Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “launch services”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,027 records · Page 57

Sustainability of soil organic carbon in consolidated gully land in China’s Loess Plateau

Massive gully land consolidation projects, launched in China’s Loess Plateau, aim to restore 2667 km 2 agricultural lands in total by consolidating 2026 highly eroded gullies. This effort represents a social engineering project where the economic development and livelihood of the farming families are closely tied to the ability of these emergent landscapes to provide agricultural services. Whether these ‘time zero’ landscapes have the resilience to provide a sustainable soil condition such as soil organic carbon (SOC) content remains unknown. By studying two watersheds, one of which is a control site, we show that the consolidated gully serves as an enhanced carbon sink, where the magnitude of SOC increase rate (1.0 gC/m 2 /year) is about twice that of the SOC decrease rate (-0.5 gC/m 2 /year) in the surrounding natural watershed. Over a 50-year co-evolution of landscape and SOC turnover, we find that the dominant mechanisms that determine the carbon cycling are different between the consolidated gully and natural watersheds. In natural watersheds, the flux of SOC transformation is mainly driven by the flux of SOC transport; but in the consolidated gully, the transport has little impact on the transformation. Furthermore, we find that extending the surface carbon residence time has the potential to efficiently enhance carbon sequestration from the atmosphere with a rate as high as 8 gC/m 2 /year compared to the current 0.4 gC/m 2 /year. The success for the completion of all gully consolidation would lead to as high as 26.67 GgC/year sequestrated into soils. This work, therefore, not only provides an assessment and guidance of the long-term sustainability of the ‘time zero’ landscapes but also a solution for sequestration CO 2 into soils.

54 ENVIRONMENTAL SCIENCES↗

Price Formation in Zero-Carbon Electricity Markets: The Role of Hydropower

In April 2019, Water Power Technologies Office (WPTO) launched the HydroWIRES Initiative to understand, enable, and improve hydropower and pumped storage hydropower’s (PSH’s) contributions to reliability, resilience, and integration in the rapidly evolving U.S. electricity system. The unique characteristics of hydropower, including PSH, make it well suited to provide a range of storage, generation flexibility, and other grid services to support the cost-effective integration of variable renewable resources. The U.S. electricity system is rapidly evolving, bringing both opportunities and challenges for the hydropower sector. While increasing deployment of variable renewables such as wind and solar have enabled low-cost, clean energy in many U.S. regions, it has also created a need for resources that can store energy or quickly change their operations to ensure a reliable and resilient grid. Hydropower (including PSH) is not only a supplier of bulk, low-cost, renewable energy but also a source of large-scale flexibility and a force multiplier for other renewable power generation sources. Realizing this potential requires innovation in several areas: understanding value drivers for hydropower under evolving system conditions, describing flexible capabilities and associated tradeoffs associated with hydropower meeting system needs, optimizing hydropower operations and planning, and developing innovative technologies that enable hydropower to operate more flexibly.

13 HYDRO ENERGY↗

Heat pipes in space and on earth

The performance of heat pipes used in the thermal control system of spacecraft such as OAO-III and ATS-6 is discussed, and applications of heat pipes to permafrost stabilization on the Alaska Pipeline and to heat recovery systems are described. Particular attention is given to the ATS-6, launched in 1974, which employs 55 heat pipes to carry solar and internal power loads to radiator surfaces. In addition, experiments involving radiative cooling based on cryogenic heat pipes have been planned for the Long Duration Exposure Facility spacecraft and for Spacelab. The role of heat pipes in Space Shuttle heat rejection services is also mentioned.

Ollendorf, S.↗

Space transfer vehicle concepts and requirements study. Volume 2, book 3: STV system interfaces

This report presents the results of systems analyses and conceptual design of space transfer vehicles (STV). The missions examined included piloted and unpiloted lunar outpost support and spacecraft servicing, and unpiloted payload delivery to various earth and solar orbits. The study goal was to examine the mission requirements and provide a decision data base for future programmatic development plans. The final lunar transfer vehicles provided a wide range of capabilities and interface requirements while maintaining a constant payload mission model. Launch vehicle and space station sensitivity was examined, with the final vehicles as point design covering the range of possible options. Development programs were defined and technology readiness levels for different options were determined. Volume 1 presents the executive summary, volume 2 provides the study results, and volume 3 the cost and WBS data.

