Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “era”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,027 records · Page 57

Fermilab Main Injector and Recycler Operations in the Megawatt Era

Significant upgrades to Fermilab's accelerator complex have accompanied the development of LBNF (the Long Baseline Neutrino Facility) and DUNE (Deep Underground Neutrino Experiment). These improvements will facilitate 1-MW operation of the NuMI (Neutrinos at the Main Injector) beam for the first time this year through changes to the Recycler slip-stacking procedure and shortening of the Main Injector ramp time. The modifications to the Recycler slip-stacking and efforts to reduce the duration of the Main Injector ramp will be discussed. Additionally, details regarding further shortening of the ramp time and the subsequent impacts on future accelerator operations are presented.

43 PARTICLE ACCELERATORS↗

The Walls Come Tumbling Down: Decontamination and Demolition of 29 Manhattan Project and Cold War-Era Buildings and Structures at Los Alamos National Laboratory-12301

When the nation's top scientists and military leaders converged on Los Alamos, New Mexico in the 1943, to work on the Manhattan Project, the facilities they used to conduct their top-secret work were quickly constructed and located in the middle of what eventually became the Los Alamos town site. After one of these early facilities caught on fire, it seemed wise to build labs and production facilities farther away from the homes of the town's residents. They chose to build facilities on what was then known as Delta Prime (DP) Mesa and called it Technical Area 21, or TA-21. With wartime urgency, a number of buildings were built at TA-21, some in as little as a few months. Before long, DP Mesa was populated with several nondescript metal and cinder-block buildings, including what became, immediately following the war, the world's first plutonium production facility. TA-21 also housed labs that used hazardous chemicals and analyzed americium, tritium and plutonium. TA-21 was a bustling center of research and production for the next several decades. Additional buildings were built there in the 1960's, but by the 1990's many of them had reached the end of their service lives. Labs and offices were moved to newer, more modern buildings. When Los Alamos National Laboratory received $212 million in funding from the American Recovery and Reinvestment Act in July 2009 for environmental cleanup projects, about $73 million of the funds were earmarked to decontaminate and demolish 21 of the old buildings at TA-21. Although some D and D of TA-21 buildings was performed in the 1990's, many of the facilities at DP Site remained relatively untouched for nearly three decades following their final operational use. In 2006, there were over three dozen buildings or structures on the mesa to be removed so that soil cleanup could be completed (and the land made available for transfer and reuse). The total footprint of buildings across the mesa was approximately 18,580 m{sup 2} (200,000 ft{sup 2}). The initially approved baseline for the ARRA D and D Project was to remove 22 buildings and structures that included approximately 14,680 m{sup 2} (158,000 ft{sup 2}) of footprint. By employing efficiencies during subcontracting, demolition, and waste segregation, the savings allowed an additional 1,580 m{sup 2} (17,000 ft{sup 2}) of footprint to be removed using ARRA funds. Additionally, the lessons learned from this experience were used to apply NNSA funding to the removal of six additional non-contaminated buildings and structures. In the end, 29 buildings and structures, including stacks, cooling towers and tanks, were removed from the mesa. The entire DP East area was cleared of buildings and sub-grade structures and the soils cleaned to residential standards. The total footprint reduction at TA-21 as a result of this effort was in excess of 17,650 m{sup 2} (190,000 ft{sup 2}). The use of a Laboratory self-performance team to start demolition of non-contaminated structures resulted in steady work performance early in the project while subcontracts were being put in place to perform more complicated abatement and contaminated demolition activities. Most importantly, there were no serious worker injuries and the minor injuries recorded were those common to construction type activities. Extensive monitoring along the site boundary demonstrated that no hazardous chemicals or radioactive contamination were released and radiological dose to the public was negligible. The ARRA demolition activities were completed six months in advance of the deadline for employing ARRA funds. Additionally, over 17,585 m{sup 3} (23,000 yds{sup 3}) of building demolition debris was safely removed from DP Mesa. All of the major buildings have been removed, unencumbered access to the SWMUs that are required to be cleaned up by the Consent Order with the state of New Mexico, has been achieved, and a significant portion of the mesa has been prepared to support a process that will eventually transfer this land from federal government control for further use. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Nuclear Crisis Communication in an Era of Fake News and Media Overload - 19414

