Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Scheduling and planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,027 records · Page 57

Earned Value Management (EVM) System Description

The purpose of this Earned Value Management (EVM) System Description is to provide guidance in NASA’s Earned Value Management Capability for the effective application, implementation, and utilization of EVM on NASA programs, projects, major contracts and subcontracts. EVM is a project management process that effectively integrates a project’s scope of work with schedule and cost elements for optimum project planning and control. The goal is to achieve timely and accurate quantification of progress that will facilitate management by exception and enable early visibility into the nature and the magnitude of technical problems as well as the intended course and success of corrective actions. This system description contains detailed information on implementation of EVM processes, procedures, roles and responsibilities.

Schumann, Deborah C.↗

Earned Value Management (EVM) System Description

The purpose of this Earned Value Management (EVM) System Description is to provide guidance in NASA’s Earned Value Management Capability for the effective application, implementation, and utilization of EVM on NASA programs, projects, major contracts and subcontracts. EVM is a project management process that effectively integrates a project’s scope of work with schedule and cost elements for optimum project planning and control. The goal is to achieve timely and accurate quantification of progress that will facilitate management by exception and enable early visibility into the nature and the magnitude of technical problems as well as the intended course and success of corrective actions. This system description contains detailed information on implementation of EVM processes, procedures, roles and responsibilities.

Christopher Lewis Sadler↗

Low Temperature Brazing: A Candidate Method for Preventing Interplanetary Contamination During the Mars Sample Return Mission

NASA and the European Space Agency are planning a joint Mars Sample Return campaign, scheduled to launch in 2026, with a very specific objective: return to Earth the rock and regolith samples that have been collected on Mars by NASA’s Perseverance rover. This is a very complex, multi-step process intended to culminate in the safe return of Mars samples to Earth. The term “safe return” implies use of a robust containment vessel designed to prevent any uncontained or unsterilized material from Mars from being returned to Earth. Hence, any technology chosen for sealing this vessel has to meet stringent contamination requirements, but also to withstand impact forces upon landing. This paper describes the development of a primary candidate for the sealing approach: brazing.

Schein, Mike↗

Planning for the semiconductor manufacturer of the future

Texas Instruments (TI) is currently contracted by the Air Force Wright Laboratory and the Defense Advanced Research Projects Agency (DARPA) to develop the next generation flexible semiconductor wafer fabrication system called Microelectronics Manufacturing Science & Technology (MMST). Several revolutionary concepts are being pioneered on MMST, including the following: new single-wafer rapid thermal processes, in-situ sensors, cluster equipment, and advanced Computer Integrated Manufacturing (CIM) software. The objective of the project is to develop a manufacturing system capable of achieving an order of magnitude improvement in almost all aspects of wafer fabrication. TI was awarded the contract in Oct., 1988, and will complete development with a fabrication facility demonstration in April, 1993. An important part of MMST is development of the CIM environment responsible for coordinating all parts of the system. The CIM architecture being developed is based on a distributed object oriented framework made of several cooperating subsystems. The software subsystems include the following: process control for dynamic control of factory processes; modular processing system for controlling the processing equipment; generic equipment model which provides an interface between processing equipment and the rest of the factory; specification system which maintains factory documents and product specifications; simulator for modelling the factory for analysis purposes; scheduler for scheduling work on the factory floor; and the planner for planning and monitoring of orders within the factory. This paper first outlines the division of responsibility between the planner, scheduler, and simulator subsystems. It then describes the approach to incremental planning and the way in which uncertainty is modelled within the plan representation. Finally, current status and initial results are described.

Fargher, Hugh E.↗

Candidate functions for advanced technology implementation in the Columbus mission planning environment

The Columbus Project is the European Space Agency's contribution to the International Space Station program. Columbus is planned to consist of three elements (a laboratory module attached to the Space Station base, a man-tended freeflyer orbiting with the Space Station base, and a platform in polar orbit). System definition and requirements analysis for Columbus are underway, scheduled for completion in mid-1990. An overview of the Columbus mission planning environment and operations concept as currently defined is given, and some of the challenges presented to software maintainers and ground segment personnel during mission operators are identified. The use of advanced technologies in system implementation is being explored. Both advantages of such solutions and potential problems they present are discussed, and the next steps to be taken by Columbus before targeting any functions for advanced technology implementation are summarized. Several functions in the mission planning process were identified as candidates for advanced technology implementation. These range from expert interaction with Columbus' data bases through activity scheduling and near-real-time response to departures from the planned timeline. Each function is described, and its potential for advanced technology implementation briefly assessed.

