Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “load power”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,027 records · Page 57

Study on Conversion from an Existing Alternating Current Medium-Voltage Line to a Direct Current Line: A Case of Load or Source Expansion

Simultaneous increase of power generation through renewable systems and load due owing to the rapid growth in electrified road transportation systems, leads to new challenges in the design, operation, and protection of distribution-level electrical power systems. This paper addresses challenges related to the integration of new sources or loads to a distribution grid through long alternating current lines. The International Council on Large Electric Systems medium-voltage benchmark model developed for North America was used for simulation studies. Use cases were developed to illuminate the issues related to long alternating current lines and the usefulness of medium-voltage direct current lines in a distribution network.

Jaldanki, Sreenivasa↗

Spinning Reserve From Hotel Load Response: Initial Progress

This project was motivated by the fundamental match between hotel space conditioning load response capability and power system contingency response needs. As power system costs rise and capacity is strained demand response can provide a significant system reliability benefit at a potentially attractive cost. At ORNL s suggestion, Digital Solutions Inc. adapted its hotel air conditioning control technology to supply power system spinning reserve. This energy saving technology is primarily designed to provide the hotel operator with the ability to control individual room temperature set-points based upon occupancy (25% to 50% energy savings based on an earlier study [Kirby and Ally, 2002]). DSI added instantaneous local load shedding capability in response to power system frequency and centrally dispatched load shedding capability in response to power system operator command. The 162 room Music Road Hotel in Pigeon Forge Tennessee agreed to host the spinning reserve test. The Tennessee Valley Authority supplied real-time metering equipment in the form of an internet connected Dranetz-BMI power quality meter and monitoring expertise to record total hotel load during both normal operations and test results. The Sevier County Electric System installed the metering. Preliminary testing showed that hotel load can be curtailed by 22% to 37% depending on the outdoor temperature and the time of day. These results are prior to implementing control over the common area air conditioning loads. Testing was also not at times of highest system or hotel loading. Full response occurred in 12 to 60 seconds from when the system operator s command to shed load was issued. The load drop was very rapid, essentially as fast as the 2 second metering could detect, with all units responding essentially simultaneously. Load restoration was ramped back in over several minutes. The restoration ramp can be adjusted to the power system needs. Frequency response testing was not completed. Initial testing showed that the units respond very quickly. Problems with local power quality generated false low frequency signals which required testing to be stopped. This should not be a problem in actual operation since the frequency trip points will be staggered to generate a droop curve which mimics generator governor response. The actual trip frequencies will also be low enough to avoid power quality problems. The actual trip frequencies are too low to generate test events with sufficient regularity to complete testing in a reasonable amount of time. Frequency response testing will resume once the local power quality problem is fully understood and reasonable test frequency settings can be determined. Overall the preliminary testing was extremely successful. The hotel response capability matches the power system reliability need, being faster than generation response and inherently available when the power system is under the most stress (times of high system and hotel load). Periodic testing is scheduled throughout the winter and spring to characterize hotel response capability under a full range of conditions. More extensive testing will resume when summer outdoor temperatures are again high enough to fully test hotel response.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Power Factor revisited

Power factor is a term whose value can be found by dividing the power in a load to the product of the voltage and the current. It has been used as a rule of thumb to estimate the cost of the losses incurred in delivering reactive power. But it has been extremely troublesome. The same load might be penalized by some definitions, and might not by others. That is still the situation today. There have been two efforts at solution. In 1919 a committee of experts was formed to solve the problem of its definition. The effort did not succeed at producing a definition; two alternatives were recommended in the committee’s final report, but both were adopted. In 2010, IEEE issued Standard 1459 to give definitions. In this standard, definitions of power factor appear under no less than seven different headings. The problem demands solution. The matter is of considerable economic importance to power producers, consumers, and instrument makers. This paper examines the history of the topic, and explores reasons for the difficulty of definition in terms of measurement theory. It is shown that power factor is not suited to purpose. In fact, no definition can exist that will define power factor usefully for its intended economic purpose. Two alternatives are proposed.

power factror, definitions, measurement theory, IE↗

Design of an Ultra-Efficient GaN High Power Amplifier for Radar Front-Ends Using Active Harmonic Load-Pull

