Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Status”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,027 records · Page 57

Technology status and project development risks of advanced coal power generation technologies in APEC developing economies

The report reviews the current status of IGCC and supercritical/ultrasupercritical pulverized-coal power plants and summarizes risks associated with project development, construction and operation. The report includes an economic analysis using three case studies of Chinese projects; a supercritical PC, an ultrasupercritical PC, and an IGCC plant. The analysis discusses barriers to clean coal technologies and ways to encourage their adoption for new power plants. 25 figs., 25 tabs.

01 COAL, LIGNITE, AND PEAT↗

Progress and Status of the Ignalina Nuclear Power Plant's New Solid Waste Management and Storage Facilities

A considerable amount of dry radioactive waste from former NPP operation has accumulated up to date and is presently stored at the Ignalina NPP site, Lithuania. Current storage capacities are nearly exhausted and more waste is to come from future decommissioning of the two RMBKtype reactors. Additionally, the existing storage facilities does not comply to the state-of-the-art technology for handling and storage of radioactive waste. In 2005, INPP faced this situation of a need for waste processing and subsequent interim storage of these wastes by contracting NUKEM with the design, construction, installation and commissioning of new waste management and storage facilities. The subject of this paper is to describe the scope and the status of the new solid waste management and storage facilities at the Ignalina Nuclear Power Plant. In summary: The turnkey contract for the design, supply and commission of the SWMSF was awarded in December 2005. The realisation of the project was initially planned within 48 month. The basic design was finished in August 2007 and the Technical Design Documentation and Preliminary Safety Analyses Report was provided to Authorities in October 2007. The construction license is expected in July 2008. The procurement phase was started in August 2007, start of onsite activities is expected in November 2007. The start of operation of the SWMSF is scheduled for end of 2009. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Current Status and Potential Impacts Regarding the Proposed Development of a Rail Line to the Yucca Mountain Nuclear Waste Repository

This paper provides a description of the current status regarding the proposed development of a rail line to the Yucca Mountain Nuclear Waste Repository in Nye County, Southern Nevada, which includes potential impacts analyzed during the National Environmental Policy Act (NEPA) process, and the subsequent creation of an Environmental Impact Statement (EIS) for the rail line. Potential impacts are addressed within the context of impacts to natural and human environmental resources found within the geographic area of the proposed federal project. Potential impacts to these resources have been fully analyzed in the Rail Alignment Draft EIS (DEIS). This paper includes a summary of the potential impacts analyzed in the DEIS. Examples of potential impacts include land use conflicts, air quality, water use, and impacts to biological and cultural resources, among others. In conclusion: Based on its obligations under the NWPA and its decision to select the mostly rail scenario for the transportation of spent nuclear fuel and high-level radioactive waste, DOE needs to ship these materials by rail in Nevada to a repository at Yucca Mountain. DOE prepared the Rail Alignment EIS to provide the background, data, information, and analyses to help decision makers and the public understand the potential environmental impacts that could result from constructing and operating a railroad for shipment of spent nuclear fuel, high-level radioactive waste, and other materials from an existing rail line in Nevada to a repository at Yucca Mountain. This railroad would consist of a rail line, railroad operations support facilities, and other related infrastructure. DOE will use the Rail Alignment EIS to decide whether to construct and operate the proposed railroad, and if so, to: - Select a rail alignment (Caliente rail alignment or Mina rail alignment) in which to construct the railroad; - Select the common segments and alternative segments within either a Caliente rail alignment or a Mina rail alignment. The Department would use the selected common segments and alternative segments to identify the public lands to be included in right-of-way applications; - Decide where to construct proposed railroad operations support facilities; - Decide whether to restrict use of the rail line to DOE trains, or whether to allow commercial shippers to operate over the rail line; and - Determine what mitigation measures to implement. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Environmental Cleanup of the Idaho National Laboratory Status Report

