Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “TRACKING STATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,027 records · Page 57

On the performance of Trellis coded modulation with octal phase shift keying over the TDRSS channel

As the National Aeronautics and Space Administration moves into the 21st century with programs like Space Station Freedom, a manned mission to Mars, and the new Landsat mission, transmission demands on the Tracking and Data Relay Satellite System (TDRSS) will very likely exceed the available bandwidth. The Manual Lujan, Jr. Center for Space Telemetering and Telecommunications Systems (CSTTS) at New Mexico State University (NMSU) is studying techniques for increasing the data rate capabilities of TDRSS. These techniques include the use of advanced bandwidth efficient modulation formats to increase the data rate that can be sustained in a TDRSS transponder and the use of lossless bandwidth compression of the data to be transmitted to lower the data rate required from the user spacecraft. Based upon current technology the most promising bandwidth efficient modulation technique is Trellis Coded Modulation (TCM) operating with Octal Phase shift Keying (8PSK). Trellis Coded Modulation coding with 8PSK carrier modulation has the capability to increase the data rate which can be transmitted through the TDRSS spacecraft by a factor of 2 to 2.5 times that available with todays coded QPSK systems with only a small penalty in link performance relative to the existing systems. However, before NASA can safely employ TCM coding it is necessary to prove that this complex format can perform on the real TDRSS link as it does in labs and simulation studies. This proof-of-concept test over a live satellite channel was the objective of the construction and testing performed under this task of the NMSU NASA grant referenced above. In conjunction with NASA, NMSU's CSTTS has constructed a system to test a new candidate TDRSS modulation scheme, TCM 8PSK, that can enhance the information throughput of the TDRSS spacecraft. The test system for this project which was constructed over a period of 18 months by NMSU consisted of two racks of commercial and univeristy-designed and -built equipment. This project has included modifications of an existing White Sands Ground Terminal (WSGT) High Rate QPSK Demodulator to demodulate 8PSK as well as the construction of other support hardware. Also, two TCM codecs (coder/decoders) have been constructed to implement two levels of bandwidth efficiency. One was designed and built by the research team at NMSU while the other was created by the University of Notre Dame with the University of South Australia. The NMSU codec achieves a 2-to-1 increase in data rate per unit bandwidth with a coding gain relative to QPSK of about 3dB. The Notre Dame/South Australia codec achieves a 2.5-to-1 increase in data rate per unit of occupied bandwidth and a coding gain of about 2dB.

Osborne, William P.↗

Calibrating Atmospheric Delay for the Cassini Gravitational Wave Experiment

The Cassini spacecraft together with one of the stations of the Deep Space Network (DSN) have been instrumented to carry out extremely precise Doppler tracking that will be used to search for the direct evidence of Gravitational radiation passing through our solar system. The two-way communications link between the ground antenna and the spacecraft constitute an "antenna" for gravitational waves that would perturb the phase of the RF signal in the link. The experiments will be carried out during the long cruise phase of the spacecraft on its journey to Saturn and will be sensitive to gravitational wave perturbations larger than the noise level fluctuations of 3 x 10(exp -15) as measured in the Allan Standard Deviation domain. The use of simultaneous, coherent X- and Ka-Band up and down signals will reduce the errors associated with charged particle fluctuations in the interplanetary medium and Earth's ionosphere to a negligible level. The primary fluctuations in the phase of the signals both to and from the spacecraft are expected to be caused by fluctuations in water vapor in the Earth's atmosphere We have designed and are testing a new atmospheric calibration system (with duplicate components) to sense line-of-sight water vapor and its physical temperature with a goal of calibrating 95% or more of tropospheric path delay fluctuations during the Cassini Gravitational Wave Experiment (GWE). The critical component of the calibration system consists of a newly designed water vapor radiometer having a I degree sensing beamwidth and 0.01 K brightness temperature stability over hour time scales. Auxiliary instrumentation includes a microwave temperature profiler to retrieve the vertical distribution of the vapor physical temperature, and surface meteorology. A detailed error budget has been developed to account for all of the possible sources of error during calibration of the GWE and will be discussed. Two identical calibration systems have been constructed in order to provide capability as well as backup during the actual GWE experiment. We will report on side-by-side testing of the vapor and temperature sensing components of this calibrations system as well as a comparison with a short baseline radio interferometric measurement at our Goldstone complex.

