Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “continuous operation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,027 records · Page 57

INSERVICE INSPECTION OF EXTENDED DRY STORAGE OF SPENT NUCLEAR FUEL, PART II: NDE/SENSOR TECHNOLOGY DEVELOPMENT AND CODIFICATION

This paper describes development and demonstration of nondestructive examination (NDE) technologies to support periodic examinations of interim dry cask storage system (DCSS) canisters for spent nuclear fuel in the USA to verify continued safe operation and that the canister confinement is intact and performing its intended safety function. Specifically, this work relates to NDE technology development for “canister” based DCSS systems which form the majority population of DCSSs, in the USA, for interim storage of spent nuclear fuel. Consideration of potential degradation of the welded stainless-steel canister in these systems is required for continued usage in the period of extended operation (PEO) beyond the initial license or certified term. Physical access to the canister surface is constrained due to narrow annulus spaces between the canister and the overpack, tortuous entry pathways, and high temperatures and radiation doses that can be damaging to materials and electronics related to inspections. Several activities to demonstrate NDE technologies for the inspections of different DCSS systems are summarized.

nondestructive examination (NDE), Dry Cask Storage↗

Landsat Data Continuity Mission (LDCM) Ascent and Operational Orbit Design

For the past 40-years, Landsat Satellites have collected Earth's continental data and enabled scientists to assess change in the Earth's landscape. The Landsat Data Continuity Mission (LDCM) is the next generation satellite supporting the Landsat science program. LDCM will fly a 16-day ground repeat cycle, Sun-synchronous, frozen orbit with a mean local time of the descending node ranging between 10:10 am and 10:15 am. This paper presents the preliminary ascent trajectory design from the injection orbit to its final operational orbit. The initial four burn ascent design is shown to satisfy all the LDCM mission goals and requirement and to allow for adequate flexibility in re-planning the ascent.

Mann, Laurie M.↗

Ground-tended payload operations of Space Station Freedom

The concepts and capabilities that supported ground-tended Space Station Freedom (SSF) utilization and operations are described. On-board computer control support capabilities are required, and potential approaches for computer sequencing are discussed. An integrated process which links the planning processes with the implementation and execution of the operations is required to perform continuous, long-term utilization of SSF. Payload designs that make accommodations for ground-tended operation can be supported by the operations infrastructure. The payload operations integration center and Space Station Control Center are to support continuous operations of payloads that are designed to be operated from the ground. An overall process of ground-tended payload operations which links the weekly planning and continuous ground-tended execution functions is defined.

Noneman, Steven R.↗

Terra MODIS: 20 years of on-orbit calibration and performance

Since its launch in December 1999, Terra Moderate Resolution Imaging Spectroradiometer (MODIS) has successfully operated for more than 20 years, with its observations generating a broad range of science data products that have greatly enabled the remote sensing community and users worldwide in their studies of many key geophysical parameters of the Earth’s systems. MODIS collects data in 36 spectral bands, covering wavelengths from 0.41 to 14.4 μm, which are calibrated by a set of onboard calibrators (OBCs). Also contributing to the sensor’s mission-long on-orbit calibration and characterization are near-monthly scheduled lunar observations and multiple time series of the sensor’s responses over select ground targets at a variety of scan angles. To a large extent, the quality of MODIS data products relies strongly on the dedicated efforts to operate and calibrate the instrument, to derive and update calibration parameters, and to develop and implement new calibration strategies and algorithms in response to on-orbit changes of the sensor’s characteristics and its OBC functions. We provide an overview of the Terra MODIS on-orbit operation and calibration activities over the last 20 years, including changes made to extend and preserve the instrument and OBC functions and their operation strategies. It also illustrates the sensor’s on-orbit performance with results derived from its OBC, lunar observations, and select ground targets and discusses major changes in sensor characteristics and corrections applied to the L1B algorithms as well as calibration lookup table updates. To date, the Terra MODIS instrument and its OBCs continue to operate and function normally. Except for those identified prelaunch, most spectral bands and detectors continue to meet their specified calibration requirements. Also discussed in our paper are lessons learned from Terra MODIS operation and calibration, as well as future efforts to further extend and maintain the quality of its long-term data records.