This work presents a new measurement technique, mixed-signal active harmonic load-pull (MSALP) developed by Anterverta-mw in partnership with Maury Microwave, that allows for wide-band ultra-high efficiency amplifiers to be designed using GaN technology. An overview of the theory behind active load-pull is presented and why load-pull is important for high-power device characterization. In addition, an example procedure is presented that outlines a methodology for amplifier design using this measurement system. Lastly, measured results of a 10W GaN amplifier are presented. This work aims to highlight the benefit of using this sophisticated measurement systems for to optimize amplifier design for real radar waveforms that in turn will simplify implementation of space-based radar systems

Active Load-pull↗

Solar Power System Evaluated for the Human Exploration of Mars

The electric power system is a crucial element of any mission for the human exploration of the Martian surface. The bulk of the power generated will be delivered to crew life support systems, extravehicular activity suits, robotic vehicles, and predeployed in situ resource utilization (ISRU) equipment. In one mission scenario, before the crew departs for Mars, the ISRU plant operates for 435 days producing liquefied methane and oxygen for ascent-stage propellants and water for crew life support. About 200 days after ISRU production is completed, the crew arrives for a 500-day surface stay. In this scenario, the power system must operate for a total of 1130 days (equivalent to 1100 Martian "sols"), providing 400 MW-hr of energy to the ISRU plant and up to 18 kW of daytime user power. A photovoltaic power-generation system with regenerative fuel cell (RFC) energy storage has been under study at the NASA Glenn Research Center at Lewis Field. The conceptual power system is dominated by the 4000- m2 class photovoltaic array that is deployed orthogonally as four tent structures, each approximately 5 m on a side and 100-m long. The structures are composed of composite members deployed by an articulating mast, an inflatable boom, or rover vehicles, and are subsequently anchored to the ground. Array panels consist of thin polymer membranes with thin-film solar cells. The array is divided into eight independent electrical sections with solar cell strings operating at 600 V. Energy storage is provided by regenerative fuel cells based on hydrogen-oxygen proton exchange membrane technology. Hydrogen and oxygen reactants are stored in gaseous form at 3000 psi, and the water produced is stored at 14.7 psi. The fuel cell operating temperature is maintained by a 40-m2 deployable pumped-fluid loop radiator that uses water as the working fluid. The power management and distribution (PMAD) architecture features eight independent, regulated 600-Vdc channels. Power management and distribution power cables use various gauges of copper conductors with ethylene tetrafluoroethylene insulation. To assess power system design options and sizing, we developed a dedicated Fortran code to predict detailed power system performance and estimate system mass. This code also modeled the requisite Mars surface environments: solar insolation, Sun angles, dust storms, dust deposition, and thermal and ultraviolet radiation. Using this code, trade studies were performed to assess performance and mass sensitivities to power system design parameters (photovoltaic array geometry and orientation) and mission parameters (landing date and landing site latitude, terrain slope, and dust storm activity). Mission analysis cases were also run. Power results are shown in this graph for an analysis case with a September 1, 2012, landing date; 18.95 North latitude landing site; two seasonal dusts storms; and tent arrays. To meet user load requirements and the ISRU energy requirement, an 8-metric ton (MT) power system and 4000-m2 photovoltaic array area were required for the assumed advanced CuInS2 thin-film solar cell technology. In this figure, the top curve is the average daytime photovoltaic array power, the middle curve is average daytime user load power, and the bottom curve is nighttime power. At mission day 1, daytime user power exceeds 120 kW before falling off to 80 kW at the end of the mission. Throughout the mission, nighttime user power is set to the nighttime power requirement. In this analysis, "nighttime" is defined as the 13- to 15-hr period when array power output is below the daytime power requirement. During dust storms, power system capability falls off dramatically so that by mission day 900, a daily energy balance cannot be maintained. Under these conditions, the ISRU plant is placed in standby mode, and the regenerative fuel cell energy storage is gradually discharged to meet user loads.