Resch, G. M.↗

Summary of Resources for the International Space Station Environmental Control and Life Support System

The assembly complete Environmental Control and Life Support (ECLS) s ystem for the International Space Station (ISS) will consist of compo nents and subsystems in both the U.S. and International partner eleme nts which together will perform the functions of Temperature and Hum idity Control (THC), Atmosphere Control and Supply (ACS), Atmosphere Revitalization (AR), Water Recovery and Management (WRM), Fire Detect ion and Suppression (FDS), and Vacuum System (VS) for the station. D ue to limited resources available on ISS, detailed attention is given to minimizing and tracking all resources associated with all systems , beginning with estimates during the hardware development phase thr ough measured actuals when flight hardware is built and delivered. A summary of resources consumed by the current on-orbit U.S. ECLS syste m hardware is presented, including launch weight, average continuous and peak power loads, on-orbit volume and resupply logistics. ..

Williams, David E.↗

Autonomous Cargo Management and Distribution for Surface Logistics

The BLiSS: Cargo Management and Retrieval project is a submission to the NASA X-Hab challenge for an autonomous system of cargo storage and retrieval for use on the Lunar Gateway system. The system is designed to stow 5 tonnes of cargo within a capsule that has an internal diameter of 3.2 meters and height of 6 meters for cargo that will be up to 0.8 meters in any one dimension. The system will inventory all cargo items placed in each cargo container and then track the containers using RFID chips for autonomous stowage and retrieval upon request by on-station crew.

Luke McFarling↗

Space Communication and Navigation Testbed Communications Technology for Exploration

NASA developed and launched an experimental flight payload (referred to as the Space Communication and Navigation Test Bed) to investigate software defined radio, networking, and navigation technologies, operationally in the space environment. The payload consists of three software defined radios each compliant to NASAs Space Telecommunications Radio System Architecture, a common software interface description standard for software defined radios. The software defined radios are new technology developed by NASA and industry partners. The payload is externally mounted to the International Space Station truss and available to NASA, industry, and university partners to conduct experiments representative of future mission capability. Experiment operations include in-flight reconfiguration of the SDR waveform functions and payload networking software. The flight system communicates with NASAs orbiting satellite relay network, the Tracking, Data Relay Satellite System at both S-band and Ka-band and to any Earth-based compatible S-band ground station.

Reinhart, Richard↗

The NASA tracking and data acquisition networks - Their history and their future

The NASA Tracking and Data Acquisition Networks were begun in the late 1950s as a part of the U.S. activities associated with the 1958-59 International Geophysical Year. The first network, the Minitrack Net, evolved into the Space Tracking and Data Acquisition Network (STADAN) for support of scientific satellites in earth orbit. The NASA Mercury and Apollo manned flight programs produced more demanding requirements for near real-time tracking, communications, and orbit determination, thus providing the impetus for new, more sophisticated networks. The Deep Space Network was also created to meet unique requirements of the planetary exploration programs. All of these programs necessitated establishing ground stations in various countries around the world, thus promoting the concept of international cooperation in space activities which NASA has fostered in many programs. This paper traces these networks from their beginnings through the various stages of development and introduction of new technologies to meet the requirements of increasingly more complex space missions. The paper also discusses the planning for new capabilities for tracking, data acquisition and communications support of future programs, including particularly the Space Station in the next decade.

Force, Charles T.↗

Satellite-Derived Dynamics of Southern Ocean Sea Ice

Antarctic ERS-2, RADARSAT Synthetic Aperture Radar and ERS-1/2 Scatterometer images were analyzed with SMMI radiometer image time-series data to investigate seasonal variability in satellite-tracked sea-ice dynamics in the Southern Ocean during 1992. Supporting field data were acquired during 'in-situ' experiments including the winter 1992 Ice Station Weddell and Winter Weddell Gyre studies. A variety of surface measurements were made during these experiments including Argos-buoy deployment and GPS drift measurements. These are used in conjunction with International Program for Antarctic Buoys drift trajectories for ice-motion tracking validation. Comparisons between gridded Special Sensor Microwave Imager (SSMI) ice-motion vectors and European Center for Medium Range Weather Forecasts/National Centers for Environmental Prediction (ECMWF/NCEP) analyses indicate that large-scale drift is forced predominantly by the long-term mean, large-scale synoptic pressure field. Only sub-daily SAR sea-ice tracking can capture high-frequency fluctuations, driven by polar lows or tidal forcing. In these cases, sea-ice drift can respond rapidly to changes in forcing on semi-diurnal time scales depending on the location with respect to the coastline. Seasonality of ice drift, particularly in the Weddell and Ross Seas, is linked to ice extent and compactness, and internal ice stresses transmitted through the pack ice from the coast. Three-monthly seasonal climatologies are presented of austral winter of ice drift in the Southern Ocean. The large Weddell and Ross Sea gyres are clearly resolved along with key seasonal and spatial attributes of their cyclonic circulation. Regional time series of ice dynamics parameters are used to illustrate correlations with meteorological forcing. Persistent divergence such as that occurring in the Ronne-Filchner polynya system results in large fractions of new ice. Similarly, convergence zones produce large fractions of deformed ice and characterize the dynamics of regions where perennial ice is observed. High shear strains also help delineate the axis of the Antarctic divergence in many places in the ice cover. In these regions, the separation between the coastal 'east wind drift'and ACC-dominated drift regimes is characterized by zonally extended regions of intense shear.