Terra↗

Advanced Communications Technology Satellite (ACTS) Used for Inclined Orbit Operations

The Advanced Communications Technology Satellite (ACTS) is operated by the NASA Glenn Research Center at Lewis Field 24 hours a day, 7 days a week. ACTS, which was launched in September 1993, is in its 7th year of operations, far exceeding the system s planned 2 years of operations and 4 years of designed mission life. After 5 successful years of operating as a geostationary satellite, the spacecraft s North-South stationkeeping was discontinued in August 1998. The system is now operating in an inclined orbit that increases at a rate of 0.8 /yr. With only scarce fuel remaining, operating in this mode extends the usage of the still totally functional payload. Although tracking systems are now needed on the experimenter Earth stations, experiment operations have continued with very little disruption. This is the only known geosynchronous Ka-band (30/20 GHz) spot-beam satellite operating in an inclined orbit. The project began its transition from geostationary operations to inclined operations in August 1998. This did not interrupt operations and was transparent to the experimenters on the system. For the space segment, new daily procedures were implemented to maintain the pointing of the system s narrow 0.3 spot beams while the spacecraft drifts in the North-South direction. For the ground segment, modifications were designed, developed, and fielded for the three classes of experimenter Earth stations. With the next generation of commercial satellite systems still being developed, ACTS remains the only operational testbed for Ka-band geosynchronous satellite communications over the Western hemisphere. Since inclined orbit operations began, the ACTS experiments program has supported 43 investigations by industry, Government, and academic organizations, as well as four demonstrations. The project s goals for inclined-orbit operations now reflect a narrower focus in the types of experiments that will be done. In these days of "faster, better, cheaper," NASA is seeking to gain greater relevance to the agency s mission from these experiments. One area that is of much interest both to NASA and the commercial world is the investigation of protocol issues related to the interoperability of satellites with terrestrial networks, such as Transmission Control Protocol/Internet Protocol (TCP/IP) and Asynchronous Transfer Mode (ATM) over wideband satellites. Other experiment areas of interest are supporting the U.S. Government and NASA as they begin using commercial space assets to meet their communications needs, evaluating issues related to operating a spot-beam satellite in inclined orbit, and evaluating new Ka-band hardware that requires a satellite link. ACTS is now in its last year of operations. Operations are planned through June 2000, when after 81 months of operations, this very successful spacecraft will be superorbited and made inert.

Bauer, Robert A.↗

Development and Assessment of the SMAP Enhanced Passive Soil Moisture Product

Launched in January 2015, the National Aeronautics and Space Administration (NASA) Soil Moisture Active Passive (SMAP) observatory was designed to provide frequent global mapping of high-resolution soil moisture and freeze-thaw state every two to three days using a radar and a radiometer operating at L-band frequencies. Despite a hardware mishap that rendered the radar inoperable shortly after launch, the radiometer continues to operate nominally, returning more than two years of science data that have helped to improve existing hydrological applications and foster new ones.Beginning in late 2016 the SMAP project launched a suite of new data products with the objective of recovering some high-resolution observation capability loss resulting from the radar malfunction. Among these new data products are the SMAP Enhanced Passive Soil Moisture Product that was released in December 2016, followed by the SMAPSentinel-1 Active-Passive Soil Moisture Product in April 2017.This article covers the development and assessment of the SMAP Level 2 Enhanced Passive Soil Moisture Product (L2_SM_P_E). The product distinguishes itself from the current SMAP Level 2 Passive Soil Moisture Product (L2_SM_P) in that the soil moisture retrieval is posted on a 9 km grid instead of a 36 km grid. This is made possible by first applying the Backus-Gilbert optimal interpolation technique to the antenna temperature (TA) data in the original SMAP Level 1B Brightness Temperature Product to take advantage of the overlapped radiometer footprints on orbit. The resulting interpolated TA data then go through various correctioncalibration procedures to become the SMAP Level 1C Enhanced Brightness Temperature Product (L1C_TB_E). The L1C_TB_E product, posted on a 9 km grid, is then used as the primary input to the current operational SMAP baseline soil moisture retrieval algorithm to produce L2_SM_P_E as the final output. Images of the new product reveal enhanced visual features that are not apparent in the standard product. Based on in situ data from core validation sites and sparse networks representing different seasons and biomes all over the world, comparisons between L2_SM_P_E and in situ data were performed for the duration of April 1, 2015 October 30, 2016. It was found that the performance of the enhanced 9 km L2_SM_P_E is equivalent to that of the standard 36 km L2_SM_P, attaining a retrieval uncertainty below 0.040 m(exp 3)/m(exp 3) unbiased root-mean-square error (ubRMSE) and a correlation coefficient above 0.800. This assessment also affirmed that the Single Channel Algorithm using the V-polarized TB channel (SCA-V) delivered the best retrieval performance among the various algorithms implemented for L2_SM_P_E, a result similar to a previous assessment for L2_SM_P.

