Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “STARTING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,027 records · Page 57

Optical timing receiver for the NASA laser ranging system. Part 2: High precision time interval digitizer

The development of a high precision time interval digitizer is described. The time digitizer is a 10 psec resolution stop watch covering a range of up to 340 msec. The measured time interval is determined as a separation between leading edges of a pair of pulses applied externally to the start input and the stop input of the digitizer. Employing an interpolation techniques and a 50 MHz high precision master oscillator, the equivalent of a 100 GHz clock frequency standard is achieved. Absolute accuracy and stability of the digitizer are determined by the external 50 MHz master oscillator, which serves as a standard time marker. The start and stop pulses are fast 1 nsec rise time signals, according to the Nuclear Instrument means of tunnel diode discriminators. Firing level of the discriminator define start and stop points between which the time interval is digitized.

Leskovar, B.↗

Pulse ignition characterization of mercury ion thruster hollow cathode using an improved pulse ignitor

An investigation of the high voltage pulse ignition characteristics of the 8 cm mercury ion thruster neutralizer cathode identified a low rate of voltage rise and long pulse duration as desirable factors for reliable cathode starting. Cathode starting breakdown voltages were measured over a range of mercury flow rates and tip heater powers for pulses with five different rates of voltage rise. Breakdown voltage requirements for the fastest rising pulse (2.5 to 3.0 kV/micro sec) were substantially higher (2 kV or more) than for the slowest rising pulse (0.3 to 0.5 kV/micro sec) for the same starting conditions. Also described is an improved, low impedance pulse ignitor circuit which reduces power losses and eliminates problems with control and packaging associated with earlier designs.

Wintucky, E. G.↗

Pulse ignition characterization of mercury ion thruster hollow cathode using an improved pulse ignitor

An investigation of the high voltage pulse ignition characteristics of the 8-cm mercury ion thruster neutralizer cathode identified a low rate of voltage rise and long pulse duration as desirable factors for reliable cathode starting. Cathode starting breakdown voltages were measured over a range of mercury flow rates and tip heater powers for pulses with five different rates of voltage rise. Breakdown voltage requirements for the fastest rising pulse (2.5 to 3.0 kV/microsec) were substantially higher (2 kV or more) than for the slowest rising pulse (0.3 to 0.5 kV/microsec) for the same starting conditions. The paper also describes an improved, low impedance pulse ignitor circuit which reduces power losses and eliminates problems with control and packaging associated with earlier designs.

Wintucky, E. G.↗

Apparatus and method for reducing thermal stress in a turbine rotor

A gas turbine is described wherein the thermal stresses in the turbine rotor are reduced. The rotor includes a central disc with a peripheral rim, and a plurality of blades extending radially outward from the rim. To reduce thermal stresses, a duct arrangement is provided which selectively directs hot gases from the turbine combustor to the rim during the turbine start up. The hot gases from the combustor serve to heat the rim, and decrease the start up period necessary to bring the temperature profile of the rotor into the operating temperature range. After the start up period, the duct arrangement is then used to direct cool gases from the turbine compressor to the rim of the rotor in order to maintain a lower rotor equilibrium temperature.

Heller, J. A.↗

Development of surface coatings for air-lubricated, compliant journal bearings to 650 C

Surface coatings for an air-lubricated, compliant journal for an automotive gas turbine engine were tested to find those capable of withstanding temperatures of either 540 C (1000 F) or 650 C (1200 F). Also, the coatings have to be capable of surviving the start-stop sliding contact cycles prior to rotor lift-off and at touchdown. Selected coating combinations were tested in start-stop tests at 14 kPa (2 psi) loading for 2000 cycles at room and maximum temperatures. Specific coating recommendations are: Cdo and graphite on foil versus chrome carbide on journal up to 370 C (700 F); NASA PS-120 (Tribaloy 400, silver, and CaF2) on journal versus uncoated foil up to 540 C (1000 F); and chemically adherent Cr2O3 on journal and foil up to 650 C (1200 F). The chemically adherent Cr2O3 coating system was further tested successfully at 35 kPa (5 psi) loading for 2000 start-stop cycles.

Bhushan, B.↗

Torque control for electric motors

Method for adjusting electric-motor torque output to accomodate various loads utilizes phase-lock loop to control relay connected to starting circuit. As load is imposed, motor slows down, and phase lock is lost. Phase-lock signal triggers relay to power starting coil and generate additional torque. Once phase lock is recoverd, relay restores starting circuit to its normal operating mode.

Bernard, C. A.↗

Large Area Crop Inventory Experiment (LACIE). Evaluation of the LACIE transition year crop calendar model

The author has identified the following significant results. The estimates of developmental stage dates from the LACIE adjustable crop calendar (ACC) winter wheat model was somewhat more accurate than the historical crop calendar after jointing. The ACC winter wheat model was not so accurate for the Texas Panhandle as it was for the other areas of the USPG-7 because dry soil conditions delayed fall planting in the Panhandle. Since the LACIE ACC winter wheat model does not contain a moisture term and it was started with historical planting dates, lengthy delays in planting mean that the ACC model will probably be started early and will estimate the developmental growth stages to occur too early in the season. The LACIE ACC spring wheat model was also started early in most areas because of late planting due to fields wet from melting snow and rain. The starter model used to estimate spring planting dates was not accurate under these wet soil conditions and tended to predict the developmental stages to occur earlier than the dates observed in the fields.

