Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “failure cause”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,027 records · Page 57

Technology Assessment Requirements for Programs and Projects

Program/project uncertainty can most simply be defined as the unpredictability of its outcome. As might be expected, the degree of uncertainty depends substantially on program/project type. For hi-tech programs/projects, uncertainty all too frequently translates into schedule slips, cost overruns and occasionally even to cancellations or failures - consummations root cause of such events is often attributed to inadequate definition of requirements. If such were indeed the root cause, then correcting the situation would simply be a matter of requiring better requirements definition, but since history seems frequently to repeat itself, this must not be the case - at least not in total. There are in fact many contributors to schedule slips, cost overruns, project cancellations and failures, among them lack of adequate requirements definition. The case can be made, however, that many of these contributors are related to the degree of uncertainty at the outset of the project. And further, that a dominant factor in the degree of uncertainty is the maturity of the technology required to bring the project to fruition. This presentation discusses the concept of relating degrees of uncertainty to Technology Readiness Levels (TRL) and their associated Advancement Degree of Difficulty (AD2) levels. It also briefly describes a quantifiable process to establish the appropriate TRL for a given technology and quantifies through the AD2 what is required to move it from its current TRL to the desired TRL in order to reduce risk and maximize likelihood of successfully infusing the technology.

Bilbro, James W.↗

Space Station Freedom integrated fault model

A demonstration of an integrated fault propagation model for Space Station Freedom is described. The demonstration uses a HyperCard graphical interface to show how failures can propagate from one component to another, both within a system and between systems. It also shows how hardware failures can impact certain defined functions like reboost, atmosphere maintenance or collision avoidance. The demonstration enables the user to view block diagrams for the various space station systems using an overview screen, and interactively choose a component and see what single or dual failure combinations can cause it to fail. It also allows the user to directly view the fault model, which is a collection of drawing and text listings accessible from a guide screen. Fault modeling provides a useful technique for analyzing individual systems and also interactions between systems in the presence of multiple failures so that a complete picture of failure tolerance and component criticality can be achieved.

Becker, Fred J.↗

Experimental and Analytical Investigation of Pressure Differentials for Clean and Loaded Wire Meshes Used in Zeolite Retention

Following failure of the carbon dioxide removal assembly (CDRA) on the ISS, a CDRA teardown, test, and evaluation (TT&E) effort found that the sorbent material was not retained as intended by the packed beds and that presence of the sorbent in the check valve and selector valve was the cause of the failure of these components. This paper documents the development of design data for an in-line filter element. The purpose of the in-line filter is to provide temporary protection for on-orbit CDRA hardware until the bed retainment system can be redesigned and replaced.

Knox, James C.↗

Support to X-33/Reusable Launch Vehicle Technology Program

The Primary activities of Lee & Associates for the referenced Purchase Order has been in direct support of the X-33/Reusable Launch Vehicle Technology Program. An independent review to evaluate the X-33 liquid hydrogen fuel tank failure, which recently occurred after-test of the starboard tank has been provided. The purpose of the Investigation team was to assess the tank design modifications, provide an assessment of the testing approach used by MSFC (Marshall Space Flight Center) in determining the flight worthiness of the tank, assessing the structural integrity, and determining the cause of the failure of the tank. The approach taken to satisfy the objectives has been for Lee & Associates to provide the expertise of Mr. Frank Key and Mr. Wayne Burton who have relevant experience from past programs and a strong background of experience in the fields critical to the success of the program. Mr. Key and Mr. Burton participated in the NASA established Failure Investigation Review Team to review the development and process data and to identify any design, testing or manufacturing weaknesses and potential problem areas. This approach worked well in satisfying the objectives and providing the Review Team with valuable information including the development of a Fault Tree. The detailed inputs were made orally in real time in the Review Team daily meetings. The results of the investigation were presented to the MSFC Center Director by the team on February 15, 2000. Attached are four charts taken from that presentation which includes 1) An executive summary, 2) The most probable cause, 3) Technology assessment, and 4) Technology Recommendations for Cryogenic tanks.

