Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “program plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,027 records · Page 57

Quantum Theory, Quantum Materials, Quantum Computing

The Sanibel Symposium series is renowned amongst materials theorists, quantum chemists, and condensed matter physicists as meetings driving progress on theory, mod eling, and simulation of materials and their molecular and nano-scale constituents. The Symposia are highly unusual (perhaps unique) in their priority emphasis on theory and computation, in having no parallel sessions, in cultivating well-attended Hot-Topic contributed oral sessions, and accessible poster sessions. These provide highly visible, influential platforms for cross-fertilization among specialist investigators, hence are strong contributors to the advance of quantum information sciences (QIS) research of strategic importance to the Office of Basic Energy Sciences (BES). As part of a five-year plan to highlight QIS challenges and opportunities and foster progress on them, each of the pre ceding three Sanibel Symposia had a thematic focus, Quantum Theory, Quantum Materi als, Quantum Computing, as a major program component. Emphasis was on quantum materials and their molecular constituents. The award for 2024 was for year four of that sustained thematic focus.

36 MATERIALS SCIENCE↗

Package Testing Program Process for Validation and Verification of Software

The purpose of this document is to define the process for validation and verification (V&V) of software used to test the thermal data acquisition equipment in the Oak Ridge National Laboratory (ORNL) Package Testing Program (PTP) as part of the testing configuration(s). This process adheres to all applicable ORNL Standards Based Management System requirements and correlates with the PTP Quality Management System and the Software Quality Assurance Plan.

97 MATHEMATICS AND COMPUTING↗

Fuel Fabrication Capability Assessment in Support of Advanced Reactor Deployments

More than 30 U.S. companies are designing a variety of advanced reactor concepts, and several companies are planning to demonstrate their reactor designs in the mid-2020s to late 2030s time frame. In 2020, the U.S. Department of Energy (DOE) announced a series of awards under the Advanced Reactor Demonstration Program (ARDP) to accelerate the successful deployment of 10 of these reactors under three pathways. TerraPower and X-energy were awarded grants under the Advanced Reactor Demonstration Program to deploy their respective Natrium reactor and Xe-100 reactor designs in the next 7–10 years. These demonstrations are in addition to several parallel programs, including the U.S. Department of Defense’s (DoD’s) interest in the development of microreactors, and interest of the National Aeronautics and Space Administration in space nuclear power and propulsion. The National Reactor Innovation Center’s (NRIC’s) mission is to accelerate the demonstration and deployment of advanced reactors; NRIC is partnering with several reactor developers and harnessing the world-class capabilities of the U.S. National Laboratory system to deliver on its mission. Several of these reactor designs will require advanced fuel forms that are not commercially available today, including metal fuel, molten salt fuel, TRi-structural ISOtropic (TRISO) particle fuel, and uranium nitride fuel. Recognizing that there may be potential gaps in the laboratory-scale process development and pilot-scale first-of-a-kind (FOAK) production of these fuel forms leading to delivery of the FOAK cores, NRIC commissioned this study to look at the challenges that need to be overcome for successful deliveries, including the evaluation of existing facilities and the potential need for a new fuel fabrication facility.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Reported Energy and Cost Savings from the DOE ESPC IDIQ Program: FY 2024