Weber, Gary A.↗

Nozomi Cis-Lunar Phase Orbit Determination

Japan's Institute of Space and Astronautical Science (ISAS) launched Nozomi, its first mission to the planet Mars using the newly developed M-V launch vehicle on July 3, 1998. Scientific objectives of the mission are to study the structure and dynamics of the Martian upper atmosphere and its interaction with the solar wind. Nozomi is a cooperative mission between ISAS and the National Aeronautics and Space Administration (NASA). The NASA contribution includes navigation and tracking services provided by the Jet Propulsion Laboratory (JPL). The spacecraft also serves as an engineering demonstration of basic technology for planetary exploration. One of the new technologies was a unique trajectory, developed by ISAS, which used solar gravitational perturbations at the weak stability boundary as an aid to achieve an Earth-Mars transfer orbit. This trajectory saves approximately 120 m/s of Delta V compared to direct hyperbolic insertion and is considered an enabling technology for the mission. Nozomi was the first spacecraft to employ this trajectory and provided on-orbit validation of the technique. The trajectory was achieved by initially placing the spacecraft in a highly elliptical cis-lunar phasing orbit. Six maneuvers were performed during this period to correct injection errors and target an outbound lunar swingby in September 1998. The gravity assist from the lunar swingby raised apogee to the vicinity of the weak stability boundary. After three more targeting maneuvers, Nozomi performed an inbound lunar swingby followed immediately by a powered Earth swingby in late December 1998. A 420 m/s Trans Mars Insertion (TMI) burn at the final Earth periapsis was intended to place the spacecraft on a heliocentric trajectory leading to Mars orbit insertion in October 1999. Orbit determination for Nozomi is performed in parallel by both ISAS and the Multi-Mission Navigation (MMNAV) group at JPL. This was an advantage for the mission because each group would generate solutions based on data collected from their respective tracking networks. Spacecraft events, such as sequence uplinks and maneuvers, were generally scheduled during passes at the Usuda tracking station in Japan. As a result, maneuver design and reconstruction was derived from MMNAV solutions based on JPL tracking data obtained immediately prior to or following maneuvers. Data was also exchanged between ISAS and MMNAV so orbit determination could be performed on joint data sets in support of critical targeting late in the cis-lunar phase. In this paper, information regarding the MMNAV orbit determination effort for the first six months of the mission is presented. The spacecraft trajectory is characterized first, followed by a discussion of the orbit determination estimation procedure and models. Results from selected orbit solutions are presented and compared against reconstructed trajectories. One area of emphasis in this paper is orbit determination in the vicinity of the weak stability boundary. Precise navigation was necessary to target the second lunar swingby and the powered Earth swingby. Delivery accuracy of 150 m was required for these critical encounters, but a number of factors contributed to the general degradation of orbit determination accuracy. This included the fact that the spacecraft was at apogee, at a range of 1.7 million km and moving at less than I km/sec perpendicular to the line of sight. Nozomi was also close to zero degrees declination where there are known limitations on orbit determination performance. Finally, S-band tracking data was acquired through the Nozomi backup low gain antenna. This antenna is offset from the axis of this spin stabilized spacecraft and superimposed large signatures in the Doppler and range data. These difficulties were overcome by combining long data arcs, spanning several maneuvers, with a high fidelity solar pressure model. The model included a physically accurate representation of the spacecraft structure and a high time resolution orientation model. Observation modeling included the removal of the spin induced Doppler bias, spin signature and per pass correction of range calibration errors applied for data leading up to critical events. As a result, all orbit determination goals were met. A second area of emphasis in this paper is the JPL tracking and orbit determination effort in support of the TMI maneuver. TMI occurred out of contact with ground stations and the JPL Goldstone tracking complex had the first pass following the bum. As a result, MMNAV had the responsibility to make a rapid assessment of the maneuver performance. MMNAV made the determination that a 100 m/s under bum had occurred and promptly informed ISAS via voice lines. ISAS immediately began preparations for a correction maneuver (TMIc), which had to be performed during the next Usuda pass. The near real time assessment by MMNAV provided accurate antenna frequency and pointing updates for the spacecraft acquisition at Usuda and the close coordination between the two agencies enabled the design and successful execution of the TMc maneuver. Propellant consumption during the correction burn dictated that the mission be redesigned. ISAS developed a new plan which adds 3 full solar orbits, two Earth swingbys and one lunar swingby with arrival at Mars in January 2004. The final Mars orbit will still enable the mission to achieve all of its science objectives.