Loomis, Audrey↗

Space Shuttle orbital flight test

This paper will review current plans for the overall Orbital Flight Test Program. Discussion will include vehicle configurations, flight test progression logic, schedules, payloads, and anticipated placards on early operational missions. STS-1 flight plan will be covered in some detail; also, the functional organization and procedures planned to conduct the test program will be reviewed.

Slayton, D. K.↗

Testing and Development of NEA Scout Solar Sail Deployer Mechanism

The Near Earth Asteroid (NEA) Scout is a deep space CubeSat designed to use an 86 square meter solar sail to navigate to a near earth asteroid called VG 1991. The solar sail deployment mechanism aboard NEA Scout has gone through numerous design cycles and ground tests since its conception in 2014. An engineering development unit (EDU) was constructed in the spring of 2016 and since then, the NEA Scout team has completed numerous ground deployments aiming to mature the deployment system and the ground test methods used to validate that system. Testing a large, non-rigid gossamer system in 1G environments has presented its difficulties to numerous solar sailing programs before, but NEA Scout’s size, sail configuration, and budget has led the team to develop new deployment techniques and uncover new practices while improving their test methods. NEA Scout’s spooled sail and boom design differs from any solar sail design to date: a single square sail membrane spooled upon a non-circular mandrel and the booms are spooled on two separate coils. This configuration was necessitated by the 6U footprint and is not common among other solar sailing missions. The program has planned and completed 3 separate full scale sail deployments to date, with a flight sail deployment test scheduled for FY18. The sail deployment tests have helped mature flight operations plans and developed preliminary off-nominal deployment mitigation strategies. The paper entitled “Design and Development of NEA Scout Solar Sail Deployer Mechanism” was presented at the 43rd Aerospace Mechanisms Symposium. Since then, the system has matured and completed ascent vent, random vibration, boom deployment and sail deployment tests. This paper will discuss the lessons learned and advancements made while working on solar sail testing and redesign cycles.

Few, Alex↗

Coordinated Radio, Electron, and Waves Experiment (CREWE) for the NASA Comet Rendezvous and Asteroid Flyby (CRAF) instrument

The Coordinated Radio, Electron, and Waves Experiment (CREWE) was designed to determine density, bulk velocity and temperature of the electrons for the NASA Comet Rendezvous and Asteroid Flyby Spacecraft, to define the MHD-SW IMF flow configuration; to clarify the role of impact ionization processes, to comment on the importance of anomalous ionization phenomena (via wave particle processes), to quantify the importance of wave turbulence in the cometary interaction, to establish the importance of photoionization via the presence of characteristic lines in a structured energy spectrum, to infer the presence and grain size of significant ambient dust column density, to search for the theoretically suggested 'impenetrable' contact surface, and to quantify the flow of heat (in the likelihood that no surface exists) that will penetrate very deep into the atmosphere supplying a good deal of heat via impact and charge exchange ionization. This final report provides an instrument description, instrument test plans, list of deliverables/schedule, flight and support equipment and software schedule, CREWE accommodation issues, resource requirements, status of major contracts, an explanation of the non-NASA funded efforts, status of EIP and IM plan, descope options, and Brinton questions.

Scudder, Jack D.↗

Intermediate Fidelity Solid State Recorder Modeling for NISAR

At 26Tb/day return average, NISAR (National Aero- nautics and Space Administration (NASA) and the In- dian Space Research Organization (ISRO) Synthetic Aperture Radar) will stress ground station facilities with a variable cadence of data generation observing nearly all of earth's land and ice to produce global time- series maps of cryospheric, solid-Earth and ecosystem phenomena. Between the instrument data generation source and downlink sink lies the primary science data bu er, the SSR (Solid State Recorder). The SSR has deferred, discrete le deletion events that occur only after a le is played back to all required ground segments (sometimes both NASA and ISRO). A forward dispatch, advancing frontier repropagation playback scheduler is proposed as a model of the SSR's greedy playback scheduling behavior. Schedules based on the existing low delity model and new intermediate delity model are compared to assess the impact of deferred, discrete deletion on planning. The low delity model is found to produce unfeasible schedules that exceed SSR capacity, causing 3.87% of all observations in a 12 day simulation to be removed by repair actions.