Energy Savings Performance Contracts (ESPCs)are a contractual mechanism that allow a federal agency to procure energy savings and facility improvements without upfront capital costs to reduce costs and resiliency. ESPCs are covered under FAR Part 23.2, and 42 USC § 8287. Section 8287(a)(2)(A) of Title 42 of the U.S. Code requires that each energy savings performance contract (ESPC) undergo an annual energy audit, resulting in a separate audit report for every project. The objective of the present report is to compile and analyze all annual ESPC audit reports issued between October 1, 2023, and September 30, 2024, for projects awarded under Generations 1, 2, and 3 of DOE’s ESPC IDIQ contracts. During this period, 205 measurement and verification (M&V) reports were produced for 200 projects; the total number of reports exceeds the number of projects because some projects generated more than one report(for example, a few projects measure savings twice per year and produce two audit reports annually, each covering a different six-month period). By aggregating the results from these individual audits, the report determines the portfolio-wide realization rate of energy and cost savings for all active ESPC projects awarded under DOE’s IDIQ program. For all 205audit reports, sufficient information was available to compare project-level estimated, reported, and guaranteed cost savings. Reported cost savings accounted for ESCO verified savings per each project’s M&V plan. The total reported cost savings for the period addressed were $\$$647.8million,compared with the total guaranteed cost savings of $\$$601.6million. On average across the reported projects: •ESPC contractors guaranteed 92.8% of the estimated cost savings• projects reported achieving 100.0% of the estimated cost savings• projects reported achieving 107.7% of the guaranteed cost savings. The M&V performed for the period indicated adjustments for government operations and maintenance impacts to savings amount to$\$$43.9millionandcould be restored with the original operational parameters for impacted projects. Accounting for this potential cost savings impact, these projects still realized 100.4% of the guaranteed cost savings. The information on estimated and reported energy savings was collected and compared for all 205of the reports examined. Based on site energy, estimated savings totaled 14.88million MMBtu, and reported savings were 15.33million MMBtu; 3.1% greater than the estimated energy savings. All of the reports examined contained sufficient information to calculate source energy savings. Based on site-adjusted source energy, total estimated energy savings were 20.90 million MMBtu, and reported savings were 21.22million MMBtu, 101.5% of the estimated energy savings. For water savings, the estimated savings were 11,539,055 kGal and the reported savings were 13,315,930 kGal. This means 1,776,875 kGal more water was saved than estimated, which is about 15% higher than the estimate. These results indicate that, overall, the reported energy savings slightly exceeded the estimated values, while estimated water savings significantly exceeded estimated values, suggesting that the projects achieved greater cost savings than originally projected. The total annual expense for the ESCOs to perform annual M&V audits and reporting was $\$$10.02million. Through this effort, $\$$647.8 million in annual cost savings was verified. The M&V results indicated that $\$$43.9 million of these verified savings reflected adjustments due to government operations A-6and maintenance impacts, which could be restored under the original operational parameters for the affected projects. These findings show the value of M&V that only costs 1.7%of the guaranteed cost savings to ensure guarantees are met.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Waste-to-Energy Technical Assistance for Local Governments

The goal of this project is to mobilize data, information, and knowledge generated about organic waste streams to local governments and support their decision-making. It builds on previous work related to wet organic waste resources (food waste, sludge, manure, waste fats and oils). The project provides an improved understanding of local waste challenges and priorities to inform BETO's R&D strategies and decision-making. It also supports local governments' goals and plans related to sustainable waste management, enables energy and/or resource recovery projects development at municipal level, and facilitates public-private partnerships. A key challenge is associated with more activities requested by entities than program allows which is mitigated by prioritization by requesting agency. All FY21 and FY22 TA requests have been completed. Major accomplishments include: 1). 34 requests managed in the past two years, 2) Distilled key challenges faced by communities. Key outcomes include strong community participation since inception of the program, dedicated program web site, deliverables tailored to communities' needs, and distribution materials (e.g., fact sheets, brochures) for a broader audience.

BIOMASS FUELS↗

Data-Driven Unit Commitment Refinement - a Scalable Approach for Complex Modern Power Grids

Integration of renewable generation, which is often intermittent and decentralized, substantially increases the stochasticity and complexity of power grid operations. Future power systems planning will require significant computational capability to evaluate balance between demand and supply under varying conditions, both temporally and spatially. The standard approach for generation unit commitment is to use mixed-integer linear programming to find the optimal generation schedule considering ramping and generator constraints. In the future grid this poses computational scalability challenges because generation and demand are not known with certainty due to stochasticity in weather and complexity of the grid. To address this challenge, we present a data-driven unit commitment approach that can efficiently include stochastic weather impacts and contingency considerations to improve unit commitment. Our approach uses graph-based data analytics techniques on solutions to the security constrained (and possibly stochastic) economic dispatch problem to identify potential improvements to a given unit commitment. Recent breakthroughs in fully-parallel stochastic economic dispatch software allow this approach to be scalably deployed. Simulations on synthetic South Carolina and Texas grids show this method can improve grid reliability with security constraints over a set of contingencies, while also meaningfully lowering total generation cost.