This paper describes the status of the cleanup of the U.S. Department of Energy's Idaho National Laboratory site (INL). On May 1, 2005 CH2M.WG Idaho, LLC (CWI) began its 7-year, $2.4 billion cleanup of the INL. When the work is completed, 3,406,871 liters (900,000 gallons) of sodium-bearing waste will have been treated; 15 high-level waste tanks will have been grouted and Resource Conservation and Recovery Act (RCRA)- closed; more than 200 facilities will have been demolished or disposed of, including three reactors, several spent fuel basins, and hot cells; thousands of containers of buried transuranic waste will have been retrieved; more than 8,000 cubic meters (10,464 cubic yards) of contact-handled transuranic waste and more than 500 cubic meters (654 cubic yards) of remote-handled transuranic waste will have been characterized, packaged, and shipped offsite; almost 200 release sites and voluntary consent order tank systems will have been remediated; and 3,178 units of spent fuel will have been moved from wet to dry storage. In 2007, CWI began the construction of the Integrated Waste Treatment Unit that will treat the sodium-bearing waste for eventual disposal; removed and disposed the 112-ton Engineering Test Reactor vessel; demolished all significant radiological facilities at Test Area North; continued the exhumation of buried transuranic wastes from the Subsurface Disposal Area at the Radioactive Waste Management Complex; shipped the first of hundreds of containers of remote-handled transuranic waste to the Waste Isolation Pilot Plant; disposed of thousands of cubic meters of low-level and low-level mixed radioactive wastes both onsite and offsite while meeting all regulatory cleanup objectives. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Biphasic Effects of Nitric Oxide Radicals on Radiation-Induced Lethality and Chromosome Aberrations in Human Lung Cancer Cells Carrying Different p53 Gene Status

Purpose: The aim of this study was to clarify the effects of nitric oxide (NO) on radiation-induced cell killing and chromosome aberrations in two human lung cancer cell lines with a different p53 gene status. Methods and Materials: We used wild-type (wt) p53 and mutated (m) p53 cell lines that were derived from the human lung cancer H1299 cell line, which is p53 null. The wtp53 and mp53 cell lines were generated by transfection of the appropriate p53 constructs into the parental cells. Cells were pretreated with different concentrations of isosorbide dinitrate (ISDN) (an NO donor) and/or 2-(4-Carboxyphenyl)-4,4,5,5-tetramethylimidazoline-1-oxyl-3-oxide (c-PTIO) (an NO scavenger) and then exposed to X-rays. Cell survival, apoptosis, and chromosome aberrations were scored by use of a colony-forming assay, Hoechst 33342 staining assay and TUNEL (terminal deoxynucleotidyl transferase-mediated dUTP [deoxyuridine triphosphate] nick end labeling) assay, and chromosomal banding techniques, respectively. Results: In wtp53 cells the induction of radioresistance and the inhibition of apoptosis and chromosome aberrations were observed in the presence of ISDN at low 2- to 10-{mu}mol/L concentrations before X-irradiation. The addition of c-PTIO and ISDN into the culture medium 6 h before irradiation almost completely suppressed these effects. However, at high concentrations of ISDN (100-500 {mu}mol/L), clear evidence of radiosensitization, enhancement of apoptosis, and chromosome aberrations was detected. However, these phenomena were not observed in mp53 cells at either concentration range with ISDN. Conclusions: These results indicate that low and high concentrations of NO radicals can choreograph inverse radiosensitivity, apoptosis, and chromosome aberrations in human lung cancer cells and that NO radicals can affect the fate of wtp53 cells.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Status of verification and validation of AREVA's ARCADIA{sup R} code system for PWR applications

In March 2010 the submittal of Topical Reports for ARCADIA{sup R} and COBRA-FLX, the thermal-hydraulic module of ARCADIA{sup R}, to the U.S. Nuclear Regulatory Commission (NRC) concluded a major step in the development of AREVA's new code system for core design and safety analyses. This submittal was dedicated to the application of the code system to uranium fuel in pressurized water reactors. The submitted information comprised results for plants operated in the US (France)) and Germany and provided uncertainties for in-core measuring systems with traveling in-core detectors and for the aero-ball system of the EPR. A reduction of the uncertainties in the prediction of F{sub AH} and F{sub Q} of > 1 % (absolute) was derived compared to the current code systems. This paper extents the verification and validation base for uranium based fuel and demonstrates the basic capabilities of ARCADIA{sup R} of describing MOX. The achieved status of verification and validation is described in detail. All applications followed the same standard without any specific calibration. The paper gives also insight in the new capability of 3D full core steady-state and transient pin-by-pin/sub-channel-by-sub-channel calculations and the opportunities offered by this feature. The gain of margins with increasing detail of the representation is outlined. Currently, the strategies for worldwide implementation of ARCADIA{sup R} are developed. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Challenges with Final Status Surveys at a Large Decommissioning Site - 13417

