Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “SPACE LOGISTICS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,027 records · Page 57

Accounting for Dose Uncertainty in Dose-Response Curve Estimation Using Hierarchical Bayes Models

As part of their development of the technology for low-boom supersonic flight, the National Aeronautics and Space Administration (NASA) is planning to conduct a set of supersonic aircraft annoyance surveys in select communities in the United States, to measure public perception of the reduced sonic boom. The relationship between a noise exposure level of a supersonic flight event and the probability of an individual being highly annoyed by the event is quantified by a dose-response curve, which is usually based on logistic regression modeling. Unavoidable amounts of estimation error are expected in the upcoming noise measurements, which can bias the results of the logistic regression if ignored. Hence, the development of an estimation approach that accounts for such error when estimating the dose-response curve is imperative. In this paper, an evaluation study is conducted to assess the impact of measurement error on dose-response curve estimation. For this, hierarchical Bayes models using different specifications are fit to data collected by NASA in 2018, as part of a risk-reduction study of supersonic flights affecting Galveston, Texas. It is observed that the estimated dose-response curve appears sensitive to uncertainty in dose measurements, being subject to attenuation bias.

community response↗

Palmer Station, Antarctica: A Ground-Based Spaceflight Analog Suitable for Validation of Biomedical Countermeasures for Deep Space Missions

Astronauts are known to exhibit a variety of immunological alterations during spaceflight including changes in leukocyte distribution and plasma cytokine concentrations, a reduction in T-cell function, and subclinical reactivation of latent herpesviruses. These alterations are most likely due to mission-associated stressors including circadian misalignment, microgravity, isolation, altered nutrition, and increased exposure to cosmic radiation. Some of these stressors may also occur in terrestrial situations. This study sought to determine if crewmembers performing overwinter deployment at Palmer Station, Antarctica displayed similar immune alterations. The larger goal was to validate a ground analog suitable for the evaluation of countermeasures designed to protect astronauts during future deep space missions. For this pilot study, plasma, saliva, hair, and health surveys were collected from Palmer Station, Antarctica winterover participants at baseline, and at five overwinter timepoints. Twenty-six subjects consented to participate over the course of two seasons. Initial sample processing was performed at Palmer, and eventually stabilized samples were returned to the Johnson Space Center for analysis. A white blood cell differential was performed (real time) using a fingerstick blood sample to determine alterations in basic leukocyte subsets throughout the winterover. Plasma and saliva samples were analyzed for 30 and 13 cytokines, respectively. Saliva was analyzed for cortisol concentration and three latent herpesviruses (DNA by qPCR), EBV, HSV1, and VZV. Hair samples were analyzed for several hormones, as a measure of stress over prolonged periods of time. Voluntary surveys related to general health and adverse clinical events were distributed to participants. It is noteworthy that due to logistical constraints due to COVID-19, the baseline samples for each season were collected in Punta Arenas, Chile, after long international travel and during isolation. Therefore, the palmer pre mission samples may not reflect a true normal ‘baseline’. Minimal alterations were observed in leukocyte distribution during overwinter. The mean percentage of monocyte concentration elevated at one timepoint. Plasma G-CSF, IL1RA, MCP-1, MIP-1β, TNFα and VEGF were decreased during at least one overwinter timepoint, whereas RANTES was significantly increased. No statistically significant changes were observed in mean saliva cytokine concentrations. Salivary cortisol was substantially elevated throughout the entire winterover compared to baseline. Compared to shedding levels observed in healthy controls (23%), the percentage of participants who shed EBV was higher throughout all winterover timepoints (52-60%). Five subjects shed HSV1 during at least one timepoint throughout the season compared to no subjects shedding during pre-deployment. Finally, VZV reactivation, common in astronauts but exceptionally rare in ground-based stress analogs, was observed in one subject during pre-deployment and a different subject at WO2 and WO3. These pilot data, somewhat influenced by the COVID-19 situation, do suggest that participants at Palmer Station do undergo immunological alterations similar to, but likely in reduced magnitude, as those observed in astronauts. We suggest that overwinter at Palmer Station may be suitable test analog for spaceflight biomedical countermeasures designed to mitigate clinical risks for deep space missions.