Holt, Timothy↗

Charged Lepton Flavour Violations searches with muons: present and future

Charged-lepton flavor violation (cLFV) is one of the most powerful probes for New Physics (NP). Since lepton flavor conservation is an accidental symmetry in the Standard Model (SM), it is naturally violated in many NP models, with contributions at the level of the current experimental sensitivities. Moreover, the negligible SM contributions would make the observation of cLFV unambiguous evidence of NP. It makes these searches extremely sensitive and, at the same time, extremely pure. Thanks to the intense muon beams currently available, their intriguing upgrade programs, and the progress in the detection techniques, cLFV muon processes are the golden channels in this field. Experimental programs to search for $\mu^+ \to e^+ \gamma$, $\mu^+ \to e^+ e^+ e^-$ and the $\mu \to e$ conversion in the nuclear field are currently ongoing. We review the current status and the strategic plans for future searches. This document is an update of the prior cLFV submission to the 2018 European Strategy for Particle Physics (ESPP); the earlier submission should be consulted for more experimental details.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Soft costs and EVSE – Knowledge gaps as a barrier to successful projects

There has been a recent push to increase access to electric vehicle (EV) charging infrastructure. The National Electric Vehicle Infrastructure (NEVI) program, part of the Bipartisan Infrastructure Law (BIL) has made significant funding available for major charging infrastructure projects along state thruways, and many state and local incentives exist for EV owners to install chargers in their homes. However, deployment of these chargers has not kept up with demand, primarily due to issues in project planning, permitting processes, and unforeseen delays. This paper serves as a review of the current understanding of these and other non-hardware costs in EV charging infrastructure projects (collectively known as “soft costs”). We found that soft costs in EV charging infrastructure projects are not well understood. Specifically, there is little agreement on how soft costs should be categorized and tracked, and less agreement still on best practices for controlling these costs and lowering barriers to infrastructure deployment. A broader review of EV charging infrastructure cost analyses shows that these costs can have significant impacts on project outcomes. EV charging infrastructure projects may be able to examine the success of the solar industry in lowering soft costs, and a similar effort may lower project costs significantly. Further work on standardizing and collecting data on EV charging infrastructure costs is required to begin addressing and controlling these costs.

32 - ENERGY CONSERVATION, CONSUMPTION, AND UTILIZA↗

Rooftop Photovoltaics and Electric Vehicle Co-Adoption: Attitudes, Norms, Diffusion, and Economics

The overall objectives of the project were to (1) Identify personal and social norms, peer effects, demographics and contextual factors (such as household energy expenditures, experience with outages, charging infrastructure availability) that may facilitate or hinder Solar-EV co-adoption; (2) outline strategies for the design of programs and practices that will enable reasoned RPV and EV adoption and their co-adoption; and (3) assemble a dataset comprised of survey responses of RPV-EV co-adopters, RPV-only adopters, EV-only adopters, and non-adopters. These objectives were only partially fulfilled given the decision to terminate the project. The research team was able to complete the semi-structured interviews, the core BY1 task and summarize the results below. As well, once the team learned of the research project’s fate, it sought and obtained the DOE SETO Technical Manager’s approval to repurpose funds for BY2 tasks to the extent feasible. Rather than invest further resources in expanding the pool of potential survey respondents and having no budget to survey, the research team repurposed funds subject and undertook a more limited (geographically) survey, but also expanded to it to include contingent valuation questions. The analysis of the survey data will necessarily be delayed given the lack of budget support, although some information on the respondent sample is in the results. Given a lack of attention to co-adoption previously, the insights generated in this project should assist decision-makers and industry actors in the development of programs and practices that enable reasoned RPV adoption and EV adoption and their co-adoption.

14 SOLAR ENERGY↗

Power Purchase Agreements: Overview

Overview guidance for the Better Buildings, Better Plants, and Better Climate Challenge programs on the types of power purchase agreements available for renewable energy procurement.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Energy I-Corps Annual Report 2022

The U.S. Department of Energy Office of Technology Transitions is pleased to provide an update on the Energy I-Corps program. Now in its eighth year, Energy I-Corps addresses critical gaps in workforce development for our National Lab researchers. It provides meaningful real-world opportunities for the application of commercialization and entrepreneurial skills to DOE technologies. As of November 2022, 191 teams from 12 National Labs have participated in Energy I-Corps over the course of 15 cohorts and the pilot. Since its inception, Energy I-Corps participants have learned from more than 180 industry mentors and conducted over 13,600 discovery interviews with companies like: EPRI, Shell, Ford, World Bank, Breakthrough Energy, John Deere, Siemens Gamesa, Chevron, Eaton, Samsung, Lowes, Johns Manville, LEGO, U.S. Army, Trane, Tesla, GM, Dow Chemical, 3M, Whirlpool, GE, Home Depot, and Amazon. Over 20 teams have launched new businesses based on their Energy I-Corps technology. Post Energy I-Corps, technologies have attracted over $140M in post-program funding and executed over 75 licenses.

