Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “environmental requirements program”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,027 records · Page 57

Marine Corps Base Camp Lejeune New River Estuary Marsh Area (2010)

Critical military training and testing on lands along the nation’s coastal and estuarine shorelines are increasingly placed at risk because of development pressures in surrounding areas, impairments due to other anthropogenic disturbances, and increasing requirements for compliance with environmental regulations. The U.S. Department of Defense (DoD) intends to enhance and sustain its training and testing assets and to optimize its stewardship of natural resources through the development and application of an ecosystem-based management approach on DoD installations. To accomplish this goal, particularly for installations in estuarine/coastal environments, the Strategic Environmental Research and Development Program (SERDP) launched the Defense Coastal/Estuarine Research Program (DCERP) as a minimum 10-year effort at Marine Corps Base Camp Lejeune (MCBCL) in North Carolina. The results of the first six years of the program (DCERP1) are presented here.The overarching objectives of DCERP are to: (1) understand the effects of military training activities, infrastructure development, and other coastal military installations; (2) develop models, tools, and indicators to evaluate ecosystem health; and (3) recommend adaptive management strategies to sustain ecosystem natural resources within the context of an active military installation.This shapefile data consist of merged data using ArcGIS 10.0. The output shapefile covers the marsh area data from two files; NRE_marsh_2009, and ICW_marsh_2012_extended. The base maps were digitized from 1989, 2004 and 2009 imagery. The output data consist of polygons with header descriptions. These polygons were used to estimate marsh area present aboard Marine Carps Base Camp Lejeune.

54 ENVIRONMENTAL SCIENCES↗

Marine Corps Base Camp Lejeune New River estuary digitized shoreline

Critical military training and testing on lands along the nation’s coastal and estuarine shorelines are increasingly placed at risk because of development pressures in surrounding areas, impairments due to other anthropogenic disturbances, and increasing requirements for compliance with environmental regulations. The U.S. Department of Defense (DoD) intends to enhance and sustain its training and testing assets and to optimize its stewardship of natural resources through the development and application of an ecosystem-based management approach on DoD installations. To accomplish this goal, particularly for installations in estuarine/coastal environments, the Strategic Environmental Research and Development Program (SERDP) launched the Defense Coastal/Estuarine Research Program (DCERP) as a minimum 10-year effort at Marine Corps Base Camp Lejeune (MCBCL) in North Carolina. The results of the first six years of the program (DCERP1) are presented here.The overarching objectives of DCERP are to: (1) understand the effects of military training activities, infrastructure development, and other coastal military installations; (2) develop models, tools, and indicators to evaluate ecosystem health; and (3) recommend adaptive management strategies to sustain ecosystem natural resources within the context of an active military installation.The shoreline was digitized as the land water boundary in 2004, 1989, and 1956 imagery. The imagery was obtained from the Installation Geospatial Information & Services Office, ITSD, BLSD, MCB Camp Lejeune, NC. These shorelines were digitized to be used to calculate shoreline-change rates within the New River Estuary as part of the Defense Coastal/Estuarine Research Program. Each shoreline was digitized separately and then merged to create one shapefile containing the shorelines of all three years.

54 ENVIRONMENTAL SCIENCES↗

Marine Corps Base Camp Lejeune New River Estuary - Acoustic Doppler Current Profiler (ADCP) Results