Enhanced↗

Reducing Cost of Chlorinated Volatile Organic Compound Remediation by Transitioning from Active to Passive Soil Vapor Extraction - 20157

Areas of high chlorinated volatile organic compound (cVOC) contamination at the Savannah River Site (SRS) have been undergoing remediation via soil vapor extraction, sometimes coupled with thermal treatments to enhance extraction rates. These active systems are effective in removing large amounts of contaminant mass from the subsurface and mitigating the impacts to groundwater. However, as extraction rates decline, costs must be evaluated with respect to the benefit of continued active operation. A decision framework for identifying conditions when a transition to a more passive remediation is appropriate has been developed with state and federal regulatory agencies. Two remediation areas have recently been transitioned from active soil vapor extraction (ASVE) to passive soil vapor extraction (PSVE) at the SRS. Performance evaluation goals including plume stabilization, overall mass removal trends, environmental sustainability and costs were considered in transitioning from active remediation to passive technologies at both sites. At the Dynamic Underground Stripping (DUS) project at the M-Area Settling Basin, ASVE was combined with steam injection to extract cVOCs during active operations. Steam injection occurred from September 2005 to September 2009. DUS utilized 63 steam injection wells, 34 active vapor extraction wells, and 3 active soil vapor extraction units (SVEUs). Two active SVEUs had 60 horsepower blowers; the third had a 25-horsepower blower. Mass removal was closely tracked during DUS operations; over 181,437 kilograms (400,000 pounds) of cVOCs were removed while active steam injection occurred. After steaming was stopped, ASVE continued. The 34 active wells were evaluated in 2012. The ASVE wells were grouped into categories of high, medium, and low extraction rates. High producing wells remained connected to a single active SVEU. Low producing wells were abandoned, and the medium producing wells were transitioned to PSVE (Microblowers{sup TM}). Microblowers{sup TM} utilize a dedicated blower per well and are solar powered. This passive technology provides energy, maintenance, and operation costs savings while still providing an efficient reduction in cVOC migration to groundwater. In 2018, the remaining ASVE wells were evaluated again. The purpose of this testing was to identify which wells removed the most mass. An optimal well configuration was determined. The criteria to discontinue ASVE was removal of less than 18 kilograms (40 pounds) per week of cVOCs. After 3 months of shutdown (rebound conditions), 2.7 kilograms (5.9 pounds) of cVOCs per week were being removed. Data from the rebound test justified ending ASVE and transitioning wells with higher extraction rates to PSVE. Wells that had depleted the cVOC mass within their zone of influence were abandoned. Performance data from existing PSVE wells justified ending PSVE at wells with depleted extraction rates. Currently the system has 16 PSVE wells operating. Another ASVE system was being used to treat cVOC contaminated soil at the A-Area Miscellaneous Rubble Pile (AMRP) at SRS. System operation began in 2004, with 7 ASVE wells connected to a 60- horsepower blower. Mass removal rates and contaminant concentrations remained consistently low over the ASVE lifespan at AMRP. This indicated that mass removal was diffusion limited. With this data, the 7 ASVE wells were transitioned to PSVE in 2017. Twelve pressure monitoring points were also transitioned to PSVE wells. AMRP currently has 19 PSVE wells operating. Both transitions from active to passive remediation had concurrence from the United States Environmental Protection Agency and the South Carolina Department of Health and Environmental Control. These transitions ensure that only the necessary amount of energy is being exerted to remediate the environment. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Business Continuity, Cybersecurity, and Backup Control Center: Standards, References, and Recommendations (White Paper)