Drinkwater, Mark R.↗

Development and Application of Weld Track Thermal Analysis for the Exploration Extravehicular Mobility Unit

NASA is studying the next generation of space suit for safe operations in space, from the International Space Station to the lunar surface as part of the Exploration Extravehicular Mobility Unit project. The backplate structure of the portable life support system (PLSS) serves as the attachment point for assembly of the PLSS and contains embedded cooling channels. The thermal loop plumbing assembly and backplate are combined into a single component such that the fluid lines run through the midplane of the backplate. The manufacturing of the Ti-6Al-4V backplate consists of machining channels into a plate, welding cover plates on each channel using an electron beam, and additional machining for excess material removal and final detail. Careful control of the electron beam weld process is necessary to completely seal cover plates, produce consistent weld tracks, and produce channels with uniform cross sections free of debris and defects. The backplate contains multiple weld channels with unique geometries. The weld process parameters include choosing the beam current and focus, accelerating voltage, travel speed, pause times between weld tracks, and sequence of weld tracks. A transient finite element thermal analysis was developed to provide support for choosing and controlling the weld process parameters to maintain a consistent melt pool along each of the weld tracks. A moving distributed heat source is modeled to represent the heat input generated by the electron beam. The heat source model is a critical input to the analysis for accurate temperature predictions during the weld process. A modified conical heat source was developed to account for the change in working distance between the backplate and cover plates. The geometry of the material being welded must be accounted for by the heat source model to define the correct energy input. The weld process control is designed according to the predicted thermal history and melt pool dimensions for each of the weld channels. The analysis model, modified heat source, temperature and melt pool predictions, application of the thermal data to the weld parameters, and comparison with micrograph cross-sections from weld trials will be discussed in this presentation.

Electron Beam Welding↗

Uncertainties in Coastal Ocean Color Products: Impacts of Spatial Sampling

With increasing demands for ocean color (OC) products with improved accuracy and well characterized, per-retrieval uncertainty budgets, it is vital to decompose overall estimated errors into their primary components. Amongst various contributing elements (e.g., instrument calibration, atmospheric correction, inversion algorithms) in the uncertainty of an OC observation, less attention has been paid to uncertainties associated with spatial sampling. In this paper, we simulate MODIS (aboard both Aqua and Terra) and VIIRS OC products using 30 m resolution OC products derived from the Operational Land Imager (OLI) aboard Landsat-8, to examine impacts of spatial sampling on both cross-sensor product intercomparisons and in-situ validations of R(sub rs) products in coastal waters. Various OLI OC products representing different productivity levels and in-water spatial features were scanned for one full orbital-repeat cycle of each ocean color satellite. While some view-angle dependent differences in simulated Aqua-MODIS and VIIRS were observed, the average uncertainties (absolute) in product intercomparisons (due to differences in spatial sampling) at regional scales are found to be 1.8%, 1.9%, 2.4%, 4.3%, 2.7%, 1.8%, and 4% for the R(sub rs)(443), R(sub rs)(482), R(sub rs)(561), R(sub rs)(655), Chla, K(sub d)(482), and b(sub bp)(655) products, respectively. It is also found that, depending on in-water spatial variability and the sensor's footprint size, the errors for an in-situ validation station in coastal areas can reach as high as +/- 18%. We conclude that a) expected biases induced by the spatial sampling in product intercomparisons are mitigated when products are averaged over at least 7 km × 7 km areas, b) VIIRS observations, with improved consistency in cross-track spatial sampling, yield more precise calibration/validation statistics than that of MODIS, and c) use of a single pixel centered on in-situ coastal stations provides an optimal sampling size for validation efforts. These findings will have implications for enhancing our understanding of uncertainties in ocean color retrievals and for planning of future ocean color missions and the associated calibration/validation exercises.