Critical military training and testing on lands along the nation’s coastal and estuarine shorelines are increasingly placed at risk because of development pressures in surrounding areas, impairments due to other anthropogenic disturbances, and increasing requirements for compliance with environmental regulations. The U.S. Department of Defense (DoD) intends to enhance and sustain its training and testing assets and to optimize its stewardship of natural resources through the development and application of an ecosystem-based management approach on DoD installations. To accomplish this goal, particularly for installations in estuarine/coastal environments, the Strategic Environmental Research and Development Program (SERDP) launched the Defense Coastal/Estuarine Research Program (DCERP) as a minimum 10-year effort at Marine Corps Base Camp Lejeune (MCBCL) in North Carolina. The results of the first six years of the program (DCERP1) are presented here.The overarching objectives of DCERP are to: (1) understand the effects of military training activities, infrastructure development, and other coastal military installations; (2) develop models, tools, and indicators to evaluate ecosystem health; and (3) recommend adaptive management strategies to sustain ecosystem natural resources within the context of an active military installation.This data package contains a zipfile of results from Acoustic Doppler Current Profilers (ADCPs) used to collect current profiles throughout the New River Estuary in 2009: Teledyne RD Instrument’s acoustic Doppler current profilers (ADCPs) were deployed throughout the NRE to understand current flows and tidal extent. (Current velocity and water level data collected by the ADCPs were also used to validate a hydrodynamic model of the NRE.) Two ADCPS were deployed by Marker 12 and the Highway 172 bridge from late-February to early-July 2009. These ADCPs were attached to steel frames that rested on the sediment surface with the ADCP looking upward to make full water column profiles of water velocity minus a 1-m blanking between the instrument and sediment surface. Also attached to the steel frames were conductivity-temperature-depth (CTD) sensors, which provided concomitant salinity, temperature, and water depth data with the ADCP current measurements. Two ADCPS were also deployed in close proximity to the AVPs in Stones and Morgan Bays from mid-July to mid-December 2009. These ADCPs were deployed flush to the estuary floor to maximize the full vertical sampling capability at these shallow stations and the AVPs collected coincidental temperature, salinity, and depth measurements. For all deployments, the ADCPs were programmed in fast ping-rate mode 12 using 20 pings per ensemble and collected profiles in 10-cm bins every 6 minutes yielding a standard deviation in velocity measurements of 1.27 cm s-1. Current velocity and water level data were analyzed to understand the tidal influence on circulation within the NRE. Harmonic analyses were performed to extract the dominant tidal constituents from the velocity and depth records using T-tide run in MATLAB (Pawlowicz et al., 2002). These measurements of tidal amplitude and phase were then used to validate the high-resolution Advanced Circulation (ADCIRC) Model of the NRE region.

54 ENVIRONMENTAL SCIENCES↗

Y-12 National Security Complex Biological Monitoring And Abatement Program 2008 Calendar Year Report

The National Pollutant Discharge Elimination System (NPDES) permit issued for the Oak Ridge Y-12 National Security Complex (Y-12 Complex) which became effective May 1, 2006, continued a requirement for a Biological Monitoring and Abatement Program (BMAP). The BMAP was originally developed in 1985 to demonstrate that the effluent limitations established for the Y-12 Complex protected the classified uses of the receiving stream (East Fork Poplar Creek: EFPC), in particular, the growth and propagation of aquatic life (Loar et al. 1989). The objectives of the current BMAP are similar, specifically to assess stream ecological conditions relative to regulatory limits and criteria, to assess ecological impacts as well as recovery in response to Y-12 operations, and to investigate the causes of continuing impacts. The BMAP consists of three tasks that reflect complementary approaches to evaluating the effects of the Y-12 Complex discharges on the biotic integrity of EFPC. These tasks include: (1) bioaccumulation monitoring, (2) benthic macroinvertebrate community monitoring, and (3) fish community monitoring. As required by the NPDES permit, the BMAP benthic macroinvertebrate community monitoring task includes studies to annually evaluate the receiving stream's biological integrity in comparison to TN Water Quality Criteria. BMAP monitoring is currently being conducted at five primary EFPC sites, although sites may be excluded or added depending upon the specific objectives of the various tasks. Criteria used in selecting the sites include: (1) location of sampling sites used in other studies, (2) known or suspected sources of downstream impacts, (3) proximity to U.S. Department of Energy (DOE) Oak Ridge Reservation (ORR) boundaries, (4) appropriate habitat distribution, and (5) access. The primary sampling sites include upper EFPC at kilometers (EFKs) 24.4 and 23.4 [upstream and downstream of Lake Reality (LR) respectively]; EFK 18.7 (also EFK 18.2 and 19), located off the ORR and below an area of intensive commercial and light industrial development; EFK 13.8, located upstream from the Oak Ridge Wastewater Treatment Facility (ORWTF); and EFK 6.3 located approximately 1.4 km below the ORR boundary (Fig. 1.1). Actual sampling locations on EFPC may differ slightly by task according to specific requirements of the task. Brushy Fork (BF) at kilometer (BFK) 7.6 and Hinds Creek at kilometer (HCK) 20.6 are the most commonly used reference sites for the Y-12 BMAP. Additional sites off the ORR are also occasionally used for reference, including Beaver Creek, Bull Run, Cox Creek, and Paint Rock Creek (Fig. 1.2). Summaries of the sampling designs for the three primary tasks of the Y-12 Complex BMAP for EFPC are presented in Tables 1.1-1.3. This report covers the 2008 period, although data collected outside this time period are included as appropriate. To address the biological monitoring requirements for Bear Creek and McCoy Branch, CERLCA-funded programs, data are summarized in Appendix A and Appendix B respectively. Data for these two watersheds are provided herein to address Section IX of the NPDES Permit for Y-12, where 'Results of these CERCLA programs can be used to meet the biological monitoring requirements of this permit...'. A summary of the toxicity testing results for Y-12 outfalls into upper EFPC is provided in Appendix C (these results have been previously reported) to provide a more thorough perspective of conditions in the stream. Data summarized in this report are available from the Oak Ridge Environmental Information system (OREIS) in an Arc-GIS usable format (http://www-oreis.bechteljacobs.org/oreis/help/oreishome.html). Per requirements specified in the NPDES permit, data collected following TDEC monitoring protocols (TDEC 2006) is also submitted directly to TDEC in Excel format.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Space Shuttle Orbiter ECLSS.