Kerslake, Thomas W.↗

Best Practices in Electricity Load Modeling and Forecasting for Long-Term Power System Planning

This document highlights the best practices on data acquisition and management, modeling and stakeholder engagement required for enhanced load modeling and forecasting. Each section is interspersed with case studies to highlight lessons from different country contexts to highlight both cross-cutting and location specific best practices needed to conduct robust load modeling and forecasting.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The evolving role of geothermal energy for decarbonizing the United States

Geothermal energy is often referred to as a niche technology that is too localized, too small or too expensive to make much of a difference in how renewable energy will be supplied in a fully decarbonized future. As a result, geothermal energy has been undervalued in terms of what it could provide to complement, rather than compete with, electricity generation from wind, solar photovoltaic, concentrating solar power and other renewables. Geothermal energy systems are fully dispatchable and can provide baseload or load-following electric power or heat suitable for a wide range of applications including supplying district heating for communities and cities, and heating and cooling of individual buildings. The focus of our study is on the potential of utilizing geothermal energy for providing heat for buildings and industry at lower temperatures, a substitute for the combustion of fossil fuels. Because heating represents about 20% (20 EJ per year) of the annual primary energy consumption in the U.S.—with most of it coming from burning natural gas, oil and/or propane in furnaces—deploying geothermal heating on a national scale could have a significant impact on lowering carbon emissions. In heating-dominated states in the U.S. Northern Tier, heating often is among the largest contributors to the state's carbon footprint. This review begins with a discussion of the motivation and rationale behind considering geothermal as a key low-carbon heating option for the U.S. The study summarizes the U.S. geothermal resource and describes the applications and main engineering components of using geothermal energy for heating and cooling, electric power generation, and co-generation using district heating, geothermal heat pumps, and power conversion with steam flashing and organic Rankine plants. Environmental benefits and impacts are described. An extensive discussion of geologic and thermal-hydraulic aspects of the subsurface is included in the review because of their critical role in determining reservoir designs at specific sites to ensure sufficient productivity that is both safe and economically viable. Models for estimating levelized costs of district heating are used to show how costs are affected by reservoir performance, infrastructure capital costs, and financial parameters. Here, the review concludes with an assessment of technical subsurface issues associated with reservoir performance and the economic requirements for providing geothermal heating in district heating systems at a sufficient scale to have an impact on decarbonizing the U.S.

15 GEOTHERMAL ENERGY↗

MEITNER Resource Team Modeling and Simulation Support to Holos-Quad Reactor Development (Final CRADA Report)

The main objective of this CRADA is to provide Argonne National Laboratory (ANL)’s modeling and simulation capabilities via ARPA-E's MEITNER (Modeling-Enhanced Innovations Trailblazing Nuclear Energy Reinvigoration) Resource Team (RT) arrangement to support the demonstration of the viability of HolosGen’s Holos-Quad reactor design. The Holos-Quad reactor design is an advanced reactor concept that incorporates many new design features, such as the neutron-coupled Subcritical Power Modules (SPMs) in its core design, elimination of balance of plant (BOP) by direct integration of a helium Brayton cycle power conversion system with each SPM, among many other innovative features. The demonstration of the viability of such an innovative reactor design warrants iterations of modeling and simulation and testing. The purpose of this project is to utilize ANL’s modeling and simulation capabilities in nuclear reactor analysis and power conversion system analysis to inform HolosGen and the Design Team (DT) in the design and optimization of the Holos-Quad concept. The major work scopes of this project include: to investigate conceptual designs and materials for radiation shielding to protect personnel and internal components such as turbomachinery; Assess the the helium Brayton cycle power conversion system performance in both nominal and load following conditions; Investigate power conversion components and overall system performance; Identify control strategies to enable load following; Perform simulations of HolosGen’s subscale simulator and using available test data for code validation/benchmark purpose; Perform core thermal-hydraulics, safety analysis, and structural analysis.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Machine Learning for Fairness-Aware Load Shedding: A Real-Time Solution via Identifying Binding Constraints: Preprint

Timely and effective load shedding in power systems is critical for maintaining supply-demand balance and preventing cascading blackouts. To eliminate load shedding bias against specific regions in the system, optimization-based methods are uniquely positioned to help balance between economic and fairness considerations. However, the resulting optimization problem involves complex constraints, which can be time-consuming to solve and thus cannot meet the real-time requirements of load shedding. To tackle this challenge, in this paper we present an efficient machine learning algorithm to enable millisecond-level computation for the optimization-based load shedding problem. Numerical studies on both a 3-bus toy example and a realistic RTS-GMLC system have demonstrated the validity and efficiency of the proposed algorithm for delivering fairness-aware and real-time load shedding decisions.

