Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Software assurance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,027 records · Page 57

WE-AB-201-03: TPS Commissioning and QA: Incorporating the Entire Planning Process

Treatment planning systems (TPS) are a cornerstone of modern radiation therapy. Errors in their commissioning or use can have a devastating impact on many patients. To support safe and high quality care, medical physicists must conduct efficient and proper commissioning, good clinical integration, and ongoing quality assurance (QA) of the TPS. AAPM Task Group 53 and related publications have served as seminal benchmarks for TPS commissioning and QA over the past two decades. Over the same time, continuing innovations have made the TPS even more complex and more central to the clinical process. Medical goals are now expressed in terms of the dose and margins around organs and tissues that are delineated from multiple imaging modalities (CT, MR and PET); and even temporally resolved (i.e., 4D) imaging. This information is passed on to optimization algorithms to establish accelerator movements that are programmed directly for IMRT, VMAT and stereotactic treatments. These advances have made commissioning and QA of the TPS much more challenging. This education session reviews up-to-date experience and guidance on this subject; including the recently published AAPM Medical Physics Practice Guideline (MPPG) #5 “Commissioning and QA of Treatment Planning Dose Calculations: Megavoltage Photon and Electron Beams”. Treatment Planning System Commissioning and QA: Challenges and Opportunities (Greg Salomons) This session will provide some key background and review publications describing prominent incidents relating to TPS commissioning and QA. Traditional approaches have been hardware and feature oriented. They aim to establish a functional configuration and establish specifications for regular testing of features (like dose calculation) to assure stable operation and detect failures. With the advent of more complex systems, more patient-specific testing has also been adopted. A number of actual TPS defects will be presented along with heuristics for identifying similar defects in the future. Finally, the Gamma test has become a popular metric for reporting TPS Commissioning and QA results. It simplifies complex testing into a numerical index, but noisy data and casual application can make it misleading. A brief review of the issues around the use of the Gamma test will be presented. TPS commissioning and QA: A process orientation and application of control charts (Michael Sharpe) A framework for commissioning a treatment planning system will be presented, focusing on preparations, practical aspects of configuration, priorities, specifications, and establishing performance. The complexity of the modern TPS make modular testing of features inadequate, and modern QA tools can provide “too much information” about the performance of techniques like IMRT and VMAT. We have adopted a process orientation and quality tools, like control charts, for ongoing TPS QA and assessment of patient-specific tests. The trending nature of these tools reveals the overall performance of the TPS system, and quantifies the variations that arise from individual plans, discrete calculations, and experimentation based on discrete measurements. Examples demonstrating application of these tools to TPS QA will be presented. TPS commissioning and QA: Incorporating the entire planning process (Sasa Mutic) The TPS and its features do not perform in isolation. Instead, the features and modules are key components in a complex process that begins with CT Simulation and extends to treatment delivery, along with image guidance and verification. Most importantly, the TPS is used by people working in a multi-disciplinary environment. It is very difficult to predict the outcomes of human interactions with software. Therefore, an interdisciplinary approach to training, commissioning and QA will be presented, along with an approach to the physics chart check and end-to-end testing as a tool for TPS QA. The role of standardization and automation in QA will also be discussed. The recommendations of MPPG #5 and practical implementation strategies (Jennifer Smilowitz) The recently published recommendations from Task Group No. 244, Medical Physics Practice Guideline on Commissioning and QA of Treatment Planning Dose Calculations: Megavoltage Photon and Electron Beams will be presented. The recommendations focus on the validation of commissioning data and dose calculations. Tolerance values for non-IMRT beam configurations are summarized based on established criteria and data collected by the IROC. More stringent evaluation criteria for IMRT dose calculations are suggested to test the limitations of the TPS dose algorithms for advanced delivery conditions. The MPPG encourages users to create a suite of validation tests for dose calculation for various conditions for static photon beams, heterogeneities, IMRT/VMAT and electron beams. This test suite is intended to be used for subsequent testing, including TPS software upgrades. In the past, the recommendations of some reports have not been widely implemented due to practical limitations. Implementation strategies, tools and processes developed by multiple centers for efficient and “do-able” MPPG #5 testing will be presented, as well as a discussion on the overall validation experience. Learning Objectives: Identify some of the key documents relevant for TPS commissioning and QA Understand strategies for testing TPS software Gain a practical knowledge of the Gamma test criteria Increase familiarity with the process of commissioning a TPS Learn about the use of Control Charts for TPS QA Review the role of the TPS in the overall planning process Increase awareness of the link between TPS QA and chart checking Gain an increased appreciation for the importance of interdisciplinary communication Understand the new recommendations from MPPG #5 on TPS Dose Algorithm Commissioning and QC/QA Learn practical implementation processes and tools for MPPG #5 validation recommendations.

60 APPLIED LIFE SCIENCES↗

WE-AB-201-04: The Recommendations of MPPG #5 and Practical Implementation Strategies