Space↗

NASA's J-2X Engine Builds on the Apollo Program for Lunar Return Missions

In January 2006, NASA streamlined its U.S. Vision for Space Exploration hardware development approach for replacing the Space Shuttle after it is retired in 2010. The revised CLV upper stage will use the J-2X engine, a derivative of NASA s Apollo Program Saturn V s S-II and S-IVB main propulsion, which will also serve as the Earth Departure Stage (EDS) engine. This paper gives details of how the J- 2X engine effort mitigates risk by building on the Apollo Program and other lessons learned to deliver a human-rated engine that is on an aggressive development schedule, with first demonstration flight in 2010 and human test flights in 2012. It is well documented that propulsion is historically a high-risk area. NASA s risk reduction strategy for the J-2X engine design, development, test, and evaluation is to build upon heritage hardware and apply valuable experience gained from past development efforts. In addition, NASA and its industry partner, Rocketdyne, which originally built the J-2, have tapped into their extensive databases and are applying lessons conveyed firsthand by Apollo-era veterans of America s first round of Moon missions in the 1960s and 1970s. NASA s development approach for the J-2X engine includes early requirements definition and management; designing-in lessons learned from the 5-2 heritage programs; initiating long-lead procurement items before Preliminary Desi& Review; incorporating design features for anticipated EDS requirements; identifying facilities for sea-level and altitude testing; and starting ground support equipment and logistics planning at an early stage. Other risk reduction strategies include utilizing a proven gas generator cycle with recent development experience; utilizing existing turbomachinery ; applying current and recent main combustion chamber (Integrated Powerhead Demonstrator) and channel wall nozzle (COBRA) advances; and performing rigorous development, qualification, and certification testing of the engine system, with a philosophy of "test what you fly, and fly what you test". These and other active risk management strategies are in place to deliver the J-2X engine for LEO and lunar return missions as outlined in the U.S. Vision for Space Exploration.

Snoddy, Jimmy R.↗

Expedition 3 Crew Interview: Frank Culbertson, Jr.

Expedition 3 Commander Frank Culbertson is seen being interviewed before leaving to become part of the third resident crew on the International Space Station (ISS). He answers questions about his inspiration to become an astronaut and his career path. He discusses his expectations for life on the ISS and the experiments he will be performing while on board. Culbertson gives details on the spacewalks that will take place during the STS-105 mission (the mission carrying the Expedition 3 crew up to the ISS) and the unloading operations for the Multipurpose Logistics Module.

Source record↗

Expedition 3 Crew Interview: Mikhail Turin

Expedition 3 Flight Engineer Mikhail Turin is seen being interviewed before leaving to become part of the third resident crew on the International Space Station (ISS). He answers questions about his inspiration to become an astronaut and his career path. He discusses his expectations for life on the ISS and the experiments he will be performing while on board. Turin gives details on the spacewalks that will take place during the STS-105 mission (the mission carrying the Expedition 3 crew up to the ISS) and the unloading operations for the Multipurpose Logistics Module.

Source record↗

Expedition 3 Crew Interview: Vladimir Dezhurov

Expedition 3 Pilot Vladimir Dezhurov is seen being interviewed before leaving to become part of the third resident crew on the International Space Station (ISS). He answers questions about his inspiration to become an astronaut and his career path. He discusses his expectations for life on the ISS and the experiments he will be performing while on board. Dezhurov gives details on the spacewalks that will take place during the STS-105 mission (the mission carrying the Expedition 3 crew up to the ISS) and the unloading operations for the Multipurpose Logistics Module.

Source record↗

Using System Mass (SM), Equivalent Mass (EM), Equivalent System Mass (ESM) or Life Cycle Mass (LCM) in Advanced Life Support (ALS) Reporting

The Advanced Life Support (ALS) has used a single number, Equivalent System Mass (ESM), for both reporting progress and technology selection. ESM is the launch mass required to provide a space system. ESM indicates launch cost. ESM alone is inadequate for technology selection, which should include other metrics such as Technology Readiness Level (TRL) and Life Cycle Cost (LCC) and also consider perfom.arxe 2nd risk. ESM has proven difficult to implement as a reporting metric, partly because it includes non-mass technology selection factors. Since it will not be used exclusively for technology selection, a new reporting metric can be made easier to compute and explain. Systems design trades-off performance, cost, and risk, but a risk weighted cost/benefit metric would be too complex to report. Since life support has fixed requirements, different systems usually have roughly equal performance. Risk is important since failure can harm the crew, but it is difficult to treat simply. Cost is not easy to estimate, but preliminary space system cost estimates are usually based on mass, which is better estimated than cost. Amass-based cost estimate, similar to ESM, would be a good single reporting metric. The paper defines and compares four mass-based cost estimates, Equivalent Mass (EM), Equivalent System Mass (ESM), Life Cycle Mass (LCM), and System Mass (SM). EM is traditional in life support and includes mass, volume, power, cooling and logistics. ESM is the specifically defined ALS metric, which adds crew time and possibly other cost factors to EM. LCM is a new metric, a mass-based estimate of LCC measured in mass units. SM includes only the factors of EM that are originally measured in mass, the hardware and logistics mass. All four mass-based metrics usually give similar comparisons. SM is by far the simplest to compute and easiest to explain.