Over the past several decades, the nuclear industry has worked diligently to improve the security and safety aspects of their technology, but it has failed to meet the challenge of the public's negative perception. Studies have shown that nuclear energy and nuclear waste evoke fear among the general populace because people see risks as immediate, unknown, uncontrollable, and potentially catastrophic. To some extent, negative public perception challenges for the nuclear industry are primarily a consequence of its own inability to communicate the benefits of nuclear science effectively with the lay public. While effective and trustworthy communication cannot guarantee success, it helps shape public opinion, and for a routinely misperceived project like a nuclear facility, that is paramount. Fukushima was the first nuclear accident to occur in the world where citizens have access to 24/7 news channels and the ability to respond in a real-time manner through social media outlets. Following the Fukushima accident, social media sites were filled with information regarding nuclear energy that were based more on mass rumor and even paranoia than facts. More locally, we have seen this trend following what was a minor external radiation release event at the WIPP in February 14, 2014. Many online news sources were flooded with anti-nuke stories aimed at pushing a fear of radiation, such as inferring an increase in cancer rates among the public from this minor incident; which was exactly the opposite of what was true. Today, when the public gets its news from social media and online sources, people are faced with rapidly changing and contrasting interpretations of the same story, depending on when they accessed the latest news. They are also increasingly vulnerable to fake news, including disinformation deliberately planted and cultivated by the anti-nuclear movement. Public reactions following these nuclear events reinforced the value of effective communication in maintaining the high level of transparency necessary for long-term, local acceptance and support for nuclear facilities. A lack of trustworthy communication leaves a vacuum that can be quickly filled by rumors and fake information. When dealing with a nuclear crisis, failure to recognize the rapidly changing and contrasting media framing, or believing fake news could have very real and catastrophic consequences. Trusted organizations must swiftly take charge and guide the way in which the crisis is framed to keep the public adequately and accurately informed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Workshop on Generalized Parton Distributions for Nucleon Tomography in the EIC Era

The aim of the workshop is to examine the theoretical components that need to be incorporated, challenges and opportunities in different LQCD formalisms for computing hadron properties non-perturbatively from the underlying fundamental theory, and the requirements for an analysis framework of experimental data. The outcome of the workshop will be a white paper, and the establishment of a collaborative effort aimed at tackling these challenges and ensuring that the resulting framework can be applied across the emerging theoretical and experimental programs.

99 GENERAL AND MISCELLANEOUS↗

Reflections on the role of MOOSE in Unleashing a Golden Era of American Energy Innovation

As the use of artificial intelligence spreads across most professions, projections for the expected energy consumption of these virtual assistants/workers dictate a large increase in energy production. Recent published estimates refer to up to a necessary tripling of nuclear energy production~\cite{iaea}. % TODO add citations This is supported by the new administration, calling on February 5th to "unleash Commercial Nuclear Power in the United States" and to launch the "long-awaited American nuclear renaissance"~\cite{doe-order}. The Department of Energy (DOE) is tasked with "enabl[ing] the rapid deployment and export of next generation nuclear technology". In terms of research of development, we must seek to "unleash American Energy Innovation", by "focus[ing] our time and resources on technologies that will advance basic science, grow America’s scientific leadership, reduce costs for American families [...]". To that end, the Department will "prioritize affordable, reliable, and secure energy technologies, including fossil fuels, advanced nuclear, geothermal, and hydropower." Following this call to action, we elect to examine the role of the open-source Multiphysics Object Oriented Simulation Environment (MOOSE)~\cite{moose3} in meeting the stated goals.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Accelerator Upgrades Required for Beam Operation at Fermilab in the PIP-II/DUNE Era

The Proton Improvement Plan - II (PIP-II) injector linac is an 800 MeV superconducting H$^-$ linac, christened Linac2, that will replace the existing 400 MeV injector to the accelerator complex at Fermilab. The higher energy, intensity and repetition rate require various upgrades to the existing accelerator complex consisting of the Booster, the Recycler Ring and the Main Injector, in order to be able to accept and accelerate beam from PIP-II. In this paper we discuss various upgrades that are required and steps being taken to implement them.

