Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “office building”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

1,016 records · Page 57

Investigation of Hardware and Instrumentation to Measure Hand Grasp Activity with the Spacesuit Gloves

Introduction: During the 2022 suited injury summit, it was hypothesized that there will be concerns for hand and glove injuries for future exploration space missions, especially given the fact that the “total number of Extravehicular activity (EVA) hours and frequency” for lunar surface missions is expected to vastly increase [1]. It has been reported that the hands experienced the greatest “absolute numbers” of reported injuries and far exceeds other injuries during EVA [1, 2]. It was reported that the most fatiguing part of the surface EVA was the repetitive gripping tasks [3]. It was recommended that a “glove sub-team” be created to look at possible injury mechanism and mitigation strategies. Some of the recommendations that were suggested [1] are as follows: examine hand fatigue, utilize motion capture, examine the duration and frequency of hand movements, and identify frequent hand motions. We started assessing hardware and instrumentation to measure hand grasp activity in the pressurized glove environment. The purpose of this test was to perform a hardware evaluation for motion capture (MoCap) gloves obtained from StretchSense (Auckland, New Zealand). The specific gloves used were the Pro Fidelity and SuperSplay to determine the repeatability, reliability, feasibility, and useability inside of a pressurized gloved environment. Methods: The MoCap gloves were customized (e.g., battery/Bluetooth pack relocated to upper arm) to better suit the pressurized testing environment and protect the subject from unintentional injury (Fig. 1). Fourteen total subjects from different demographics (i.e., gender and pressurized glove experience level) participated in this test series. Testing included one session each of a baseline data collection (NASA Johnson Space Center (JSC) building 21) and a spacesuit glove box (Fig. 2 at JSC building 7 room 2027) data collection (under vacuum down to 4.3 psid), where each session lasted 3-5 hours. Controlled and reproducible tasks to systematically evaluate the repeatability and reliability of the hardware were performed during baseline data collection. Additionally, subjects performed simulated EVA-like tasks in a pressurized gloved environment. For all sessions, MoCap gloves were placed on each of the subjects’ hands and the signal from it, or the raw capacitance (Fig. 3), was analysed. The raw capacitance was used to estimate the open and closed hand states between the testing conditions and allow us to provide an offset caused by the pressurized environment. Results & Discussion: Initial observation with the bare hands (baseline) condition showed that the MoCap gloves appeared to track grasping and releasing of the fingers (opening and closing fist) with both high- and low-speed conditions, while adduction and abduction of the fingers were not relatively tracked. A hardware evaluation was done outside of the glove box to assess the reliability and repeatability of the MoCap glove. In one task, a point force was applied to various locations on the back of the hand. When the point force was applied to the space between the 1st digit and the pointer finger, there was a noticeable distortion to the MoCap data. Another task examining an increasing force from a 10 lb. sandbag applied to the back of the hand while lying flat on a table, showed a constant flat line with only a distortion when the weight was increased or added to the back of the hand. Fig. 3 shows an object relocation task where you can see when each individual finger “opened” and “closed” (changed position) when picking up and setting down the dumbbell. When the fingers were stationary, the signal remained relatively flat compared to the peaks and valleys that can be observed in Fig. 3. This study showed promising results and imperative input into an attempt to discriminate between hand states across various functional tasks and should be evaluated with context to the repeatability and reliability outcomes. Depending on the task done inside of the pressurized glove box environment and outside, the results appear to be affected by many different factors (i.e., drift, pressure, hand size, etc.). Significance: If this hardware proves to be reliable and repeatable in determining the open and closed hand states then this may provide critical insight into assisting in the characterization of the pressurized gloved environment and the effect on crew member exertion level. Ultimately, this tool will provide useful data for quantifying the repetitive nature of EVA training and tasks. Acknowledgments: The authors would like to acknowledge the NASA Mars Campaign Office for providing funding for this research. Lastly, thanks to all the engineers and technicians at NASA JSC who helped with this data collection. References: [1] Reiber, et al. (2022), NASA/TM-20220007605; [2] Scheuring, et al. (2009), Av., Sp., and Envir. Med. 80(2). [3] Scheuring, et al. (2007), NASA/TM–2007–214755.

