the SFWST program to close the knowledge gap related to external loads on SNF.

Kadooka, Kevin↗

Modeling and Uncertainty Quantification of CESAR1 Solvent System for Post-Combustion Capture

This presentation is focused on the development of the CESAR1 solvent system model by the CCSI2 team and validation with pilot plant data from Technology Centre Mongstad. It also serves as an update of previous work by incorporating a new thermodynamic model of the system developed by collaborators from Heriot-Watt University through the SCOPE program. Finally, it includes some discussions on future directions of the project including collaboration with SCOPE to add the capability of amine emissions prediction along with some parametric uncertainty quantification work on the submodels.

Morgan, Joshua↗

New initiatives in materials security

NRC Mission: To license and regulate the Nation's civilian use of byproduct, source, and special nuclear materials to ensure adequate protection of public health and safety, promote the common defense and security, and protect the environment. Scope of Responsibility: NRC's regulatory mission covers three main areas: - Reactors: commercial reactors for generating electric power and non-power reactors used for research, testing, and training; - Materials: uses of nuclear materials in medical, industrial, and academic settings and facilities that produce nuclear fuel; - Waste: transportation, storage, and disposal of nuclear materials and waste, and decommissioning of nuclear facilities from service. A Changing Environment: - National security is dominant concern; - Obtain appropriate balance between safety and Security initiatives and Operational activities; - Multiple layers of systems, infrastructures for various licensees. Effective Communication: Not easy; Sound bites galore; Nuclear 'phobia'; Acceptability of risk; Balance of cost and benefits; Responsibility of the regulator, licensees and radiation protection professionals. Prioritized Licensee Groups: - High priority: Panoramic irradiators; manufacturers/distributors; - Medium priority: medical and research facilities, radiography, well-logging, broad-scope licenses, self-shielded irradiators, open-field irradiators, and other licensees; - Low priority: Portable gauges. Increased Security Measures: Security Zone; Control Access; Monitor, Detect, Assess, and Respond; Transportation Security; Additional control to secure portable and mobile devices; Liaison with Local Law Enforcement Agencies; Background Investigations and Fingerprinting; License Verification; Document Retention; Information Protection; Orders/Legally binding requirements to more than 3000 licensees. Orders Issued: Large Panoramic Irradiators Security Measures (60 Orders issued 6/03, Inspections done); Manufacturing and Distribution Licensees Security Measures (61 Orders issued 1/04, Inspections done); Transportation of Radioactive Material Quantities of Concern (167 Orders Issued 07/05, Inspections done); Orders for Increased Control Measures for other types of sources by categories of licenses (1,098 NRC Orders and 1782 binding State requirements issued by 12/05, Implemented 06/06, Inspections done by NRC and States). Security Inspection Results: All first year Increased Control inspections completed; NRC Information Notice (IN) 2007-16 issued May 2007; Since IN 2007-16 was issued, {approx}50% of the NRC inspections performed resulted in violations; Licensees misinterpreted or incompletely implemented requirements; Common theme: failure to properly document actions or programs when implementing the Increased Controls. Energy Policy Act of 2005: Established Radiation Source Protection and Security Task Force: cooperative effort with 14 Federal agencies, 2 State organizations; Comprehensive analysis of the security of radiation sources in the U.S.; Directed NRC to contract with National Academy of Sciences to conduct a study on radiation source use and replacement; Report to the President and Congress issued 8/06 and every 4 years thereafter. Radiation Source Protection and Security Task Force: Need higher priority on international transport security; Evaluate feasibility of using new and existing technologies to detect and discourage theft during transport; Conduct a feasibility study on the possible phase out of CsCl in highly dispersible forms; Further evaluate potential alternative technologies; Expedite completion of fingerprint requirements in Act. National Source Tracking System: Joint NRC/DOE 2003 report on Radiological Dispersal Devices recommended development of a national source tracking system; IAEA Code of Conduct recommended establishment of a national registry; U.S. Energy Policy Act of 2005 placed requirements for NRC to issue regulations establishing a mandatory tracking system. New Fingerprinting Requirements: Orders were issued to NRC Increased Control licensees on Dec 5, 2007; Licensees have 60 days to notify the NRC if they are unable to comply or if compliance is unnecessary; Licensees have 90 days to fingerprint and approve a Trustworthiness and Reliability Official; Licensees will have 180 days to implement program; 34 Agreement Stated Increased Control Licensees will receive similar requirements within 180 days. 2007 GAO Investigation: Formed Bogus Company and Obtained NRC License; Altered NRC License; Two Suppliers Agreed to Sell Material; Parallel Attempt to Obtain Agreement State; License Aborted When Notified of Site Visit. Short-Term Actions Taken: Terminated the NRC License; Stopped issuance of new NRC licenses until Interim Guidance was issued; Mandatory pre-Licensing visits or meetings for new applicants; Performed consequence assessment; Coordinated with Federal and State Partners; Retrospective exam ensure licensees are legitimate. Action Plan: Independent, 120-day external review Issued 2/11/08 for comment; National Source Tracking System - Jan 2009; Web-Based Licensing; General Licenses and Outreach; Pre-Licensing and Materials Working Groups; Agreement State Partnership; Comprehensive Internal Assessment. Regulatory Issue Summary (RIS 2008-02): Issued February 1, 2008; Latest developments in materials security; Highlights Energy Policy Act 2005, GAO report and National Academy pending Feb 2008 report; New efforts with DHS, DOE/NNSA and manufacturers on additional security enhancements for Cs-137 irradiators; Low-cost, easily implemented physical security improvements. Enhanced State, Federal and International Partnerships: Federal, State and local interface; DHS' Domestic Nuclear Detection Office 'Securing the Cities' Initiative; DHS Protective Action Guides for RDDs and INDs; DOE/NNSA's Securing the Sources Initiative; International nuclear security outreach activities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The US DOE-EM International Program - 13004

