Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “issues management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,027 records · Page 57

DOI Use of AVIRIS Data in Natural Resources Management: A Technology Transfer Project Status Report

A meeting was held in December 1996, attended by representatives from Department of the Interior (DOI) and National Aeronautical and Space Administration (NASA) at the request of Department of the Interior Secretary, Bruce Babbitt and NASA, Administrator Director Dan Goldin, to discuss the use of hyperspectral systems and related remote sensing technologies in addressing environmental issues of environmental importance to the (DOI). It was determined that NASA/DOI Coordination be established, comprised of representatives from each agency, designated to address the environmental issues and resulting technologies. A steering committee was formed consisting of representatives from NASA Headquarters, NASA PI's from University California-Davis, University of Colorado-Boulder, University of New Hampshire and DOI Bureaus (Indian Affairs, Land Management, Reclamation, National Park Service, and US Geological Survey).

Getter, James R.↗

Solvent Recovery and Management at the Savannah River Site H-Canyon Facility

NIOWAVE, Inc. is a domestic supplier of medical and industrial isotopes from uranium and radium. The Savannah River National laboratory (SRNL) is currently providing support to NIOWAVE, which plans to deploy a superconducting electron linear accelerator (LINAC) to fission uranium for Mo-99 production without the need for a nuclear reactor or HEU. The uranium from the Mo-99 production targets will be purified using a modified PUREX (Plutonium Uranium Reduction Extraction) solvent extraction process to recover the uranium in the product stream. The uranium will then be precipitated as an oxalate which is calcined to U 3 O 8 to fabricate pellets for new Mo-99 targets. In previous support provided to NIOWAVE, the SRNL demonstrated a solvent washing process to remove degradation products from the tributyl phosphate (TBP) solvent used in the modified PUREX process under development for uranium recovery. To supplement this technology demonstration, NIOWAVE requested the SRNL to provide summary information on the solvent recovery and management activities which are used at the Savannah River Site (SRS) H-Canyon facility. An existing reference document for the reprocessing of irradiated HEU fuels at the SRS was used as the primary reference for the solvent management activities; although, other reference documents were used to provide supplementary information. The information provided includes a brief summary of the solvent degradation issues which have been observed in the H-Canyon solvent extraction cycles and resulting process safety concerns. The solvent recovery processes for the three cycles of solvent extraction used in the H-Canyon were subsequently described including the process equipment which consists of the continuous and batch solvent washers, pumps, and tanks. A final section is provided on the monitoring and analysis of solvent quality based on the previous work performed at the SRNL for NIOWAVE and past research and development activities performed to support the solvent extraction processes in both the SRS F-Canyon and H-Canyon facilities.

07 ISOTOPE AND RADIATION SOURCES↗

Performance Evaluation of Data-Enhanced Hierarchical Control for Grid Operations

This paper presents a hardware-in-the-loop (HIL) simulation to evaluate the performance of voltage regulation of Data-Enhanced Hierarchical Control (DEHC). This DEHC uses an advanced distribution management system (ADMS) for grid operations to control legacy and grid-edge devices and coordinate with distributed energy management systems (DERMS) to manage high penetrations of photovoltaics (PV) on a utility distribution system. The HIL platform provides realistic laboratory testing, including accurate modeling (legacy devices, grid-edge devices, and PV) of the real-world distribution system from a utility partner, a real controller (ADMS), software controller DERMS, hardware grid-edge devices, and standard communications protocols. The test results demonstrate functionalities of the integrated platform and the performance of voltage regulation of the coordinated control systems. Based on laboratory testing, the utility can set up the same grid-automation system to manage DERs, legacy devices, and grid-edge devices to achieve their system-level control and operation objectives (e.g., voltage regulation), thus de-risking potential issues such as instability for field deployment.