Rachel L Thompson↗

Imagery Integration Team

The Human Exploration Science Office (KX) provides leadership for NASA's Imagery Integration (Integration 2) Team, an affiliation of experts in the use of engineering-class imagery intended to monitor the performance of launch vehicles and crewed spacecraft in flight. Typical engineering imagery assessments include studying and characterizing the liftoff and ascent debris environments; launch vehicle and propulsion element performance; in-flight activities; and entry, landing, and recovery operations. Integration 2 support has been provided not only for U.S. Government spaceflight (e.g., Space Shuttle, Ares I-X) but also for commercial launch providers, such as Space Exploration Technologies Corporation (SpaceX) and Orbital Sciences Corporation, servicing the International Space Station. The NASA Integration 2 Team is composed of imagery integration specialists from JSC, the Marshall Space Flight Center (MSFC), and the Kennedy Space Center (KSC), who have access to a vast pool of experience and capabilities related to program integration, deployment and management of imagery assets, imagery data management, and photogrammetric analysis. The Integration 2 team is currently providing integration services to commercial demonstration flights, Exploration Flight Test-1 (EFT-1), and the Space Launch System (SLS)-based Exploration Missions (EM)-1 and EM-2. EM-2 will be the first attempt to fly a piloted mission with the Orion spacecraft. The Integration 2 Team provides the customer (both commercial and Government) with access to a wide array of imagery options - ground-based, airborne, seaborne, or vehicle-based - that are available through the Government and commercial vendors. The team guides the customer in assembling the appropriate complement of imagery acquisition assets at the customer's facilities, minimizing costs associated with market research and the risk of purchasing inadequate assets. The NASA Integration 2 capability simplifies the process of securing one-of-a-kind imagery assets and skill sets, such as ground-based fixed and tracking cameras, crew-in the-loop imaging applications, and the integration of custom or commercial-off-the-shelf sensors onboard spacecraft. For spaceflight applications, the Integration 2 Team leverages modeling, analytical, and scientific resources along with decades of experience and lessons learned to assist the customer in optimizing engineering imagery acquisition and management schemes for any phase of flight - launch, ascent, on-orbit, descent, and landing. The Integration 2 Team guides the customer in using NASA's world-class imagery analysis teams, which specialize in overcoming inherent challenges associated with spaceflight imagery sets. Precision motion tracking, two-dimensional (2D) and three-dimensional (3D) photogrammetry, image stabilization, 3D modeling of imagery data, lighting assessment, and vehicle fiducial marking assessments are available. During a mission or test, the Integration 2 Team provides oversight of imagery operations to verify fulfillment of imagery requirements. The team oversees the collection, screening, and analysis of imagery to build a set of imagery findings. It integrates and corroborates the imagery findings with other mission data sets, generating executive summaries to support time-critical mission decisions.

Calhoun, Tracy↗

Technology Integration to Gain Commercial Efficiency for the Urban Goods Delivery System, Meet Future Demand for City Passenger and Delivery Load/Unload Spaces, and Reduce Energy Consumption

This three-year project supported by the U.S. Department of Energy Vehicle Technologies Office has the potential to radically improve the urban freight system in ways that help both the public and private sectors. Working from 2018-2021, project researchers at the University of Washington’s Urban Freight Lab and collaborators at the Pacific Northwest National Laboratory have produced key data, tested technologies in complex urban settings, developed a prototype parking availability app, and helped close major knowledge gaps. All the fruits of this project can be harnessed to help cities better understand, support and actively manage truck load/unload operations and their urban freight transport infrastructure. Project learnings and tools can be used to help make goods delivery firms more efficient by reducing miles traveled and the time it takes to complete deliveries, benefitting businesses and residents who rely on the urban freight system for supplies of goods. And, ultimately, these project learnings and tools can be used to make cities more livable by minimizing wasted travel, which, in turn, contributes to reductions in fuel consumption and emissions. Cities today are challenged to effectively and efficiently manage their infrastructure to absorb the impacts of ever-increasing e-commerce-fueled delivery demand. All delivery trucks need to park somewhere to unload and load. Yet today’s delivery drivers have no visibility on available parking until they arrive at a site, which may be full. That means they can wind up cruising for parking, which wastes time and fuel and contributes to congestion. Once drivers do find parking, the faster they can unload at the spot, the faster they free up space for other drivers, helping others avoid circling for parking. This makes the parking space—and thus the greater load/unload network—more productive. To this end, the research team successfully met the project’s three goals, developing and piloting strategies and technologies to: 1. Reduce parking-seeking behavior in the study area by 20%; 2. Reduce parcel truck dwell time (the time a truck spends in a spot to load/unload) in the study area by 30%; 3. Increase curb space, alley space and private loading bay occupancy rates in the study area. The research team met these goals by creating and piloting on Seattle streets OpenPark, a first-of-its-kind real-time and forecasting curb parking app customized for commercial delivery drivers—giving drivers the “missing link” in their commonly used routing tools that tell them how best to get to delivery locations, but not what parking is available to use when they get there. Installing in-ground sensors on commercial vehicle load zones (CVLZs) and passenger load zones (PLZs) in the 10-block study area in Seattle’s downtown neighbourhood of Belltown let researchers glean real-time curb parking data. The research team also met project goals by piloting three parcel lockers in public and private spaces open to any delivery carrier, creating a consolidated delivery hub that lets drivers complete deliveries faster and spend less time parked. Researchers collected and analysed data to produce the first empirical, robust, statistically significant results as to the impact of the lockers, and app, on on-the-ground operations. In addition to collecting and analyzing sensor and other real-time and historical data, researchers rode along with delivery drivers to confirm real-world routing and parking behavior. Researchers also surveyed building managers on their private loading bay operations to understand how to boost usage.