Jones, Harry↗

Remediation of Centre Pier, Port Hope, Ontario: Historical, Logistical, Regulatory and Technical Challenges - 13118

Centre Pier is a 3.9 ha property owned by the Commissioners of the Port Hope Harbour in the Municipality of Port Hope, Ontario, Canada. It is centrally located on the Port Hope waterfront and is bounded on the west by the Port Hope Harbour, on the east by the Ganaraska River, on the south by Lake Ontario, and on the north by a railway corridor. The property is currently leased by the Commissioners of the Port Hope Harbour to the Cameco Corporation which owns the four onsite building that are used as warehouse space for their uranium conversion facility located on the western side of the Harbour. Remediation of this site forms part of the Port Hope Project being undertaken by Atomic Energy of Canada Limited (AECL) and Public Works and Government Services Canada (PWGSC) as part of the Port Hope Area Initiative (PHAI). Soil impacts include radiological, metals and petroleum hydrocarbons resulting from long term historical industrial use. Radiological impacts in soil extend across most of the site primarily within the upper metre of fill. Metals-contaminated soil is present across the entire site in the underlying fill material. The metals-contaminated fill extends to a maximum depth of 2.0 m below grade at the north end of the site which is underlain by peat. However, the metals-contaminated soil could extend to the top of the bedrock on the remainder of the site. Based on the elevation of the bedrock in the adjacent river and Harbour Basin, the metals-contaminated soil may extend to a depth of 5.6 m or 6.5 m below existing grade. Petroleum-contaminated soil is present on the southeast side of the site, where a storage tank farm was previously located. Challenges include: - The complex history of the site both relating to site use and Pier construction. Pier development began in the 1800's and was undertaken by many different entities. Modifications and repairs were made over the years resulting in several different types of Pier walls and fill that must be considered during remediation. A wide variety of industrial activity on the Pier including extensive foundry operations as well as the industrial nature of the fill used to construct the Pier has resulted in extensive contamination distribution. The Pier structure will require reinforcement to permit both the remediation of the Pier and the adjacent Harbour and remediation techniques will need to be well suited to minimize disruption of wall structures as well as being able to deal with fill ranging from ash to boulders. - Multiple stakeholders are responsible for building demolition, remediation of radiological impacts, remediation of industrial impacts and the use of the site as a staging area for Harbour sediment remediation. The successful remediation of the Centre Pier will require careful negotiation and planning for the various remediation activities noted above. - The depth of contamination on the Pier would result in the complete removal of the Pier if all contamination were to be excavated. Therefore, a Risk Assessment will be conducted to determine the appropriate means for in situ risk management for materials to be left in place below a proposed depth of 1.5 m below current grade. With the concurrence of the property owners and Provincial regulators, the Risk Assessment will be undertaken in accordance with the Provincial requirements that will ensure adequate protection of the environment and future users of the site. - The end use of the Pier has yet to be confirmed by the Municipality. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Converting information from paper to optical media

The technology of converting large amounts of paper into electronic form is described for use in information management systems based on optical disk storage. The space savings and photographic nature of microfiche are combined in these systems with the advantages of computerized data (fast and flexible retrieval of graphics and text, simultaneous instant access for multiple users, and easy manipulation of data). It is noted that electronic imaging systems offer a unique opportunity to dramatically increase the productivity and profitability of information systems. Particular attention is given to the CALS (Computer-aided Aquisition and Logistic Support) system.

