Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “River”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,027 records · Page 57

Siting GNEP at the Savannah River Site: Using Legacy and Infrastructure in a Commercial Energy Park Concept

The Savannah River Site (SRS) was proposed as one of eleven potential sites to be included in the U.S. Department of Energy Programmatic Environmental Impact Statement (PEIS) for the Global Nuclear Energy Partnership (GNEP) program. The approach to meet siting and infrastructure requirements for possible GNEP facilities at the SRS focused on available infrastructure including land, cooling water systems, high voltage power supplies, existing heavy haul roadways, existing analytical capabilities, and existing waste handling capabilities. Additional siting criteria and existing SRS capabilities and conditions were developed to locate the GNEP within a commercial Energy Park contained within, but separate from, the SRS. Included as part of, or corollary to, existing infrastructure at the SRS was the availability of a nuclear trained workforce living within the area. The SRS consists of approximately 803 square kilometers (310 square miles) in the Upper Atlantic Coastal Plain of South Carolina bordering along the Savannah River. Historic production reactors, processing, and laboratory facilities are currently being decommissioned and destroyed while new facilities such as the MOX facility are being built. Existing legacy infrastructure, beneficial to the potential GNEP facilities, continues to exist and operate. The SRS has a long history of processing, reprocessing and in the disposition of nuclear fuels and byproducts continuing through today with HCanyon as the only DOE facility currently capable of uranium reprocessing. Because of ongoing operations and maintenance of historic systems, SRS has existing infrastructure immediately available for GNEP facilities in or near the proposed Energy Park. The Energy Park location was chosen to achieve maximum use of this legacy infrastructure. In summary: Requirements for potential or conceivable GNEP facilities can be met using the existing facilities and infrastructure of the SRS. A potential commercially operated Energy Park located within the existing boundaries of the SRS can use existing site infrastructure to lessen the overall construction costs and decrease the start up time for our national GNEP program. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Qualification of a Radioactive High Aluminum Glass for Processing in the Defense Waste Processing Facility at the Savannah River Site

At the Savannah River Site (SRS) the Defense Waste Processing Facility (DWPF) has been immobilizing SRS's radioactive high level waste (HLW) sludge into a borosilicate glass for approximately eleven years. Currently the DWPF is immobilizing HLW sludge in Sludge Batch 4 (SB4). Each sludge batch is nominally two million liters of HLW and produces nominally five hundred stainless steel canisters 0.6 meters in diameter and 3 meters tall filled with the borosilicate glass. In SB4 and earlier sludge batches, the Al concentration has always been rather low, (less than 9.5 weight percent based on total dried solids). It is expected that in the future the Al concentrations will increase due to the changing composition of the HLW. Higher Al concentrations could introduce problems because of its known effect on the viscosity of glass melts and increase the possibility of the precipitation of nepheline in the final glass and decrease its durability. In 2006 Savannah River National Laboratory (SRNL) used DWPF processes to immobilize a radioactive HLW slurry containing 14 weight percent Al to ensure that this waste is viable for future DWPF processing. This paper presents results of the characterization of the high Al glass prepared in that demonstration. At SRNL, a sample of the processed high Al HLW slurry was mixed with an appropriate glass frit as performed in the DWPF to make a waste glass containing nominally 30% waste oxides. The glass was prepared by melting the frit and waste remotely at 1150 deg. C. The glass was then characterized by - determining the chemical composition of the glass including the concentrations of several actinide and U-235 fission products, - calculating the oxide waste loading of the glass based on the chemical composition and comparing it to that of the target - determining if the glass composition met the DWPF processing constraints such as glass melt viscosity and liquidus temperature along with a waste form affecting constraint that prevents the precipitation of nepheline (NaAlSiO{sub 4}) crystals in the glass melt - measuring the durability of the glass using the ASTM Standard Product Consistency Test (PCT) leach test to determine if the durability of the glass based on B, Li, and Na releases met the requirements for acceptance in a US geologic repository - measuring the leachability of several radionuclides using the ASTM Standard PCT leach test and comparing them to the B, Li, and Na releases - examining the glass by scanning electron microscopy and energy dispersive X-ray spectrometry to determine if any crystals had formed in the glass melt. Results indicate that the high Al glass met all the requirements for processing and product quality in the DWPF. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Savannah River Site Tank 48H Waste Treatment Project Technology Readiness Assessment