41 EE - Solar Energy Technologies Office (EE-4S)↗

Oil and Natural Gas Development near and beneath Uranium Tailings Cells and Other Remediated Sites - 20358

DOE LM is responsible for maintaining remedies at more than 50 remediated sites that require active long-term surveillance and maintenance (LTS and M). Institutional controls (ICs) were established to limit human and environmental exposures to residual contamination by controlling land use, restricting access to potential hazards, and making the public aware of potential dangers from the residual contamination. ICs for each site were developed based on current and foreseeable conditions; however, these controls should evolve to mitigate potential human health and other environmental risks from unanticipated changes in activities or site conditions. Activities conducted beyond the DOE long-term care boundaries by non-DOE parties may impact the effectiveness of ICs or even the long-term stability of disposal cells and groundwater remedies. Several sites that LM manages or that will transfer to LM for LTS and M are in active oil and gas production basins. The sites are associated with uranium ore milling or nuclear test sites and have been remediated or are in the process of remediation and have no ongoing DOE mission. Particularly since 2005, hydraulic fracturing ('fracking') combined with directional drilling has dramatically increased oil and natural gas (oil/gas) production in the United States, now making it the number one hydrocarbon-producing country. Fracking has allowed production from shale and other rocks of low natural permeability that were historically not considered viable oil/gas resources. Also, because wellbores can now be drilled as many as 5 kilometers or more horizontally, hydrocarbons can be recovered from zones without having access to the surface above them. Drilling activity near Rulison, Colorado, the location of an underground nuclear detonation managed by LM, has raised public concerns that remnant radioactivity in the detonation zone could migrate to producing wells and enter the natural gas distribution system. At sites like the Falls City, Texas, Disposal site, transitioned to LM with a split estate, increased production in the region has resulted in wellbores beneath the long-term care boundary of the site. While the DOE license for Falls City was approved by the NRC in 1997 without the acquisition of the subsurface rights, NRC has raised concerns on whether this activity impacts the integrity of the cell and/or groundwater remedies. In Wyoming, LM is anticipating receiving the license for the Bear Creek site and manages the Spook site, both locations of uranium mill tailings disposal cells. These Wyoming sites are in an active region of major oil and gas development. This change in surrounding land use will require LM to work collaboratively with NRC to address these concerns. At several DOE sites radioactive waste, and often intermixed nonradioactive constituents, is permanently isolated in engineered disposal cells. At other sites, residual contamination can be present in groundwater, blast cavities, and infinite amounts within soil. Areas targeted for oil and gas development at the Texas and Wyoming sites range from depths of 2440 to 3350 meters (8000-11000 feet) below ground surface. When most site remedies were designed, oil and gas development was not considered to be an issue within the site boundary. With the more recent uses of directional drilling, fracking, and associated wastewater injections, the evaluative criteria for incoming sites and ICs for managing long-term protectiveness and regulatory compliance are changing. Although DOE surface ownership was previously thought to be a robust IC to prevent surface and subsurface development, particularly at disposal sites, that may no longer be the case. Whereas the subsurface development at Texas and Wyoming sites is currently occurring at thousands of meters beneath the surface, shallower and direct onsite development would be more of a concern for LM. The energy introduced when a well is hydraulically fractured causes microseismic events (magnitude -2 to 1.0) as the fractures propagate but does not directly cause seismic events (earthquakes) of sufficient magnitude to damage surface structures. Additionally, the extent of the hydraulic fractures is limited to the targeted depths, which are far below the surface. However, earthquakes of sufficient magnitude to damage surface structures have been attributed to the injection of wastewater into disposal wells. States that have experienced these effects have enacted regulations that limit the rate and pressures that wastewater can be injected into disposal wells. Items LM may consider are the need for monitoring the volume of water injected into nearby disposal wells and possibly installing seismic stations at sites most susceptible to damage. While the need to demonstrate that no impact from oil and gas extraction activities on a site groundwater remedy or disposal cells will vary from site to site, LM is assessing risk criteria for this activity. Though LM has not experienced an issue yet at a uranium tailings disposal site, it cannot assume that there will be none, and must address NRC concerns. LM is building on past experiences at other sites and beginning to form new processes with the hope that these concepts can be applied for other future sites. (authors)