Treatment planning systems (TPS) are a cornerstone of modern radiation therapy. Errors in their commissioning or use can have a devastating impact on many patients. To support safe and high quality care, medical physicists must conduct efficient and proper commissioning, good clinical integration, and ongoing quality assurance (QA) of the TPS. AAPM Task Group 53 and related publications have served as seminal benchmarks for TPS commissioning and QA over the past two decades. Over the same time, continuing innovations have made the TPS even more complex and more central to the clinical process. Medical goals are now expressed in terms of the dose and margins around organs and tissues that are delineated from multiple imaging modalities (CT, MR and PET); and even temporally resolved (i.e., 4D) imaging. This information is passed on to optimization algorithms to establish accelerator movements that are programmed directly for IMRT, VMAT and stereotactic treatments. These advances have made commissioning and QA of the TPS much more challenging. This education session reviews up-to-date experience and guidance on this subject; including the recently published AAPM Medical Physics Practice Guideline (MPPG) #5 “Commissioning and QA of Treatment Planning Dose Calculations: Megavoltage Photon and Electron Beams”. Treatment Planning System Commissioning and QA: Challenges and Opportunities (Greg Salomons) This session will provide some key background and review publications describing prominent incidents relating to TPS commissioning and QA. Traditional approaches have been hardware and feature oriented. They aim to establish a functional configuration and establish specifications for regular testing of features (like dose calculation) to assure stable operation and detect failures. With the advent of more complex systems, more patient-specific testing has also been adopted. A number of actual TPS defects will be presented along with heuristics for identifying similar defects in the future. Finally, the Gamma test has become a popular metric for reporting TPS Commissioning and QA results. It simplifies complex testing into a numerical index, but noisy data and casual application can make it misleading. A brief review of the issues around the use of the Gamma test will be presented. TPS commissioning and QA: A process orientation and application of control charts (Michael Sharpe) A framework for commissioning a treatment planning system will be presented, focusing on preparations, practical aspects of configuration, priorities, specifications, and establishing performance. The complexity of the modern TPS make modular testing of features inadequate, and modern QA tools can provide “too much information” about the performance of techniques like IMRT and VMAT. We have adopted a process orientation and quality tools, like control charts, for ongoing TPS QA and assessment of patient-specific tests. The trending nature of these tools reveals the overall performance of the TPS system, and quantifies the variations that arise from individual plans, discrete calculations, and experimentation based on discrete measurements. Examples demonstrating application of these tools to TPS QA will be presented. TPS commissioning and QA: Incorporating the entire planning process (Sasa Mutic) The TPS and its features do not perform in isolation. Instead, the features and modules are key components in a complex process that begins with CT Simulation and extends to treatment delivery, along with image guidance and verification. Most importantly, the TPS is used by people working in a multi-disciplinary environment. It is very difficult to predict the outcomes of human interactions with software. Therefore, an interdisciplinary approach to training, commissioning and QA will be presented, along with an approach to the physics chart check and end-to-end testing as a tool for TPS QA. The role of standardization and automation in QA will also be discussed. The recommendations of MPPG #5 and practical implementation strategies (Jennifer Smilowitz) The recently published recommendations from Task Group No. 244, Medical Physics Practice Guideline on Commissioning and QA of Treatment Planning Dose Calculations: Megavoltage Photon and Electron Beams will be presented. The recommendations focus on the validation of commissioning data and dose calculations. Tolerance values for non-IMRT beam configurations are summarized based on established criteria and data collected by the IROC. More stringent evaluation criteria for IMRT dose calculations are suggested to test the limitations of the TPS dose algorithms for advanced delivery conditions. The MPPG encourages users to create a suite of validation tests for dose calculation for various conditions for static photon beams, heterogeneities, IMRT/VMAT and electron beams. This test suite is intended to be used for subsequent testing, including TPS software upgrades. In the past, the recommendations of some reports have not been widely implemented due to practical limitations. Implementation strategies, tools and processes developed by multiple centers for efficient and “do-able” MPPG #5 testing will be presented, as well as a discussion on the overall validation experience. Learning Objectives: Identify some of the key documents relevant for TPS commissioning and QA Understand strategies for testing TPS software Gain a practical knowledge of the Gamma test criteria Increase familiarity with the process of commissioning a TPS Learn about the use of Control Charts for TPS QA Review the role of the TPS in the overall planning process Increase awareness of the link between TPS QA and chart checking Gain an increased appreciation for the importance of interdisciplinary communication Understand the new recommendations from MPPG #5 on TPS Dose Algorithm Commissioning and QC/QA Learn practical implementation processes and tools for MPPG #5 validation recommendations.

60 APPLIED LIFE SCIENCES↗

Convective Weather Avoidance with Uncertain Weather Forecasts

Convective weather events have a disruptive impact on air traffic both in terminal area and in en-route airspaces. In order to make sure that the national air transportation system is safe and efficient, it is essential to respond to convective weather events effectively. Traffic flow control initiatives in response to convective weather include ground delay, airborne delay, miles-in-trail restrictions as well as tactical and strategic rerouting. The rerouting initiatives can potentially increase traffic density and complexity in regions neighboring the convective weather activity. There is a need to perform rerouting in an intelligent and efficient way such that the disruptive effects of rerouting are minimized. An important area of research is to study the interaction of in-flight rerouting with traffic congestion or complexity and developing methods that quantitatively measure this interaction. Furthermore, it is necessary to find rerouting solutions that account for uncertainties in weather forecasts. These are important steps toward managing complexity during rerouting operations, and the paper is motivated by these research questions. An automated system is developed for rerouting air traffic in order to avoid convective weather regions during the 20- minute - 2-hour time horizon. Such a system is envisioned to work in concert with separation assurance (0 - 20-minute time horizon), and longer term air traffic management (2-hours and beyond) to provide a more comprehensive solution to complexity and safety management. In this study, weather is dynamic and uncertain; it is represented as regions of airspace that pilots are likely to avoid. Algorithms are implemented in an air traffic simulation environment to support the research study. The algorithms used are deterministic but periodically revise reroutes to account for weather forecast updates. In contrast to previous studies, in this study convective weather is represented as regions of airspace that pilots are likely to avoid. The automated system periodically updates forecasts and reassesses rerouting decisions in order to account for changing weather predictions. The main objectives are to reroute flights to avoid convective weather regions and determine the resulting complexity due to rerouting. The eventual goal is to control and reduce complexity while rerouting flights during the 20 minute - 2 hour planning period. A three-hour simulation is conducted using 4800 flights in the national airspace. The study compares several metrics against a baseline scenario using the same traffic and weather but with rerouting disabled. The results show that rerouting can have a negative impact on congestion in some sectors, as expected. The rerouting system provides accurate measurements of the resulting complexity in the congested sectors. Furthermore, although rerouting is performed only in the 20-minute - 2-hour range, it results in a 30% reduction in encounters with nowcast weather polygons (100% being the ideal for perfectly predictable and accurate weather). In the simulations, rerouting was performed for the 20-minute - 2-hour flight time horizon, and for the en-route segment of air traffic. The implementation uses CWAM, a set of polygons that represent probabilities of pilot deviation around weather. The algorithms were implemented in a software-based air traffic simulation system. Initial results of the system's performance and effectiveness were encouraging. Simulation results showed that when flights were rerouted in the 20-minute - 2-hour flight time horizon of air traffic, there were fewer weather encounters in the first 20 minutes than for flights that were not rerouted. Some preliminary results were also obtained that showed that rerouting will also increase complexity. More simulations will be conducted in order to report conclusive results on the effects of rerouting on complexity. Thus, the use of the 20-minute - 2-hour flight time horizon weather avoidance teniques performed in the simulation is expected to provide benefits for short-term weather avoidance.