Ryne, Mark↗

Habitat Concepts for Deep Space Exploration

Future missions under consideration requiring human habitation beyond the International Space Station (ISS) include deep space habitats in the lunar vicinity to support asteroid retrieval missions, human and robotic lunar missions, satellite servicing, and Mars vehicle servicing missions. Habitat designs are also under consideration for missions beyond the Earth-Moon system, including transfers to near-Earth asteroids and Mars orbital destinations. A variety of habitat layouts have been considered, including those derived from the existing ISS designs and those that could be fabricated from the Space Launch System (SLS) propellant tanks. This paper presents a comparison showing several options for asteroid, lunar, and Mars mission habitats using ISS derived and SLS derived modules and identifies some of the advantages and disadvantages inherent in each. Key findings indicate that the larger SLS diameter modules offer built-in compatibility with the launch vehicle, single launch capability without on-orbit assembly, improved radiation protection, lighter structures per unit volume, and sufficient volume to accommodate consumables for long duration missions without resupply. The information provided with the findings includes mass and volume comparison data that should be helpful to future exploration mission planning efforts.

Smitherman, David↗

Development of an Ablative 3D Quartz / Cyanate Ester Composite for the Orion Spacecraft Compression Pad

With the successful flight test of the Orion Multipurpose Crew Vehicle last December, NASA is well on its way to sending humans into deep space with the goal of putting astronauts on Mars in the 2030s. Orion will receive some upgrades for its next launch in 2018 including a newly developed 3D Quartz Cyanate Ester composite material for the compression pad. The compression pads are 10-inches in diameter and 3-inches thick. The pucks are at 4 locations in the heat shield that serve as a part of the mechanism for holding the Crew and Service modules together during most mission phases prior to separation followed by Earth re-entry. Thus the compression pad has structural, aerothermal and thermal protection requirements.This paper describes the approach used for developing the new 3D composite, including continuous 3D weaving on an automated loom followed by resin transfer molding. Mechanical, thermal and arc jet testing of the 3D composite are also described.

Feldman, Jay↗

Grappling Spacecraft

This article provides a survey overview of the techniques, mechanisms, algorithms, and test and validation strategies required for the design of roboticgrappling vehicles intended to approach and grapple free-flying client satellites. We concentrate on using a robotic arm to grapple a free-floating spacecraft, as distinct from spacecraft docking and berthing, where two spacecraft directly mate with each other. Robotic grappling of client spacecraft is a deceptively complex problem: It entails designing a robotic system that functions robustly in the visually stark, thermally extreme orbital environment,operating near massive and extremely expensive yet fragile client hardware,using relatively slow flight computers with limited and laggy communica-tions. Spaceflight robotic systems are challenging to test and validate priorto deployment and extremely expensive to launch, which significantly limitsopportunities to experiment with new techniques. These factors make thedesign and operation of orbital robotic systems significantly different fromthose of their terrestrial counterparts, and as a result, only a relative handfulof systems have been demonstrated on orbit. Nevertheless, there is increas-ing interest in on-orbit robotic servicing and assembly missions, and grap-pling is the core requirement for these systems. Although existing systemssuch as the Space Station Remote Manipulator System have demonstratedextremely reliable operation, upcoming missions will attempt to expand thetypes of spacecraft that can be safely and dependably grappled and berthed.