The Orbiter Environmental Control and Life Support System (ECLSS) provides the functions of atmosphere revitalization, crew life support, active thermal conditioning, and airlock support for EVA and docking activities. The ECLSS must satisfy the requirements of orbital missions with four to ten crewmembers and mission duration of a few hours to 30 days and the requirements associated with an atmospheric horizontal flight test program and ferry flight missions. The ECLSS development plan utilizes an ECLSS ground test article and thermal/vacuum testing to support the first horizontal flight test at the end of 1976. The ground testing and horizontal flight test program certify the Orbiter ECLSS for the first orbital flight in early 1978.

Stoll, O. T.↗

Satellite Power Systems (SPS) concept definition study exhibit C. Volume 3: Experimental verification definition

An environmentally oriented microwave technology exploratory research program aimed at reducing the uncertainty associated with microwave power system critical technical issues is described. Topics discussed include: (1) Solar Power Satellite System (SPS) development plan elements; (2) critical technology issues related to the SPS preliminary reference configuration; (3) pilot plant to demonstrate commercial viability of the SPS system; and (4) research areas required to demonstrate feasibility of the SPS system. Progress in the development of advanced GaAs solar cells is reported along with a power distribution subsystem.

Source record↗

Aquifer thermal energy storage program

The purpose of the Aquifer Thermal Energy Storage Demonstration Program is to stimulate the interest of industry by demonstrating the feasibility of using a geological formation for seasonal thermal energy storage, thereby, reducing crude oil consumption, minimizing thermal pollution, and significantly reducing utility capital investments required to account for peak power requirements. This purpose will be served if several diverse projects can be operated which will demonstrate the technical, economic, environmental, and institutional feasibility of aquifer thermal energy storage systems.

Fox, K.↗

Prototype space station automation system delivered and demonstrated at NASA

The Automated Subsystem Control for Life Support System (ASCLSS) program has successfully developed and demonstrated a generic approach to the automation and control of Space Station subsystems. The hierarchical and distributed real time controls system places the required controls authority at every level of the automation system architecture. As a demonstration of the automation technique, the ASCLSS system automated the Air Revitalization Group (ARG) of the Space Station regenerative Environmental Control and Life Support System (ECLSS) using real-time, high fidelity simulators of the ARG processess. This automation system represents an early flight prototype and an important test bed for evaluating Space Station controls technology including future application of ADA software in real-time control and the development and demonstration of embedded artificial intelligence and expert systems (AI/ES) in distributed automation and controls systems.

Block, Roger F.↗

Manned space nuclear systems design guidelines

The philosophy utilized on space nuclear system design and safety has evolved gradually over the last 30 years in the United States. Past programs have primarily been concerned with unmanned systems, except for the ROVER/NERVA engine development program which was in support of a manned mission to Mars. This papear proposes top level design guidelines for the use of nuclear devices for manned space applications. The guidelines presented cover failure and redundancy criteria, payload and flight vehicle specifications, environmental compatibility, mission operational constraints, construction and servicing, and radiation constraints. This paper also raises design and operational concerns requiring further examination. The purpose of this paper is to provide direction for the development of manned space nuclear systems currently envisioned for the Space Exploration Initiative.