Karahan, Sinan↗

"Soiling, Cleaning, and Abrasion: The Results of the Five-Year Photovoltaic Glass Coating Field Study" [Slides]

External contamination ("soiling") of the incident surface is a major limiting factor for solar technologies. A 5-year field glass coupon study was conducted to better understand external contamination and its effects; compare cleaning methods and the use of preventative coatings; and explore the abrasion resulting from cleaning to advise on accelerated abrasion testing. Test sites included the cities of Dubai (UAE), Kuwait City (Kuwait), Mesa (AZ), Mumbai (India), and Sacramento (CA). Through the 5-year cumulative study, dry brush, water spray, and wet sponge and squeegee cleaning methods were compared to no cleaning. Optical microscopy was used to obtain images, including representative color images, grayscale images for object analysis, and oblique images for coating integrity assessment. A thresholding protocol was developed to analyze and distinguish specimens using the ImageJ software. Optical performance was quantified using a spectrophotometer, including comprehensive optical characterization (transmittance, reflectance, and absorptance in addition to forward- and back-scattering). Atomic force microscopy was used to verify the abrasion damage morphology, including the width and depth of surface scratches. Analysis of the results included correlation of optical performance and particle area coverage, rank order (by coating or location), and the acceleration factor for abrasion damage. The efficacy of external cleaning was more readily distinguished from the effectiveness of antisoiling coatings. The acceleration factor for dry brush cleaning of a porous silica coating was found to be on the order of unity.

14 SOLAR ENERGY↗

Science Planning for Multi-Spacecraft Coordinated Observations

Fulfilling the promise of an era of great observatories, NASA now has more than three space-based astronomical telescopes operating in different wavebands. This situation provides astronomers with a unique opportunity to simultaneously observe with multiple observatories. Yet scheduling multiple observatories simultaneously is highly inefficient when compared to single observatory observations. Thus, programs using multiple observatories are limited not due to scientific restrictions, but due to operational inefficiencies. Each year, a number of proposals are accepted by a space-based observatory for conduction of astronomical observations and gathering of science data for the study of galactic events. Since each space-based observatory uses a set of instruments designed to operate in specific energy regions, most such studies are conducted by submitting observation proposals to multiple observatories, with requests to coordinate among themselves. To assure that the proposed observations can be scheduled, each observatory's staff has to check that the observations are valid and meet all the constraints for their own observatory; in addition, they have to verify that the observations satisfy the constraints of the other observatories. Thus, coordinated observations require painstaking manual collaboration among the observatory staff at each observatory. In order to exploit new paradigms for observatory operation, the Goddard Space Flight Center's Advanced Architectures and Automation Branch has developed a prototype tool called the Visual Observation Layout Tool (VOLT). The main objective of VOLT is to provide a visual tool to automate the science planning of coordinated observations for multiple spacecraft, as well as to increase the scheduling probability of observations. However, VOLT is also useful for single observatory planning to optimize observatory control. Three space-based missions are interested in using VOLT (the Hubble Space Telescope, the Chandra X-Ray Observatory, and the Far Ultraviolet Spectroscopic Explorer). The VOLT team members have collaborated with these missions to gather requirements and obtain feedback on their mission planning processes. VOLT has been developed as a cross-platform Java client application for use by scientists and observatory science planning staff to visualize scheduling options and constraints. It also supports a lightweight graphical user interface for remote viewing via a Web front end. Additionally, it uniquely supports the ability to interact with multiple, diverse scheduling packages in order to determine windows of opportunity for observations and visually portray the constraints of each observation request. VOLT enables science data capture scenarios which are currently either impossible, or which require extensive time and manpower to coordinate amongst multiple observatories. it supports early detection of planning conflicts by generating coordinated solutions based on observatory schedulability and constraints. The project development approach has included frequent prototype demonstrations to our interested missions to obtain feedback after each release of the software. We will present an overview of our lessons learned in infusing the VOLT tool into the operations of the missions we have collaborated with and a brief demonstration of the software.