This Whitepaper provides an overview and synopsis of relevant standards for Control Center, Cyber Security and Continuity of Operations for electric power utilities. It also provides suggestions and recommendations for the outline of a cybersecurity plan and a business continuity plan, and suggests training and certification opportunities for both cybersecurity and business continuity.

24 POWER TRANSMISSION AND DISTRIBUTION↗

ACTS Operations Extended Through a University-Based Consortium

The Advanced Communications Technology Satellite (ACTS) program was slated for decommissioning in October 2000. With plans in place to move the spacecraft to an orbital graveyard and then shut the system down, NASA was challenged to consider the feasibility of extending operations for education and research purposes provided that an academic organization would be willing to cover operations costs. This was determined to be viable, and in the fall of 2000, NASA announced that it would consider extending operations. On March 19, 2001, NASA, the Ohio Board of Regents, and the Ohio University signed a Space Act Agreement to continue ACTS operations for 2 more years with options to extend operations up to a total of 4 years. To accomplish this, the Ohio University has formed a university-based consortium, the Ohio Consortium for Advanced Communications Technology (OCACT), and acts as the managing member. The Ohio University is responsible for the full reimbursement of NASA's operations costs, and does this through consortium membership. NASA retains the operating license of the spacecraft and has two contractors supporting spacecraft and master control station operations. This flexible arrangement between NASA and academia allows the education community to access a large communications satellite for learning about spacecraft operations and to use the system's transponders for communications applications. It also allows other organizations, such as commercial companies, to become consortium members and use the ACTS wideband Ka-band (30/20 GHz) payload. From the consortium members, six areas of interest have been identified.

Bauer, Robert A.↗

IXO-XMS LVSID Anti-Coincidence Detector

This document describes a high-TRL backup implementation of the anti-coincidence detector for the IXO/XMS instrument. The backup detector, hereafter referred to as the low-voltage silicon ionization detector (LVSID), has been successfully flown on Astro-E2 (Suzaku)/XRS and is currently being implemented, without significant changes, on the Astro-H/SXS instrument. The LVSID anti-coincidence detector on Astro-E2/XRS operated successfully for almost 2 years, and was not affected by the loss of liquid helium in that instrument. The LVSID continues to operate after almost 5 years on-orbit (LEO, 550 km) but with slightly increased noise following the expected depletion of solid Neon after 22 months. The noise of the device is increased after the loss of sNe due to thermally induced bias and readout noise. No radiation damage, or off-nominal affects have been observed with the LVSID on-orbit during the Astro-E2/XRS program. A detector die from the same fabrication run will be used on the Astro-H/SXS mission. The LVSID technology and cryogenic JFET readout system is thus TRL 9. The technology is described in detail in section 2. The IXO/XMS "backup-up" anti-coincidence detector is a small array of LVSID detectors that are almost identical to those employed for Astro -E2/XRS as described in this document. The readout system is identical and, infact would use the same design as the Astro -E2/XRS JFET amplifier module (19 channels) essentially without changes except for its mechanical mount. The changes required for the IXO/XMS LVSID array are limited to the mounting of the LVSID detectors, and the mechanical mounting of the JFET amplifier sub-assembly. There is no technical development needed for the IXO/XMS implementation and the technology is ready for detailed design-work leading to PDR. The TRL level is thus at least 6, and possibly higher. Characteristics of an IXO/XMS LVSID anti-co detector are given in Table 1 and described in detail in section 3.