Coastal ocean color↗

STS-112 Flight Day 6 Highlights

On the sixth flight day of STS-112 (Atlantis crewmembers include Dave Wolf, Mission Specialists; Sandy Magnus, Mission Specialists; Pam Melroy, Pilot; Jeff Ashby, Commander; Piers Sellers, Mission Specialists; Fyodor Yurchikhin, Mission Specialists), Wolf and Sellers are seen preparing for an EVA (extravehicular activity) during which they will service the ISS (International Space Station) to which Atlantis is docked. This will be the 45th EVA in support of ISS assembly and maintenance and the 20th conducted from the ISS. While the astronauts prepare, video footage is shown of the Sahara desert, over which the ISS is passing in a track that will take it over North Africa and the Mediterranean Sea. During the EVA, the External Television Camera Group will be brought out of the station and attached to the station. As the astronauts work, their helmet mounted cameras provide excellent footage of the ISS with the Shuttle docked at the Destiny Laboratory Module. Multiple shots of the station show several modules including Destiny, Quest, Unity and Zarya, as well as Canadarm 2 and Atlantis. The video closes with a wide angle shot of the ISS.

Source record↗

Component pose reconstruction using a single robotic total station for panelized building envelopes

The construction industry can benefit greatly from increased automation in construction processes in terms of precision, time, and labor costs. This is especially true for prefabricated construction for either new buildings or envelope retrofits. Here, prefabricated components are manufactured offsite according to design specifications and installed onsite. Accurate information on the component’s position and orientation (pose) is needed to achieve this. A tool named “Real-Time Evaluator” (RTE), designed to autonomously track prefabricated components as they are being installed and provide real-time installation instructions, is currently under development using a single robotic total station. This is challenging since at least three points are needed to determine the pose of an object in space. To achieve this goal with a single robotic total station, two key algorithms were developed: the “resection” algorithm aligns the digital twin with the physical twin regardless of the location of the total station, and the “transformation” algorithm gives instructions of translations and rotations to installers to achieve the desired installation pose. The algorithms were evaluated experimentally on a lab-scale demonstration. Results show that the resection algorithm achieved an average error of < 3.1 mm, while the transformation algorithm predicted the rotation angle along a single axis with an error of < 0.5◦.

Tang, Mengjia↗

Advanced Communications Architecture Demonstration Made Significant Progress

Simulation for a ground station located at 44.5 deg latitude. The Advanced Communications Architecture Demonstration (ACAD) is a concept architecture to provide high-rate Ka-band (27-GHz) direct-to-ground delivery of payload data from the International Space Station. This new concept in delivering data from the space station targets scientific experiments that buffer data onboard. The concept design provides a method to augment the current downlink capability through the Tracking Data Relay Satellite System (TDRSS) Ku-band (15-GHz) communications system. The ACAD concept pushes the limits of technology in high-rate data communications for space-qualified systems. Research activities are ongoing in examining the various aspects of high-rate communications systems including: (1) link budget parametric analyses, (2) antenna configuration trade studies, (3) orbital simulations (see the preceding figure), (4) optimization of ground station contact time (see the following graph), (5) processor and storage architecture definition, and (6) protocol evaluations and dependencies.

Carek, David Andrew↗

Radiological and Environmental Monitoring at the Clean Slate I and III Sites, Tonopah Test Range, Nevada, With Emphasis on the Implications for Off-site Transport