Source record↗

Application of Failure Mode and Effects Analysis to Intraoperative Radiation Therapy Using Mobile Electron Linear Accelerators

Purpose: Failure mode and effects analysis (FMEA) represents a prospective approach for risk assessment. A multidisciplinary working group of the Italian Association for Medical Physics applied FMEA to electron beam intraoperative radiation therapy (IORT) delivered using mobile linear accelerators, aiming at preventing accidental exposures to the patient. Methods and Materials: FMEA was applied to the IORT process, for the stages of the treatment delivery and verification, and consisted of three steps: 1) identification of the involved subprocesses; 2) identification and ranking of the potential failure modes, together with their causes and effects, using the risk probability number (RPN) scoring system, based on the product of three parameters (severity, frequency of occurrence and detectability, each ranging from 1 to 10); 3) identification of additional safety measures to be proposed for process quality and safety improvement. RPN upper threshold for little concern of risk was set at 125. Results: Twenty-four subprocesses were identified. Ten potential failure modes were found and scored, in terms of RPN, in the range of 42-216. The most critical failure modes consisted of internal shield misalignment, wrong Monitor Unit calculation and incorrect data entry at treatment console. Potential causes of failure included shield displacement, human errors, such as underestimation of CTV extension, mainly because of lack of adequate training and time pressures, failure in the communication between operators, and machine malfunctioning. The main effects of failure were represented by CTV underdose, wrong dose distribution and/or delivery, unintended normal tissue irradiation. As additional safety measures, the utilization of a dedicated staff for IORT, double-checking of MU calculation and data entry and finally implementation of in vivo dosimetry were suggested. Conclusions: FMEA appeared as a useful tool for prospective evaluation of patient safety in radiotherapy. The application of this method to IORT lead to identify three safety measures for risk mitigation.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Mechanical properties of dissimilar metal joints composed of DP 980 steel and AA 7075-T6

In this study, a solid state joining process, called friction bit joining, was used to spot weld aluminium alloy 7075-T6 to dual phase 980 steel. Lap shear failure loads for specimens without adhesive averaged ~10kN, while cross-tension specimens averaged 2·8 kN. Addition of adhesive with a thickness up to 500 μm provided a gain of ~50% to lap shear failure loads, while a much thinner layer of adhesive increased cross-tension failure loads by 20%. Microstructures of the welds were martensitic, but the hardness of the joining bit portion was greater than that of the DP 980, owing to its higher alloy content. Softening in the heat affected zone of a welded joint appeared to be relatively small, though it was enough to cause nugget pullout failures in some lap shear tension specimens. Finally, other failures in lap shear tension were interfacial, while all of the failures in cross-tension were interfacial.

36 MATERIALS SCIENCE↗

Statistical and sensitivity analysis of failing rods in EPR LBLOCA

A statistical fuel failure analysis procedure has been developed, and is now applied in full scale to a large break loss-of-coolant accident (LBLOCA) scenario in EPR-type nuclear power plant. The goal is to statistically determine the number of failing fuel rods. It is also important to bring out the underlying causes for rod failures, and therefore a sensitivity analysis procedure for the preceding complex calculation chain is outlined and adopted. In order to produce a statistically reliable estimation on the number of failing rods, a large number of simulations are required. In the analysis, single rods are simulated with the coupled fuel performance - thermal hydraulics code FRAPTRAN-GENFLO. The statistically varied factors are divided into global and local by their range of influence. Transient thermal hydraulic and power history boundary conditions and model parameters are global and affect all the rods. Fuel rod manufacturing parameters and other rod position related factors are local and are related to a certain rod. The number of global scenarios is 59 as dictated by the Wilks' formula, and 1000 randomly sampled rods are simulated in each scenario. The thermal hydraulic and transient power boundary conditions for the fuel performance code are calculated with a statistical version of the system code APROS. The steady-state irradiation histories are simulated with FRAPCON, and the steady-state power histories used as boundary conditions for FRAPCON are obtained from SIMULATE calculations. Thus, a multistage calculation chain is required to consolidate the procedure. As an outcome, in the worst global scenario, 1.4% of the simulated rods failed. It can be concluded that the Finnish safety regulations, i.e. max. 10% of the rods allowed to fail, are met. In order to find out which input parameters have significance to the outcome of the analysis, a sensitivity analysis is done. At the moment, only the worst global scenario is considered but later on it is possible to include also the sensitivities of the global factors. Due to complexity of the existing data, first the relevant input parameters for the sensitivity analysis have to be specified. Data visualization with a cobweb graph is used for the screening. Then, selected sensitivity measures are calculated between the chosen input and output parameters. The sensitivity indices calculated are the Borgonovo's delta measure, the first order Sobol sensitivity index, and squared Pearson correlation coefficients. The first mentioned is a novelty in this context. As an outcome, the most relevant parameters with respect to the cladding integrity were determined to be the decay heat power during the transient, the thermal hydraulic conditions in the rod's location in the reactor, and the steady-state irradiation history of the rod as represented in this analysis by the rod burnup. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Mars Science Laboratory Rover Integrated Pump Assembly Bellows Jamming Failure