One of U.S. Department of Energy's (DOE) primary missions at Savannah River Site (SRS) is to retrieve and treat the high level waste (HLW) remaining in SRS tanks and close the F and H tank farms. At present, a significant impediment to timely completion of this mission is the presence of significant organic chemical contamination in Tank 48H. Tank 48H is a 1.3 million gallon tank with full secondary containment, located and interconnected within the SRS tank system. However, the tank has been isolated from the system and unavailable for use since 1983, because its contents - approximately 250,000 gallons of salt solution containing Cs-137 and other radioisotopes - are contaminated with nearly 22,000 Kg of tetraphenylborate, a material which can release benzene vapor to the tank head space in potentially flammable concentrations. An important element of the DOE SRS mission is to remove, process, and dispose of the contents of Tank 48H, both to eliminate the hazard it presents to the SRS H-Tank Farm and to return Tank 48H to service. Tank 48H must be returned to service to support operation of the Salt Waste Processing Facility, to free up HLW tank space, and to allow orderly tank closures per Federal Facility Agreement commitments. The Washington Savannah River Company (WSRC), the SRS prime contractor, has evaluated alternatives and selected two processes, Wet Air Oxidation (WAO) and Fluidized Steam Bed Reforming (FBSR) as candidates for Tank 48H processing. Over the past year, WSRC has been testing and evaluating these two processes, and DOE is nearing a final technology selection in late 2007. In parallel with WSRC's ongoing work, DOE convened a team of independent qualified experts to conduct a Technology Readiness Assessment (TRA). The purpose of the TRA was to determine the maturity level of the Tank 48H treatment technology candidates - WAO and FBSR. The methodology used for this TRA is based on detailed guidance for conducting TRAs contained in the Department of Defense (DoD), Technology Readiness Assessment Desk-book. The TRA consists of three parts: - Determination of the Critical Technology Elements (CTEs) for each of the candidate processes. - Evaluation of the Technology Readiness Levels (TRLs) of each CTE for each process. - Defining of the technology testing or engineering work necessary to bring immature technologies to the appropriate maturity levels. The TRA methodology assigns a TRL to a technology based on the lowest TRL assigned to any CTE of that technology. Based on the assessment, the overall TRL for WAO was 2 and the TRL for FBSR was 3. WAO was limited by the current lack of definition for the off-gas treatment system (TRL of 2). The FBSR Product Handling had little or no test work and therefore received the lowest score (TRL of 3) for the FBSR CTEs. In summary, both FBSR and WAO appear to be viable technologies for treatment of Tank 48H legacy waste. FBSR has a higher degree of maturity than WAO, but additional technology development will be required for both technologies. However, the Assessment Team believes that sufficient information is available for DOE to select the preferred or primary technology. Limited testing of the backup technology should be conducted as a risk mitigation strategy. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integrated process gas modeling for tritium systems at the Savannah River Site

Significant savings are being realized from the consolidated tritium gas-processing operations at the Savannah River Site. However, the trade-off is some reduction of operational flexibility due to decreased storage capacity for process and waste gases. Savannah River National Laboratory researchers are developing an integrated process gas model for tritium processing using Aspen Custom Modeler{sup TM} (ACM) software. The modeling involves fully characterizing process flow streams (gas composition, quantity), frequency of batch transfers, and availability of equipment in the flow stream. The model provides a valuable engineering tool to identify flow bottlenecks, thereby enabling adjustments to be made to improve process operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Use of Electronic Hand-held Devices for Collection of Savannah River Site Environmental Data - 13329

Savannah River Nuclear Solutions has begun using Xplore Tablet PC's to collect data in the field for soil samples, groundwater samples, air samples and round sheets at the Savannah River Site (SRS). EPA guidelines for groundwater sampling are incorporated into the application to ensure the sample technician follows the proper protocol. The sample technician is guided through the process for sampling and round sheet data collection by a series of menus and input boxes. Field measurements and well stabilization information are entered into the tablet for uploading into Environmental Restoration Data Management System (ERDMS). The process helps to eliminate input errors and provides data integrity. A soil sample technician has the ability to collect information about location of sample, field parameter, describe the soil sample, print bottle labels, and print chain of custody for the sample that they have collected. An air sample technician has the ability to provide flow, pressure, hours of operation, print bottle labels and chain of custody for samples they collect. Round sheets are collected using the information provided in the various procedures. The data are collected and uploaded into ERDMS. The equipment used is weather proof and hardened for the field use. Global Positioning System (GPS) capabilities are integrated into the applications to provide the location where samples were collected and to help sample technicians locate wells that are not visited often. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Risk-Based Remediation Approach for Cs-137 Contaminated Sediment/Soils at the Savannah River Site (SRS) Lower Three Runs Tail (U) - 13348 - SRNS-RP-2012-00546