Sanders, Jerry B.↗

Mars 2020 Entry, Descent, and Landing System Software Implementation

On February 18th, 2021, the Mars 2020 project's Perseverance Rover successfully touched down on the Martian surface after nearly eight years of development. The Mars 2020 Entry, Descent, and Landing (EDL) System largely leveraged heritage from the Mars Science Laboratory (MSL) EDL System while employing targeted technological advancements. The landing process is autonomously directed by a software behavior implemented in the rover's primary flight computer called the EDL Timeline that assumes control of the vehicle six days before atmospheric entry. This paper first walks through the basics of the EDL Timeline mechanics and how the behavior is designed to account for internal system variations and environmental unknowns. It then summarizes the interactions between the EDL timeline and other high-level system behaviors like spacecraft mode transitions and system fault protection, focusing on the complications that arise when passing spacecraft control between executive functions. Although the MSL-inherited EDL System is reliable and capable, targeted updates and a thorough verification and validation program were required for Mars 2020. This paper discusses changes made to close vulnerabilities discovered during both MSL and Mars 2020 development cycles, landing system capability enhancements that were enabling for Mars 2020's mission, and how these updates were integrated with the heritage system. It then describes how both analysis and testing campaigns were utilized to verify and validate all aspects of EDL and system behaviors that run during the six days before landing, as well as the operational workarounds that were needed to address problems found during the development and commissioning process. Finally, this paper imparts lessons learned from Mars 2020 EDL development, implementation, and operations, emphasizing how systems designed to conduct time-critical mission events with low margin of error can be improved in the future.

Stehura, Aaron↗

Mars 2020 Entry, Descent, and Landing Software Implementation

On February 18th, 2021, the Mars 2020 project's Perseverance Rover successfully touched down on the Martian surface after nearly eight years of development. The Mars 2020 Entry, Descent, and Landing (EDL) System largely leveraged heritage from the Mars Science Laboratory (MSL) EDL System while employing targeted technological advancements. The landing process is autonomously directed by a software behavior implemented in the rover's primary flight computer called the EDL Timeline that assumes control of the vehicle six days before atmospheric entry. In addition to performing the critical function of landing the rover on the Martian surface, the EDL timeline behavior must co-exist in a non-partitioned software and system environment with other high-level functions that accomplish the goals for the rest of the mission. Due to the criticality of EDL, the potential for loss of mission, and a need for complete system autonomy, the standard for how the EDL Timeline interacts with other functions in the system is highly constrained. This paper first walks through the basics of the EDL Timeline mechanics and how the behavior is designed to account for internal system variations and environmental unknowns. It then summarizes the interactions between the EDL timeline and other high-level system behaviors like spacecraft mode transitions and system fault protection, focusing on the complications that arise when passing spacecraft control between executive functions. Although the MSL-inherited EDL System is reliable and capable, targeted updates and a thorough verification and validation program were required for Mars 2020. This paper discusses changes made to close vulnerabilities discovered during both MSL and Mars 2020 development cycles, landing system capability enhancements that were enabling for Mars 2020's mission, and how these updates were integrated with the heritage system. It then describes how both analysis and testing campaigns were utilized to verify and validate all aspects of EDL and system behaviors that run during the six days before landing, as well as the operational workarounds that were needed to address problems found during the development and commissioning process. Finally, this paper imparts lessons learned from Mars 2020 EDL development, implementation, and operations, emphasizing how systems designed to conduct time-critical mission events with low margin of error can be improved in the future.