Porter, Scott F.↗

Ground Software Technologies – Embracing Change: Mission Drivers and Technology Opportunities to Enable Long Lived Missions

Mission lifecycles have proven to extend well beyond their original design. The benefits to this are countless but introduce challenges in today’s rapidly changing ground infrastructure and software technologies used to enable mission success. What remains constant is the risk posture missions maintain when accepting change and the use of new technologies. Larger missions are ready for change in early lifecycle development but near launch and especially in operations, few continue to evolve beyond what is set in place in phase C. This paper will discuss how the Advance Multi-Mission Operations System (AMMOS) intends to address, three driving missions concerns: Maintaining functionality (hardware/software) for decades, rapidly responding to security vulnerabilities in software, and finally the ability to quickly evolve infrastructure and software changes. These driving concerns are briefly described below: 1. Maintaining functionality (hardware/software) for decades. Hardware updates considerably faster than 10 years ago. Expectations that a system can remain in place for more than 10 years is no longer valid. Expecting to find hardware replacements for a system older than 5 years will increasingly become more and more challenging. How than do missions plan for hardware changes for long lived missions? Principle Objective: Provide abstraction by virtualizing and containerizing software abstract away any hardware dependencies and package up the application lightweight units. 2. Rapidly responding to security vulnerabilities in software. Cost is often the main impediment and largely driven by the revalidation and testing of system that undergo change. In todays, environment security updates are a major diver demanding systems remain up to date. How then do missions accept these changes and avoid large testing efforts? Principle Objective: Help reduce the cost of re-testing by automation of testing, deployment, and compartmentalizing change. 3. Ability to quickly evolve infrastructure and software changes. Responding quickly to change is similar to the second concern in this paper regarding security vulnerabilities. In this case, it address broader concerns of updating software and infrastructure on a more realistic timeline. How do missions stay up to date with the most recent versions of software and allowing for improved functionality? Principle Objective: Use continuous integration techniques at the system level to ensure rapid turnaround. This paper explores each of these concerns in more detail. It focuses the AMMOS’s current plans, challenges and current roadmap.

Giovannoni, Brian J.↗

Aluminum Electrolytic Capacitor Vulnerability Evaluation in DC Power Supplies at the Spallation Neutron Source

The service life of electrolytic capacitors is a concern for long-term reliable operation of power supplies. The Power Conversion Group at the Spallation Neutron Source (SNS) facility of Oak Ridge National Laboratory is responsible for more than 500 power supplies with over 1000 electrolytic capacitors installed in these power supplies. Most of the electrolytic capacitors have been in operation since 2007 and are either well over or close to the manufacturer provided lifetime. This paper addresses this vulnerability to ensure continued reliable operation of the SNS. The power supply circuit is simulated in a MATLAB/Simulink environment to quantify the capacitor ripple current and operating voltage. Combined with manufacturer data, this information is used to estimate capacitor lifetime. Utilizing the simulation results and lifetime projections of the capacitors, capacitor replacements for the power supplies is prioritized. To assess end-of-life, the ambient temperature and ripple current of the capacitor is used. Based on the manufacturer's data and scientific literature review, capacitor end-of-life is established. The results of the simulations and analysis is presented. Data on the highest priority supplies will also be presented, and statistics on the capacitor performance, reliability and remaining lifetime will be shown.

Harave, Sudarshan↗

Will cosmic strings be discovered using the Space Telescope?

Cosmic strings are topologically stable defects in the vacuum of space which may be produced by a phase transition in the early universe. Here, it is suggested that observations of very distant galaxies are a more useful means of discovering strings than quasar observations. It is argued that if there is only one string out to redshift z - about 1 the probability that it crosses a random image obtained using the Wide Field Camera (WFC) of the Space Telescope is about 0.0001. In order to discover a cosmic string the Space Telescope WFC will be required to operate almost continuously in primary and serendipity modes, and a cosmic string, if it exists, may be discovered within the first few years of operation.