Deaton, Timothy N.↗

Geometric Reasoning for Automated Planning

An important aspect of mission planning for NASA s operation of the International Space Station is the allocation and management of space for supplies and equipment. The Stowage, Configuration Analysis, and Operations Planning teams collaborate to perform the bulk of that planning. A Geometric Reasoning Engine is developed in a way that can be shared by the teams to optimize item placement in the context of crew planning. The ISS crew spends (at the time of this writing) a third or more of their time moving supplies and equipment around. Better logistical support and optimized packing could make a significant impact on operational efficiency of the ISS. Currently, computational geometry and motion planning do not focus specifically on the optimized orientation and placement of 3D objects based on multiple distance and containment preferences and constraints. The software performs reasoning about the manipulation of 3D solid models in order to maximize an objective function based on distance. It optimizes for 3D orientation and placement. Spatial placement optimization is a general problem and can be applied to object packing or asset relocation.

Clement, Bradley J.↗

NASA's Nuclear Thermal Propulsion Project

Space fission power systems can provide a power rich environment anywhere in the solar system, independent of available sunlight. Space fission propulsion offers the potential for enabling rapid, affordable access to any point in the solar system. One type of space fission propulsion is Nuclear Thermal Propulsion (NTP). NTP systems operate by using a fission reactor to heat hydrogen to very high temperature (>2500 K) and expanding the hot hydrogen through a supersonic nozzle. First generation NTP systems are designed to have an Isp of approximately 900 s. The high Isp of NTP enables rapid crew transfer to destinations such as Mars, and can also help reduce mission cost, improve logistics (fewer launches), and provide other benefits. However, for NTP systems to be utilized they must be affordable and viable to develop. NASA's Advanced Exploration Systems (AES) NTP project is a technology development project that will help assess the affordability and viability of NTP. Early work has included fabrication of representative graphite composite fuel element segments, coating of representative graphite composite fuel element segments, fabrication of representative cermet fuel element segments, and testing of fuel element segments in the Compact Fuel Element Environmental Tester (CFEET). Near-term activities will include testing approximately 16" fuel element segments in the Nuclear Thermal Rocket Element Environmental Simulator (NTREES), and ongoing research into improving fuel microstructure and coatings. In addition to recapturing fuels technology, affordable development, qualification, and utilization strategies must be devised. Options such as using low-enriched uranium (LEU) instead of highly-enriched uranium (HEU) are being assessed, although that option requires development of a key technology before it can be applied to NTP in the thrust range of interest. Ground test facilities will be required, especially if NTP is to be used in conjunction with high value or crewed missions. There are potential options for either modifying existing facilities or constructing new ground test facilities. At least three potential options exist for reducing (or eliminating) the release of radioactivity into the environment during ground testing. These include fully containing the NTP exhaust during the ground test, scrubbing the exhaust, or utilizing an existing borehole at the Nevada National Security Site (NNSS) to filter the exhaust. Finally, the project is considering the potential for an early flight demonstration of an engine very similar to one that could be used to support human Mars or other ambitious missions. The flight demonstration could be an important step towards the eventual utilization of NTP.

Houts, Michael↗

Gateway Lunar Habitat Modules as the Basis for a Modular Mars Transit Habitat

This paper provides a summary of the results from a recent concept study of various configurations for a Mars Transit Habitat. The designs considered are composed of modules based on published contractor concepts proposed for the lunar Gateway through NASA’s NextSTEP program. Using these Gateway concepts as a starting point for the design of a Mars Transit Habitat has potential advantages. Both Gateway and Mars Transit Habitats will have similar requirements for long-term operations in deep space, autonomous and remote operations when the crew is not onboard, and similar requirements for transferring crew to and from a planetary surface—the Moon and Mars respectively. The contractor designs for Gateway were traded against a monolithic transit habitat previously proposed by NASA’s Mars Integration Group. In addition, these concepts were considered for a “shakedown” mission for the transit habitat hardware in cislunar space to build confidence in new systems, including the advanced environmental control and life support systems needed for Mars missions. The results presented include overall vehicle configurations, mass, and volume estimates for the selected design concepts. Two concepts using large expandable modules are identified as leading candidates for a Mars Transit Habitat and the remaining elements are identified as representative of the habitable pressure vessels needed for safe haven configurations, logistics modules, surface habitats, rovers, and descent and ascent crew cabins in the overall Mars Architecture.