In 1963, the U.S. Department of Energy (DOE) (formerly the Atomic Energy Commission [AEC]) implemented Operation Roller Coaster on the Tonopah Test Range (TTR) and an adjacent area of the Nevada Test and Training Range (NTTR) (formerly the Nellis Air Force Range [NAFR]). Operation Roller Coaster consisted of four tests in which chemical explosions were detonated in the presence of nuclear devices to assess the dispersal of radionuclides and evaluate the effectiveness of storage structures to contain the ejected radionuclides. These tests resulted in the dispersal of plutonium over the ground surface downwind of the test ground zero (GZ). Three tests—Clean Slate I, II, and III—were conducted on the TTR in Cactus Flat. The fourth, Double Tracks, was conducted in Stonewall Flat on the NTTR. The Desert Research Institute (DRI) installed two monitoring stations in 2008, Station 400 at the Sandia National Laboratories (SNL) Range Operations Center (ROC) and Station 401 at Clean Slate III. Station 402 was installed at Clean Slate I in 2011 to measure radiological, meteorological, and dust conditions. The monitoring activity was implemented to determine if radionuclide contamination in the soil at the Clean Slate sites was being transported beyond the contamination area boundaries. Some of the data collected also permits comparison of radiological exposure at the TTR monitoring stations to conditions observed at Community Environmental Monitoring Program (CEMP) stations around the NTTR. Annual average gross alpha values from the TTR monitoring stations are higher than values from the surrounding CEMP stations. Annual average gross beta values from the TTR monitoring stations are generally lower than values observed for the surrounding CEMP stations. This may be due to use of sample filters with larger pore space because when glass-fiber filters began to be used at TTR Station 400, gross beta values increased. Gamma spectroscopy typically identified only naturally occurring radionuclides. The radionuclides cesium-134 and -137 were identified in only two samples at each station collected in the weeks following the destruction of the nuclear power reactor in Fukushima, Japan, on March 11, 2011. Observed gamma energy values never exceeded the local background by more than 4 μR/h. The higher observed gamma values were coincident with wind from any of the cardinal directions, which suggests that there is no significant transport from the Clean Slate contamination areas. Annual average daily gamma values at the TTR stations are higher than at the surrounding CEMP stations, but they are equivalent to or just slightly higher than the background estimates made at locations at equivalent elevations, such as Denver, Colorado. Winds in excess of approximately 15 mph begin to resuspend soil particles and create dust, but dust generation is also affected by soil temperature, relative humidity, and soil water content. Power curves provide good predictive equations for dust concentration as a function of wind speed. However, winds in the highest wind speed category occur infrequently.

54 ENVIRONMENTAL SCIENCES↗

Simulation of the Gravsat/Geopause mission

A simulation of the proposed low Gravsat and high Geopause satellite mission is presented. This mission promises fundamental improvements in the accuracy of low order geopotential coefficients by using satellite-to-satellite tracking technology coupled with a global sampling of the gravity field. Ten days of data from six stations are assumed. A drag compensation system for the low satellite is also postulated. The results show a one to two order of magnitude improvement in the accuracy of the low order coefficients through degree 8 and order 6. These results are easily adjusted to reflect a different data accuracy level and low satellite altitude.

Koch, D. W.↗

Dynamic satellite geodesy

It is pointed out that during the time since the last quadrennial report dynamic satellite geodesy has been continually refined with several new and independent solutions for the gravity field and station coordination. The generalized geoid seems to be known to about 3 m. Satellite-to-satellite tracking has been investigated as a means of determining the fine structure of the gravity field. The earth tide continues to be studied with satellite perturbation analysis. Investigations of polar motion are also considered.

Gaposchkin, E. M.↗

Atmospheric density, temperature and wind measurement techniques during the 1980 Energy Budget Campaign

Super Loki rocketsonde systems are described. The datasonde telemeters data to a ground station where ambient temperatures are calculated between 20 and 70 km. The sphere is a passive, radar tracked system which allows density to be calculated between 30 and 90 km. When flown simultaneously the systems give redundant data in the altitudes between 30 and 70 km. The datasonde has a balloon parachute that descends more slowly than a conventional parachute and is more stable. Because of launch constraints the datasondes reached very high apogees, leading to very fast descent velocities. Aerodynamic heating reduced thermistor sensitivity. Anomalous parachute behavior influenced wind sensing until a denser layer was reached. The spheres collapsed above 60 km altitude, but their data, combined with dropsonde data give significant results for 21 flights. These show that the stratosphere is colder than Cospar 72 model predictions and the mesosphere is warmer.

Schmidlin, F. J.↗

Computer simulation of TDRSS autotracking

The Tracking and Data Relay Satellite System (TDRSS) consists of synchronous-orbit satellites and a single ground station at White Sands, NM. Each TDRSS satellite has two 16-foot dish antennas with dual-frequency feeds for transmission and reception at S- and Ku-band. Autotracking is required on the Ku-band return link from user spacecraft. The TDRSS autotrack system was verified by computer simulation rather than by end-to-end hardware testing. One of the simulation models is described. Attention is given to an overview of system operation, a computer model description, and the simulation results. An example plot shows the sensitivity of system pointing error to user incidental amplitude modulation frequency.

Jones, S. C.↗