Krishnagopal, S. [Fermilab]↗

A New Era for Modern Bubble Chamber Technology: Cooling and Real-Time Control for the MAMBA Neutrino Bubble Chamber∗

Future neutrino experiments such as DUNE will be limited less by statistics than by how well neutrino--nucleus interactions are understood, and the cleanest way to improve that understanding is to measure interactions with light nuclei such as hydrogen or deuterium. The detector best suited to the job, the bubble chamber, has not been built for a neutrino beam in about fifty years. MAMBA (Modern Adaptive Modular Bubble chamber Archetype) is a small prototype at Fermilab intended to bring the technology back with modern cryogenics and automation, cycling continuously at 1~Hz. This paper summarizes my work on two of its subsystems during a summer internship. A new solid copper thermal link brought the coldhead to 21.3~K in a commissioning cooldown, near the 20~K operating target. An Industrial Shields Raspberry Pi programmable logic controller (PLC) running OpenPLC was characterized at a median round-trip response of 0.64~ms over 20,000 trials, with 0.66\% of trials exceeding 1~ms. Both results support continuous cycling.

Williams, Nicholas [Fermilab; DuPage Coll.]↗

DEMOLISHING A COLD-WAR-ERA FUEL STORAGE BASIN SUPERSTRUCTURE LADEN WITH ASBESTOS

The K East (KE) Basin facilities are located near the north end of the Hanford Site's 100 K area. The facilities were built in 1950 as part of the KE Reactor complex and constructed within 400 meters of the Columbia River, which is the largest river in the Pacific Northwest and by volume the fourth largest river in the United States. The basin, located adjacent to the reactor, was used for the underwater storage of irradiated nuclear fuel discharged from the reactor. The basin was covered by a superstructure comprising steel columns and beams, concrete, and cement asbestos board (CAB) siding. The project's mission was to complete demolition of the structure over the K East basin within six months of tumover from facility deactivation activities. The demolition project team implemented open-air demolition techniques to demolish the facility to slab-on-grade. Several innovative techniques were used to control contamination and maintain contamination control within the confines of the demolition exclusion zone. The techniques, which focused on a defense-in-depth approach, included spraying fixatives on interior and exterior surfaces before demolition began; applying fixatives; misting using a fine spray of water during demolition; and demolishing the facility systematically. Another innovation that aided demolition was to demolish the building with the non-friable CAB remaining in place. The CAB siding covered the exterior of the building, portions of the interior walls, and was an integral part of the multiple layered roof. The project evaluated the risks involved in removing the CAB material in a radiologically contaminated environment and determined that radiological dose rates and exposure to radiological contamination and industrial hazards would be significantly reduced by removing the CAB during demolition using heavy equipment. The ability to perform this demolition safely and without spreading contamination (radiological or asbestos) demonstrates that similar open-air demolition ofcontaminated structures can be performed successfully.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

DEMOLISHING A COLD WARE ERA FULE STORAGE BASIN SUPERSTRUCTURE LADEN WITH ASBESTOS

The K East (KE) Basin facilities are located near the north end of the Hanford Site's 100 K area. The facilities were built in 1950 as part of the KE Reactor complex and constructed within 400 meters of the Columbia River, which is the largest river in the Pacific Northwest and by volume the fourth largest river in the United States. The basin, located adjacent to the reactor, was used for the underwater storage of irradiated nuclear fuel discharged from the reactor. The basin was covered by a superstructure comprising steel columns and beams, concrete, and cement asbestos board (CAB) siding. The project's mission was to complete demolition of the structure over the KE Basin within six months of turnover from facility deactivation activities. The demolition project team applied open-air demolition techniques to bring the facility to slab-on-grade. Several innovative techniques were used to control contamination and maintain contamination control within the confines of the demolition exclusion zone. The techniques, which focused on a defense-in-depth approach, included spraying fixatives on interior and exterior surfaces before demolition began; applying fixatives during the demolition; misting using a fine spray of water during demolition; and demolishing the facility systematically. Another innovative approach that made demolition easier was to demolish the building with the non-friable CAB remaining in place. The CAB siding covered the exterior of the building and portions of the interior walls, and was an integral part of the multiple-layered roof. The project evaluated the risks involved in removing the CAB material in a radiologically contaminated environment and determined that radiological dose rates and exposure to radiological contamination and industrial hazards would be significantly reduced by using heavy equipment to remove the CAB during demolition. The ability to perform this demolition safely and without spreading contamination (radiological or asbestos) demonstrates that contaminated structures can be torn down successfully using similar open-air demolition techniques.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Reliability of Operation at SLAC in the LCLS Era