Smitherman, David↗

Development of an SE(3)-based Rigid Body Pose Estimation Scheme for Unknown Moments of Inertia in a Spacecraft

In real-world applications, the consideration of state and parameter uncertainties is an important part of any navigation and control system. Uncertainties can arise because of the instruments, communication systems, or external disturbances. Parameter uncertainty can be due to uncertainties in the data or the calibration process used. The objective of this research is to develop a rigid body pose estimation scheme on nonlinear manifolds of rigid body motion groups for unknown mass properties moments of inertia with application in space launch. An unscented Kalman filter is developed on special Euclidean space and their tangent bundle to address uncertainties in the states and inertia properties. This estimator accounts for uncertainties, while considering rotational-translational coupling, and avoids singularity or non-uniqueness issues. Since this estimator is based on the nonlinear manifolds on which rigid body motion evolves, it is reliable and is expected to result in high level of accuracy. The estimators are validated on a generic model of Logistic Module (LM) and a cuboid spacecraft model. The algorithms can then be tested on Dragon XL, HTV-X, and possibly other spacecraft.

Moments of Inertia↗

Machine Learning for Predicting Team Functioning in HERA Missions

Team functioning is integral to success in future long term space exploration missions. Proactively detecting declines in team functioning can mitigate conflict and ensure mission success. This project developed a speech-based artificial intelligence (AI) system that unobtrusively predicts degradation in team functioning, including performance and cohesion, in the Human Exploration Research Analog (HERA) Campaigns 4 and 5. The AI system conducted automated analysis of the prosodic (tone of voice) and linguistic (language content) components of speech, modeling interpersonal dynamics at both the turn-taking and day-wide levels. We investigated team functioning via observing structured interactions (i.e., multi-mission space exploration vehicle-extra vehicular activity [MMSEV-EVA], team interaction battery [TIB]) and unstructured interactions before the MMSEV-EVA task. We developed machine learning models to predict team functioning (objective task accuracy, self reported team efficacy and self reported team cohesion) by analyzing OpenSmile acoustic features, linguistic descriptors extracted via the linguistic inquiry and word count (LIWC) dictionary, and semantic embeddings. In the TIB, static models using logistic regression and random forests were not able to predict task accuracy, but predicted team efficacy and cohesion during both the decision making and relational tasks to a moderate level (60-70%). Majority voting on the individual turns to predict day long team efficacy further increased accuracies (70-80%). Finally, long short-term memory (LSTM) models showed the best performance across all variables (80-91%), including task performance. In the MMSEV-EVA, static models achieved an accuracy of 60% with majority voting, which increased to 80% through the incorporation of mission day as a variable, accounting for the learning effect. A key finding across both tasks was the "team-dependent" nature of these interactions; models achieved much higher accuracy when trained on prior days of the same team's data rather than attempting to generalize across entirely different teams, with even 1-2 days of prior data per team achieving 5-15% improvement over team-independent models. In addition, the incorporation of pre-task data from the same team also improves model performance, e.g., incorporating data from the decision-making task of the TIB, which preceded the relational task, improved the prediction of team efficacy and cohesion during the latter. We compared model performance when trained on machine-generated data compared to data that had been further corrected by human annotators. Overall, models trained on human-corrected data exhibited a modest improvement in performance, particularly when acoustic features were used. We found no significant correlation between word error rate (WER) and model accuracy (r(55) = -0.08, p = 0.51), but model’s accuracy was significantly higher for medium/high quality transcription (0.74 (SD = 0.48)) compared to the low-quality group (0.64 (SD = 0.36)) (t(63)=2.82, p = 0.006). Based on these, several design recommendation emerge, that could inform Standards at NASA. Models predicting team functioning should incorporate at least one to two days of historical interaction data, include brief pre-task discussions, and explicitly model temporal learning effects, especially for longer operational tasks. Minimum quality standards for automated speech-processing pipelines are needed, given the performance gains observed with manually corrected acoustic data. Finally, systems should leverage both acoustic features and language embeddings in complementary ways, with modality choices and fusion strategies tailored to mission context, task demands, and data quality requirements.

Shrivatsa Mishra↗

Modular space station

The modular space station comprising small, shuttle-launched modules, and characterized by low initial cost and incremental manning, is described. The initial space station is designed to be delivered into orbit by three space shuttles and assembled in space. The three sections are the power/subsystems module, the crew/operations module, and the general purpose laboratory module. It provides for a crew of six. Subsequently duplicate/crew/operations and power/subsystems modules will be mated to the original modules, and provide for an additional six crewmen. A total of 17 research and applications modules is planned, three of which will be free-flying modules. Details are given on the program plan, modular characteristics, logistics, experiment support capability and requirements, operations analysis, design support analyses, and shuttle interfaces.