Carl Glen Henshaw↗

Message Mode Operations for Spacecraft: A Proposal for Operating Spacecraft During Cruise and Mitigating the Network Loading Crunch

The NASA Deep Space Network (DSN) is a world-class spacecraft tracking facility with stations located in Spain, Australia and USA, servicing Deep Space Missions of many space agencies. The current system of scheduling spacecraft during cruise for multiple 8 hour tracking sessions per week currently leads to an overcommitted DSN. Studies indicate that future projected mission demands upon the Network will only make the loading problem worse. Therefore, a more efficient scheduling of DSN resources is necessary in order to support the additional network loading envisioned in the next few years: The number of missions is projected to increase from 25 in 1998 to 34 by 2001. In fact given the challenge of the NASA administrator, Dan Goldin, of launching 12 spacecraft per year, the DSN would be tracking approximately 90 spacecraft by 2010. Currently a large amount of antenna time and network resources are subscribed by a project in order to have their mission supported during the cruise phase. The recently completed Mars Pathfinder mission was tracked 3 times a week (8 hours/day) during the majority of its cruise to Mars. This paper proposes an innovative approach called Message Mode Operations (MMO) for mitigating the Network loading problem while continuing to meet the tracking, reporting, time management, and scheduling requirements of these missions during Cruise while occupying very short tracking times. MMO satisfies these requirements by providing the following services: Spacecraft Health and Welfare Monitoring Service Command Delivery Service Adaptive Spacecraft Scheduling Service Orbit Determination Service Time Calibration Service Utilizing more efficient engineering telemetry summarization and filtering techniques on-board the spacecraft and collapsing the navigation requirements for Doppler and Range into shorter tracks, we believe spacecraft can be adequately serviced using short 10 to 30 minute tracking sessions. This claim assumes that certain changes would have to he made in the way the Network traditionally services missions in Cruise. Furthermore, limiting spacecraft to short sessions will free up larger blocks of time in the tracking schedule to help accommodate future tracking demands soon to be placed upon the Network. This paper describes the key characteristics and benefits of MMO, the operational scenarios for its use, the required changes to the ground system in order to make this approach feasible and the results of two simulations: 1) to determine the effects of MMO on projected mission loading on the DSN and, 2) to determine the effect MMO has on spacecraft orbit determination.

Greenberg, Ed↗

Safer Foundation Solar Demands Skill Collaborative

The milestones and accomplishments achieved in Safer’s Solar Demands Skill Training program required a collective effort of stakeholders. The ability to achieve the desired results and impact lives of the population we serve works best when collaborating with community stakeholders such as community-based organizations, faith-based organizations, community activists, local law enforcement, community residents, employers, and elected and appointed officials. We are working harder than ever to place clients in-demand careers and high-growth industry sectors. Our employer engagement with high growth sectors continues to increase, we have been able to deepen our relationships in this space by providing in demand stackable credential training. Launched our initiative in the green job space by partnering with organizations like ComEd, the Department of Energy, community-based organizations, faith-based organizations, and manufacturers that helped to train clients in the green jobs and renewable energy space. By the end of the year, we will have completed our tenth cohort of photovoltaic solar installation training. The training has been used as a foundation for solar panel installers to acquire new skills in in the green jobs career pathways, such as sales and customer service. It has also served as a pipeline to union-level trade positions through the skills participants obtained through partnership engagement. Safer Foundation's policy and advocacy team plays a major role in expanding opportunities for people with records to over one hundred occupations, including the trades. This reform has allowed many to secure living wage employment, reducing the high recidivism rate within Illinois. Safer continues to build our social enterprise with Reconstructive Technology Partners (RTP). RTP is introducing people with records to the construction trades such as solar, carpentry and electrical through residential remodeling of homes on smaller construction projects. Understanding the need to have a greater community presence, outreach was extended to a boots on the ground model, including, but not limited to door-to-door engagement, DE-EE0008571 Safer Foundation Page 4 of 29 local radio broadcasting and print ads in local newspapers. We continue to seek innovative ways to increase Safer Foundations' presence in the renewable energy space. Outreach efforts gave us an opportunity to share critical reentry information and opportunities about our PV installer program. Giving us reach with local and national audiences alike. We launched a systematic approach to improving client data and client tracking through an evidence-based practices initiative. That implemented an agency wide cross-functional data management system. The system supported our goal of reviewing, evaluating, and making recommendations to improve operational processes, program delivery, information sharing, and more. Played a significant part in the success of the solar program. Finally, economists around the nation agree that there is a significant labor shortage. The shortage directly threatens our ability to sustain our economic growth; if employers do not have access to the workers they need, it can lead to a shutdown in the economic recovery. The demand for Safer Foundation services is more important and impactful than ever. We will continue to build upon our 50 years of experience to address the challenges ahead and serve more people in a better way. We are confident we will accomplish beautiful things that benefit everyone involved because together, we are powerful.