Maks, Lori↗

Personnel Certifications for the Design, Installation and Maintenance of Photovoltaic Systems. Final Technical Report

The North American Board of Certified Energy Practitioners (NABCEP) is the most respected, well-established, and widely recognized national certification organization for professionals in the field of renewable energy. NABCEP’s certifications were created to facilitate consumer protection, improve quality assurance, and help employers judge the skills of existing or potential employees. The certifications also allow individuals to differentiate themselves from others in their field and advance their careers while fostering increased recognition of the profession. Since NABCEP’s founding in 2002, all of its certification exams have been administered in paper-and-pencil format twice per year at 30 exam sites around the United States. The biannual test administration and relatively low number of exam sites make it challenging for many qualified renewable energy professionals to take NABCEP’s certification exams. The rigorous nature of the exam, which leads to many candidates failing the exam on their first and sometimes second attempts, combined with the low number of annual test administrations means that anyone who fails will need to wait another six months for the chance to retake the exam. These factors limited the potential growth of NABCEP’s certification programs and the resultant quality assurance within the renewable energy industry. Thanks to a generous grant by the Department of Energy’s Solar Training and Education for Professional (STEP) program, NABCEP recently began updating its Photovoltaic (PV) Installation Professional Exam and developing three new specialty certifications in PV design, PV installation, and PV commissioning & maintenance. One of the primary objectives of this STEP-funded project was to develop the exams using a computer-based testing (CBT) model to increase the number of exam administrations and available exam sites for NABCEP’s certification exams. To successfully complete this project, NABCEP partnered with Castle Worldwide, Inc. With more than 25 years of experience in test development, test administration, analysis of examinations, and has a staff of 70 experienced personnel, NABCEP was confident that Castle’s team was more than qualified to help NABCEP make the transition to CBT examinations. NABCEP and Castle Worldwide jointly developed a project management plan that included key deliverables, scope management, a work breakdown structure, roles and responsibilities, and a project schedule with milestones. The project schedule was carefully monitored to ensure that activities along the critical path were not delayed and, when deemed necessary, the project was crashed to add resources so that activities could occur in parallel. NABCEP and Castle Worldwide staff met weekly to discuss any potential schedule variances and activities which might delay the closing of the project. NABCEP also recruited 46 subject matter experts (SMEs) to work with Castle’s staff on this project. NABCEP staff, SME’s, and Castle staff worked together to develop the Job Task Analyses that form the basis for the certification exams, create new examination forms, conduct passing score studies, and complete a psychometrical analysis of potential exam items. NABCEP’s SMEs utilized Castle’s item development platform during face-to-face meetings, webinars, and remote item authoring to write, review, and approve exam items. Castle also used their software to psychometrically analyze existing exam items to confirm the reliability and validity of the NABCEP’s certification exams. On January 3rd, 2018, NABCEP’s began offering its PV Installation Professional certification exam via CBT. The exam was available at Castle’s nearly 600 exam sites in the United States. A large number of sites will help to ensure better access for solar professionals in rural and remote areas, which drives down the implicit costs of taking the certification exams. Thanks to the STEP grant and the robust partnership between NABCEP and Castle Worldwide, Inc., personnel certifications will be much more accessible and affordable for renewable energy professionals.

14 SOLAR ENERGY↗

Comparison of 3-dimensional dose reconstruction system between fluence-based system and dose measurement-guided system

COMPASS system (IBA Dosimetry, Schwarzenbruck, Germany) and ArcCHECK with 3DVH software (Sun Nuclear Corp., Melbourne, FL) are commercial quasi-3-dimensional (3D) dosimetry arrays. Cross-validation to compare them under the same conditions, such as a treatment plan, allows for clear evaluation of such measurement devices. In this study, we evaluated the accuracy of reconstructed dose distributions from the COMPASS system and ArcCHECK with 3DVH software using Monte Carlo simulation (MC) for multi-leaf collimator (MLC) test patterns and clinical VMAT plans. In a phantom study, ArcCHECK 3DVH showed clear differences from COMPASS, measurement and MC due to the detector resolution and the dose reconstruction method. Especially, ArcCHECK 3DVH showed 7% difference from MC for the heterogeneous phantom. ArcCHECK 3DVH only corrects the 3D dose distribution of treatment planning system (TPS) using ArcCHECK measurement, and therefore the accuracy of ArcCHECK 3DVH depends on TPS. In contrast, COMPASS showed good agreement with MC for all cases. However, the COMPASS system requires many complicated installation procedures such as beam modeling, and appropriate commissioning is needed. In terms of clinical cases, there were no large differences for each QA device. The accuracy of the compass and ArcCHECK 3DVH systems for phantoms and clinical cases was compared. Both systems have advantages and disadvantages for clinical use, and consideration of the operating environment is important. The QA system selection is depending on the purpose and workflow in each hospital.

61 RADIATION PROTECTION AND DOSIMETRY↗

A Virtual Laboratory for Aviation and Airspace Prognostics Research

Integration of Unmanned Aerial Vehicles (UAVs), autonomy, spacecraft, and other aviation technologies, in the airspace is becoming more and more complicated, and will continue to do so in the future. Inclusion of new technology and complexity into the airspace increases the importance and difficulty of safety assurance. Additionally, testing new technologies on complex aviation systems and systems of systems can be challenging, expensive, and at times unsafe when implementing real life scenarios. The application of prognostics to aviation and airspace management may produce new tools and insight into these problems. Prognostic methodology provides an estimate of the health and risks of a component, vehicle, or airspace and knowledge of how that will change over time. That measure is especially useful in safety determination, mission planning, and maintenance scheduling. In our research, we develop a live, distributed, hardware- in-the-loop Prognostics Virtual Laboratory testbed for aviation and airspace prognostics. The developed testbed will be used to validate prediction algorithms for the real-time safety monitoring of the National Airspace System (NAS) and the prediction of unsafe events. In our earlier work1 we discussed the initial Prognostics Virtual Laboratory testbed development work and related results for milestones 1 & 2. This paper describes the design, development, and testing of the integrated tested which are part of milestone 3, along with our next steps for validation of this work. Through a framework consisting of software/hardware modules and associated interface clients, the distributed testbed enables safe, accurate, and inexpensive experimentation and research into airspace and vehicle prognosis that would not have been possible otherwise. The testbed modules can be used cohesively to construct complex and relevant airspace scenarios for research. Four modules are key to this research: the virtual aircraft module which uses the X-Plane simulator and X-PlaneConnect toolbox, the live aircraft module which connects fielded aircraft using onboard cellular communications devices, the hardware in the loop (HITL) module which connects laboratory based bench-top hardware testbeds and the research module which contains diagnostics and prognostics tools for analysis of live air traffic situations and vehicle health conditions. The testbed also features other modules for data recording and playback, information visualization, and air traffic generation. Software reliability, safety, and latency are some of the critical design considerations in development of the testbed.