97 MATHEMATICS AND COMPUTING↗

Logic-controlled solid-state switchgear for 270 volt dc.

A feasibility study to design and demonstrate solid-state switchgear composed of circuit breakers and a power transfer switch is described. The switchgear operates on a nominal 270 Vdc circuit and controls power to a load up to 15 A. One circuit breaker may be interconnected to a second to form a power transfer switch. Breaker or switch on-off and transfer functions can be remotely controlled. Automatic overload trip-out is provided through an ultimate current trip and an I squared t trip for transient overcurrents lower than the ultimate current trip level. A number of reclosures with variable time delay between trip-out and reclosure are programmed and controlled by integrated analog and COSMOS logic circuits. A commutation circuit that creates minimal transient disturbances to either source or load was developed to interrupt current flow through the main SCR switching element.-

Waddington, D.↗

Parallel processing methods for space based power systems

This report presents a method for doing load-flow analysis of a power system by using a decomposition approach. The power system for the Space Shuttle is used as a basis to build a model for the load-flow analysis. To test the decomposition method for doing load-flow analysis, simulations were performed on power systems of 16, 25, 34, 43, 52, 61, 70, and 79 nodes. Each of the power systems was divided into subsystems and simulated under steady-state conditions. The results from these tests have been found to be as accurate as tests performed using a standard serial simulator. The division of the power systems into different subsystems was done by assigning a processor to each area. There were 13 transputers available, therefore, up to 13 different subsystems could be simulated at the same time. This report has preliminary results for a load-flow analysis using a decomposition principal. The report shows that the decomposition algorithm for load-flow analysis is well suited for parallel processing and provides increases in the speed of execution.

Berry, F. C.↗

Demonstration of a Novel Technology to Manage Electricity Demand in Grid-Independent Military Microgrids

This research was conducted by the National Renewable Energy Laboratory (NREL) in collaboration with the S&C Electric Inc. through funding provided by the ESTCP. The project demonstrates use of cybersecure Automated Demand Response (ADR) technology to effectively manage microgrid loads during grid-independent, also known as "islanded," operation. When military microgrids become isolated from the main electrical grid, they are required to balance electricity supply and demand locally. Given that local generation may be constrained, the prevailing strategy involves shedding all but the most critical loads by tripping smart circuit breakers, which then necessitate manual resetting. This approach is generally implemented at the building level, which means that the buildings with mission-critical activities are exempt from load management and remain fully powered, whereas those deemed non-critical can experience a complete loss of service. In this research we developed a method that allows building automation systems to selectively control their assets in response to load shedding request from a microgrid controller, avoiding total loss of service in contrast to the conventional control approach. A commercial OpenADR client server by GridFabric is used for communication between the microgrid controller and the building management system (BMS). The microgrid controller monitors both generation capacity and various assets within the microgrid and issues a demand reduction request when necessary. This request is communicated to the OpenADR server via Modbus. Upon receiving the request, the OpenADR server forwards it to the BMS utilizing the OpenADR protocol. The BMS is pre-configured with various levels of load reduction strategies based on the controllable assets available, allowing for a nuanced approach to demand reduction. Both lab and field tests were performed that considered load shedding needed to achieve closed transition into island mode and to accommodate changing loads and power source availability while islanded. A commercial microgrid controller was used for these tests with normal programming within the expected constraints of the system capabilities. That is, the solution did not require any specialized modification to the code base of the controller. Given the latency of the round-trip communication path between the microgrid controller and the various devices involved with the load shed processes, there are certain scenarios for which the demonstrated solution are appropriate and some which are not. The methods described in this report can be used for load shedding/restoration during transitions between islanded and grid-tied modes of operation, as well as accommodating normal variations in load and the need to remove a power source from operation for maintenance. These methods should not be used for scenarios that require load shedding within a second or two such as sudden and unanticipated significant load increases or loss of power sources through equipment faults.