04 OIL SHALES AND TAR SANDS↗

The Future of Air Traffic Management

A system for the control of terminal area traffic to improve productivity, referred to as the Center-TRACON Automation System (CTAS), is being developed at NASA's Ames Research Center under a joint program with the FAA. CTAS consists of a set of integrated tools that provide computer-generated advisories for en-route and terminal area controllers. The premise behind the design of CTAS has been that successful planning of traffic requires accurate trajectory prediction. Data bases consisting of representative aircraft performance models, airline preferred operational procedures and a three dimensional wind model support the trajectory prediction. The research effort has been the design of a set of automation tools that make use of this trajectory prediction capability to assist controllers in overall management of traffic. The first tool, the Traffic Management Advisor (TMA), provides the overall flow management between the en route and terminal areas. A second tool, the Final Approach Spacing Tool (FAST) provides terminal area controllers with sequence and runway advisories to allow optimal use of the runways. The TMA and FAST are now being used in daily operations at Dallas/Ft. Worth airport. Additional activities include the development of several other tools. These include: 1) the En Route Descent Advisor that assist the en route controller in issuing conflict free descents and ascents; 2) the extension of FAST to include speed and heading advisories and the Expedite Departure Path (EDP) that assists the terminal controller in management of departures; and 3) the Collaborative Arrival Planner (CAP) that will assist the airlines in operational decision making. The purpose of this presentation is to review the CTAS concept and to present the results of recent field tests. The paper will first discuss the overall concept and then discuss the status of the individual tools.

Denery, Dallas G.↗

A Novel Multi-Agent Deep Reinforcement Learning-enabled Distributed Power Allocation Scheme for mmWave Cellular Networks

We consider the power allocation problem over shared spectrum for millimeter-Wave (mmWave) cellular downlink. Existing approaches usually find sub-optimal solutions by solving a non-convex optimization which leads to scalability issues due to centralized control. Therefore, distributed and adaptive approaches are desirable. Recently, model-free Deep Reinforcement Learning (DRL) has achieved success in such wireless resource management tasks. By modeling the radio environment as a Markov Decision Process (MDP) with the base stations (BSs) being the agents, power allocation can be automated at the agent level with comparable throughput performance to conventional centralized schemes. The multi-agent setting presents new challenges as the radio environment is impacted by the joint actions of the agents and is no longer stationary from any individual agent’s perspective. Existing literature bypasses this non-stationarity violation by ignoring it which may cause performance degradation. To tackle this issue, we propose a distributed continuous power allocation scheme based on a modified version of multi-agent Deep Deterministic Policy Gradient (MADDPG) that is tailored for the distributed multiple-agent setting. The proposed scheme employs a centralized-training distributed-execution framework where Q-functions are trained over subsets of BSs while each BS determines its transmit power based only on its own local observation. It admits constant per-BS communication and computation complexity and is thus scalable to large networks. Numerical evaluation shows that the proposed scheme adapts well to a wide range of interference conditions and can achieve comparable or better performance than several state-of-the-art non-learning approaches.

99 GENERAL AND MISCELLANEOUS↗

FY2021 Savannah River Site Composite Analysis Annual Summary Review

This document provides the Department of Energy (DOE) Order 435.1 and its manual, Radioactive Waste Management (DOE 2021a, 2021b) required Annual Review for the Savannah River Site (SRS) Composite Analysis (CA). Progress made to-date toward addressing the secondary issue from the LFRG review of the 2010 SRS CA has focused primarily upon inventory estimate improvements. Inventory impacts dose in a linear fashion and reduces the uncertainty with the CA conclusions. Maintenance items are addressed, as funding allows, based on the relative risk associated with meeting the performance objectives. Currently, there is minimal risk in exceeding the DOE 100 mrem/yr CA primary dose limit or the DOE 30 mrem/yr dose constraint (administrative limit).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Y-12 Groundwater Protection Program Groundwater and Surface Water Sampling and Analysis Plan (CY 2021)

This plan provides a description of the groundwater and surface water quality monitoring activities planned for calendar year (CY) 2021 at the U.S. Department of Energy Y-12 National Security Complex (Y-12) that will be managed by the Y-12 Groundwater Protection Program (GWPP). Groundwater and surface water monitoring is performed by the GWPP. Groundwater and surface water monitoring will be performed in three hydrogeologic regimes at Y-12: the Bear Creek Hydrogeologic Regime (Bear Creek Regime), the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), and the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek and East Fork regimes are located in Bear Creek Valley and the Chestnut Ridge Regime is located south of Y-12. Additional surface water monitoring will be performed north of Pine Ridge along the boundary of the Oak Ridge Reservation. The following sections of this report provide details regarding the CY 2021 groundwater and surface water monitoring activities. Section 2 describes the monitoring locations in each regime and the processes used to select the sampling locations. A description of the field measurements and laboratory analytes is provided in Section 3. Sample collection methods and procedures are described in Section 4, and Section 5 lists the documents cited for more detailed operational and technical information. The narrative sections of the report reference several appendices. Figures (maps and diagrams) and tables (excluding a data summary table presented in Section 4) are in Appendix A and Appendix B, respectively. Groundwater Monitoring Schedules (when issued throughout CY 2021) will be inserted in Appendix C, and addenda to this plan (if issued) will be inserted in Appendix D. Laboratory requirements (bottle lists, holding times, etc.) are provided in Appendix E, and an approved Waste Management Plan is provided in Appendix F. Modifications to the CY 2021 monitoring program may be necessary during implementation. Changes in programmatic requirements may alter the analytes specified for selected monitoring wells or may add or remove wells from the planned monitoring network. Each modification to the monitoring program will be approved by the Y-12 GWPP manager and documented as an addendum to this sampling and analysis plan.