LVC-DE↗

The Wallops Flight Facility Rapid Response Range Operations Initiative

While the dominant focus on short response missions has appropriately centered on the launch vehicle and spacecraft, often overlooked or afterthought phases of these missions have been launch site operations and the activities of launch range organizations. Throughout the history of organized spaceflight, launch ranges have been the bane of flight programs as the source of expense, schedule delays, and seemingly endless requirements. Launch Ranges provide three basic functions: (1) provide an appropriate geographical location to meet orbital other mission trajectory requirements, (2) provide project services such as processing facilities, launch complexes, tracking and data services, and expendable products, and (3) assure safety and property protection to participating personnel and third-parties. The challenge with which launch site authorities continuously struggle, is the inherent conflict arising from projects whose singular concern is execution of their mission, and the range s need to support numerous simultaneous customers. So, while tasks carried out by a launch range committed to a single mission pale in comparison to efforts of a launch vehicle or spacecraft provider and could normally be carried out in a matter of weeks, major launch sites have dozens of active projects separate sponsoring organizations. Accommodating the numerous tasks associated with each mission, when hardware failures, weather, maintenance requirements, and other factors constantly conspire against the range resource schedulers, make the launch range as significant an impediment to responsive missions as launch vehicles and their cargo. The obvious solution to the launch site challenge was implemented years ago when the Department of Defense simply established dedicated infrastructure and personnel to dedicated missions, namely an Inter Continental Ballistic Missile. This however proves to be prohibitively expensive for all but the most urgent of applications. So the challenge becomes how can a launch site provide acceptably responsive mission services to a particular customer without dedicating extensive resources and while continuing to serve other projects? NASA's Wallops Flight Facility (WFF) is pursuing solutions to exactly this challenge. NASA, in partnership with the Virginia Commercial Space Flight Authority, has initiated the Rapid Response Range Operations Initiative (R3Ops). R3Ops is a multi-phased effort to incrementally establish and demonstrate increasingly responsive launch operations, with an ultimate goal of providing ELV-class services in a maximum of 7-10 days from initial notification routinely, and shorter schedules possible with committed resources. This target will be pursued within the reality of simultaneous concurrent programs, and ideally, largely independent of specialized flight system configurations. WFF has recently completed Phase 1 of R3Ops, an in-depth collection (through extensive expert interviews) and software modeling of individual steps by various range disciplines. This modeling is now being used to identify existing inefficiencies in current procedures, to identify bottlenecks, and show interdependencies. Existing practices are being tracked to provide a baseline to benchmark against as new procedures are implemented. This paper will describe in detail the philosophies behind WFF's R3Ops, the data collected and modeled in Phase 1, and strategies for meeting responsive launch requirements in a multi-user range environment planned for subsequent phases of this initiative.

Underwood, Bruce E.↗

Patterns of Radiation Therapy Practice for Patients Treated for Intact Cervical Cancer in 2005 to 2007: A Quality Research in Radiation Oncology Study

Purpose: To assess practice patterns and compliance with clinical performance measures for radiation therapy (RT) for patients with intact carcinoma of the cervix. Methods and Materials: Trained research associates reviewed the records of 261 randomly selected patients who received RT for cervix carcinoma between 2005 and 2007 from 45 facilities randomly selected after stratification by practice type. National estimates of patient and treatment characteristics were calculated from survey data using SUDAAN statistical software. Results: From the survey data, we estimated that only 8% of US facilities treated on average more than 3 eligible patients per year. No small or medium nonacademic facilities in the survey treated more than 3 eligible patients per year. Approximately 65.5% of patients began treatment in a facility that treated 3 or fewer eligible patients per year. Although 87.5% of patients had brachytherapy as part of their treatment, the proportion treated with external beam RT only was about double that estimated from the 1996 to 1999 survey. The use of high-dose-rate brachytherapy sharply increased, particularly in small nonacademic facilities. Overall, patients treated in nonacademic facilities were more likely to have incomplete or protracted treatment; 43% of patients treated in small nonacademic facilities did not have treatment completed within 10 weeks. Also, patients treated in facilities that treated 3 or fewer eligible patients per year were significantly less likely to receive concurrent chemotherapy than were patients treated in other facilities. Conclusion: Survey results indicate a disturbingly high rate of noncompliance with established criteria for high-quality care of patients with cervical cancer. Noncompliance rates are particularly high in nonacademic facilities, especially those that treat relatively few patients with intact cervical cancer.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Synthesis of Correct Digital Controller Models from Specifications by Model Transformation (21-0320)

The design of high consequence controllers (in weapons systems, autonomy, etc.) that do what they are supposed to do is a significant challenge. Testing simply does not come close to meeting the requirements for assurance. Today circuit designers at Sandia (and elsewhere) typically capture the core behavior of their components using state models in tools such as STATEFLOW. They then check that their models meet certain requirements (e.g. “The system bus must not deadlock” or “both traffic lights at an intersection must not be green at the same time”) using tools called model checkers. If the model checker returns “yes” then the property is guaranteed to be satisfied by the model. However, there are several drawbacks to this industry practice: (1) there is a lot of detail to get right, this is particularly challenging when there are multiple components requiring complex coordination (2) any errors returned by the model checker have to be traced back through the design and fixed, necessitating rework, (3) there are severe scalability problems with this approach, particularly when dealing with concurrency. All this places high demands on the designers who now face not only an accelerated schedule but also controllers of increasing complexity. This report describes a new and fundamentally different approach to the construction of safety-critical digital controllers. Instead of directly constructing a complete model and then trying to verify it, the designer can start with an initial abstract (think “sketch”) model plus the requirements, from which a correct concrete model is automatically synthesized. There is no need for post-hoc verification of required functional properties. Having tool to carry this out will significantly impact the nation’s ability to ensure the safety of high-consequence digital systems. The approach has been implemented in a prototype tool, along with a suite of examples, including ones that reflect actual problems faced by designers. Our approach operates on a variant of Statecharts developed at Sandia called Qspecs. Statecharts are a widely used formalism for developing concurrent reactive systems, supporting scalability through allowing state models containing composite states, which are the serial or parallel composition of substates which can themselves contain statecharts. Statecharts enable an incremental style of development, in which states are progressively refined to incorporate greater detail in an incremental model of software development. Our approach formulates a set of constraints from the structure of the models and the requirements and propagates these constraints to a fixpoint. The solution to the constraints is an inductive invariant along with guards on the transitions. We also show how our approach extends to implementation refinement, decomposition, composition, and elaboration. We currently handle safety requirements written in LTL (Linear Temporal Logic)