14 SOLAR ENERGY↗

Two-Column Aerosol Project (TCAP): Ground-Based Radiation and Aerosol Validation Using the NOAA Mobile SURFRAD Station Field Campaign Report

The National Oceanic and Atmospheric Administration (NOAA) is preparing for the launch of the Geostationary Operational Environmental Satellite R-Series (GOES-R) satellite in 2015. This satellite will feature higher time (5-minute versus 30-minute sampling) and spatial resolution (0.5 km vs 1 km in the visible channel) than current GOES instruments provide. NOAA’s National Environmental Satellite Data and Information Service has funded the Global Monitoring Division at the Earth System Research Laboratory to provide ground-based validation data for many of the new and old products the new GOES instruments will retrieve specifically related to radiation at the surface and aerosol and its extensive and intensive properties in the column. The Two-Column Aerosol Project (TCAP) had an emphasis on aerosol; therefore, we asked to be involved in this campaign to de-bug our new instrumentation and to provide a new capability that the U.S. Department of Energy (DOE) Atmospheric Radiation Measurement (ARM) Climate Research Facility’s Mobile Facilities (AMF) did not possess, namely surface albedo measurement out to 1625 nm. This gave us a chance to test remote operation of our new multi-filter rotating shadowband radiometer/multi-filter radiometer (MFRSR/MFR) combination. We did not deploy standard broadband shortwave and longwave radiation instrumentation because ARM does this as part of every AMF deployment. As it turned out, the ARM standard MFRSR had issues, and we were able to provide the aerosol column data for the first 2 months of the campaign covering the summer flight phase of the deployment. Using these data, we were able to work with personnel at Pacific Northwest National Laboratory (PNNL) to retrieve not only aerosol optical depth (AOD), but single scattering albedo and asymmetry parameter, as well.

54 ENVIRONMENTAL SCIENCES↗

NUSAT 1: The first ejectable getaway special

Four hours, fourteen minutes and forty-two seconds after the space shuttle, Challenger, was launched on mission 51B, a small satellite was ejected into independent orbit from a Getaway Special canister. This event was an exciting milestone in a project conceived over seven years ago. It is hoped that the story of NUSAT (Northern Utah SATellite) will be an inspiration for other experimentors to exploit this new service of the Getaway Special program. This paper describe the purpose and history of the project, the NUSAT spacecraft, the ground station and its operation, and some future directions envisioned by the participants.