LCLS hardware availability has been above 90% for the first two commissioning runs of the accelerator. In this paper we compare the reliability data for LCLS (availability, MTBF and MTTR) to those of PEP-II, the e{sup +}e{sup -} collider operating previously at SLAC. It may be seen that the linac availability is not significantly different now than it was before, while the availability of the whole LCLS facility is significantly higher than that of the PEP-II facility as a whole (which was about 87%). Most of the improvement is in the MTTR. Ways to improve availability towards the goal of 95% are discussed.

43 PARTICLE ACCELERATORS↗

Genome Project Standards in a New Era of Sequencing

For over a decade, genome 43 sequences have adhered to only two standards that are relied on for purposes of sequence analysis by interested third parties (1, 2). However, ongoing developments in revolutionary sequencing technologies have resulted in a redefinition of traditional whole genome sequencing that requires a careful reevaluation of such standards. With commercially available 454 pyrosequencing (followed by Illumina, SOLiD, and now Helicos), there has been an explosion of genomes sequenced under the moniker 'draft', however these can be very poor quality genomes (due to inherent errors in the sequencing technologies, and the inability of assembly programs to fully address these errors). Further, one can only infer that such draft genomes may be of poor quality by navigating through the databases to find the number and type of reads deposited in sequence trace repositories (and not all genomes have this available), or to identify the number of contigs or genome fragments deposited to the database. The difficulty in assessing the quality of such deposited genomes has created some havoc for genome analysis pipelines and contributed to many wasted hours of (mis)interpretation. These same novel sequencing technologies have also brought an exponential leap in raw sequencing capability, and at greatly reduced prices that have further skewed the time- and cost-ratios of draft data generation versus the painstaking process of improving and finishing a genome. The resulting effect is an ever-widening gap between drafted and finished genomes that only promises to continue (Figure 1), hence there is an urgent need to distinguish good and poor datasets. The sequencing institutes in the authorship, along with the NIH's Human Microbiome Project Jumpstart Consortium (3), strongly believe that a new set of standards is required for genome sequences. The following represents a set of six community-defined categories of genome sequence standards that better reflect the quality of the genome sequence, based on our collective understanding of the different technologies, available assemblers, and the varied efforts to improve upon drafted genomes. Due to the increasingly rapid pace of genomics we avoided the use of rigid numerical thresholds in our definitions to take into account the types of products achieved by any combination of technology, chemistry, assembler, or improvement/finishing process.

59 BASIC BIOLOGICAL SCIENCES↗

New Physics Search in the LHCb Era

The authors present theoretical and experimental preparations for an indirect search for new physics (NP) using the rare decay {bar B}{sub d} {yields} {bar K}*{sup 0}{mu}{sup +}{mu}{sup -}. They design new observables with very small theoretical uncertainties and good experimental resolution.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

The Dawn of a New Era for High Energy Density Physics

The field of High Energy Density (HED) physics is on the verge of a revolutionary event - the achievement of fusion ignition in the laboratory. New laser facilities, the OMEGA Extended Performance (EP) laser at the University of Rochester and the National Ignition Facility (NIF) at Lawrence Livermore National Laboratory, greatly extend the range of high energy density (HED) plasma conditions (including ignition) accessible in the laboratory. These conditions are among the most extreme obtainable, with pressures in excess of {approx}1,000,000 atmospheres. Experiments at these facilities will elucidate fundamental new science in astrophysics, materials science, laser-matter interactions, and other areas. The demonstration of fusion ignition will be the culmination of decades of research, and for the first time, will open the burning plasma regime to laboratory exploration. Ignition will spur the development of advanced options for clean, environmentally sustainable energy.

42 ENGINEERING↗