97 MATHEMATICS AND COMPUTING↗

NORTH DAKOTA CARBONSAFE PHASE III: SITE CHARACTERIZATION AND PERMITTING OF GEOLOGIC STORAGE OF CARBON DIOXIDE

The Energy & Environmental Research Center (EERC), in partnership with Minnkota Power Cooperative Inc. (Minnkota), SLB, and Computer Modelling Group Ltd. (CMG), supported wide-scale deployment of carbon capture and storage (CCS) as part of the U.S. Department of Energy (DOE) National Energy Technology Laboratory Carbon Storage Assurance Facility Enterprise (CarbonSAFE) Initiative Phase III. This phase included the acquisition, analysis, and development of information to fully characterize two storage complexes to demonstrate viable storage resources for commercial volumes of CO2 (defined by DOE as a minimum of 50 million tonnes [MMt] of CO2 within a 30-year period) (National Energy Technology Laboratory, 2024). Phase III also involved the preparation, submission, and approval of North Dakota underground injection control (UIC) Class VI storage facility permits (SFPs)—required precursors to applications for Class VI injection well permits. The presumed viability of commercial-scale CCS, situated adjacent to Minnkota’s Milton R. Young Station (MRYS), is validated by Minnkota’s continued pursuit of Project Tundra—an initiative to build the world’s largest lignite-based CCS project in central North Dakota (www.projecttundrand.com). Project Tundra comprises two scopes of work, Tundra Capture (installation of postcombustion CO2 capture at MRYS) and Tundra SGS (secure geologic storage). The efforts of North Dakota CarbonSAFE Phase III, Site Characterization and Permitting, supported Tundra SGS. Extensive site-specific characterization activities included a successful multimeasurement geophysical approach and drilling a stratigraphic test well (J-ROC 1, subsequently renamed Liberty-1) adjacent to MRYS. Core collection and analyses, downhole testing and fluid sampling, and geophysical logging were performed on J-ROC 1 and on a nearby stratigraphic test well (known as J-LOC 1), which was drilled, cored, and tested under a complementary project funded by the North Dakota Lignite Research Program. The injection tests performed on J-LOC 1 positively impacted the CarbonSAFE project, resulting in fewer proposed injection wells and significant construction, operations, and monitoring cost savings. The characterization data collected and analyses performed were integrated into geologic models, and successive numerical simulations were run to determine CO2 plume extent and subsurface pressure buildup associated with the planned CO2 injection rate of nearly 4 MMt per year. The latter doubles the CarbonSAFE Initiative goal with an estimated 100 MMt of CO2 stored in 20 years. Application of the U.S. Environmental Protection Agency’s (EPA’s) method for estimating the Class VI Rule area of review (AOR) to the overpressurized Broom Creek Formation inspired an alternative method of calculation, called risk-based AOR delineation. This peer-reviewed method was applied for the first time during the storage facility-permitting process. The two SFP applications submitted in 2021 successfully resulted in North Dakota Industrial Commission (NDIC) orders in 2022 authorizing the creation of the storage facility areas and amalgamation of pore space as well as establishing financial responsibility requirements. After approval of the SFPs, Minnkota filed in 2022 applications for permits to reenter the J-ROC 1 well and to drill two new wells—all with the intended purpose to become Class VI injection wells. To establish eligibility under the Internal Revenue Code for Section 45Q tax incentives, a monitoring, reporting, and verification (MRV) plan was prepared and submitted by Minnkota to EPA in 2022, resulting in the first such plan approved in North Dakota. Also in 2022, under the National Environmental Policy Act (NEPA), Minnkota prepared and submitted an environmental information volume (EIV) describing the proposed CCS project and associated potential environmental impacts. Based on the EIV, DOE determined that the proposed construction project required an environmental assessment, and Minnkota submitted the first draft in 2023 and a revised draft in 2024. Both submissions were followed by a public comment period. Subsequently, DOE issued a finding of no significant impact (FONSI) on September 13, 2024. A successful outreach program, strongly based in the production, presentation, and dissemination of informational material, fostered an environment to aid stakeholders in making informed decisions regarding the planned project. Opportunities for public input were provided at various steps along the way, including at county planning and zoning meetings, before and during the SFP administrative hearing, and during environmental assessment public comment periods. In addition, land/pore space owners and mineral owners had various points of contact, including granting access rights, securing pore space leasing, and mineral owner notifications. Based upon the successful storage facility permitting issued by NDIC, approval of the MRV plan by EPA, and receipt of a FONSI under the NEPA, Minnkota is continuing its pursuit of Project Tundra. In December 2023, the Office of Clean Energy Demonstrations under its Carbon Capture Demonstrations Projects Program announced funding for the capture system (Office of Clean Energy Demonstrations, 2023) and a proposal for CarbonSAFE Phase IV: Construction funding was submitted in March 2024 for the storage project. A go/no-go decision to proceed with construction and operations in the Broom Creek Formation is anticipated in 2024. References National Energy Technology Laboratory, CarbonSafe Initiative, https://netl.doe.gov/carbon-management/carbon-storage/carbonsafe (accessed August 2024). Office of Clean Energy Demonstrations, 2023, OCED selects three projects in CA, ND, and TX to reduce harmful carbon pollution, create new economic opportunities, and advance carbon reducing technologies, December, www.energy.gov/oced/articles/oced-selects-three-projects-ca-nd-and-tx-reduce-harmful-carbon-pollution-create-new (accessed August 2024).