The U.S. Department of Energy (DOE) Office of Environmental Management (EM) conducts international collaboration activities in support of U.S. policies and objectives regarding the accelerated risk reduction and remediation of environmental legacy of the nations' nuclear weapons program and government sponsored nuclear energy research. The EM International Program supported out of the EM Office of the Associate Principal Deputy Assistant Secretary pursues collaborations with foreign government organizations, educational institutions and private industry to assist in identifying technologies and promote international collaborations that leverage resources and link international experience and expertise. In fiscal year (FY) 2012, the International Program awarded eight international collaborative projects for work scope spanning waste processing, groundwater and soil remediation, deactivation and decommissioning (D and D) and nuclear materials disposition initiatives to seven foreign organizations. Additionally, the International Program's scope and collaboration opportunities were expanded to include technical as well as non-technical areas. This paper will present an overview of the on-going tasks awarded in FY 2012 and an update of upcoming international activities and opportunities for expansion into FY 2013 and beyond. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An Initial Evaluation of Characterization and Closure Options for Underground Pipelines within a Hanford Site Single-Shell Tank Farm - 13210

The Hanford Site includes 149 single-shell tanks, organized in 12 'tank farms,' with contents managed as high-level mixed waste. The Hanford Federal Facility Agreement and Consent Order requires that one tank farm, the Waste Management Area C, be closed by June 30, 2019. A challenge to this project is the disposition and closure of Waste Management Area C underground pipelines. Waste Management Area C contains nearly seven miles of pipelines and 200 separate pipe segments. The pipelines were taken out of service decades ago and contain unknown volumes and concentrations of tank waste residuals from past operations. To understand the scope of activities that may be required for these pipelines, an evaluation was performed. The purpose of the evaluation was to identify what, if any, characterization methods and/or closure actions may be implemented at Waste Management Area C for closure of Waste Management Area C by 2019. Physical and analytical data do not exist for Waste Management Area C pipeline waste residuals. To develop estimates of residual volumes and inventories of contamination, an extensive search of available information on pipelines was conducted. The search included evaluating historical operation and occurrence records, physical attributes, schematics and drawings, and contaminant inventories associated with the process history of plutonium separations facilities and waste separations and stabilization operations. Scoping analyses of impacts to human health and the environment using three separate methodologies were then developed based on the waste residual estimates. All analyses resulted in preliminary assessments, indicating that pipeline waste residuals presented a comparably low long-term impact to groundwater with respect to soil, tank and other ancillary equipment residuals, but exceeded Washington State cleanup requirement values. In addition to performing the impact analyses, the assessment evaluated available sampling technologies and pipeline removal or treatment technologies. The evaluation accounted for the potential high worker risk, high cost, and schedule impacts associated with characterization, removal, or treatment of pipelines within Waste Management Area C for closure. This assessment was compared to the unknown, but estimated low, long-term impacts to groundwater associated with remaining waste residuals should the pipelines be left 'as is' and an engineered surface barrier or landfill cap be placed. This study also recommended that no characterization or closure actions be assumed or started for the pipelines within Waste Management Area C, likewise with the premise that a surface barrier or landfill cap be placed over the pipelines. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integrated High-Level Waste System Planning - Utilizing an Integrated Systems Planning Approach to Ensure End-State Definitions are Met and Executed - 13244