Doubleday, Joshua R.↗

NASA Institute for Advanced Concepts

The purpose of NASA Institute for Advanced Concepts (NIAC) is to provide an independent, open forum for the external analysis and definition of space and aeronautics advanced concepts to complement the advanced concepts activities conducted within the NASA Enterprises. The NIAC will issue Calls for Proposals during each year of operation and will select revolutionary advanced concepts for grant or contract awards through a peer review process. Final selection of awards will be with the concurrence of NASA's Chief Technologist. The operation of the NIAC is reviewed biannually by the NIAC Science, Exploration and Technology Council (NSETC) whose members are drawn from the senior levels of industry and universities. The process of defining the technical scope of the initial Call for Proposals was begun with the NIAC "Grand Challenges" workshop conducted on May 21-22, 1998 in Columbia, Maryland. These "Grand Challenges" resulting from this workshop became the essence of the technical scope for the first Phase I Call for Proposals which was released on June 19, 1998 with a due date of July 31, 1998. The first Phase I Call for Proposals attracted 119 proposals. After a thorough peer review, prioritization by NIAC and technical concurrence by NASA, sixteen subgrants were awarded. The second Phase I Call for Proposals was released on November 23, 1998 with a due date of January 31, 1999. Sixty-three (63) proposals were received in response to this Call. On December 2-3, 1998, the NSETC met to review the progress and future plans of the NIAC. The next NSETC meeting is scheduled for August 5-6, 1999. The first Phase II Call for Proposals was released to the current Phase I grantees on February 3,1999 with a due date of May 31, 1999. Plans for the second year of the contract include a continuation of the sequence of Phase I and Phase II Calls for Proposals and hosting the first NIAC Annual Meeting and USRA/NIAC Technical Symposium in NASA HQ.

Cassanova, Robert A.↗

Version 5 Release Status and Plans: AIRS Science Team

This viewgraph presentation reviews the development of version 5 of Atmospheric Infrared Sounder (AIRS) software. The overarching goal for version 5 is to enhance AIRS software to expand its utility for climate research and to improve the impact on weather forecasting.

focus group↗

Automated observation scheduling for the VLT

It is becoming increasingly evident that, in order to optimize the observing efficiency of large telescopes, some changes will be required in the way observations are planned and executed. Not all observing programs require the presence of the astronomer at the telescope: for those programs which permit service observing it is possible to better match planned observations to conditions at the telescope. This concept of flexible scheduling has been proposed for the VLT: based on current and predicted environmental and instrumental observations which make the most efficient possible use of valuable time. A similar kind of observation scheduling is already necessary for some space observatories, such as Hubble Space Telescope (HST). Space Telescope Science Institute is presently developing scheduling tools for HST, based on the use of artificial intelligence software development techniques. These tools could be readily adapted for ground-based telescope scheduling since they address many of the same issues. The concept are described on which the HST tools are based, their implementation, and what would be required to adapt them for use with the VLT and other ground-based observatories.

Johnston, Mark D.↗

An RF interference mitigation methodology with potential applications in scheduling

Software tools for interference analysis and mitigation were developed in the Communications Link Analysis and Simulation System (CLASS) environment for: communications performance evaluation; and mission planning. Potential applications are seen in analysis, evaluation, and optimization of user schedules. Tools producing required separation angles and potential interference intervals can be used as an aid to mutual interference mitigation within a scheduling system.