54 ENVIRONMENTAL SCIENCES↗

Evaluation of Integrated Demand Management Looking into Strategic & Tactical Flow Management

The motivation behind Integrated Demand Management (IDM) research is to explore possible improvements to United States National Airspace System (NAS) performance that could be realized through procedural integration of strategic traffic flow management capabilities, such as the Collaborative Trajectory Options Program (CTOP), and tactical capabilities, such as Time Based Flow Management (TBFM). An initial IDM concept for clear weather operations was developed and evaluated for potential benefits, including efficiency, delay reduction, predictability and throughput, and to identify any major issues that might represent a showstopper for a fielded application. Newark Liberty International Airport (EWR) arrival operations provided a use case for concept development. EWR uses miles-in-trail (MIT) metering to regulate demand into TBFM during high volume operations, and short-haul flights are often penalized with excessive, last-minute ground delays when the overhead stream is saturated. IDM addresses this problem by replacing MIT conditioning with CTOP to better manage the demand delivery to the TBFM entry points. A quasi-real time high-fidelity simulation that would normally involve participants was conducted using heuristic-based procedures that mimicked operators behaviors instead. Five total conditions were compared: two baseline conditions with MIT delivery to TBFM entry points using two different TBFM settings; and three IDM conditions: one with airborne speed control using an Required Time of Arrival (RTA) capability, a second without RTA, and a third with no wind forecast errors. Results suggest that the IDM concept can deliver traffic more efficiently by shifting the delays from airborne to ground for both RTA and non-RTA conditions, while maintaining a target throughput rate. The results also suggest that with good predictability of airport capacity, excessive TBFM ground delay can be minimized by applying more strategic CTOP delay, increasing predictability for the airline operators. Overall, the results indicate that the implementation of an IDM concept under clear weather conditions can improve NAS system performance. Future IDM research aims to expand the concept to address demandcapacity imbalance d severe weather.

Time-Based Flow Management (TBFM)↗

Air Traffic Controller Acceptability of Unmanned Aircraft System Detect-and-Avoid Thresholds

A human-in-the-loop experiment was conducted with 15 retired air traffic controllers to investigate two research questions: (a) what procedures are appropriate for the use of unmanned aircraft system (UAS) detect-and-avoid systems, and (b) how long in advance of a predicted close encounter should pilots request or execute a separation maneuver. The controller participants managed a busy Oakland air route traffic control sector with mixed commercial/general aviation and manned/UAS traffic, providing separation services, miles-in-trail restrictions and issuing traffic advisories. Controllers filled out post-scenario and post-simulation questionnaires, and metrics were collected on the acceptability of procedural options and temporal thresholds. The states of aircraft were also recorded when controllers issued traffic advisories. Subjective feedback indicated a strong preference for pilots to request maneuvers to remain well clear from intruder aircraft rather than deviate from their IFR clearance. Controllers also reported that maneuvering at 120 seconds until closest point of approach (CPA) was too early; maneuvers executed with less than 90 seconds until CPA were more acceptable. The magnitudes of the requested maneuvers were frequently judged to be too large, indicating a possible discrepancy between the quantitative UAS well clear standard and the one employed subjectively by manned pilots. The ranges between pairs of aircraft and the times to CPA at which traffic advisories were issued were used to construct empirical probability distributions of those metrics. Given these distributions, we propose that UAS pilots wait until an intruder aircraft is approximately 80 seconds to CPA or 6 nmi away before requesting a maneuver, and maneuver immediately if the intruder is within 60 seconds and 4 nmi. These thresholds should make the use of UAS detect and avoid systems compatible with current airspace procedures and controller expectations.