42 ENGINEERING↗

Summary of Technical Peer Review on the Risk Assessment Framework proposed in Report INL/RPT-22-68656 for Digital Instrumentation and Control Systems

This report summarizes the peer review activities initiated by Idaho National Laboratory (INL) during fiscal year (FY) 2023 for the evaluation and improvement of the methodology developed under the U.S. Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) Program, Risk Informed Systems Analysis (RISA) Pathway, digital instrumentation and control (DI&C) risk assessment project. In FY 2019, the RISA Pathway initiated a project to develop a risk assessment strategy for delivering a technical basis to support effective and secure DI&C technologies for digital upgrades/designs. A framework was proposed for this strategy, which aims to (1) provide a best-estimate, risk-informed capability to quantitatively and accurately estimate the risk impact of plant modernization, considering the introduction of high safety-significant safety-related (HSSSR) DI&C systems, (2) support and supplement existing risk-informed DI&C design guides by providing quantitative risk information and evidence, (3) offer a capability of design architecture evaluation of various DI&C systems, (4) assure the long-term safety and reliability of HSSSR DI&C systems, and (5) reduce uncertainty in costs and support integration of DI&C systems in the plant. The R&D efforts of this project from FY 2019 through FY 2022 were focused on methodology improvement and demonstration of the proposed framework for the risk assessment and design optimization of safety-critical DI&C systems. Collaborations with the nuclear industry have been initiated to support the reliability and risk assessment of their DI&C systems by using the proposed framework. In FY 2023, the framework has reached to a point for a technical peer review and obtain stakeholder feedback. This peer review activity includes coordination of the reviews performed by a group of industry stakeholders, documentation of the peer review suggestions, providing resolutions and responses to the peer review comments. The objective of this technical peer review is to obtain representative feedback on the proposed framework to improve the technical qualities of its methodology and readiness for deployment to the industry. Feedback may identify potential areas for improvement and further development. The Subject Matter experts were invited to review the latest project report documenting the methodology developed in the project and provide evaluations of the technical qualities of the proposed framework and relevant methods. The reviewed project report is “An Integrated Framework for Risk Assessment of High Safety-significant Safety-related Digital Instrumentation and Control Systems in Nuclear Power Plants: Methodology and Demonstration” INL/RPT-22-68656 (short as “INL/RPT-22-68656” in this report). This peer review report documents the technical questions provided for technical peer review and introduces the technical peer reviewers from the stakeholders including nuclear utilities, regulators, and universities. Comments from technical peer reviewers and the resolutions and responses to these comments are outlined. Insights and lessons learned from the technical peer review are summarized in conclusions and future work. The primary audience of this report are DI&C designers, engineers, and probabilistic risk assessment (PRA) practitioners. This includes stakeholders, such as the nuclear utilities and regulators who consider the deployment and upgrade of DI&C systems, DI&C software developers and reviewers, and cybersecurity specialists.

99 GENERAL AND MISCELLANEOUS↗

SU-E-CAMPUS-T-01: Automation of the Winston-Lutz Test for Stereotactic Radiosurgery

Purpose: To optimize clinical efficiency and shorten patient wait time by minimizing the time and effort required to perform the Winston-Lutz test before stereotactic radiosurgery (SRS) through automation of the delivery, analysis, and documentation of results. Methods: The radiation fields of the Winston-Lutz (WL) test were created in a “machine-QA patient” saved in ARIA for use before SRS cases. Images of the BRW target ball placed at mechanical isocenter are captured with the portal imager for each of four, 2cm×2cm, MLC-shaped beams. When the WL plan is delivered and closed, this event is detected by in-house software called EventNet which automates subsequent processes with the aid of the ARIA web services. Images are automatically retrieved from the ARIA database and analyzed to determine the offset of the target ball from radiation isocenter. The results are posted to a website and a composite summary image of the results is pushed back into ImageBrowser for review and authenticated documentation. Results: The total time to perform the test was reduced from 20-25 minutes to less than 4 minutes. The results were found to be more accurate and consistent than the previous method which used radiochromic film. The images were also analyzed with DoseLab for comparison. The difference between the film and automated WL results in the X and Y direction and the radius were (−0.17 +/− 0.28) mm, (0.21 +/− 0.20) mm and (−0.14 +/− 0.27) mm, respectively. The difference between the DoseLab and automated WL results were (−0.05 +/− 0.06) mm, (−0.01 +/− 0.02) mm and (0.01 +/− 0.07) mm, respectively. Conclusions: This process reduced patient wait times by 15–20 minutes making the treatment machine available to treat another patient. Accuracy and consistency of results were improved over the previous method and were comparable to other commercial solutions. Access to the ARIA web services is made possible through an Eclipse co-development agreement with Varian Medical Systems.