The Savannah River Site (SRS) is a Department of Energy site which has produced nuclear materials for national defense, research, space, and medical programs since the 1950's. As a by-product of this activity, approximately 37 million gallons of high-level liquid waste containing approximately 292 million curies of radioactivity is stored on an interim basis in 45 underground storage tanks. Originally, 51 tanks were constructed and utilized to support the mission. Four tanks have been closed and taken out of service and two are currently undergoing the closure process. The Liquid Waste System is a highly integrated operation involving safely storing liquid waste in underground storage tanks; removing, treating, and dispositioning the low-level waste fraction in grout; vitrifying the higher activity waste at the Defense Waste Processing Facility; and storing the vitrified waste in stainless steel canisters until permanent disposition. After waste removal and processing, the storage and processing facilities are decontaminated and closed. A Liquid Waste System Plan (hereinafter referred to as the Plan) was developed to integrate and document the activities required to disposition legacy and future High-Level Waste and to remove from service radioactive liquid waste tanks and facilities. It establishes and records a planning basis for waste processing in the liquid waste system through the end of the program mission. The integrated Plan which recognizes the challenges of constrained funding provides a path forward to complete the liquid waste mission within all regulatory and legal requirements. The overarching objective of the Plan is to meet all Federal Facility Agreement and Site Treatment Plan regulatory commitments on or ahead of schedule while preserving as much life cycle acceleration as possible through incorporation of numerous cost savings initiatives, elimination of non-essential scope, and deferral of other scope not on the critical path to compliance. There is currently a premium on processing and storage space in the radioactive liquid waste tank system. To enable continuation of risk reduction initiatives, the Plan establishes a processing strategy that provides tank space required to meet, or minimizes the impacts to meeting, programmatic objectives. The Plan also addresses perturbations in funding and schedule impacts. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The EM SSAB Annual Work Plan Process: Focusing Board Efforts and Resources - 13667

One of the most daunting tasks for any new member of a local board of the Environmental Management Site Specific Advisory Board (EM SSAB) is to try to understand the scope of the clean-up activities going on at the site. In most cases, there are at least two or three major cleanup activities in progress as well as monitoring of past projects. When planning for future projects is added to the mix, the list of projects can be long. With the clean-up activities involving all major environmental media - air, water, soils, and groundwater, new EM SSAB members can find themselves totally overwhelmed and ineffective. Helping new members get over this initial hurdle is a major objective of EM and all local boards of the EM SSAB. Even as members start to understand the size and scope of the projects at a site, they can still be frustrated at the length of time it takes to see results and get projects completed. Many project and clean-up timelines for most of the sites go beyond 10 years, so it's not unusual for an EM SSAB member to see the completion of only 1 or 2 projects over the course of their 6-year term on the board. This paper explores the annual work planning process of the EM SSAB local boards, one tool that can be used to educate EM SSAB members into seeing the broader picture for the site. EM SSAB local work plans divide the site into projects focused on a specific environmental issue or media such as groundwater and/or waste disposal options. Projects are further broken down into smaller segments by highlighting major milestones. Using these metrics, local boards of the EM SSAB can start to quantify the effectiveness of the project in achieving the ultimate goal of site clean-up. These metrics can also trigger board advice and recommendations for EM. At the beginning of each fiscal year, the EM SSAB work plan provides a road map with quantifiable checkpoints for activities throughout the year. When the work plans are integrated with site-specific, enforceable regulatory milestones, they can provide a comprehensive work plan for not only the board, but also regulators, site contractors, and DOE. Because the work plans are reviewed and approved by DOE, they carry some weight in holding local boards of the EM SSAB accountable. This structure provides the basis for local boards to achieve their primary function, to provide DOE with information, advice, and recommendations concerning issues affecting the EM program at the site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Technology Development: From Idea to Implementation - 12131