unmanned aircraft systems↗

Fluorine Limits and Impacts in High-Level Waste Glass Compositions

The impact of elevated fluorine (F) content on Hanford high-level waste (HLW) glasses has not previously been studied in detail. This effort represents the first systematic study to determine what F concentration limits should be used for the design of alkali-borosilicate-based Hanford Waste Treatment and Immobilization Plant (WTP) HLW glasses, and to document the technical basis for that limit. If alkali borosilicate glass made from Hanford HLW can accommodate a large amount of F, the large capital costs for complex sludge washing facilities may be avoided, as would much of the operational costs and negative schedule impacts associated with handling the large volumes of water required to dissolve these salts. In order to determine a limit for F in likely HLW glass compositions, an evaluation was conducted on glasses with F ≤ 0.90 mass% from previous nuclear waste glass studies. The collected dataset contains 239 glasses (232 HLW glasses and 7 LAW glasses) including 109 glasses with 0.9 ≤ F mass% ≤ 2.5, 116 with 2.5 < F mass% ≤ 8.0, and 14 with F mass% ≥ 8 (max. F mass% = 17.42). The collected composition and property data were analyzed to determine the basis for the F tolerance, i.e. the maximum F concentration that can be processed without potential issues. Fluorine volatility, product consistency test (PCT) response, liquidus temperature (T L ), glass melt viscosity, and crystallinity have been investigated. No limits for F concentration can be made based on F volatility, T L , or glass melt viscosity, because the data show that high F in glasses do not indicate, with high probability, being restricted by those property constrains. However, crystallinity and PCT response were used to estimate the F tolerance. The results show that glasses with high F (≥ 0.90 mass%) are more likely to form large fractions of F-containing crystal phases which may increase PCT responses, i.e. decrease the glass durability. Based on the results of crystallinity and PCT data, the F tolerance of 4.5 mass% is estimated. There is no evidence of other glass components, such as calcium oxides and alkali metal oxides have combined impacts with F on the glass properties. Overall, the available high-F glass data is limited, especially in the designed HLW glass composition regions. Future work on formulation and testing of HLW glasses with F ≥ 0.9 mass% will close the data gaps and expand operational flexibility with respect to the fluoride tolerances. Volatility of F from melters and corrosion of materials in contact with glass melts are important for processing of high-F wastes; yet no test data are currently available. It is recommended tests be conducted to address these two potential issues.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation of the 2018 Version of the Integrated Surveillance Program Database Pressure Equation

The Integrated Surveillance Program (ISP) Database Pressure Equation was developed to determine with reasonable certainty the total maximum pressure of hydrogen and other gases in packaged 3013 containers stored at Savannah River Site (SRS) in support of the destructive evaluation (DE) process. The pressure equation in the Department of Energy (DOE) 3013 Standard, “Standard for Stabilization, Packaging and Storage of Plutonium- Bearing Materials” (DOE-STD-3013-2004) used a bounding assumption that all the water is decomposed to form hydrogen. However, the results of Los Alamos National Laboratory (LANL) shelf-life experiments showed that hydrogen is consumed, and that the maximum pressures would not approach the design pressure of the 3013 container. Therefore, the ISP Database Pressure Equation was revised in 2008 to include terms for the generation of helium and hydrogen as a function of time, as well as the consumption of water and destruction of hydrogen based on shelf-life results. The 2008 ISP Database Pressure Equation provided a more reasonable estimate of the total maximum pressure in packaged 3013 containers than the pressure equation in versions of the 3013 Standard issued prior to 2018.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Potential Impacts of Dynamic Electricity Pricing in California: Load Shape and Customer Bill Impacts Under Elastic Customer Response