60 APPLIED LIFE SCIENCES↗

Real-time verification of multileaf collimator-driven radiotherapy using a novel optical attenuation-based fluence monitor

Purpose: Multileaf collimator (MLC)-driven conformal radiotherapy modalities [e.g., such as intensity-modulated radiotherapy (IMRT), intensity-modulated arc therapy, and stereotactic body radiotherapy] are more subject to delivery errors and dose calculation inaccuracies than standard modalities. Fluence monitoring during treatment delivery could reduce such errors by allowing an independent interface to quantify and assess measured difference between the delivered and planned treatment administration. We developed an optical attenuation-based detector to monitor fluence for the on-line quality control of radiotherapy delivery. The purpose of the current study was to develop the theoretical background of the invention and to evaluate the detector's performance both statistically and in clinical situations. Methods: We aligned 60 27-cm scintillating fibers coupled to a photodetector via clear optical fibers in the direction of motion of each of the 60 leaf pairs of a 120 leaves Millenium MLC on a Varian Clinac iX. We developed a theoretical model to predict the intensity of light collected on each side of the scintillating fibers when placed under radiation fields of varying sizes, intensities, and positions. The model showed that both the central position of the radiation field on the fiber (x{sub c}) and the integral fluence passing through the fiber ({Phi}{sub int}) could be assessed independently in a single measurement. We evaluated the performance of the prototype by (1) measuring the intrinsic variation of the measured values of x{sub c} and {Phi}{sub int}, (2) measuring the impact on the measured values of x{sub c} and {Phi}{sub int} of random leaf positioning errors introduced into IMRT fields, and (3) comparing the predicted values of x{sub c} and {Phi}{sub int} calculated with the treatment planning software to the measured values of x{sub c} and {Phi}{sub int} in order to assess the predictive effectiveness of the developed theoretical model. Results: We observed a very low intrinsic dispersion, dominated by Poisson statistics, for both x{sub c} (standard deviations of less than 1 mm) and {Phi}{sub int} (standard deviations of less than 0.20%). When confronted with random leaf positioning errors from IMRT segments, {Phi}{sub int} was highly sensitive to single leaf positioning errors as small as 1 mm at isocenter, while x{sub c} was sensitive to leaf pair translation errors of at least 2 mm at isocenter. Owing to the uncertainties in the doses calculated in regions of high perpendicular dose gradients, the measured values of x{sub c} and {Phi}{sub int} deviated from the predicted values of x{sub c} and {Phi}{sub int} by a mean of 1.3 mm and 2.6%, respectively. Conclusion: Our study showed that an optical attenuation-based detector can be used to effectively monitor integral fluence during radiotherapy delivery. The performance of such a system would enable real-time quality control of the incident fluence in current MLC-driven treatments such as IMRT and future adaptive radiotherapy procedures where new treatment plans will have to be delivered without passing thru the current standard quality control chain.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Formal Safety Certification of Aerospace Software

In principle, formal methods offer many advantages for aerospace software development: they can help to achieve ultra-high reliability, and they can be used to provide evidence of the reliability claims which can then be subjected to external scrutiny. However, despite years of research and many advances in the underlying formalisms of specification, semantics, and logic, formal methods are not much used in practice. In our opinion this is related to three major shortcomings. First, the application of formal methods is still expensive because they are labor- and knowledge-intensive. Second, they are difficult to scale up to complex systems because they are based on deep mathematical insights about the behavior of the systems (t.e., they rely on the "heroic proof"). Third, the proofs can be difficult to interpret, and typically stand in isolation from the original code. In this paper, we describe a tool for formally demonstrating safety-relevant aspects of aerospace software, which largely circumvents these problems. We focus on safely properties because it has been observed that safety violations such as out-of-bounds memory accesses or use of uninitialized variables constitute the majority of the errors found in the aerospace domain. In our approach, safety means that the program will not violate a set of rules that can range for the simple memory access rules to high-level flight rules. These different safety properties are formalized as different safety policies in Hoare logic, which are then used by a verification condition generator along with the code and logical annotations in order to derive formal safety conditions; these are then proven using an automated theorem prover. Our certification system is currently integrated into a model-based code generation toolset that generates the annotations together with the code. However, this automated formal certification technology is not exclusively constrained to our code generator and could, in principle, also be integrated with other code generators such as RealTime Workshop or even applied to legacy code. Our approach circumvents the historical problems with formal methods by increasing the degree of automation on all levels. The restriction to safety policies (as opposed to arbitrary functional behavior) results in simpler proof problems that can generally be solved by fully automatic theorem proves. An automated linking mechanism between the safety conditions and the code provides some of the traceability mandated by process standards such as DO-178B. An automated explanation mechanism uses semantic markup added by the verification condition generator to produce natural-language explanations of the safety conditions and thus supports their interpretation in relation to the code. It shows an automatically generated certification browser that lets users inspect the (generated) code along with the safety conditions (including textual explanations), and uses hyperlinks to automate tracing between the two levels. Here, the explanations reflect the logical structure of the safety obligation but the mechanism can in principle be customized using different sets of domain concepts. The interface also provides some limited control over the certification process itself. Our long-term goal is a seamless integration of certification, code generation, and manual coding that results in a "certified pipeline" in which specifications are automatically transformed into executable code, together with the supporting artifacts necessary for achieving and demonstrating the high level of assurance needed in the aerospace domain.