cohort↗

Inspiring Tomorrow's Water Power Workforce to Lead the Clean Energy Revolution

Renewable water power, including hydropower and marine energy, will play a key role in building a reliable and flexible 100% clean energy future. That future needs a larger, modern workforce - one that's more diverse, equitable, and inclusive - to power and improve these technologies. And researchers at the National Renewable Energy Laboratory (NREL) are committed to fostering tomorrow's water power workforce through science, technology, engineering, and mathematics (STEM) and workforce development programs. Through events, online resources, and more, the lab aims to engage and inspire careers in water power.

app↗

The Status and Ambitions of the US Heavy Element Program

The aim of this whitepaper is to highlight the current capabilities and priorities of the US Heavy Element community and to provide the framework for a coordinated advancement of nuclear science from these studies. This is an organized effort to reflect on what has been achieved in the field given the recommendations and initiatives of the 2015 NSAC Long Range Plan, and on what can be realized in the next decade given current and possibly expanded investments. Current investments have positioned the US community to be among the world leaders in studies of the nuclear and chemical properties of the heaviest elements. These include studies of reaction mechanisms, moving us ever closer to the “island of stability”, in spectroscopy, allowing us to better understand nuclear structure at these extreme proton numbers, in chemical behavior, looking to determine how these elements should be placed on the Periodic Table, in performing the first measurements where isotopes are directly identified by their mass numbers, and in laying the foundation for a potential US-led new element discovery experiment. At present, the highest priority of the US Heavy Element community is to capitalize on the current investments by supporting the operations of US facilities at optimal values. These facilities include the Argonne Tandem Linac Accelerator System at Argonne National Laboratory and other Department of Energy facilities such as the 88-Inch Cyclotron at Lawrence Berkeley National Laboratory, which has a dedicated superheavy element program, as well as university laboratories, including Texas A&M University. The High Flux Isotope Reactor at Oak Ridge National Laboratory is crucial to providing the radioactive isotopes required for heavy element science targets. This facility should be supported to provide the actinide materials that are essential for US-based science. Production of stable, rare isotopes for beam material, including 48 Ca, 50 Ti, 54 Cr and 58 Fe, at the Stable Isotope Production and Research Center is critical to continued research in heavy element science and should be a priority. The continued development of targets for heavy element science and retaining US-based expertise is critical for the heavy element community. This is an area that is currently under pressure. For example, the target laboratory at Argonne National Laboratory serves a broad community and is currently under threat due to loss of critical personnel. The skills needed to make targets for nuclear science and develop new targetry methods need to be supported long term at Argonne, Oak Ridge and Lawrence Livermore National Laboratories as well as maintaining the programs at Oregon State University and San José State University as vital pipelines for training students. Advances in theory are the foundation to understand how nuclei behave and to predict those behaviors in new circumstances. Progress in these studies will necessitate continued and new investment and access to high-performance computing. The future health of the heavy element field is dependent on the continuous support of talented early-career professionals at all levels. It is critical that opportunities continue to be created for the next generation to become established in heavy element research so that we can ensure the field is attracting and retaining the best minds for continued success. It is also clear that to ensure diversity of ideas, perspectives and techniques, we need to recruit diverse personnel that are trained at the best facilities. The heavy element community is in support of continued investment to programs with initiatives in diversity, equity, and inclusion. Looking to the next decade of research, support needs to maintain and grow US leadership in heavy element science. Specifically, new investments in state-of-the-art instrumentation will be essential to scientific development of the field and in expanding scientific knowledge. Advances in the next generation of electron cyclotron resonance ion sources, multi-reflection time-of-flight devices, laser spectroscopy, trapping methods and next generation alpha and gamma spectroscopy systems should be prioritized.

38 RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCLEA↗

Enabling Regulatory and Business Models for Broad Microgrid Deployment (White Paper)

This white paper is one of seven being prepared for the Department of Energy (DOE) Microgrid Research & Development (R&D) program as part of a strategy development effort for the next 10 years. The seven white papers focus on the following areas: 1. Program vision, objectives, and R&D targets in 5 and 10 years, 2. T&D co-simulation of microgrid impacts and benefits, 3. Building blocks for microgrids, 4. Microgrids as a building block for the future grid, 5. Advanced microgrid control and protection, 6. Integrated models and tools for microgrid planning, designs, and operations, 7. Enabling regulatory and business models for broad microgrid deployment. This white paper is focused on Topic 7, as a sustainable regulatory and business environment for microgrid development is a foundational element for securing DOE's vision for the future role of microgrids in the U.S. electric sector. The objective of this white paper is to systematically characterize regulatory issues involved in microgrid deployment and microgrid business models, and from this evidence identify a robust and well-justified set of research recommendations for the Department of Energy Office of Electricity, informing programmatic vision, objectives and activities for the DOE Microgrid R&D Program.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Next Generation System Analysis Model Recently Added Features and Future Plans - Abstract