As part of decommissioning a former nuclear fuel manufacturing site, one of the crucial final steps is to conduct Final Status Surveys (FSS) in order to demonstrate compliance with the release criteria. At this decommissioning site, the area for FSS was about 100 hectares (248 acres) and included varying terrain, wooded areas, ponds, excavations, buildings and a brook. The challenges in performing the FSS included determining location, identifying FSS units, logging gamma walkover survey data, determining sample locations, managing water in excavations, and diverting water in the brook. The approaches taken to overcome these challenges will be presented in the paper. The paper will present and discuss lessons learned that will aid others in the FSS process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Fuel Conversion Efforts at the High Flux Isotope Reactor – a 2023 Status Update

The High Flux Isotope Reactor (HFIR) provides one of the world’s highest steady-state neutron fluxes in the world for neutron scattering experiments focused on impactful scientific discovery, as well as materials irradiation studies and production of medical, industrial, and research isotopes. Efforts are ongoing to convert HFIR from high-enriched uranium (HEU) to low-enriched uranium (LEU) fuel while maintaining or enhancing current performance and safety margin, thus sustaining HFIR’s mission portfolio and reactor-based neutron science leadership. This paper presents a status update on the HFIR fuel conversion efforts.

Sizemore, Carol↗

Status of DUNE Offline Computing

We summarize the status of Deep Underground Neutrino Experiment (DUNE) Offline Software and Computing program. We describe plans for the computing infrastructure needed to acquire, catalog, reconstruct, simulate and analyze the data from the DUNE experiment and its prototypes in pursuit of the experiment's physics goals of precision measurements of neutrino oscillation parameters, detection of astrophysical neutrinos, measurement of neutrino interaction properties and searches for physics beyond the Standard Model. In contrast to traditional HEP computational problems, DUNE's Liquid Argon Time Projection Chamber data consist of simple but very large (many GB) data objects which share many characteristics with astrophysical images. We have successfully reconstructed and simulated data from 4% prototype detector runs at CERN. The data volume from the full DUNE detector, when it starts commissioning late in this decade will present memory management challenges in conventional processing but significant opportunities to use advances in machine learning and pattern recognition as a frontier user of High Performance Computing facilities capable of massively parallel processing. Our goal is to develop infrastructure resources that are flexible and accessible enough to support creative software solutions as HEP computing evolves.

43 PARTICLE ACCELERATORS↗

The Dresden Felsenkeller shallow-underground accelerator laboratory for nuclear astrophysics - Status and first physics program

Favored by the low background in underground laboratories, low-background accelerator-based experiments are an important tool to study nuclear reactions involving stable charged particles. This technique has been used for many years with great success at the 0.4 MV LUNA accelerator in the Gran Sasso laboratory in Italy, protected from cosmic rays by 1400 m of rock. However, the nuclear reactions of helium and carbon burning and the neutron source reactions for the astrophysical s-process require higher beam energies than those available at LUNA. Also the study of solar fusion reactions necessitates new data at higher energies. As a result, in the present NuPECC long range plan for nuclear physics in Europe, the installation of one or more higher-energy underground accelerators is strongly recommended. An intercomparison exercise using the same High-Purity Ge detector at several sites has shown that, with a combination of 45 m rock overburden, as can be found in the Felsenkeller underground site in Dresden, and an active veto against the remaining muon flux, in a typical nuclear astrophysics setup a background level can be achieved that is similar to the deep underground scenario as in the Gran- Sasso underground laboratory, for instance. Recently, a muon background study and geodetic measurements were carried out by the REGARD group. It was estimated that the rock overburden at the place of the future ion accelerator is equivalent to 130 m of water. The maximum muon flux measured was 2.5 m{sup -2} sr{sup -1} s{sup -1}, in the direction of the tunnel entrance. Based on this finding, a used 5 MV pelletron tandem accelerator with 250 μA up-charge current and external sputter ion source has been obtained and transported to Dresden. Work on an additional radio-frequency ion source on the high voltage terminal is in progress and far advanced. The installation of the accelerator in the Felsenkeller is expected for the near future. The status of the project and the planned access possibilities for external users will be reported, together with the instrumentation to be installed and proposals for the first solar physics measurements to be done at this new low-background facility. (authors)