The Mars Science Laboratory rover and spacecraft utilize two mechanically pumped fluid loops for heat transfer to and from the internal electronics assemblies and the Radioisotope Thermo-Electric Generator (RTG). The heat transfer fluid is Freon R-11 (CFC-11) which has a large coefficient of thermal expansion. The Freon within the heat transfer system must have a volume for safe expansion of the fluid as the system temperature rises. The device used for this function is a gas-over-liquid accumulator. The accumulator uses a metal bellows to separate the fluid and gas sections. During expansion and contraction of the fluid in the system, the bellows extends and retracts to provide the needed volume change. During final testing of a spare unit, the bellows would not extend the full distance required to provide the needed expansion volume. Increasing the fluid pressure did not loosen the jammed bellows either. No amount of stroking the bellows back and forth would get it to pass the jamming point. This type of failure, if it occurred during flight, would result in significant overpressure of the heat transfer system leading to a burst failure at some point in the system piping. A loss of the Freon fluid would soon result in a loss of the mission. The determination of the source of the jamming of the bellows was quite elusive, leading to an extensive series of tests and analyses. The testing and analyses did indicate the root cause of the failure, qualitatively. The results did not provide a set of dimensional limits for the existing hardware design that would guarantee proper operation of the accumulator. In the end, a new design was developed that relied on good engineering judgment combined with the test results to select a reliable enough solution that still met other physical constraints of the hardware, the schedule, and the rover system.

bellows↗

DiagSoftfailure: Automated Soft-Failure Diagnostic Tool Using Machine Learning for Network Users

Network performance problems resulting in slow data communication speed become a significant obstacle for a satisfactory user experience. Currently, there is a lack of an automated diagnostic tool that can help network users to find the complicated network problems that degrade network performance. To fill up this gap, InfoBeyond proposes DiagSoftfailure to provide an automated diagnosis tool. DiagSoftfailure is a machine learning-based approach to infer the location and root cause of network failures that result in performance degradation. As a user-focused tool, it allows a network user to request a diagnosis. DiagSoftfailure can automatically collect the raw packet traces in the network. Base on the network signature, automated classifiers trained by combining supervised and semi-supervised machine learning is used to identify both known and unknown soft-failures in the network. A report allows novice and expert users to understand network problems for troubleshooting. In this document, we describe the DiagSoftfailure diagnosis algorithms and our experiments in a live high-speed network. DiagSoftfailure achieves 96.39% accuracy for known soft-failure diagnosis and 99.82% for unknown soft-failure diagnosis, respectively. Such results demonstrate that DiagSoftfailure is a viable technology. InfoBeyond would develop it as a marketable product that can be used by universities, Labs, DOE, government agencies, organizations, enterprises, and scientific communities to improve their network diagnosis capabilities.

42 ENGINEERING↗

Effect of Correlation on Multi-Engine Rocket Propulsion Systems

A matter of great concern in the design and operation of multi-engine rocket propulsion systems is the effect of the premature shutdown of one engine on the vehicle. This probability that a premature shutdown will cause a vehicle loss is termed correlation. Based on airbreathing experiences as well as rocket engine data the best estimate of this correlation is made and then applied to the overall multi-engine reliability problem to demonstrate its potential effect. At this point, follow-on analyses are pointed out that illustrate how any potential failures that may cause a correlatable event can be eliminated; thus bringing this correlation to almost 0.

Baker, J. R.↗

Physics Based Modeling and Prognostics of Electrolytic Capacitors

This paper proposes first principles based modeling and prognostics approach for electrolytic capacitors. Electrolytic capacitors have become critical components in electronics systems in aeronautics and other domains. Degradations and faults in DC-DC converter unit propagates to the GPS and navigation subsystems and affects the overall solution. Capacitors and MOSFETs are the two major components, which cause degradations and failures in DC-DC converters. This type of capacitors are known for its low reliability and frequent breakdown on critical systems like power supplies of avionics equipment and electrical drivers of electromechanical actuators of control surfaces. Some of the more prevalent fault effects, such as a ripple voltage surge at the power supply output can cause glitches in the GPS position and velocity output, and this, in turn, if not corrected will propagate and distort the navigation solution. In this work, we study the effects of accelerated aging due to thermal stress on different sets of capacitors under different conditions. Our focus is on deriving first principles degradation models for thermal stress conditions. Data collected from simultaneous experiments are used to validate the desired models. Our overall goal is to derive accurate models of capacitor degradation, and use them to predict performance changes in DC-DC converters.