Charles A. Bonsal↗

Systems Analysis and Structural Design of an Unpressurized Cargo Delivery Vehicle

The International Space Station will require a continuous supply of replacement parts for ongoing maintenance and repair after the planned retirement of the Space Shuttle in 2010. These parts are existing line-replaceable items collectively called Orbital Replacement Units, and include heavy and oversized items such as Control Moment Gyroscopes and stowed radiator arrays originally intended for delivery aboard the Space Shuttle. Current resupply spacecraft have limited to no capability to deliver these external logistics. In support of NASA's Exploration Systems Architecture Study, a team at Langley Research Center designed an Unpressurized Cargo Delivery Vehicle to deliver bulk cargo to the Space Station. The Unpressurized Cargo Delivery Vehicle was required to deliver at least 13,200 lbs of cargo mounted on at least 18 Flight Releasable Attachment Mechanisms. The Crew Launch Vehicle design recommended in the Exploration Systems Architecture Study would be used to launch one annual resupply flight to the International Space Station. The baseline vehicle design developed here has a cargo capacity of 16,000 lbs mounted on up to 20 Flight Releasable Attachment Mechanisms. Major vehicle components are a 5.5m-diameter cargo module containing two detachable cargo pallets with the payload, a Service Module to provide propulsion and power, and an aerodynamic nose cone. To reduce cost and risk, the Service Module is identical to the one used for the Crew Exploration Vehicle design.

Wu, K. Chauncey↗

CubeSat Initiatives at KSC

Even though the Small PayLoad Integrated Testing Services or SPLITS line of business is newly established, KSC has been involved in a variety of CubeSat projects and programs. CubeSat development projects have been initiated through educational outreach partnerships with schools and universities, commercial partnerships and internal training initiatives. KSC has also been involved in CubeSat deployment through programs to find launch opportunities to fly CubeSats as auxiliary payloads on previously planned missions and involvement in the development of new launch capabilities for small satellites. This overview will highlight the CubeSat accomplishments at KSC and discuss planning for future projects and opportunities.

CubeSat↗

Paving the Path for Human Space Exploration: The Challenges and Opportunities

Lauri Hansen, Director of Engineering at NASA Johnson Space Center will discuss the challenges of human space exploration. The future of human exploration begins with our current earth reliant missions in low earth orbit. These missions utilize the International Space Station to learn how to safely execute deep space missions. In addition to serving as an exploration test bed and enabling world class research, the International Space Station enables NASA to build international and commercial partnerships. NASA's next steps will be to enable the commercialization of low earth orbit while concentrating on developing the spacecraft and infrastructure necessary for deep space exploration and long duration missions. The Orion multi-purpose crew vehicle and the Space Launch System rocket are critical building blocks in this next phase of exploration. There are many challenges in designing spacecraft to perform these missions including safety, complex vehicle design, and mass challenges. Orion development is proceeding well, and includes a significant partnership with the European Space Agency (ESA) to develop and build the Service Module portion of the spacecraft. Together, NASA and ESA will provide the capability to take humans further than we have ever been before - 70,000 km past the moon. This will be the next big step in expanding the frontiers of human exploration, eventually leading to human footprints on Mars.

Hansen, Lauri↗

Comparison of Daily, Monthly (Lunar), Yearly, Decadal, Quarter-Century, Half-Century, and Centurial Shoreline Change Rates at the Kennedy Space Center, Cape Canaveral, Florida, USA

The Kennedy Space Center (KSC) is North America’s premier spaceport and provides crucial access to space for both government and private entities. The National Aeronautics and Space Administration (NASA) facilities are clustered along a 12 km active shoreline at Cape Canaveral, Florida, USA, with the entire NASA and US Space Force station (SF) shoreline stretching over 32 km (Figure 1). Several Launch Complexes (LC’s) including the modern heavy lift facilities are only a few tens of meters from the active shoreline and are imminently threatened by continued sea level rise and ongoing coastal erosion. The space center was built on the northern part of Cape Canaveral. Images collected in 1943 show that Apollo Heavy Lift Launch Complexes were built in swales on ground that was at or below sea level with Launch Complex 39B constructed on a paleo inlet (Figures 2 and 3). Today the Heavy Lift Launch Complexes are ~220 meters from the shoreline with the area between the complexes retreating at the highest rates along the cape (Figure 4). To better understand the intersection of environmental concerns, limited budgets for shoreline protection, and sheltering critical infrastructure; NASA, The University of Florida, United States Geological Survey (USGS), National Park Service (NPS) and contractors have and continue to conduct numerous studies to characterize and understand the shoreline evolution and rates of change at KSC. This project aims to better understand and visualize the temporal and spatial variability of change along the NASA shoreline beyond a simple point to point solution.