There are good ideas and new technologies proposed every day to solve problems within the DOE complex. A process to transition a new technology from inception to the decision to launch a project with baselines is described. Examples from active technology development projects within Savannah River Remediation (SRR) will be used to illustrate the points. The process includes decision points at key junctures leading to preliminary design. At that point, normal project management tools can be employed. The technology development steps include proof-of-principle testing, scaled testing and analysis, and conceptual design. Tools are used that define the scope necessary for each step of technology development. The tools include use of the DOE technology readiness guide, Consolidated Hazards Analysis (CHA) and internal checklists developed by Savannah River Remediation. Integration with operating or planned facilities is also included. The result is a roadmap and spreadsheet that identifies each open question and how it may be answered. Performance criteria are developed that enable simple decisions to be made after the completion of each step. Conceptual design tasks should begin as the technology development continues. The most important conceptual design tasks at this point in the process include process flow diagrams (PFDs), high level Process and Instrumentation Drawings (P and IDs), and general layout drawings. These should influence the design of the scaled simulant testing. Mechanical and electrical drawings that support cost and schedule development should also be developed. An early safety control strategy developed from the CHA will also influence the cost. The combination of test results, calculations and early design output with rough order of magnitude cost and schedule information provide input into the decisions to proceed with a project and data to establish the baseline. This process can be used to mature any new technology, especially those that must be integrated into complicated flow sheets. Then fully informed decisions can be made to usher technology development ideas through project implementation. Examples from active technology development projects, Tank 48 Treatment and Enhanced Chemical Cleaning, are presented. This model for technology development integrates several tools and activities to provide a logical method for maturing new ideas and technologies. It provides a framework to develop a good idea into a full up design/build project. This model defines a set of integrated tasks to mature the technology and define scope, cost and schedule necessary to make business decisions for implementing technology development. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Dynamic Waste Isolation Pilot Plant Performance Assessment Tool - 12490

The Waste Isolation Pilot Plant (WIPP) Performance Assessment (PA) methodology comprises a toolbox used to demonstrate regulatory compliance of the repository after facility closure. The PA framework rests upon an extensive suite of computational codes. In some cases, significant alteration of code inputs is a tedious and difficult task. Due to the nature of the application for which they are used, PA codes used in support of WIPP regulatory compliance demonstration must satisfy stringent quality assurance requirements. Consequently, many of the coding practices used during original code development are still implemented today. A more efficient workflow configuration has the potential to alleviate difficulties associated with extensive code input modifications. Here, this potential is assessed via an implementation of a more flexible scientific workflow system for a subset of the codes used in WIPP PA. The scientific workflow approach taken here for a dynamic PA system enables users from disparate backgrounds to dramatically shorten the time between hypothesis and analysis by decreasing the amount of a priori knowledge, from a range of disciplines, needed to execute the code. Having smaller iteration times allows for more ideas to be tested and explored, which leads to safer and more optimized systems. Note that these high-level, dynamic tools are intended only for initial scoping studies on the personal computer of a researcher. Full, regulatory compliance calculations may occur only within a qualified computing environment. However, the WIPP PA tools here may guide future research and indicate regions of the analysis space that are worth further study. This next generation of PA software provides the ability to perform scoping investigations of repository performance quickly and easily, and has an accessible and useful interface to a variety of users, such as fuel cycle systems designers, domain experts such as repository modelers, and policy makers. The purview of this project allows for many opportunities for future work. Foremost among these is the desire to implement the full BRAGFLO suite within the workflow. This will entail porting or wrapping Genmesh, Matset, LHS, and ICSet within Python. Moreover, unifying the two GUIs into a single driver application would be a natural next step. Once the BRAGFLO suite is completed, other portions of WIPP PA could be implemented with corresponding and inter-operable work-flows. Likely first candidates for this are those codes that are similarly computationally intensive, such as the one used to generate complementary cumulative distribution functions used to demonstrate regulatory compliance (code CCDFGF). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Fusion Power measurement at ITER

Nuclear fusion research aims to provide energy for the future in a sustainable way and the ITER project scope is to demonstrate the feasibility of nuclear fusion energy. ITER is a nuclear experimental reactor based on a large scale fusion plasma (tokamak type) device generating Deuterium - Tritium (DT) fusion reactions with emission of 14 MeV neutrons producing up to 700 MW fusion power. The measurement of fusion power, i.e. total neutron emissivity, will play an important role for achieving ITER goals, in particular the fusion gain factor Q related to the reactor performance. Particular attention is given also to the development of the neutron calibration strategy whose main scope is to achieve the required accuracy of 10% for the measurement of fusion power. Neutron Flux Monitors located in diagnostic ports and inside the vacuum vessel will measure ITER total neutron emissivity, expected to range from 1014 n/s in Deuterium - Deuterium (DD) plasmas up to almost 10{sup 21} n/s in DT plasmas. The neutron detection systems as well all other ITER diagnostics have to withstand high nuclear radiation and electromagnetic fields as well ultrahigh vacuum and thermal loads. (authors)