Cheffin, R. E.↗

Large Area Crop Inventory Experiment (LACIE). Evaluation of three-category classification

The author has identified the following signficant results. Examination of both machine estimates and stratified areal estimates produced by clustering and classification reveal no significant differences between the proportion estimates and ground truth estimates. When testing the variances of the machine estimates, a significant reduction in the variances was found when the number of starting dots was increased from 30 to 45. The variances were again reduced, although not significantly, when the number of starting dots was increased from 45 to 60. From these results, 60 starting dots are recommended for a three-category classifier. When examining the variances of the estimates for the four estimation procedures (using 60 dots), no significant differences were found between procedures. Thus, only the machine clustering may be used to produce an estimate, and the stratified areal estimate computations and maximum likelihood classification can be deleted.

Havens, K. A.↗

Trigger, an active release experiment that stimulated auroral particle precipitation and wave emissions

The experiment design, including a description of the diagnostic and chemical release payload, and the general results are given for an auroral process simulation experiment. A drastic increase of the field aligned charged particle flux was observed over the approximate energy range 10 eV to more than 300 keV, starting about 150 ms after the release and lasting about one second. The is evidence of a second particle burst, starting one second after the release and lasting for tens of seconds, and evidence for a periodic train of particle bursts occurring with a 7.7 second period from 40 to 130 seconds after the release. A transient electric field pulse of 200 mv/m appeared just before the particle flux increase started. Electrostatic wave emissions around 2 kHz, as well as a delayed perturbation of the E-region below the plasma cloud were also observed. Some of the particle observations are interpreted in terms of field aligned electrostatic acceleration a few hundred kilometers above the injected plasma cloud. It is suggested that the acceleration electric field was created by an instability driven by field aligned currents originating in the plasma cloud.

Holmgren, G.↗

HG ion thruster component testing

Cathodes, isolators, and vaporizers are critical components in determining the performance and lifetime of mercury ion thrusters. The results of life tests of several of these components are reported. A 30-cm thruster CIV test in a bell jar has successfully accumulated over 26,000 hours. The cathode has undergone 65 restarts during the life test without requiring any appreciable increases in starting power. Recently, all restarts have been achieved with only the 44 volt keeper supply with no change required in the starting power. Another ongoing 30-cm Hg thruster cathode test has successfully passed the 10,000 hour mark. A solid-insert, 8-cm thruster cathode has accumulated over 4,000 hours of thruster operation. All starts have been achieved without the use of a high voltage ignitor. The results of this test indicate that the solid impregnated insert is a viable neutralizer cathode for the 8-cm thruster.

Mantenieks, M. A.↗

Compressible boundary-layer stability calculations for sweptback wings with suction

The stability of the laminar boundary layers on two transonic wings of infinite span with distributed suction is investigated with the compressible, parallel-flow stability theory. Both wings have supercritical airfoil sections; one has a sweep angle of 23 deg, the other of 35 deg. Zero-frequency disturbances are used to represent cross-flow instability, and disturbances with the wavenumber vector aligned with the local flow direction represent traveling-wave instability. In both cases, the maximum spatial amplification rate is used as a measure of the instability. For the suction, distributions with constant mass flux downstream of the starting point are used. The main objective is to determine how the maximum amplification rate varies with the magnitude and starting point of the suction. It is found for both types of disturbances that the maximum amplification rate varies almost linearly with the suction magnitude up to at least the point where the amplification rate is halved. Different starting locations for the suction in the first 4% of the chord were found to affect cross-flow instability, but to have little influence on traveling-wave instability.

Mack, L. M.↗

Magnetohydrodynamics MHD Engineering Test Facility ETF 200 MWe power plant. Conceptual Design Engineering Report CDER. Volume 3: Costs and schedules

The estimated plant capital cost for a coal fired 200 MWE electric generating plant with open cycle magnetohydrodynamics is divided into principal accounts based on Federal Energy Regulatory Commision account structure. Each principal account is defined and its estimated cost subdivided into identifiable and major equipment systems. The cost data sources for compiling the estimates, cost parameters, allotments, assumptions, and contingencies, are discussed. Uncertainties associated with developing the costs are quantified to show the confidence level acquired. Guidelines established in preparing the estimated costs are included. Based on an overall milestone schedule related to conventional power plant scheduling experience and starting procurement of MHD components during the preliminary design phase there is a 6 1/2-year construction period. The duration of the project from start to commercial operation is 79 months. The engineering phase of the project is 4 1/2 years; the construction duration following the start of the man power block is 37 months.