43 PARTICLE ACCELERATORS↗

Environmental cleanup of the East Tennessee Technology Park - Year three - A status report - 15522

On August 1, 2011, URS - CH2M Oak Ridge LLC (UCOR) began its five-year, $1.4 billion cleanup of the East Tennessee Technology Park (ETTP), the former Oak Ridge Gaseous Diffusion Plant, located on the U.S. Department of Energy's (DOE) Oak Ridge Reservation (Reservation) in Tennessee. Under the contract, the base period scope of work to be completed by 2016 includes demolition of both the K-25 and K-31 gaseous diffusion buildings and all demolition waste dispositioned, initiation of demolition on the remaining K-27 gaseous diffusion building, safe storage of transuranic (TRU) waste for eventual transfer to the Transuranic Waste Processing Center, previously designated -No-Path-To-Disposition Waste- dispositioned to the extent possible, and completion of design and engineering of a mercury treatment system to be installed at the Y-12 National Security Complex (Y-12). UCOR will have also managed DOE Oak Ridge Office of Environmental Management (OREM)-owned facilities at ETTP, Oak Ridge National Laboratory (ORNL), and Y-12 in a safe and cost-effective manner. Since assuming responsibilities as the ETTP and Oak Ridge Reservation cleanup contractor, UCOR has completed its life-cycle Performance Measurement Baseline; received its Earned Value Management System (EVMS) certification; completed the deactivation and demolition (D and D) of the 44-acre K-25 gaseous diffusion building; removed and disposed of a contaminated underground storage tank (Tank W-1A) at ORNL; dispositioned mercury-contaminated storage tanks at Y-12; completed closure of the Toxic Substances Control Act Incinerator; disposed of more than 158,000 cubic yards of cleanup waste while managing the on-site Environmental Management Waste Management Facility (EMWMF); and conducted operations, surveillance, and maintenance activities at 180 DOE EM facilities at ETTP, ORNL, and Y-12 in a safe and cost-effective manner. In 2014, UCOR completed the removal and disposal of all of the K-25 demolition debris; completed the removal of asbestos-laden transite siding on the K-31 gaseous diffusion building and began demolition of that 17-acre building; advanced the characterization and deactivation of the K-27 gaseous diffusion building, readying the building for the start of demolition in 2015; advanced the design and engineering of a Mercury Treatment Facility to be located at Y-12; continued the cost-effective and safe disposition of all cleanup wastes; and readied ETTP for Voluntary Protection Program Star Status Assessment in 2015. Project performance as of December 31, 2014, continued to be excellent: - Cost Performance Index - 1.12 - Schedule Performance Index - 1.02 At the same time, since safety is the foundation of all cleanup work, UCOR's safety record goes hand-in-hand with its excellent project performance. Through calendar year 2014, UCOR's recordable injury rate was 1.04 occurrences per 200,000 work hours, and the lost workday case rate was 0.52. This performance continues to be due, in large part, to the people and processes URS and CH2M HILL, the parent companies of UCOR, brought to the project. Key enablers included: - Selected and deployed experienced staff in key leadership positions throughout the organization, continually re-energizing the organization with new leaders - Implemented previously successful safety programs and initiatives from other DOE sites, such as DOE's Voluntary Protection Program - Brought fresh thinking and innovation to tackling tough project issues, such as the deactivation of the Technetium-99-contaminated areas of K-27, applying lessons learned from the D and D of K-25; and implementing a -waste factory- approach to cleanup - Maintained continuing alignment between UCOR's contract with DOE and its Performance Measurement Baseline - rapidly addressing contract changes when they arose - Maintained a readiness both from a process as well as experienced personnel perspective to support DOE OREM in performing other significant Oak Ridge Reservation cleanup activities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Current status of the DOE/NNSA nuclear criticality safety program hands-on criticality safety training courses