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Structure and Process of Managing the UO2 Dry In-Pile Fracture Test Irradiation Experiment

The management and structure of a novel research and development (R&D) project can be hard to navigate. This is especially true when it involves nuclear fuel. Familiarity with institutional safety and procedural requirements, a well defined scope, and accurate cost estimates can all help ensure successful project management from start to finish. The Dry In-Pile Fracture Test (DRIFT) experiments performed at the Transient Test Reactor Facility are an excellent example of managing an R&D project within its scope and budget constraints. The objective of the DRIFT test was to develop fracture propagation data in a manner consistent with light-water reactors to validate and improve the fracture propagation models of uranium oxide fuels in the MOOSE (Multiphysics Object-Oriented Simulation Environment)-BISON-Marmot code framework [1].

99 GENERAL AND MISCELLANEOUS↗

Consolidated Nuclear Security, LLC, Excess Facility Disposition Program - 17289

Consolidated Nuclear Security, LLC (CNS), the management and operating contractor for the Y-12 National Security Complex (Y-12) in Oak Ridge, Tennessee, and the Pantex Plant (Pantex) in Amarillo, Texas, has developed an integrated strategy to address badly deteriorating excess facilities presenting risks to people, the environment, and the National Nuclear Security Administration (NNSA) mission. The comprehensive, integrated Excess Facilities Disposition Program (EFDP) incorporates NNSA scope for excess facility risk reduction, preparation of facilities to be transferred to the U.S. Department of Energy (DOE) Office of Environmental Management (EM) for demolition, and demolition of non-process contaminated facilities. The Program has been developed using the NNSA Office of Safety, Infrastructure, and Operations (NA-50) Program Management Plan as a guide. The Program has undertaken actions to address the most immediate risks associated with CNS excess facilities. At Y-12, new foam roofs have been installed on Buildings 9201-5 (Alpha 5), 9204-4 (Beta 4), and 9206 to minimize further facility degradation. Tanks and dikes outside of Alpha 5 and Beta 4 are also being disconnected, drained, and filled with concrete. In addition, Beta 4 will be getting a new electrical system as its Manhattan Project-era system will be replaced by a temporary 'construction power' setup that will provide as-needed electricity to the building that is safer, more reliable, and will ease demolition activities in the future. The EFDP is also focusing on the basement of Alpha 5 and is planning to remove the water from the aging facility's flooded basement, which in some areas contains up to 54 inches of water. The EFDP is also planning several efforts to remove excess materials from Alpha 5 and Beta 4, de-inventory the Alpha 5 Mercury House System and numerous transformers, and de-inventory Beta 4 hydraulic pumps and systems. Efforts are also underway to deactivate and decommission non-process-contaminated facilities at Y-12 and at Pantex. The EFDP has prioritized the performance of work to reduce risk while at the same time supporting the preparation of process-contaminated Y-12 facilities for transfer to EM. The Program aligns with the EM goal to have the NNSA scope completed in Alpha 5 and Beta 4 by the end of FY 2020, and Building 9206 completed by the end of FY 2024. These dates and project sequencing will support the Y-12-related DOE EM cleanup initiatives. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Value of Integrated Risk and Issue Management - 17516

Risk management is a tool that has been used by project managers for several decades to help manage scope, cost, and schedule baselines and to improve the likelihood of project success. More recently, the risk management process has been applied to the management of companies and corporations under the designation of Enterprise Risk Management (ERM) where it is used to help ensure success in meeting strategic objectives. All of this focus on risk (related to events or conditions that may occur) is normally done without considering how issues (related to events or conditions that will or has occurred) may impact the allocation of resources required to address risks, and perhaps more importantly, how resources required to support normal work scope may be impacted. This paper suggests the use of an integrated risk and issue management process, where risks and issues are managed concurrently using similar but separate and distinct processes. The benefit of using an integrated process is the organization and centralization of data related to risks and issues that becomes available for decision makers to use in prioritizing and allocating limited resources between performing normal work, addressing risks, or resolving issues. Applying integrated risk and issue management to any activity will lead to better decisions, whether the activity is personal, project, program, or enterprise. (authors)