Stehura, Aaron↗

Development of Cryogenic Phase Change Materials for Lunar Sample Return

One of the scientific goals of NASA’s Artemis missions is to return regolith samples from the lunar surface. To maintain scientific integrity of these samples, including any volatiles that may exist, cryogenic stowage is desired. FROSTE (Frozen Return Of Samples To Earth) is the element of the Moon to Mars architecture that is tasked with developing and advancing concepts related to this goal. Both active and passive solutions are being considered, but active solutions (cryo-coolers) have high mass and cost penalties. Phase change materials (PCMs) are commonly used as passive thermal management solutions, particularly for sensitive scientific samples. However, there are currently no PCMs capable of providing cooling at the cryogenic temperatures needed to enable lunar sample return with volatiles intact (<120 K). FROSTE has identified two possible candidate materials that could fill this gap. Testing is required to verify the thermal performance of these materials, as well as gain experience with their handling characteristics. We are conducting this testing at the Marshall Space Flight Center’s Space Environmental Effects laboratory, in vacuum, with liquid nitrogen providing cooling ability below the freezing point of the materials. In this talk, we will present an overview of the FROSTE program element and share results from the initial development testing of two cryogenic phase change materials.

phase change material↗

Building Envelope Characteristics in Cold Climates

Prescriptive guidelines for thermal insulation in the design of buildings in cold climates have traditionally been derived by a holistic consideration of climatic factors, energy policy, environmental policy, and economics. The differences in thermal barrier requirements in buildings across the arctic and subarctic regions of the world are influenced as much by the differing priorities of the governing bodies that set these requirements as by actual physical demands and conditions. Usually, national requirements for building envelope characteristics such as thermal insulation values, building envelope airtightness, vapor permeability, building mass, and detailing are based on economics, durability, and environmental considerations. Consideration of thermal energy system resilience provides a new paradigm through which to view the optimization of these parameters. The paper describes specifics of construction in cold climates; summarizes best practice requirements for the building envelope characteristics for buildings located in cold and arctic climate of the United States, Canada, and Scandinavian countries; provides some details illustrating how to implement these requirements; and compares the effects of different levels of building envelope efficiency and building mass on indoor air temperature decay when heat supply is interrupted. The paper also presents results from experts' discussions during the consultation forum "Thermal Energy Systems Resilience in Cold/Arctic Climates" (ERDC 2020) and research conducted under the IEA EBC Annex 73, the Environmental Security Technology Certification Program (ESTCP) Project "Technologies Integration to Achieve Resilient, Low-Energy Military Installations," and U.S. Army Program project 633734T1500 under Military Engineering Technology Demonstration. The paper complements the Cold-Climate Design Guide (ASHRAE 2015) with a focus on the resilience of thermal energy systems.

Arctic↗

United States data collection activities and requirements, volume 1

The potential market for a data collection system was investigated to determine whether the user needs would be sufficient to support a satellite relay data collection system design. The activities of 107,407 data collections stations were studied to determine user needs in agriculture, climatology, environmental monitoring, forestry, geology, hydrology, meteorology, and oceanography. Descriptions of 50 distinct data collections networks are described and used to form the user data base. The computer program used to analyze the station data base is discussed, and results of the analysis are presented in maps and graphs. Information format and coding is described in the appendix.

Hrin, S.↗

Considerations of human intrusion in U.S. programs for deep geologic disposal of radioactive waste

Regulations in the United States that govern the permanent disposal of spent nuclear fuel and high-level radioactive waste in deep geologic repositories require the explicit consideration of hypothetical future human intrusions that disrupt the waste. Specific regulatory requirements regarding the consideration of human intrusion differ in the two sets of regulations currently in effect in the United States; one defined by the Environmental Protection Agency's 40 Code of Federal Regulations part 197, applied only to the formerly proposed geologic repository at Yucca Mountain, Nevada, and the other defined by the Environmental Protection Agency s 40 Code of Federal Regulations part 191, applied to the Waste Isolation Pilot Plant in New Mexico and potentially applicable to any repository for spent nuclear fuel and high-level radioactive waste in the United States other than the proposed repository at Yucca Mountain. This report reviews the regulatory requirements relevant to human intrusion and the approaches taken by the Department of Energy to demonstrating compliance with those requirements.