Source record↗

Manned space platforms, payloads and tending

A concept has been developed for providing for a permanent manned presence in space for science, applications, and technology plus growth potential to support major future operational missions. An initial crew of two to four is accommodated along with installations for interior, exterior and tended payloads. Tended payloads support includes servicing of remote free-flying spacecraft, basing of reusable orbital transfer vehicles and basing of teleoperator-mounted payloads for near-station excursions. Candidate payloads, plus configuration, flight operation, subsystem and ground logistics aspects are described, as are Shuttle interactions.

Runge, F. C.↗

Predicting Crew Time Allocations for Lunar Orbital Missions Based on Historical ISS Operational Activities

As the National Aeronautics and Space Administration continues to define candidate architectures for the planned lunar “Gateway”, it will be necessary to have a detailed understanding of how the crew will inhabit, operate, and maintain the spacecraft. The nature of the Gateway vehicle systems configuration and operations will have a direct impact on the scope of work activities required of the crew. Crew work schedules are sensitive to variations in spacecraft architecture, visiting vehicle activities, and logistics operations – particularly within short duration missions as initially planned for the lunar Gateway. These system and operational configurations must be taken into account when planning for crew time availability to conduct science activities on Gateway missions. This paper presents a methodology that is used to predict crew time distributions for lunar Gateway missions, as applied in NASA’s Exploration Crew Time Model (ECTM). The process utilized for evaluating crew time distributions is based on the categorization of all crew activities into a standardized ontology. Historical ISS daily crew timeline data from July 20, 2011 (post STS retirement) to present day was captured via the Operational Planning Timeline Integration System (OPTimIS) database and characterized according to the standardized ontology. This process enabled correlation and statistical analysis of the ISS data according to common mission parameters such as crew size, ECLSS system design, vehicle traffic operations, and logistics delivery operations. The results of the statistical analysis are a set of crew time distributions for each activity category. These distributions are then utilized within the ECTM to examine crew time allocations based on mission parameter inputs, which serve to characterize the Gateway mission configurations. Results for predicted crew time allocations for representative short duration Gateway missions are presented. These results can be used to evaluate crew schedule availability for science and utilization activities. Variations in expected mission architectures and mission operations are accounted for to correct crew time predictions. The analysis is being leveraged to plan utilization capability objectives that are achievable on the Gateway missions, as well as inform the viability of various mission architecture options.

Stromgren, Chel↗

NASA Gateway Refueling Architecture and Concept of Operation

The Lunar Gateway is a deep space orbiting outpost being developed by NASA in partnership with ESA and other domestic and international partners. It is a critical component of NASA’s Artemis program supporting long-term human exploration of the moon and is designed to be refueled, requiring the on-orbit transfer of propellants. The first two modules of Gateway to be launched will be the Power and Propulsion Element (PPE) and the Habitation and Logistics Outpost (HALO). The PPE contains the bipropellant chemical and electrical propulsion systems that will provide attitude control and orbit raising capability for Gateway. The reaction control system (RCS) utilizes monomethylhydrazine (MMH) and mixed oxides of nitrogen-3 (MON-3) as the fuel and oxidizer, respectively. Helium is used as a pressurant. The Advanced Electric Propulsion Systems (AEPS) and Busek hall thrusters that comprise the solar electric propulsion (SEP) system use xenon as the propellent. The ESPRIT Refueling Module, provided by ESA, will supply the propellant refueling function to Gateway’s propulsion systems. On-orbit refueling is a complex, technically challenging operation that is key to enabling sustainable crewed Lunar and Martian exploration. Numerous systems may be involved in the refueling operation. Also numerous systems are required to enable the successful ability for Gateway to refuel such as, SEP, RCS, Structure & Mechanisms (S&M), Guidance, Navigation and Control (GNC), Thermal, Software, Vehicle System Manager (VSM), Flight Ops, Extra Vehicular Robotics (EVR), Communication and Tracking (C&T), Avionics, and more. This paper will detail the design architecture, concept of operations, and challenges associated with the Gateway refueling system. The methodologies used in Gateway will be compared to those implemented in OSAM-1 and the best practices documented by AIAA and CONFERS (Consortium For Execution Of Rendezvous And Servicing Operations).

Brandie L. Rhodes↗