99 GENERAL AND MISCELLANEOUS↗

Value of Integrated Risk and Issue Management - 17589

Risk management is a tool that has been used by project managers for several decades to help manage scope, cost, and schedule baselines and to improve the likelihood of project success. More recently, the risk management process has been applied to the management of companies and corporations under the designation of Enterprise Risk Management (ERM) where it is used to help ensure success in meeting strategic objectives. All of this focus on risk (related to events or conditions that may occur) is normally done without considering how issues (related to events or conditions that will or has occurred) may impact the allocation of resources required to address risks, and perhaps more importantly, how resources required to support normal work scope may be impacted. This paper suggests the use of an integrated risk and issue management process, where risks and issues are managed concurrently using similar but separate and distinct processes. The benefit of using an integrated process is the organization and centralization of data related to risks and issues that becomes available for decision makers to use in prioritizing and allocating limited resources between performing normal work, addressing risks, or resolving issues. Applying integrated risk and issue management to any activity will lead to better decisions, whether the activity is personal, project, program, or enterprise. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Humboldt bay power plant decommissioning transition to civil works - 15039

Decommissioning of the Pacific Gas and Electric (PG and E) Company Humboldt Bay Power Plant (HBPP) Unit 3 nuclear facility has now, after more than three decades of SAFSTOR, completed the Plant Systems Removal Phase by removal of all radiologically significant plant systems from the buildings in June 2014. The HBPP historical design and construction, close proximity to the bay and associated tidal interactions poses unique challenges to an effective decommissioning effort as the Site transitions to a major earthwork project - designated as Civil Works. The last significant large component removal project remaining is segmentation and disposal of the reactor pressure vessel shell and this project is now integrated and executed under Civil Works with PG and E solely in an oversight role across the site beginning 2015. The value from run-up and mock-up testing of tooling to segment the HBPP reactor vessel will be discussed. Experience obtained, especially at error prone interfaces, during start-up, systemisation and operating phases for the First of a Kind (KOAK) tooling will be discussed. Implementation of the civil scope of work commenced July 2013. Its status and experience applicable to other decommissioning efforts will be provided from an owner's perspective. Implementation of the civil work scope includes development and implementation of oversight capability including policy, procedures and deployment of skilled, experienced and trained oversight staff in the field. Challenges encountered and solutions implemented during mobilization and ramp up of the civil contractor commensurate with demobilization of the self-perform staff will be covered. Partnering with the contractor to establish a good Client/Contractor relationship and tips on where to invest owner resources will be shared. Development of a solid baseline project schedule that incorporates regulatory constraints, client expectations and contract constraints and its importance to safe, compliant project execution will be shared. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Implementing a Low-Activity Waste Direct Feed Capability in the Waste Treatment and Immobilization Plant Project - 15594

The current design of the Waste Treatment and Immobilization Plant (WTP) requires that all waste be processed through the Pretreatment (PT) Facility. The U.S. Department of Energy (DOE) has developed a strategic, phased approach to completing the WTP Project, beginning with feeding some liquid waste from the tank farms to the Low-Activity Waste (LAW) Facility, bypassing the PT Facility. To accomplish this, the DOE Office of River Protection (ORP) will construct a new capability outside WTP to remove cesium and solids from the liquid portion of the tank waste before transferring that waste to the LAW Facility. This new capability, referred to as the Low-Activity Waste Pretreatment System, is outside WTP and not included in the project's scope. The primary driver for the Direct-Feed LAW (DFLAW) approach is to enable commissioning of the LAW Facility for low-activity waste processing before the PT and High-Level Waste Facilities are complete and operational. As such, the functions intended to be provided to the LAW Facility by the PT Facility and the common functionality with the High-Level Waste Facility must be refined and modified. The DFLAW approach will provide necessary systems and facilities to replace these enabling PT Facility functions until the PT Facility is completed and commissioned. In February 2014, ORP requested the WTP contractor to develop separate contract modification proposals for completing: (1) the LAW Facility, Balance of Facilities, and Analytical Laboratory work scope in the current contract through hot commissioning in a manner to accommodate a phased start of the WTP mission; and (2) initial planning and design for incorporating a permanent capability to accommodate DFLAW in the WTP. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Pursuing Cost Effective Tank Waste Characterization at the Savannah River Site - 16172