Source record↗

Study of vapor flow into a capillary acquisition device

An analytical model was developed that prescribes the conditions for vapor flow through the window screen of a start basket. Several original submodels were developed as part of this model. The submodels interrelate such phenomena as the effect of internal evaporation of the liquid, the bubble point change of a screen in the presence of wicking, the conditions for drying out of a screen through a combination of evaporation and pressure difference, the vapor inflow rate across a wet screen as a function of pressure difference, and the effect on wicking of a difference between the static pressure of the liquid reservoir and the surrounding vapor. Most of these interrelations were verified by a series of separate effects tests, which were also used to determine certain empirical constants in the models. The equations of the model were solved numerically for typical start basket designs, and a simplified start basket was constructed to verify the predictions, using both volatile and nonvolatile test liquids. The test results verified the trends predicted by the model.

Dodge, F. T.↗

Vapor flow into a capillary propellant-acquisition device

An analytical model is described that specifies the conditions needed to cause a flow of vapor through the screens of a start basket. The analytical model is composed of several original submodels that interrelate the evaporation of the liquid in the basket, the bubble-point change of a screen in the presence of wicking, the drying out of a screen through a combination of evaporation and pressure difference, the vapor flow rate across a wet screen as a function of pressure difference, and the effect on wicking of a difference between the static pressure of the liquid reservoir and the vapor surrounding the screen. Most of the interrelations were demonstrated by a series of separate-effects tests, which were also used to determine certain empirical constants. The equations of the model were solved numerically for typical start basket designs. A simplified start basket was constructed and tested to verify these predictions, using both volatile and non-volatile liquids. The test results verified the trends predicted by the model.

Dodge, F. T.↗

Solar cycle variations in the interplanetary magnetic field

ISEE 3 interplanetary magnetic field measurements have been used to extend the NSSDC hourly averaged IMF composite data set through mid-1982. Most of sunspot cycle 20 (start:1964) and the first half of cycle 21 (start:1976) are now covered. The average magnitude of the field was relatively constant over cycle 20 with approx. 5-10% decreases in 1969 and 1971, when the Sun's polar regions changed polarity, and a 20% decrease in 1975-6 around solar minimum. Since the start of the new cycle, the total field strength has risen with the mean for the first third of 1982 being about 40% greater than the cycle 20 average. As during the previous cycle, an approx. 10% drop in IMF magnitude accompanied the 1980 reversal of the solar magnetic field. While the interplanetary magnetic field is clearly stronger during the present solar cycle, another 5-7 years of observations will be needed to determine if cycle 21 exhibits the same modest variations as the last cycle. Accordingly, it appears at this time that intercycle changes in IMF magnitude may be much larger than the intracycle variations.

Slavin, J. A.↗

Structural analysis

Hot section components of aircraft gas turbine engines are subjected to severe thermal-structural loading conditions, especially during the start-up and take-off portions of the engine cycle. The most severe and damaging stresses and strains are those induced by the steep thermal gradients induced during the start-up transient. These transient stresses and strains are also the most difficult to predict, in part because the temperature gradients and distributions are not well known or predictable, and also because the cyclic elasto-viscoplastic behavior of the materials at these extremes of temperature and strain are not well known or predictable. One element of the structures program will develop improved time-varying thermal-mechanical load models for the entire engine mission cycle from start-up to shutdown. The thermal model refinements will be consistent with those required by the structural code including considerations of mesh-point density, strain concentrations, and thermal gradients. Models will be developed for the burner liner, turbine vane and turbine blade.

Johns, R. H.↗

Implicit dual control for general stochastic systems

A new implicit dual technique is presented for stochastic adaptive control synthesis. In this technique, denoted as the method of utility costs (MOUC), a new control policy is derived from a known starting control policy by using a single iteration in time-varying policy space. An important result is that the new control policy yields a corresponding improvement in adaptive performance relative to the known starting policy. Since the starting policy can be chosen arbitrarily, the new policy has potentially superior performance relative to any existing design. Unlike other implicit dual designs, the MOUC can be applied to systems having constrained inputs, discontinuities, discrete valued disturbances, as well as in situations where the variances of the associated process statistics are large. A numerical example is given in which a controller is synthesized to provide improved performance relative to the Open-Loop Feedback policy of Dreyfus.

Bayard, D. S.↗

HOST structural analysis program overview

Hot section components of aircraft gas turbine engines are subjected to severe thermal structural loading conditions, especially during the start up and take off portions of the engine cycle. The most severe and damaging stresses and strains are those induced by the steep thermal gradients induced during the start up transient. These transient stresses and strains are also the most difficult to predict, in part because of the temperature gradients and distributions are not well known or readily predictable, and also because the cyclic elastic viscoplastic behavior of the materials at these extremes of temperature and strain are not well known or readily predictable. A broad spectrum of structures related technology programs is underway to address these deficiencies. One element of the structures program is developing improved time varying thermal mechanical load models for the entire engine mission cycle from start up to shutdown. Another major part of the program is the development of new and improved nonlinear 3-D finite elements and associated structural analysis programs, including the development of temporal elements with time dependent properties to account for creep effects in the materials and components.

Johns, R. H.↗