Kulkarni, Chetan↗

Environmental Testbed Development to Evaluate Power Distribution Materials in Electrified Aircraft (EA)

NASA is pursuing the development of electrified propulsion (EP) technologies to improve air transportation in terms of efficiency, affordability, and sustainability. The power requirements are expected to reach 20 megawatts for large EP commercial airliners. A key challenge is transmission and distribution of the high voltage (20 kilovolts) needed for some EP systems. This is a challenge because the risk of electrical failure in aircraft at high altitude (low pressure) due to corona discharge and other forms of partial discharge increases significantly when voltages exceed 327 V. Corona discharge is a form of partial discharge in which gaseous molecules are ionized by strong electric fields. Corona discharge leads to aging in power transmission lines. Aging is a leading cause of electrical failure in electrical insulation materials. In particular, aging from electrical, vibrational, and thermal stresses decrease the performance life of insulation materials. There are currently no test standards or equipment that can effectively age materials under high altitude, voltage and frequency conditions. This poster proposes a design for a test system including an environmental chamber that can simulate the environment of future EP systems for material and component aging tests.

Materials Test chamber Design↗

Early Warning: Development of Confidential Incident Reporting Systems

Accidents hardly ever happen without warning. The combination, or sequence, of failures and mistakes that cause an accident may indeed be unique but the individual failures and mistakes rarely are. In the USA in 1974 the crews on two different aircraft misunderstood the same aeronautical chart and descended towards their destination dangerously early towards a mountain. The first crew were in good weather conditions and could see the mountain and resolved their misinterpretation of the chart. The second crew six weeks later were not so lucky. In cloud they had no clues to point out their mistake nor the presence of the mountain. The resulting crash and the ensuing inquiry, which brought to light the previous incident, shocked the country but gave it the impetus to instigate a safety reporting system. This system eventually became the NASA's Aviation Safety Reporting System (ASRS). The programme collects incident reports from pilots, controllers, mechanics, cabin attendants and many others involved in aviation operations. By disseminating this safety information the ASRS has helped enormously to give US airlines and airspace the highest safety standards. Accident prevention is a goal sought by everyone in the aviation industry and establishing effective incident reporting programmes can go a long way toward achieving that goal. This article will describe the steps and issues required to establish an incident reporting system. The authors summarize the lessons learned from the ASRS, now in its twentieth year of operation and from the Confidential Human Factors Reporting (HER) Programme run by British Airways, an airline that is a recognized world leader in safety reporting and analysis. The differences between government and airline operation of confidential safety reporting systems will be addressed.

OLeary, Mike J.↗

On Automating Failure Mode Analysis and Enforcing its Integrity

This paper reports our experience on the development of a design-for-safety (DFS) workbench called Risk Assessment and Management Environment (RAME) for microelectronic avionics systems. Our objective is to transform DFS practice from an ad-hoc, inefficient, error-prone approach to a stringent engineering process such that DFS can keep up with the rapidly growing complexity of avionics systems. In particular, RAME is built upon an information infrastructure that comprises a fault model, a knowledge base, and a failure reporting/tracking system. This infrastructure permits systematic learning from prior projects and enables the automation of failure modes, effects and criticality analysis (FMECA). Among other unique features, the most important advantage of RAME is its capability of directly accepting design source code in hardware description languages (HDLs) for automated failure mode analysis, which enables RAME to be compatible and to evolve with most electronic-computer-aided-design systems. Through an initial experimental evaluation of the RAME prototype, we show that our approach to FMECA automation improves failure mode analysis turn-around-time, completeness, and accuracy.

design for safety↗

Analysis and Optimization of Test Plans for Advanced Exploration Systems Reliability and Supportability

Future crewed exploration missions beyond Low Earth Orbit (LEO) will operate farther from Earth and be logistically isolated for longer than any previous human spaceflight mission. Under these conditions, supportability and reliability willbestronger drivers of mission mass and risk than they have been in the past. Items with high failure rates, or uncertain failure rates, can result in high spares mass requirements and/or high risk on deep space missions. Testing is a critical element of system development which provides the opportunity to identify and resolve design issues, defects, or other failure modes before they cause problems during a mission. Reliability growth programs can reduce failure rates by identifying and remove failure modes via design changes, and long-duration life testing can provide valuable data to reduce failure rate estimate uncertainty and verify (to some level of confidence) that components are as reliable as expected. Testing activities take time and resources, however, and must be incorporated into program plans in order to be fully effective. This paper presents an integrated reliability test plan analysis and optimization methodology, which has been used to inform Advanced Exploration Systems (AES) Life Support Systems (LSS) ground test planning for future missions. The methodology determines the optimal number of test units to purchase and allocation of test time –split between reliability growth and uncertainty reduction testing –across a given set of items in order to minimize spares mass for a given mission under constraints on total test cost and schedule. Model outputs also include expected spares mass after testing and the expected number of modifications or refurbishments during testing, both of which can inform program planning. Discussion of the model, conclusions, and future work are also presented.