24 POWER TRANSMISSION AND DISTRIBUTION↗

IEEE SusTech 2025 Presentation

This paper evaluates the capability of a fully electric pickup truck, using the Ford F-150 Lightning as an example, to provide power to the circuit of a multi-robot system. The case study was conducted on a simulated INL Autonomous Pit Exploration System (APES) designed for the inspection of nuclear waste tank pits. Through a series of controlled tests, the vehicle’s power delivery consistency, load-handling capability, and battery performance were assessed under various conditions. First of all, the load test demonstrated that the vehicle provided stable power with low distortion and no unexpected interruptions. Second, during the operational limit test, the 240V system sustained loads up to 7.4 kW before tripping, providing insights into its operational limits. Last but not least, during a simulated full-scale APES operation, the vehicle’s battery depleted by only 6\% over an hour, indicating sufficient capacity for extended use while retaining reserve power for transportation needs. This study highlights the potential of electric vehicles as reliable power sources for field operations, contributing to the advancement of sustainable technologies by reducing reliance on traditional fossil fuel generators and promoting the integration of clean energy solutions in remote and challenging environments.

42 - ENGINEERING↗

Energy-saving opportunities of direct-DC loads in buildings

Despite the recent interest in direct current (DC) power distribution in buildings, the market for DC-ready loads remains small. The existing DC loads in various products or research test beds are not always designed to efficiently leverage the benefits of DC. This work addresses a pressing need for a study into the development of efficient DC loads. In particular, it focuses on documenting and demonstrating how to best leverage a DC input to eliminate or improve conversion stages in a load's power converter. This work identifies how typical building loads can benefit from DC input, including bath fans, refrigerators, wall adapters, task lights, and zone lighting. It then details the development of several prototypes that demonstrate efficiency savings with DC. The most efficient direct-DC loads are explicitly designed for DC from the ground up, rather than from an AC modification.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Design Features and Initial RF Performance of a Gradient Hardened 17 GHz TW Linac Structure

To avoid surface erosion damage and to assist in studying RF breakdown thresholds in 17 GHz TW linac structures, a gradient hardened structure has been fabricated with high temperature brazed and machined stainless steel surfaces located in the peak E-field region of the beam apertures and the peak H-field regions of the input coupler cavity. The microwave design parameters and physical dimensions of this 22 cavity, 120 degree phase advance structure were chosen to allow the high gradient performance to be compared against a similar design all-copper structure that has been tested in a dual ring, power recirculating amplifier system. The final design parameters of the gradient hardened structure are discussed; the influence of stainless steel RF losses on the power buildup of the resonant ring and on the structure gradient distribution are described; waveforms are shown of the unique ability of the power amplifier to rapidly quench RF breakdown discharges in the linac structure by automatically sensing and redirecting the RF source power to a matched load; and preliminary test results during high power RF processing of the gradient hardened linac structure are presented.

43 PARTICLE ACCELERATORS↗

REDOX electrochemical energy storage

Reservoirs of chemical solutions can store electrical energy with high efficiency. Reactant solutions are stored outside conversion section where charging and discharging reactions take place. Conversion unit consists of stacks of cells connected together in parallel hydraulically, and in series electrically. Stacks resemble fuel cell batteries. System is 99% ampere-hour efficient, 75% watt hour efficient, and has long projected lifetime. Applications include storage buffering for remote solar or wind power systems, and industrial load leveling. Cost estimates are $325/kW of power requirement plus $51/kWh storage capacity. Mass production would reduce cost by about factor of two.

Thaller, L. H.↗

Unity power factor converter

A unity power factor converter capable of effecting either inversion (dc-to-dc) or rectification (ac-to-dc), and capable of providing bilateral power control from a DC source (or load) through an AC transmission line to a DC load (or source) for power flow in either direction, is comprised of comparators for comparing the AC current i with an AC signal i.sub.ref (or its phase inversion) derived from the AC ports to generate control signals to operate a switch control circuit for high speed switching to shape the AC current waveform to a sine waveform, and synchronize it in phase and frequency with the AC voltage at the AC ports, by selectively switching the connections to a series inductor as required to increase or decrease the current i.

Wester, Gene W.↗