Wong, Yen F.↗

Integration and Testing Challenges of Small Satellite Missions: Experiences from the Space Technology 5 Project

The Space Technology 5(ST5) payload was successfully carried into orbit on an OSC Pegasus XL launch vehicle, which was carried aloft and dropped from the OSC Lockheed L-1011 from Vandenberg Air Force Base March 22,2006, at 9:03 am Eastern time, 6:03 am Pacific time. In order to reach the completion of the development and successful launch of ST 5, the systems integration and test(I&T) team determined that a different approach was required to meet the project requirements rather than the standard I&T approach used for single, room-sized satellites. The ST5 payload, part of NASA's New Millennium Program headquartered at JPL, consisted of three micro satellites (approximately 30 kg each) and the Pegasus Support Structure (PSS), the system that connected the spacecrafts to the launch vehicle and deployed the spacecrafts into orbit from the Pegasus XL launch vehicle. ST5 was a technology demonstration payload, intended to test six (6) new technologies for potential use for future space flights along with demonstrating the ability of small satellites to perform quality science. The main technology was a science grade magnetometer designed to take measurements of the earth's magnetic field. The three spacecraft were designed, integrated, and tested at NASA Goddard Space Flight Center with integration and environmental testing occurring in the Bldg. 7-1 0-15-29. The three spacecraft were integrated and tested by the same I&T team. The I&T Manager determined that there was insufficient time in the schedule to perform the three I&T spacecraft activities in series used standard approaches. The solution was for spacecraft #1 to undergo integration and test first, followed by spacecraft #2 and #3 simultaneously. This simultaneous integration was successful for several reasons. Each spacecraft had a Lead Test Conductor who planned and coordinated their spacecraft through its integration and test activities. One team of engineers and technicians executed the integration of all three spacecraft, learning and gaining knowledge and efficiency as spacecraft #1 integration and testing progressed. They became acutely familiar with the hardware, operation and processes for I&T, thus each team member had the experience and knowledge to safely execute I&T for spacecraft #2 and #3 together. The integration team was very versatile and each member could perform many different activities or work any spacecraft, when needed. Daily meetings between the three Lead TCs and technician team allowed the team to plan and implement activities efficiently. The three (3) spacecraft and PSS were successfully integrated and tested, shipped to the launch site, and ready for launch per the I&T schedule that was planned three years previously.

Sauerwein, Timothy A.↗

Lunar-Ultraviolet Telescope Experiment (LUTE) integrated program plan

A detailed Lunar Ultraviolet Telescope Experiment (LUTE) program plan representing major decisions and tasks leading to those decisions for program execution are presented. The purpose of this task was to develop an integrated plan of project activities for the LUTE project, and to display the plan as an integrated network that shows the project activities, all critical interfaces, and schedules. The integrated network will provide the project manager with a frame work for strategic planning and risk management throughout the life of the project.

Smith, Janice F.↗

MARVEL Technical Overview: Breakdown of cost and scope growth through 90% Final Design

This report presents a breakdown of cost and scope growth for the Microreactor Applications Research Validation and Evaluation (MARVEL) project through the design phase, and includes observations, lessons learned, and the results from an independent project assessment. It presents the status and history of the project. Technology maturity is considered in high-level, qualitative comparison to other microreactor design efforts. Its purpose is to record MARVEL’s evolution and lessons learned from the planning and design phases through completion of 90% final design. Analyses included a detailed review of project cost, schedule, and periodic project reports and management documents. The Primary Coolant Apparatus Test (PCAT) is specifically highlighted. It was concluded that MARVEL would have benefited from more extensive planning early in the project to better define cost and schedule to provide more certainty in the total project cost and delivery date. Modest cost and schedule improvements may have been possible, but compared qualitatively, MARVEL’s total cost and schedule performance are consistent with that of other efforts currently underway. Better planning would have provided more certainty, improved risk mitigations, and potentially eliminated delays due to funding shortfalls. A recommended path forward is presented that addresses recommendations in the independent project assessment.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

AND/OR graph representation of assembly plans

A compact representation of all possible assembly plans of a product using AND/OR graphs is presented as a basis for efficient planning algorithms that allow an intelligent robot to pick a course of action according to instantaneous conditions. The AND/OR graph is equivalent to a state transition graph but requires fewer nodes and simplifies the search for feasible plans. Three applications are discussed: (1) the preselection of the best assembly plan, (2) the recovery from execution errors, and (3) the opportunistic scheduling of tasks. An example of an assembly with four parts illustrates the use of the AND/OR graph representation in assembly-plan preselection, based on the weighting of operations according to complexity of manipulation and stability of subassemblies. A hypothetical error situation is discussed to show how a bottom-up search of the AND/OR graph leads to an efficient recovery.

Homem De Mello, Luiz S.↗