The U. S. Department of Energy Office of Environmental Management has tasked the Savannah River National Laboratory (SRNL) with developing strategies and technologies to understand, optimize, scale, and speed up tank waste characterization. This scope is part of a multi-year project with the end goal of implementing programmatic changes that accelerate tank waste processing and tank closure schedules, and at the same time reduce characterization costs, while maintaining data integrity. The project is currently in its second year. During the first year of the project, SRNL completed a series of activities focused on understanding the range of current characterization practices, needs, gaps, risks, and potential alternative approaches. Based on the results, conclusions were drawn regarding aspects of the programs that are most costly and time consuming; particular waste constituents that drive costs, schedule, and program risks; alternative characterization approaches (other than sampling and analysis) that are less expensive and more rapid; new laboratory methods holding the greatest promise for reducing characterization costs and schedule; and in whole, the primary areas where current characterization practices can be improved. SRNL's current scope is focusing on three primary activities: 1) development of a technical basis/strategy for improving the cost effectiveness and schedule of SRNL's tank closure characterization program; 2) design/assembly of hardware, plumbing, and software for automating select radiochemical separation and waste removal processes; and 3) development and testing of alternative radiochemical separation protocols most likely to improve high resource demand/time consuming analysis methods (such as Ra-226, Pa-231, Tc-99/I-129, and/or Y/trivalent actinide separations). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste Management 2016 300-296 Soil Remediation Project. Developing Innovative Solutions to Overcome Design Challenges - 16229

The 324 Building is a non-reactor, Hazard Category 2, Nuclear Facility located in the 300 Area of the U.S. Department of Energy (DOE) Hanford Site, located near Richland, Washington. The building is undergoing deactivation, decommissioning, decontamination, and demolition by Washington Closure Hanford (WCH) under the River Corridor Closure Contract. During the Cold War Era, the facility was used for chemical and radionuclide processing associated with nuclear weapons production. Historical records indicate that in October 1986, approximately 516 L of a concentrated liquid waste stream containing cesium-137 and strontium-90 was spilled onto the floor of B-Cell. B-Cell is located in the Radiochemical Engineering Complex (REC) of the 324 Building. It is estimated that this spill contained approximately 1.3 million curies of radioactivity. Some fraction of the spill was recovered; however, an unknown quantity was released into the soil beneath the 324 Building through an undetected breach in the B-Cell floor sump. Unknown quantities of water were used after the spill to wash items contained in B-Cell. When B-Cell was taken out of service, wastes being removed from B-Cell were placed in Grout Containers (GCs) and stabilized using a particulate grout. In the course of grouting activities, grout was spilled on the floor of B-Cell, eventually filling the sump. The primary scope of this project is to design, test, and implement a process capable of removing and isolating contaminated soil below B-Cell. This remediation effort has been divided into two removal zones identified as the primary and secondary removal zones. Based on current assumptions and estimates, the primary phase of this cleanup effort will remove roughly 156.45 m{sup 3} of highly contaminated materials. B-Cell debris, particulate grout, and the floor slab and liner comprise about 21.24 m{sup 3} of the total. The remaining 135.21 m3 will be contaminated soil. All of this material must be disposed of within the existing 324 Facility or packaged for disposal at the Hanford site. The objective of this project is to remove the B-Cell floor and highly contaminated underlying soils from beneath B-Cell using remote equipment to reduce the radiation levels and allow open-air excavation for the remaining contaminated soil. The challenges and subsequent technological solutions encountered from the Conceptual Design phase to the 100% Design Issued For Fabrication/Issued For Construction (IFF/IFC) consisted in part of the following: Design an efficient remote cleanup strategy for highly contaminated Low Level Waste (LLW) given the unknowns. Maintain contamination control down to 18 feet below B-Cell in a highly radioactive environment (12,870 R/Hr Cs-137 and Sr-90). Perform facility upgrades to enable remediation process implementation while maintaining integrity of pre-existing facility structure and license. Designing first-of-a-kind remote equipment for use in high radiation areas. Developing first-of-a-kind operations sequences for remote equipment while minimizing usage of original facility equipment (i.e. cranes, manipulators, etc.). Conducting time-motion studies of operations sequences to maximize efficiency while keeping dose As Low As Reasonably Achievable (ALARA) in a high dose environment. Construction of a full scale mockup to conduct performance testing in a clean environment and train the work force to operate the equipment. Overcoming scope, budget and schedule constraints associated with a fast-track DOE project. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