Swift, Peter N.↗

Affordable Development and Qualification Strategy for Nuclear Thermal Propulsion

Nuclear Thermal Propulsion (NTP) is a concept which uses a nuclear reactor to heat a propellant to high temperatures without combustion and can achieve significantly greater specific impulse than chemical engines. NTP has been considered many times for human and cargo missions beyond low earth orbit. A lot of development and technical maturation of NTP components took place during the Rover/NERVA program of the 60's and early 70's. Other NTP programs and studies followed attempting to further mature the NTP concept and identify a champion customer willing to devote the funds and support the development schedule to a demonstration mission. Budgetary constraints require the use of an affordable development and qualification strategy that takes into account all the previous work performed on NTP to construct an existing database, and include lessons learned and past guidelines followed. Current guidelines and standards NASA uses for human rating chemical rocket engines is referenced. The long lead items for NTP development involve the fuel elements of the reactor and ground testing the engine system, subsystem, and components. Other considerations which greatly impact the development plans includes the National Space Policy, National Environmental Policy Act, Presidential Directive/National Security Council Memorandum #25 (Scientific or Technological Experiments with Possible Large-Scale Adverse Environmental Effects and Launch of Nuclear Systems into Space), and Safeguards and Security. Ground testing will utilize non-nuclear test capabilities to help down select components and subsystems before testing in a nuclear environment to save time and cost. Existing test facilities with minor modifications will be considered to the maximum extent practical. New facilities will be designed to meet minimum requirements. Engine and test facility requirements are based on the driving mission requirements with added factors of safety for better assurance and reliability. Emphasis will be placed on small engines, since the smaller the NTP engine, the easier it is to transport, assemble/disassemble, and filter the exhaust during tests. A new ground test concept using underground bore holes (modeled after the underground nuclear test program) to filter the NTP engine exhaust is being considered. The NTP engine system design, development, test, and evaluation plan includes many engine components and subsystems, which are very similar to those used in chemical engines, and can be developed in conjunction with them Other less mature NTP engine components and subsystems (e.g., reactor) will be thoroughly analyzed and tested to acceptable levels recommended by the referenced standards and guidelines. The affordable development strategy also considers a prototype flight test, as a final step in the development process. Preliminary development schedule estimates show that an aggressive development schedule (without much margin) will be required to be flight ready for a 2033 human mission to Mars.

Gerrish, Harold P., Jr.↗

Affordable Development and Qualification Strategy for Nuclear Thermal Propulsion

Nuclear Thermal Propulsion (NTP) is a concept which uses a nuclear reactor to heat a propellant to high temperatures without combustion and can achieve significantly greater specific impulse than chemical engines. NTP has been considered many times for human and cargo missions beyond low earth orbit. A lot of development and technical maturation of NTP components took place during the Rover/NERVA program of the 60's and early 70's. Other NTP programs and studies followed attempting to further mature the NTP concept and identify a champion customer willing to devote the funds and support the development schedule to a demonstration mission. Budgetary constraints require the use of an affordable development and qualification strategy that takes into account all the previous work performed on NTP to construct an existing database, and include lessons learned and past guidelines followed. Current guidelines and standards NASA uses for human rating chemical rocket engines is referenced. The long lead items for NTP development involve the fuel elements of the reactor and ground testing the engine system, subsystem, and components. Other considerations which greatly impact the development plans includes the National Space Policy, National Environmental Policy Act, Presidential Directive/National Security Council Memorandum #25 (Scientific or Technological Experiments with Possible Large-Scale Adverse Environmental Effects and Launch of Nuclear Systems into Space), and Safeguards and Security. Ground testing will utilize non-nuclear test capabilities to help down select components and subsystems before testing in a nuclear environment to save time and cost. Existing test facilities with minor modifications will be considered to the maximum extent practical. New facilities will be designed to meet minimum requirements. Engine and test facility requirements are based on the driving mission requirements with added factors of safety for better assurance and reliability. Emphasis will be placed on small engines, since the smaller the NTP engine, the easier it is to transport, assemble/disassemble, and filter the exhaust during tests. A new ground test concept using underground bore holes (modeled after the underground nuclear test program) to filter the NTP engine exhaust is being considered. The NTP engine system design, development, test, and evaluation plan includes many engine components and subsystems, which are very similar to those used in chemical engines, and can be developed in conjunction with them Other less mature NTP engine components and subsystems (e.g., reactor) will be thoroughly analyzed and tested to acceptable levels recommended by the referenced standards and guidelines. The affordable development strategy also considers a prototype flight test, as a final step in the development process. Preliminary development schedule estimates show that an aggressive development schedule (without much margin) will be required to be flight ready for a 2033 human mission to Mars.

Gerrish, Harold P., Jr.↗