The Nuclear Waste Policy Act of 1982, as amended (NWPA 1982), established the federal government’s responsibility to accept spent nuclear fuel (SNF) and high-level radioactive waste (HLW) from waste owners and generators for ultimate disposition. SNF generated by the current fleet of commercial nuclear reactors is being stored at the reactor sites in spent fuel pools (SFPs) and in dry independent spent fuel storage installations (ISFSIs). The US Department of Energy Office of Nuclear Energy (DOE-NE) is developing an Integrated Waste Management Program (IWMP) comprising a suite of options and supporting analyses to enable future informed choices. The IWMP is applying integrated waste management system architecture analysis, system engineering, and decision analysis principles to inform potential future decisions regarding potential nuclear waste management system architectures. Architecture analyses of the IWM system are being conducted to support the future deployment of a comprehensive system for managing nuclear waste that considers all major aspects of the back end of the nuclear fuel cycle (i.e., transportation, storage, and disposal). The Next Generation System Analysis Model (NGSAM) is an agent-based simulation software tool designed for the express purpose of modeling the IWM system. NGSAM imports data from the Oak Ridge National Laboratory (ORNL) Unified Database (e.g., historic assembly information, thermal profiles for assembly heat, at-reactor dry storage loadings) to ensure that the simulation initializes with a realistic representation of the state of commercial SNF in the United States. Recent major enhancements that have been implemented into NGSAM since NGSAM was last presented at the WM2019 conference include: • Tracking of railroad escort and buffer car acquisition. • Addition of heavy haul and barge routes for some sites, as well as support for user-defined inter-modal routes. • Updates to the logic that checks the thermal maps prior to package transport. • Addition of an allocation method that predicts when reactor sites will pack assemblies from their pools for dry storage and allocates packages to those reactor sites in the preceding periods, favoring direct transport packages and reducing the number of packages that reactor sites pack for dry storage at their ISFSIs. • Addition of reactor site family operational limits, which are used to limit the number of loads from the pool and from dry storage at a given reactor site per year. • Support has been added for multiple canister loading maps and packages having multiple compatible transportation overpacks. • Updates in the handling of non-commercial fuel, including a new database containing data to support the updates. • Support for repackaging at reactor sites. • Implementing additional output reports or modifying existing reports. • User edits can now be created and edited via the NGSAM website. • Ability to load packages for dry storage at ISF pools. • Same-type package blending at DOE sites. • Support for multi-mode transloading at reactor sites. These new features have improved NGSAM capabilities and/or improve the user experience with the model and will be discussed in more detail. The initial NGSAM requirements for advanced reactor fuels, reprocessing, treatment, and conditioning are preliminary and are described at a high level in this paper: analysts will provide more specific requirements to the NGSAM team in the future. Additionally, there are many data needs associated with modeling advanced reactors in NGSAM, but many of the data or plans are still in progress and/or yet to be fully defined. However, this document describes an initial exploration of the data relevant to this program. Advanced reactor data will likely require revision as concepts evolve and new considerations are made. This is a technical paper that does not take into account contractual limitations or obligations under the Standard Contract for Disposal of Spent Nuclear Fuel and/or High-Level Radioactive Waste (Standard Contract) (10 CFR Part 961). For example, under the provisions of the Standard Contract, spent nuclear fuel in multi-assembly canisters is not an acceptable waste form, absent a mutually agreed to contract amendment. To the extent discussions or recommendations in this paper conflict with the provisions of the Standard Contract, the Standard Contract governs the obligations of the parties, and this paper in no manner supersedes, overrides, or amends the Standard Contract. This paper reflects technical work which could support future decision making by DOE. No inferences should be drawn from this paper regarding future actions by DOE, which are limited both by the terms of the Standard Contract and Congressional appropriations for the Department to fulfill its obligations under the Nuclear Waste Policy Act including licensing and construction of a spent nuclear fuel repository.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Evaluation of Portable Acceleration Solutions for LArTPC Simulation Using Wire-Cell Toolkit