Peck, Wesley↗

Ares I and Ares V First Stage - Powering Exploration

The National Aeronautics and Space Administration (NASA) Ares Projects Office (APO) is continuing to make progress toward the final design of the first stage propulsion system for the Ares I crew launch vehicle and the Ares V cargo launch vehicle. Ares I and Ares V will provide the space launch capabilities needed to fulfill NASA' s exploration strategy of sending human beings to the Moon, Mars, and beyond. As primary propulsion for the Ares launch vehicles, the Space Shuttle-derived Reusable Solid Rocket Motor (RSRM) is one of the first and most important components to be tested. The first flight of Ares I, called Ares I-X, will occur in April 2009, with booster integration to begin at Kennedy Space Center (KSC) by autumn 2008. The Ares I-X flight will use a combination of flight and simulation hardware to obtain data on controlling the long and narrow crew launch vehicle configuration. The test will use a four-segment RSRM from the Shuttle inventory and a fifth spacer segment to simulate the size and weight of the operational five-segment motor to be used on later flights. The upper stage, Orion crew exploration vehicle, and launch abort system will all be replaced with simulator hardware. Manufacturing work has begun on the spacer segment, as well as the new forward hardware for the booster. Atlas V avionics will be adapted to control Ares I-X' s first stage. That hardware is undergoing hardware-in-the-loop testing in a contractor-provided systems integration laboratory (SIL); a critical design review (CDR) was completed in December 2007. Drogue and main parachute drop tests have also been conducted successfully at Yuma Proving Grounds, allowing the First Stage team to begin fabricating parachutes for Ares I-X. The Ares I-X flight test will be the first flight test for the parachutes. A series of preliminary design technical interchange meetings is being conducted prior to the Ares I-X CDR in January 2007 to ensure readiness for the flight. Much of the First Stage activity in 2007 has focused on a series of preliminary design (PDR) activities associated with each booster subsystem. These events will culminate in a formal preliminary design review in 2008, where subsystems and component specifications will be developed and associated analyses and drawings will be evaluated for technical adequacy. The first stage also has been undergoing a series of trade studies to determine means for upgrading booster performance and reducing operational costs. Performance improvement studies have included changing from polybutadiene acrylonitrile (PBAN) propellant to hydroxyl-terminated polybutadiene (HTPB); replacing aluminum with composite motor casings; and optimizing or upgrading the propellant grain and nozzle structures. Some or all of these changes could result in a block upgrade to the Ares I first stage, after becoming the standard configuration for the Ares V. The cost reduction studies included a change from reusable or recoverable boosters to completely expendable boosters; changing from hydrazine-powered to more environmentally friendly electrohydrostatic actuators (EHAs) on the thrust vector control (TVC) system; and changing the location of the separation plane to reduce the likelihood of recontact upon booster separation. The expendability trade study resulted in a decision to keep the recoverable boosters, as the new hardware costs significantly outweighed the potential operational cost savings due to reduced ground operations. Likewise, due to cost considerations, the team continued using existing hydrazine-powered actuators for the TVC system. The separation plane location for Ares I is still being studied, with results to be announced in 2008. In short, the Ares launch vehicles' first stage is building upon NASA's close familiarity with this Shuttle-derived system, while continuing to seek out improvements for long-term exploration.

