Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Stand”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,027 records · Page 57

High Resolution Photoexcitation Measurements Exacerbate the Long-Standing Fe XVII Oscillator Strength Problem

For more than 40 years, most astrophysical observations and laboratory studies of two key soft x-ray diagnostic 2p - 3d transitions, 3C and 3D, in Fe XVII ions found oscillator strength rations f(3C)/f(3D) disagreeing with theory, but uncertainties had precluded definitive statements on this much studied conundrum. Here, we resonantly excite these lines using synchrotron radiation at PETRA III, and reach, at a millionfold lower photon intensities, a 10 times higher spectral resolution, and 3 times smaller uncertainty than earlier work. Our final result of f(3C)/f(3D) = 3.09(8)(6) supports many of the earlier clean astrophysical and laboratory observations, while departing by five sigmas from our own newest large-scale ab initio calculations, and excluding all proposed explanations, including those invoking nonlinear effects and population transfers.

Electron-ion collisions↗

LISA : Pointing sensor development stand

We are developing a pointing sensor as part of the technology development effort for the Laser Interferometer Space Antenna (LISA) mission. The sensor will measure the angle between two beams, by measuring the phase difference in the heterodyne frequency on different sides of the pupil plane. In LISA, one beam would be from the local laser, while the other beam comes from a different spacecraft. The beam coming from the other space craft will have a Doppler shift due to changes in the orbits of the satellites. The phase difference across the aperture will be measured to align the incoming and outgoing beams.

LISA↗

Overview of Plume-Surface Interaction Data from Subscale Inert Gas Testing at NASA MSFC Test Stand 300 Vacuum Facilities

Maturation and validation of predictive modeling capabilities for plume-surface interaction, and the effects caused by the impingement of rocket engine exhaust on surface regolith, require relevant, highly characterized ground test data. The multi-phase nature of this problem poses challenges to ground testing across physical scaling, test environments and techniques, and diagnostics. NASA has developed a Physics Focused Ground Test (PFGT) of plume-surface interaction to address this need. The PFGT is a subscale, inert-gas experiment at Mars- and Lunar-relevant ambient pressure conditions that will provide critical data for model validation of cratering, ejecta, and plume physics. In this test, the ambient pressure in a vacuum chamber will be varied, along with the height of a supersonic nozzle above a surface, and the mass flow rate through the nozzle. Testing will be performed on a range of regolith simulants of varying composition and will also include instrumented impingement plate tests in place of regolith simulant to characterize gas-only plume physics. Novel high-speed visual diagnostics will capture temporal data on crater formation and ejecta dynamics, and planar laser-induced fluorescence diagnostics will capture plume structure and behavior. This paper will present an overview of the data collected during this test – for both the cratering and ejecta testing and the gas-only plume physics testing. Emphasis will be placed on trends, effects, and interactions observed in the data across the test parameter space.

Chad J. Eberhart↗

Overview of Plume-Surface Interaction Data from Subscale Inert Gas Testing at NASA MSFC Test Stand 300 Vacuum Facilities

Maturation and validation of predictive modeling capabilities for plume-surface interactions and their effects requires relevant, highly characterized ground test data. The National Aeronautics and Space Administration has developed a test bed for these behaviors under its Game Changing Developments Plume Surface Interactions project, and has undertaken testing at the Marshall Space Flight Center to address critical data needs. This manuscript provides a high-level overview of the testing and its associated data.

Chad J Eberhart↗

Stand Alone Electrical Equipment PRL 227a (Formerly PRL 227 LOC3) Confirmatory Sampling Report Addendum

HydroGeoLogic, Inc. (HGL) prepared this Confirmatory Sampling Report Addendum (CSRA) for the National Aeronautics and Space Administration (NASA), Kennedy Space Center (KSC), Florida. PRL 227a Location of Concern (LOC) 3 is located on 10th Street, west of the former Vertical Processing Facility (M7-1469), SWMU 077. The Load Break Switches (LBS) were installed in 1986 and are suspected to have formerly contained dielectric fluid that contained polychlorinated biphenyls (PCBs). The LBS were replaced in 1993 with new LBSs that do not contain PCBs. The LBS are located on a concrete pad surrounded by grass that is mowed and maintained. A total of 330 soil samples were collected between June 2020 and December 2022 from 88 locations at depths ranging from 0-0.5 to 19-20 ft bls. In general, soil samples collected from depths less than 5 ft were collected via hand auger and samples collected beyond 5 ft bls were collected using a direct-push technology drill rig. Soil samples collected from greater than 5 ft bls to 20 ft bls were collected to confirm PCBs were not present at depth in the aquifer matrix. Delineation samples were collected using an approximately 20 ft horizontal spacing. PCB impacted soil has been completely delineated to the State of Florida residential soil cleanup target level (SCTL) at PRL 227a horizontally and vertically. PCB concentrations have been identified above the residential and industrial SCTL as well as concentrations greater than or equal to 50 ppm requiring coordination with EPA and disposal at a facility authorized under TSCA. Based upon the CSRA sampling, an interim measure is recommended to remove PCB impacted soil above the residential SCTL. The total volume of PCB impacted soil to be removed is 591.6 cubic yards. This includes approximately 9.3 cubic yards of soil with PCB concentrations greater than or equal to 50 ppm. An interim measure work plan is included as an attachment to this report.

electrical equipment↗

NASA’s Space Launch System Stands Ready on Doorstep of Maiden Voyage Launch and Progress Made to Future Missions

NASA and its partners made significant progress towards the Artemis I launch in 2022. The integrated Space Launch System (SLS)vehicleand Orion spacecraft were first rolled out of the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center (KSC) in March. SLS is a super heavy-lift vehicle to send large, strategic payloads to the Moon, Mars, and beyond. It isthebackbone of the Artemis human lunar exploration program. Rollout transported the vehicle to Launch Pad 39B for a series of tests, including the wet dress rehearsal (WDR). Multiple attempts were required to complete WDR, each building on the one before. Following the WDR campaign, NASA teams refined hardware and launch procedures, and the vehicle was prepared for its first launch attempt scheduled for August 29. Challenges with the weather and hardware resulted in a scrub on the 29th, and the second attempt was set for Sept. 3. A hydrogen leak on the tail service mast umbilical forced a scrub. NASA teams completed repairs and testing on the vehicle on Launch Pad 39B to preserve a launch attempt at the end of September. Managers chose to return the vehicle to the VAB to protect it fromthe threat of Hurricane Ian. Within the VAB, NASA further inspected and prepared SLS for selected November windows. In addition to progress to the Artemis I mission, significant progress was made on the Artemis II and Artemis III rockets. Progress was also made towards on the Block 1B and Block 2 variants, beginning on the fourth and ninth flight, respectively. Both variants will provide significant improvements in both launch mass and mission flexibility to multiple destinations. This paper will discuss Artemis I vehicle integration, testing, and available results from the launch campaign to date.

Bruce Askins↗