The Liquid Argon Time Projection Chamber (LArTPC) technology plays an essential role in many current and future neutrino experiments. Accurate and fast simulation is critical to developing efficient analysis algorithms and precise physics model projections. The speed of simulation becomes more important as Deep Learning algorithms are getting more widely used in LArTPC analysis and their training requires a large simulated dataset. Heterogeneous computing is an efficient way to delegate computationally intensive tasks to specialized hardware. However, as the landscape of compute accelerators quickly evolves, it becomes increasingly difficult to manually adapt the code to the latest hardware or software environments. A solution which is portable to multiple hardware architectures without substantially compromising performance would thus be very beneficial, especially for long-term projects such as the LArTPC simulations. In search of a portable, scalable and maintainable software solution for LArTPC simulations, we have started to explore high-level portable programming frameworks that support several hardware backends. In this paper, we present our experience porting the LArTPC simulation code in the Wire-Cell Toolkit to NVIDIA GPUs, first with the CUDA programming model and then with a portable library called Kokkos. Preliminary performance results on NVIDIA V100 GPUs and multi-core CPUs are presented, followed by a discussion of the factors affiecting the performance and plans for future improvements.

Yu, Haiwang↗

A Conceptual Framework to Describe Energy Efficiency and Demand Response Interactions

Energy efficiency (EE) and demand response (DR) resources provide important utility system and ratepayer benefits. At the same time, the rapid change in the amount and type of variable renewable energy, like solar and wind, is reshaping the role and economic value of EE and DR, and will likely affect time-dependent valuation of EE and DR measures. Utilities are increasingly interested in integrating EE and DR measures and technologies (as well as other distributed energy resources) as a strategic approach to improve their collective cost-effectiveness and performance. However, the specific EE and DR features that may be best integrated, the interplay between changing EE and DR resource potential, and the resulting utility system impacts, are not well understood. We develop a framework to identify the EE and DR attributes, system conditions, and technological factors that are likely to drive interactions between EE and DR. We apply the framework to example measures with different technology specifics (e.g., presence of controls, building type, and targeted end use) in the context of different system conditions (e.g., peak demand, load-building periods during high renewable generation output). Ultimately, the framework defines EE and DR interactions not only by the change in discretionary load (i.e., DR potential) but also by the change in likelihood of participation in EE and DR programs—as well as the change in system need for, and the overall availability of, EE and DR resources. The framework is intended to improve the integration of EE and DR in utility operational and planning activities.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The Architecture of Area 12 Camp - Nevada's Atomic Ghost Town. An Architectural Survey of Area 12 Camp, Nevada National Security Site, Nye County, Nevada

The U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) plans to demolish 10 buildings and one structure in Area 12 Camp at the Nevada National Security Site (NNSS) in Nye County, Nevada, to meet current and future National Weapons Science, Global and Homeland Security Program, and Environmental Management mission requirements and to reduce dangers to site workers from some of these resources. These demolitions constitute an undertaking subject to review under Title 54 U.S.C. § 306108, commonly known as Section 106 of the National Historic Preservation Act, Title 54 U.S.C. § 300101, et seq., and its implementing regulations, 36 C.F.R. Part 800. These resources were recorded and evaluated as individually ineligible for the National Register of Historic Places (National Register or NRHP) by Menocal and Shaw (2019). Upon review by the Nevada State Historic Preservation Office (SHPO) and internal review by Desert Research Institute (DRI) and NNSA/NFO staff, it was determined that these resources needed to be rerecorded and evaluated in relation to what appeared to be a National Register-eligible Historic District made up of the entirety of Area 12 Camp. Based on preliminary information, it appeared that all 11 resources would likely be contributing elements of that historic district. With that assumption in mind, recording of the entire proposed Area 12 Camp Historic District was done for three purposes. First, it would result in a definitive significance evaluation of the 11 resources in question. Second, recording of the entire camp would be offered as an appropriate mitigation measure for the demolition of these resources. Third, it would present an essential background for future management of resources within the district boundaries. Prior to the present survey, Area 12 Camp had not yet been systematically recorded; therefore, DRI surveyed an area of approximately 229 acres for architectural resources. This effort resulted in the identification, recording, and evaluation of the Area 12 Camp Historic District (SHPO Resource No. D372), including the identification of its contributing components. This district is recommended eligible for the National Register of Historic Places under Criteria A and C. It is unevaluated under Criteria B and D. The Area 12 Historic District contains 71 Principal Resources, which include landscapes, buildings, and structures. Of these resources, 69 (including 10 of the 11 resources to be removed) are recommended as contributing elements of the historic district during its period of significance corresponding to nuclear testing from 1960 through 1992. During most of the Cold War, the government reservation now called the NNSS was named the Nevada Test Site (NTS).

54 ENVIRONMENTAL SCIENCES↗