The increasing penetration of renewable energy in California has intensified grid management challenges, exemplified by the “duck curve” and the resulting need for steep ramping and curtailment of renewables. To address these issues, dynamic electricity tariffs that vary in near-real time are being considered to incentivize customers to shift demand and support the grid. This study extends previous work on the bill impacts of such tariffs in the absence of load response by quantifying the system-level and customer impacts of load response based on customer price elasticity. Customer-level load response modeling was conducted using meter data from 411,000 customers across residential, commercial, and industrial sectors. Customer demand elasticity was estimated using literature-based values, with scenarios ranging from low to high elasticity, including an automation-enhanced scenario. Results indicate that universal adoption of, and response to, dynamic tariffs can significantly reduce peak net load (by 15%) and maximum ramping requirements (by 20%) with moderate elasticity, delivering demand response resources comparable to or exceeding current programs at all elasticity levels. Bill analysis shows that, when responding elastically to dynamic prices, most non-PV customers experience modest savings, while PV customers may see higher effective rates due to lower compensation for exports during low-price periods. Emissions analysis reveals a reduction in per-kWh emissions system-wide, with a total absolute load increase of 2% accompanied by a negligible absolute emissions increase. The study concludes that while dynamic tariffs offer substantial grid benefits, customer bill savings under modeled response behaviors may be too modest to drive widespread adoption without additional incentives or enabling technologies. Future research should model flexible loads and advanced control technologies with greater fidelity to better represent the potential opportunities of dynamic tariffs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Pilot workload and fatigue: A critical survey of concepts and assessment techniques

The principal unresolved issues in conceptualizing and measuring pilot workload and fatigue are discussed. These issues are seen as limiting the development of more useful working concepts and techniques and their application to systems engineering and management activities. A conceptual analysis of pilot workload and fatigue, an overview and critique of approaches to the assessment of these phenomena, and a discussion of current trends in the management of unwanted workload and fatigue effects are presented. Refinements and innovations in assessment methods are recommended for enhancing the practical significance of workload and fatigue studies.

Gartner, W. B.↗

Missions/Planning Panel

A panel discussion was held to develop a viewpoint of space power technology needs and state of readiness for future mission scenarios. Among the points made in the discussion, it was agreed that missions, particularly the far term ones, do serve to drive technology; however, as the missions become nearer term, issues of schedule and cost severely limit the willingness to accept risk. There are, in fact, no rewards to a mission manager for introducing new technology. Mission downscaling is the usual response to technology limitations. All panelists agreed that there exists a serious gap between when technologists feel their job is done and what mission managers need for decision. Typically a two to three year engineering development gap exists. It is essential to take technologies to the engineering model level and conduct a flight demonstration to close this gap. All agreed that increased effort should be made to achieve stronger interactions between planners and technologists and that workshops like the present one are a step in the right direction. Technologists need mission credibility and vice versa.

Fordyce, J. S.↗

Orbital Debris

Earth orbital debris issues and recommended future activities are discussed. The workshop addressed the areas of environment definition, hazards to spacecraft, and space object management. It concluded that orbital debris is a potential problem for future space operations. However, before recommending any major efforts to control the environment, more data are required. The most significant required data are on the population of debris smaller than 4 cm in diameter. New damage criteria are also required. When these data are obtained, they can be combined with hypervelocity data to evaluate the hazards to future spacecraft. After these hazards are understood, then techniques to control the environment can be evaluated.

Donald J. Kessler↗

Computer integration of engineering design and production: A national opportunity

The National Aeronautics and Space Administration (NASA), as a purchaser of a variety of manufactured products, including complex space vehicles and systems, clearly has a stake in the advantages of computer-integrated manufacturing (CIM). Two major NASA objectives are to launch a Manned Space Station by 1992 with a budget of $8 billion, and to be a leader in the development and application of productivity-enhancing technology. At the request of NASA, a National Research Council committee visited five companies that have been leaders in using CIM. Based on these case studies, technical, organizational, and financial issues that influence computer integration are described, guidelines for its implementation in industry are offered, and the use of CIM to manage the space station program is recommended.

Source record↗

Group-level issues in the design and training of cockpit crews

Cockpit crews always operate in an organizational context, and the transactions between the crew and representatives of that context (e.g., organizational managers, air traffic controllers) are consequential for any crew's performance. For a complete understanding of crew performance a look beyond the traditional focus on individual pilots is provided to see how team- and organization-level factors can enhance (or impede) the ability of even well-trained individuals to work together effectively. This way of thinking about cockpit crews (that is, viewing them as teams that operate in organizations) offers some potentially useful avenues for thinking about next steps in the development of CRM training programs. Those possibilities are explored, emphasizing how they can enrich (not replace) individually-focussed CRM training.

Hackman, J. Richard↗