Priskos, Alex S.↗

Rapid Evaluation Framework for the CMIP7 Assessment Fast Track

As Earth system models (ESMs) grow in complexity and in volume of output data, there is an increasing need for rapid, comprehensive evaluation of their scientific performance. The upcoming Assessment Fast Track for the Seventh Phase of the Coupled Model Intercomparison Project (CMIP7) will require expeditious response for model analyses designed to inform and drive integrated Earth system assessments. To meet this challenge, the Rapid Evaluation Framework (REF), a community-driven platform for benchmarking and performance assessment of ESMs, was designed and developed. The initial implementation of the REF, constructed to meet the near-term needs of the CMIP7 Assessment Fast Track, builds upon four disparate community evaluation and benchmarking tools that are coupled together using the Coordinated Model Evaluation Capabilities (CMEC) framework. The REF runs within a containerized workflow for portability and reproducibility and is aimed at generating and organizing diagnostics covering a variety of model variables. The REF leverages well documented observational datasets to provide assessments of model fidelity across a collection of diagnostics. All diagnostics were identified and selected with community involvement and consultation. Operational integration with the Earth System Grid Federation (ESGF) will permit automated execution of the REF for selected diagnostics as soon as model output data are published on ESGF by the originating modeling centers. The REF is designed to be portable across a range of current computational platforms to facilitate use by modeling centers for assessing the evolution of model versions or gauging the relative performance of CMIP simulations before being published on ESGF. When integrated into production simulation workflows, results from the REF provide immediate quantitative feedback that allows model developers and scientists to quickly identify model biases and performance issues. After the REF is released to the community, its subsequent development and support will be prioritized by an international consortium of scientists and engineers, enabling a broader impact across Earth science disciplines. For instance, the REF will facilitate improvements to models and will enhance confidence in model projections through process-based selection of models based on their performance with respect to observations. Production of reproducible diagnostics and community-based assessments are key features of the REF. Furthermore, providing interoperability with existing evaluation packages assures that contributions from previous community efforts will be available for use in future model intercomparison projects.

Hoffman, Forrest [ORNL] (ORCID:0000000158024134)↗

Advancing ocean monitoring and knowledge for societal benefit: the urgency to expand Argo to OneArgo by 2030