Denney, Ewen↗

Mobile Router Developed and Tested

The NASA Glenn Research Center, under a NASA Space Act Agreement with Cisco Systems, has been performing joint networking research to apply Internet-based technologies and protocols to space-based communications. As a result of this research, NASA performed stringent performance testing of the mobile router, including the interaction of routing and the transport-level protocol. In addition, Cisco Systems developed the mobile router for both commercial and Government markets. The code has become part of the Cisco Systems Internetworking Operating System (IOS) as of release 12.2 (4) T--which will make this capability available to the community at large. The mobile router is software code that resides in a network router and enables entire networks to roam while maintaining connectivity to the Internet. This router code is pertinent to a myriad of applications for both Government and commercial sectors, including the "wireless battlefield." NASA and the Department of Defense will utilize this technology for near-planetary observation and sensing spacecraft. It is also a key enabling technology for aviation-based information applications. Mobile routing will make it possible for information such as weather, air traffic control, voice, and video to be transmitted to aircraft using Internet-based protocols. This technology shows great promise in reducing congested airways and mitigating aviation disasters due to bad weather. The mobile router can also be incorporated into emergency vehicles (such as ambulances and life-flight aircraft) to provide real-time connectivity back to the hospital and health-care experts, enabling the timely application of emergency care. Commercial applications include entertainment services, Internet protocol (IP) telephone, and Internet connectivity for cruise ships, commercial shipping, tour buses, aircraft, and eventually cars. A mobile router, which is based on mobile IP, allows hosts (mobile nodes) to seamlessly "roam" among various IP subnetworks. This is essential in many wireless networks. A mobile router, unlike a mobile IP node, allows entire networks to roam. Hence, a device connected to the mobile router does not need to be a mobile node because the mobile router provides the roaming capabilities. There are three basic elements in the mobile IP: the home agent, the foreign agent, and the mobile node. The home agent is a router on a mobile node's home network that tunnels datagrams for delivery to the mobile node when it is away from home. The foreign agent is a router on a remote network that provides routing services to a registered mobile node. The mobile node is a host or router that changes its point of attachment from one network or subnetwork to another. In mobile routing, virtual communications are maintained by the home agent, which forwards all packets for the mobile networks to the foreign agent. The foreign agent passes the packets to the mobile router, which then forwards the packets to the devices on its networks. As the mobile router moves, it will register with its home agent on its whereabouts via the foreign agent to assure continuous connectivity.

Ivancic, William D.↗

Patient-specific QA and delivery verification of scanned ion beam at NIRS-HIMAC

Purpose: To evaluate a patient-specific QA program and system for constancy checking of a scanning delivery system developed at the National Institute of Radiological Sciences.Methods: For the patient-specific QA, all the planned beams are recalculated on a water phantom with treatment planning software (TPS). The recalculated dose distributions are compared with the measured distributions using a 2D ionization chamber array at several depths, and evaluated using gamma index analysis with criteria of 3% and 3 mm and a pass rate of 90%. For the constancy check, the authors developed the multiwire proportional chamber (MWPC), which can record the delivered 2D fluence images in a slice-by-slice manner. During irradiation for dosimetric QA with the 2D ionization chamber array and an accordion-type water phantom, the 2D fluence images are recorded using the MWPC in the delivery system. These recorded images are then compared to those taken in the treatment session to check the constancy check. This analysis also employs gamma index analysis using the same criteria as in the patient-specific QA. These patient-specific QA and constancy check evaluations were performed using the data of 122 patients.Results: In the patient-specific QA, the measured dose distributions agreed well with those calculated by the TPS, and the QA criteria were satisfied in all measurements. The additional check of the fluence comparison ensured the constancy of the delivered field during each treatment irradiation.Conclusions: The authors established a patient-specific QA program and additional check of delivery constancy in every treatment session. Fluence comparison is a strong tool for constancy checking of the delivery system.

61 RADIATION PROTECTION AND DOSIMETRY↗

FUSRAP Case Study - Benefits and Lessons Learned from Implementation of a Modern Data Solution at Maywood - 18399

This paper focuses on data production and management practices dating back to 1999 that continue to evolve to support the project today. In 2000, the FUSRAP Maywood Project began using a software environmental data management system and laboratory information management system, developed by a single database administrator (DA) and authored in Microsoft Access{sup TM} (MS Access). The original databases included basic functionality including sample number assignment and label generation, tracking of LIMS gamma spec QC and assignment of basic qualifiers and basic database queries. The DA continued over the next fifteen years to refine the EDMS/LIMS by integrating project-specific data evaluation guidance document processes and Quality Assurance/Quality Control (QA/QC) charting and excursion warning tools. With the retirement of the original DA, the U.S. Army Corps of Engineers (USACE)-Cabrera Team procured and implemented a commercial-leaning solution using modern database tools and an established EDMS vendor. For the database transition process, the project team established and configured the new EDMS/LIMS with basic architecture and accessibility; evaluated existing workflows; established/revised LIMS and EDMS-related documentation (manuals and procedures); and conducted dry runs and validation testing. The overall team coordinated closely to facilitate a seamless transition from initial assessment and authoring, to data migration, and finally to resumption of normal ongoing operations. Key features of the new EDMS Subcontractor's software included lookup tables, an import wizard, data checking options and unique indexes. Since the database systems became operational, the technical staff gathered useful feedback from end users (e.g., lab staff, field engineers, task managers, and the third-party data validator) to refine the EDMS/LIMS operation. This feedback triggered improvements in the performance of onsite laboratory qualification forms, promoted consistency in sample ID numbers between the database sample planning screens and field chain-of-custodies, corrected bugs in the LIMS Duplicate Evaluation Report, eliminated data import issues such as blank, inconsistent or missing data from key fields. One of the advantages of the commercial database solution was that it allowed the project to cut cost over time due to the lower cost of database maintenance provided by the commercial database vendor versus the cost of an on-staff DA. Cost savings are estimated at $40,000 per year. There were also indirect cost savings resulting from implementation of the new database since it allowed better integration of the LIMS and EDMS. While there will always be challenges associated with long term records/data management for any old remediation site, the Maywood Team's approach to an upgraded EDMS/LIMS implementation serves as one element of the overall effort to enhance the integrity and reproducibility of critical data that supports the remediation program while at the same time, more effectively using available resources. These lessons-learned will enhance implementation of cost-effective solutions for similar environmental remediation sites. (authors)

97 MATHEMATICS AND COMPUTING↗