In 2011 the US Department of Energy/National Nuclear Security Administration (DOE/NNSA) Nuclear Criticality Safety Program (NCSP) developed and piloted a 2-week nuclear criticality safety (NCS) practitioner course to support training and qualification of new NCS staff. The course was developed in accordance with the American National Standard Institute/American Nuclear Society (ANSI/ANS) standard for NCS training and qualifications (ANSI/ANS-8.26-2007). In 2013, an NCS manager's course was developed for process supervisors, managers, regulators, and other professionals with NCS-related responsibilities. These courses consist of classroom education, facility training, and hands-on subcritical and critical experiments training. Each course is currently offered twice per year. The 2-week practitioner course offers a week of classroom training, with practical workshops and exercises focused on teaching students how to perform an NCS evaluation. The second week of training involves hands-on critical and subcritical experiments and measurements. The first week is offered in Las Vegas, Nevada, at the DOE Nevada Field Office or the National Atomic Testing Museum. Depending on the student's clearance level, the second week is offered at Sandia National Laboratory (SNL) (uncleared and L-cleared students) or at the National Criticality Experiments Research Center (NCERC) (Q-cleared students). The 1-week manager's course is offered at SNL or NCERC, depending on clearance or interest, and includes classroom and hands-on critical and subcritical experiments and measurements. This paper provides an overview and status report for the DOE/NNSA NCSP training courses in NCS and provides information about future course offerings. (author)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Overview and status of domestic and international standards for nuclear criticality safety

For many years, the domestic and international consensus standards for nuclear criticality safety (NCS) have provided guidance for those performing hands-on operations involving fissionable materials. These consensus standards have been crucial to reducing the number of criticality accidents in process facilities. The last known criticality accident inside the United States was in 1978 (39 years ago at this writing) at the Idaho Chemical Processing Plant, and outside the United States, an accident occurred at Tokai-Mura, Japan, in 1999 (18 years ago at this writing). The domestic consensus standards for NCS include the American Nuclear Society (ANS) standards. The ANS Standards Board, the NCS Consensus Committee, and the ANS-8 Subcommittee oversee the development and maintenance of these standards. There are currently eighteen standards in revision (seven) or maintenance (eleven) cycles, and one standard is currently in development. The international consensus standards for NCS calculations, procedures, and practices are maintained and developed within the International Organization for Standardization, Technical Committee 85 on Nuclear Energy, Subcommittee 5 on Nuclear Fuel Technology, and Working Group 8, Nuclear Criticality Safety. Seven standards are currently available, one standard is in revision, and four standards are at various stages of development. This paper provides the NCS community with an overview and status report of domestic and international NCS consensus standards to stimulate interest and to support their continued development. (author)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

The Status of LILW Complex Disposal Facility Construction in Korea-18511

This paper provides the status and experiences of Low and Intermediate-level radioactive Waste (LILW) disposal facility in Korea. The LILW disposal facility is being constructed in Gyeongju-si, Korea. It can dispose of 800,000 drums (hereafter, 'drums' means '200 liter drum equivalents' unless specified otherwise) of radioactive waste in a site of 2,060,000 m{sup 2}. The first stage of the LILW facility construction was completed in June 2014, and approved for use by Nuclear Safety and Security Commission (NSSC) in December 2014. The first stage of the LILW facility, which is a type of underground silo with disposal capacity of 35,200 m{sup 3} (100,000 drums), consists of a construction tunnel, an operation tunnel, an access shaft, and six silos, etc. Silo for final disposal is located 80∼130 m below sea level, 25 m in diameter and 50 m in height. The capacity of each silo is approximately 16,700 drums. The second stage of the LILW facility is under construction and will be completed by December 2020. The second stage of the LILW facility, which is a type of near-surface disposal with disposal capacity of 32,875 m{sup 3} (125,000 drums), consists of an underground gallery, three movable cranes and twenty vaults, etc. Vault for final disposal is located about 100 m above sea level, 20 m in width, 20 m length and 10.9 m in height. The capacity of each vault is approximately 6,250 drums. A second receipt and storage facility is to be completed by June 2021. This facility is under designing to prepare for further increasing radioactive waste receipt quantities. It has storage capacity of 10,000 drums (existing receipt and storage facility have storage capacity of 7,000 drums)and will be divided into several sections for pre-disposal work, storage, a passage to link the existing facility to the second receipt and storage facility and truck bay, etc. These components of the LILW disposal facilities are together called LILW complex disposal facility. It is the world's first LILW disposal facility with two different types of disposal facilities in one site. For efficient operation, these disposal facilities share a receipt and storage building, a waste water treatment system, a measurement and monitoring system, etc. Once the construction of the first two stages is completed, LILW disposal facilities will be incrementally expanded, and as the whole LILW disposal facilities are completed, all LILW in Korea will be disposed of these disposal facilities efficiently according to its radioactivity level and managed safely by KORAD. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Final Status Surveys of Subsurface Contaminated Areas - 19473