Testing↗

Analysis and Optimization of Test Plans for Advanced Exploration Systems Reliability and Supportability

Future crewed exploration missions beyond Low Earth Orbit (LEO) will operate farther from Earth and be logistically isolated for longer than any previous human spaceflight mission. Under these conditions, supportability and reliability willbestronger drivers of mission mass and risk than they have been in the past. Items with high failure rates, or uncertain failure rates, can result in high spares mass requirements and/or high risk on deep space missions. Testing is a critical element of system development which provides the opportunity to identify and resolve design issues, defects, or other failure modes before they cause problems during a mission. Reliability growth programs can reduce failure rates by identifying and remove failure modes via design changes, and long-duration life testing can provide valuable data to reduce failure rate estimate uncertainty and verify (to some level of confidence) that components are as reliable as expected. Testing activities take time and resources, however, and must be incorporated into program plans in order to be fully effective. This paper presents an integrated reliability test plan analysis and optimization methodology, which has been used to inform Advanced Exploration Systems (AES) Life Support Systems (LSS) ground test planning for future missions. The methodology determines the optimal number of test units to purchase and allocation of test time –split between reliability growth and uncertainty reduction testing –across a given set of items in order to minimize spares mass for a given mission under constraints on total test cost and schedule. Model outputs also include expected spares mass after testing and the expected number of modifications or refurbishments during testing, both of which can inform program planning. Discussion of the model, conclusions, and future work are also presented.

Testing↗

Redesign of the Extravehicular Mobility Unit Airlock Cooling Loop Recovery Assembly

During EVA (Extravehicular Activity) 23 aboard the ISS (International Space Station) on 07/16/2013 an episode of water in the EMU (Extravehicular Mobility Unit) helmet occurred, necessitating a termination of the EVA (Extravehicular Activity) shortly after it began. The root cause of the failure was determined to be ground-processing short-comings of the ALCLR (Airlock Cooling Loop Recovery) Ion Beds which led to various levels of contaminants being introduced into the Ion Beds before they left the ground. The Ion Beds were thereafter used to scrub the failed EMU cooling water loop on-orbit during routine scrubbing operations. The root cause investigation identified several areas for improvement of the ALCLR Assembly which have since been initiated. Enhanced washing techniques for the ALCLR Ion Bed have been developed and implemented. On-orbit cooling water conductivity and pH analysis capability to allow the astronauts to monitor proper operation of the ALCLR Ion Bed during scrubbing operation is being investigation. A simplified means to acquire on-orbit EMU cooling water samples have been designed. Finally, an inherently cleaner organic adsorbent to replace the current lignite-based activated carbon, and a non-separable replacement for the separable mixed ion exchange resin are undergoing evaluation. These efforts are undertaken to enhance the performance and reduce the risk associated with operations to ensure the long-term health of the EMU cooling water circuit.

Steele, John↗

Redesign of the Extravehicular Mobility Unit Airlock Cooling Loop Recovery Assembly

During EVA (Extravehicular Activity) 23 aboard the ISS (International Space Station) on 07/16/2013 an episode of water in the EMU (Extravehicular Mobility Unit) helmet occurred, necessitating a termination of the EVA (Extravehicular Activity) shortly after it began. The root cause of the failure was determined to be ground-processing short-comings of the ALCLR (Airlock Cooling Loop Recovery) Ion Beds which led to various levels of contaminants being introduced into the Ion Beds before they left the ground. The Ion Beds were thereafter used to scrub the failed EMU cooling water loop on-orbit during routine scrubbing operations. The root cause investigation identified several areas for improvement of the ALCLR Assembly which have since been initiated. Enhanced washing techniques for the ALCLR Ion Bed have been developed and implemented. On-orbit cooling water conductivity and pH analysis capability to allow the astronauts to monitor proper operation of the ALCLR Ion Bed during scrubbing operation is being investigated. A simplified means to acquire on-orbit EMU cooling water samples has been designed. Finally, an inherently cleaner organic adsorbent to replace the current lignite-based activated carbon, and a non-separable replacement for the separable mixed ion exchange resin are undergoing evaluation. These efforts are undertaken to enhance the performance and reduce the risk associated with operations to ensure the long-term health of the EMU cooling water circuit.

Steele, John↗