Richard MacKenzie III↗

Newly Released TRMM Version 7 Products, Other Precipitation Datasets and Data Services at NASA GES DISC

The NASA Goddard Earth Sciences Data and Information Services Center (GES DISC) is home of global precipitation product archives, in particular, the Tropical Rainfall Measuring Mission (TRMM) products. TRMM is a joint U.S.-Japan satellite mission to monitor tropical and subtropical (40 S - 40 N) precipitation and to estimate its associated latent heating. The TRMM satellite provides the first detailed and comprehensive dataset on the four dimensional distribution of rainfall and latent heating over vastly undersampled tropical and subtropical oceans and continents. The TRMM satellite was launched on November 27, 1997. TRMM data products are archived at and distributed by GES DISC. The newly released TRMM Version 7 consists of several changes including new parameters, new products, meta data, data structures, etc. For example, hydrometeor profiles in 2A12 now have 28 layers (14 in V6). New parameters have been added to several popular Level-3 products, such as, 3B42, 3B43. Version 2.2 of the Global Precipitation Climatology Project (GPCP) dataset has been added to the TRMM Online Visualization and Analysis System (TOVAS; URL: http://disc2.nascom.nasa.gov/Giovanni/tovas/), allowing online analysis and visualization without downloading data and software. The GPCP dataset extends back to 1979. Version 3 of the Global Precipitation Climatology Centre (GPCC) monitoring product has been updated in TOVAS as well. The product provides global gauge-based monthly rainfall along with number of gauges per grid. The dataset begins in January 1986. To facilitate data and information access and support precipitation research and applications, we have developed a Precipitation Data and Information Services Center (PDISC; URL: http://disc.gsfc.nasa.gov/precipitation). In addition to TRMM, PDISC provides current and past observational precipitation data. Users can access precipitation data archives consisting of both remote sensing and in-situ observations. Users can use these data products to conduct a wide variety of activities, including case studies, model evaluation, uncertainty investigation, etc. To support Earth science applications, PDISC provides users near-real-time precipitation products over the Internet. At PDISC, users can access tools and software. Documentation, FAQ and assistance are also available. Other capabilities include: 1) Mirador (http://mirador.gsfc.nasa.gov/), a simplified interface for searching, browsing, and ordering Earth science data at NASA Goddard Earth Sciences Data and Information Services Center (GES DISC). Mirador is designed to be fast and easy to learn; 2)TOVAS; 3) NetCDF data download for the GIS community; 4) Data via OPeNDAP (http://disc.sci.gsfc.nasa.gov/services/opendap/). The OPeNDAP provides remote access to individual variables within datasets in a form usable by many tools, such as IDV, McIDAS-V, Panoply, Ferret and GrADS; 5) The Open Geospatial Consortium (OGC) Web Map Service (WMS) (http://disc.sci.gsfc.nasa.gov/services/wxs_ogc.shtml). The WMS is an interface that allows the use of data and enables clients to build customized maps with data coming from a different network.

Liu, Zhong↗

Crew Exploration Vehicle Service Module Ascent Abort Coverage

The Crew Exploration Vehicle (CEV) is required to maintain continuous abort capability from lift off through destination arrival. This requirement is driven by the desire to provide the capability to safely return the crew to Earth after failure scenarios during the various phases of the mission. This paper addresses abort trajectory design considerations, concept of operations and guidance algorithm prototypes for the portion of the ascent trajectory following nominal jettison of the Launch Abort System (LAS) until safe orbit insertion. Factors such as abort system performance, crew load limits, natural environments, crew recovery, and vehicle element disposal were investigated to determine how to achieve continuous vehicle abort capability.

Tedesco, Mark B.↗