This paper addresses how the U.S. Army Corps of Engineers (USACE) has performed final status surveys (FSS) at sites with subsurface contaminated areas. The Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM) guidance addresses only surficial contamination. This paper will explore alternative methodologies used by the USACE to demonstrate compliance with the release criterion when contamination extends below the surface. Special challenges posed by small areas of elevated activity at depth will also be addressed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

History and Status of DoE's Standardized Canister - 19657

The U.S. Department of Energy (DOE) is responsible for managing spent nuclear fuel (SNF) currently in its possession, as well as SNF that will come into its possession in the future. DOE will rely upon the standardized canister to confine radionuclides and precluding the moderator in order to ensure safe, long-term management and disposition of SNF in its possession. This strategy helps minimize characterization costs (i.e., funds and exposure) and other technical challenges associated with the traditional approach of relying on fuel-specific properties to demonstrate compliance with the regulator. The use of the standardized canister offers the following benefits: - The standardized canister design is complete. It has been tested under a variety of drop and accident scenarios and was subsequently licensed under 10 CFR 72 as a storage system as part of the Foster Wheeler Environmental Corporation (FWENC) Facility. It is also part of the license submittal for Yucca Mountain. - There is high confidence that the standardized canister design can be stored within commercially-available storage casks and licensed as part of a transportation-system package. - A robust standardized canister simplifies accident analyses and does not rely on characterization of the contained waste. This simplifies safety analysis, provides a greater level of confidence with stakeholders and reduces cost and risk. - A common design for the associated packaging, closure, and loadout facilities results in significant savings. - The DOE standardized canister would simplify design efforts, procurement, and fabrication. - Standardizing handling activities and associated training, procedures, equipment, and tooling leads to enhanced safety and surety of operations. The standardized canister is the preferred package for these materials. It withstood scrutiny by the Yucca Mountain Repository License Application, the Nuclear Regulatory Commission's (NRC) Advisory Committee on Nuclear Waste, the Nuclear Waste Technical Review Board, an American Society of Mechanical Engineers peer review, and the FWENC storage license application. This evaluation summarizes and documents the status of the design and rationale for the DOE standardized canister, and outlines remaining needs before deployment. In addition, it discusses the factors that have the potential to influence storage, transportation, and disposal of DOE SNF. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 109: US HLW Repository: Status and Next Steps

This panel focused on the technical, institutional and broader political issues associated with advancing a US HLW Repository program including programmatic, regulatory, legislative and funding challenges. Panelist with presentations: WM 2020 HLW Repository Status and Next Steps (Leo Blundo)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 94: US DOE Procurement Opportunities and End-State Contracting Model Status

This panel focused on DoE's procurement implementation strategy and planned activities for its first-tier contractors (Tier 1 procurements). This panel also focused on the implementation status of DoE's End State Contracting Model, which uses a single-award ID/IQ approach to give DOE flexibility to better define discrete scopes of work for site closure or end states. The panelists provided their prospective on progress toward the implementation of this new approach, lessons learned and the path forward for upcoming opportunities utilizing this contracting model. Panelists with presentations: EFCOG (Billy Morrison); DOE Procurement Opportunities - 4 Ways for Small Business Participation (Anne Marie Bird); US DOE Procurement and Contracting Opportunities (Aaron Deckard)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