Pacynski, B.↗

Behavior of Forged S-816 Turbine Blades in Steady-state Operation of J33-9 Turbojet Engine with Stress-rupture and Metallographic Evaluations / by F. B.garrett, C. A. Gyorgak, and J. W. Weeton

An investigation was conducted to determine the behavior of recently produced, forged S-816 turbine blades in a full-scale turbojet engine, and in particular, the scatter in performance of the alloy. The turbine blades were operated as continuously as possible at a temperature of 1500 degrees F and a centrifugal stress of 21,500 pounds per square inch. The operating lives of the turbine blades varied from 181 to 539 hours, a range of 358 hours. Stress-rupture properties of specimens cut from blade airfoils also varied considerably, as much as 1257 hours at 20,000 pounds per square inch and 1500 degrees F. Since the variability of scatter of stress-rupture data is greater than that of blade performance, the scatter is probably caused by variations in the properties of the forged blades rather than by variations caused by engine operation or installation of the blades. Metallographic examinations were made to determine possible causes of the scatter and although numerous differences in microstructures of blades were found, no consistent tendencies were observed and the findings did not permit an explanation of the scatter of blade performance. The results of the metallographic examinations and of the physical tests indirectly indicated variables in the fabricating method caused the scatter in properties.

Garrett, Floyd B↗

Aquarius Radiometer Performance: Early On-Orbit Calibration and Results

The Aquarius/SAC-D observatory was launched into a 657-km altitude, 6-PM ascending node, sun-synchronous polar orbit from Vandenberg, California, USA on June 10, 2011. The Aquarius instrument was commissioned two months after launch and began operating in mission mode August 25. The Aquarius radiometer meets all engineering requirements, exhibited initial calibration biases within expected error bars, and continues to operate well. A review of the instrument design, discussion of early on-orbit performance and calibration assessment, and investigation of an on-going calibration drift are summarized in this abstract.

Piepmeier, Jeffrey R.↗

Stakeholder Engagement Review Meeting Summary Report

Sustainability in the context of the Light Water Reactor Sustainability (LWRS) Program is the ability to maintain the safe and economic operation of the existing fleet of nuclear power plants now and in the future. It has two objectives with respect to long-term operations: (1) to provide science and technology-based solutions to industry to safely enhance the economical operation of power reactors; and (2) to manage the aging of systems, structures, and components (SSCs) so that nuclear power plants can continue to operate safely and cost-effectively.

42 ENGINEERING↗

Implosion mediated gas-puff hybrid X-pinch

Imploding gas-puff z-pinches are efficient sources of intense X-rays. However, the unpredictable size, number, and location of hot-spots along the pinch axis make them unsuitable for applications such as point-projection radiography. Crossed wire or hybrid X-pinches on the other hand provide small, localized sources but require fast current rise times and must be reloaded after each pulse. In this letter, we present the first experimental demonstration of an implosion mediated gas-puff hybrid x-pinch in which an annular gas-puff implosion is shaped and focused onto pair of conical electrodes separated by a small gap. Here, this setup produces an intense X-ray source with controllable timing that can be operated with or without a central wire. Because the gas-puff implosion time determines the formation of the pinch, this configuration can continue to operate efficiently as a point X-ray source for longer current pulses than conventional x-pinches.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

STS-114: Mission Status Briefing

Phil Engelauf, STS-114 Mission Operations Representative; Mark Ferring, Lead ISS Flight Director; Cindy Begley, Lead Spacewalk Officer for the Mission were present. Phil reported that the vehicle continues to operate very cleanly, no system anomalies or issues, crew keeping up with the timelines, and small minor and major EVA activities went extremely well. He recapped previous day's activities such as: nitrogen transfer to the Station, and storing water and transferring it to the Space Station. Mark noted Mission Specialists Steven Robinson and Souichi Noguchi's superb job doing EVA. Cindy gave a technical detail of the CMG1 remove and replace activities with supporting video clips. News media focused their questions on technical details of flight activities and safety.

Source record↗