The ocean plays an essential role in regulating Earth’s climate, influencing weather conditions, providing sustenance for large populations, moderating anthropogenic climate change, encompassing massive biodiversity, and sustaining the global economy. Human activities are changing the oceans, stressing ocean health, threatening the critical services the ocean provides to society, with significant consequences for human well-being and safety, and economic prosperity. Effective and sustainable monitoring of the physical, biogeochemical state and ecosystem structure of the ocean, to enable climate adaptation, carbon management and sustainable marine resource management is urgently needed. The Argo program, a cornerstone of the Global Ocean Observing System (GOOS), has revolutionized ocean observation by providing real-time, freely accessible global temperature and salinity data of the upper 2,000m of the ocean (Core Argo) using cost-effective simple robotics. For the past 25 years, Argo data have underpinned many ocean, climate and weather forecasting services, playing a fundamental role in safeguarding goods and lives. Argo data have enabled clearer assessments of ocean warming, sea level change and underlying driving processes, as well as scientific breakthroughs while supporting public awareness and education. Building on Argo’s success, OneArgo aims to greatly expand Argo’s capabilities by 2030, expanding to full-ocean depth, collecting biogeochemical parameters, and observing the rapidly changing polar regions. Providing a synergistic subsurface and global extension to several key space-based Earth Observation missions and GOOS components, OneArgo will enable biogeochemical and ecosystem forecasting and new long-term climate predictions for which the deep ocean is a key component. Driving forward a revolution in our understanding of marine ecosystems and the poorly-measured polar and deep oceans, OneArgo will be instrumental to assess sea level change, ocean carbon fluxes, acidification and deoxygenation. Emerging OneArgo applications include new views of ocean mixing, ocean bathymetry and sediment transport, and ecosystem resilience assessment. Implementing OneArgo requires about $100 million annually, a significant increase compared to present Argo funding. OneArgo is a strategic and cost-effective investment which will provide decision-makers, in both government and industry, with the critical knowledge needed to navigate the present and future environmental challenges, and safeguard both the ocean and human wellbeing for generations to come.

ARGO↗

SuperLab 2.0 Showcase: Connecting Five Labs to Tackle Grid Complexity and Unlock Unique Grid Asset Potential

SuperLab 2.0 (5-Lab Demo) is a collaborative, national-scale experiment showcasing the coordination of geographically distributed energy assets in real time. The demonstration integrates 25 physical and digital assets, spanning wind, PV, batteries, electrolyzers, DC fast chargers, microgrid controllers, building automation systems, small modular reactor (SMR), control centers, and gas turbines, across five DOE national laboratories-NLR, INL, NETL, LBNL, and SNL. These assets are unified using Energy Sciences Network (ESnet), a low-latency, high-performance U.S. Department of Energy's (DOE) network, and controlled via a centralized energy controller hosted at NLR's ARIES facility. The demonstration validates the ability to stress-test hybrid energy systems under dynamic scenarios to de-risk advanced control strategies for greater resilience and flexibility. SuperLab 2.0 (5-Lab Demo) showcased a major advancement in federated national laboratory collaboration, enabling real-time, cross-laboratory experimentation to coordinate geographically dispersed distributed energy resources (DERs) using various communication protocols and networks. SuperLab 2.0 (5-Lab Demo) built on previous demonstrations conducted between NLR-PNNL and NLR-INL connecting diverse assets including distant protection devices, a SMR simulator, and a high temperature electrolyzer (HTE). Previous demos were based on a single connection between two labs with minimal coordination challenges. The 5-Lab demo with a centralized controller, distributed testbeds across different geographical locations, and use of protocols-based communication represents a scenario closer to real-world grid operations that coordinate resources across a region to meet system needs. This experiment studied how local DER controllers interact with a centralized energy controller during normal and abnormal events to maintain reliability. The SuperLab team across the five labs implemented a notional power system model equivalent of transmission and distribution lines, represented by the data networks interconnecting the labs. Each lab continuously exchanged local parameters (such as P and Q) from its Hardware-In-Loop (CHIL) and Power Hardware-In-Loop (PHIL) assets through centralized energy controller at NLR, enabling real-time interaction and coordination across sites. By leveraging ESnet as the communication backbone, the team successfully operated the distributed assets as a unified power system, with each bus represented by a different laboratory. This setup mirrors how assets interact in real-world power systems across dispersed locations with various protocols and latencies. At each lab site, assets were operated using their own local controllers which were coordinated through an overarching operation and control layer of centralized energy controller, equivalent to how an energy management system (EMS) orchestrates assets across a regional or national grid. SuperLab's federated connectivity utilized a Digital Real-Time Simulators (DRTS)-type gateway to connect Controller Hardware-In-Loop (CHIL) and PHIL assets between labs. To enable this federated connection through ESnet, a deterministic network was established where latency variations were consistent. This consistency allowed the development of digital filters for the power system assets across CHIL and PHIL interfaces to avoid unstable and unreliable grid conditions. This report provides an overview of the cross-laboratory configuration and offers insights into interconnecting geographically distributed research assets to test them as if they were co-located. This experiment represents a step toward linking nine DOE national laboratories, enabling nation-wide simulations that can address utility-driven challenges with grid resilience, flexibility, and modernization.

24 POWER TRANSMISSION AND DISTRIBUTION↗