Lower Three Runs is a large blackwater stream that runs through the eastern and southern portion of the Savannah River Site. The Lower Three Runs watershed includes two SRS facility areas: P Area (P Reactor) and R Area (R Reactor) that provided effluent discharges to Lower Three Runs. During reactor operations, effluent discharges were well above natural (pre-industrial) or present day stream discharges. The watershed contains a 2,500-acre mainstream impoundment (PAR Pond), several smaller pre-cooler ponds, and a canal system that connects the pre-cooler ponds and discharges surface water to PAR Pond. From the PAR Pond dam, Lower Three Runs flows approximately 36 kilometers braiding through bottom-land/flood-plain forests before it enters the Savannah River. About eight kilometers downstream from the PAR Pond dam, the SRS boundary narrows (termed the Lower Three Runs tail) providing a limited buffer of DOE property for the Lower Three Runs stream and associated flood-plain. Previous screening characterization efforts revealed Cs-137 contamination in the sediment/soils of the flood-plain. As a part of the American Recovery and Reinvestment Act stimulus package, a comprehensive characterization effort was executed on the sediment/soils of the Lower Three Runs tail flood-plain providing a comprehensive look at the contaminant signature of the area. As a follow-up to that characterization, a regulatory decision Core Team, comprised of members of the South Carolina Department of Health and Environmental Control, Environmental Protection Agency - Region IV, and DOE, conducted negotiations on a risk-based approach to address the level of contamination found in the tail flood-plain as an early action that provided a long-term solution to exposure scenarios. For evaluation purposes, the adolescent trespasser was selected as the most likely human receptor for the Lower Three Runs tail portion because of the natural attractiveness of the area for recreational activities (i.e., hunting, fishing, hiking etc.) and access from public property. Exposure of the adolescent trespasser to Cs-137 contaminated sediment/soil at concentrations greater than 23.7 pico curies per gram have been calculated to result in an unacceptable cancer risk (> 1 x 10{sup -4}). Comparing the characterization sampling results conducted in 2009 with the benchmark concentration of 23.7 pCi/g, identified elevated risk levels along three sampling areas in the Lower Three Runs tail portion. On January 5, 2012, it was agreed by the core team that a Removal Action in the Lower Three Runs tail was to be conducted for the identified soil/sediment locations in the three identified areas that exceed the 1 x 10{sup -4} risk (23.7 pCi/g) for the adolescent trespasser receptor. The addition of Land Use Controls following the Removal Action was appropriate to protect human health and the environment. A systematic screening matrix was initiated at the identified hot spots (i.e., sampling points with Cs-137 activities greater than 23.7 pCi/g) to identify the limits of the excavation area. Sediment/soil within the defined removal areas would be excavated to the depth necessary to achieve the cleanup goal and disposed of in a CERCLA Off-Site Rule approved disposal facility. It was agreed that this removal action would adequately reduce the volume of available Cs-137 in the Lower Three Runs tail and consequently residual activities of the Cs-137 would decay over time reducing the amount of Cs-137 available in the tail which would curtail risk. The Land Use Controls consist of installation of an additional seven miles of fencing at major road crossings, utility easements, and at areas that showed a higher probability of access. In addition, signs were placed along the entire SRS perimeter of the Lower Three Runs tail approximately every 200 feet. Sign posts included both a No Trespassing sign and a Contaminant Warning sign. The project initiated a subcontract for both the removal action and the installation of fencing and signs on May 1, 2012. All field activities were completed by July 26, 2012. The project excavated and disposed of over 2700 cubic yards of contaminated sediment/soil, erected approximately seven miles of fence and placed over 2,000 signs demonstrating DOE's commitment to protect human health and act as a good neighbor to residents in the area. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Use of Subsurface Barriers to Support Treatment of Metals and Reduce the Flux of Tritium to Fourmile Branch at the Savannah River Site in South Carolina - 13358

The Savannah River Site (SRS) produced tritium, plutonium, and special nuclear materials for national defense, medicine, and the space programs. Acidic groundwater plumes containing metals, metallic radionuclides, non-metallic radionuclides and tritium sourced from the F and H Area Seepage Basins have impacted the surface water of Fourmile Branch on SRS. Tritium releases from Fourmile Branch have impacted the water quality within areas of the Savannah River adjacent to the SRS, and this circumstance has been an ongoing regulatory concern. The F and H Area Seepage Basins operated until 1988 for the disposition of deionized acidic waste water from the F and H Separations Facilities. The waste water contained dilute nitric acid and low concentrations of non-radioactive metals, and radionuclides, with the major isotopes being Cs-137, Sr-90, U-235, U-238, Pu-239, Tc-99, I-129, and tritium. The tritium concentration in the waste water was relatively elevated because there is not a practicable removal method in water. The acid content of the waste water during the operational period of the basins was equal to 12 billion liters of nitric acid. The seepage basins were closed in 1988 and backfilled and capped by 1991. The plumes associated with the F and H basins cover an area of nearly 2.4 square kilometers (600 acres) and discharge along ∼2,600 meters of Fourmile Branch. The acidic nature of the plumes and their overall discharge extent along the branch represent a large challenge with respect to reducing contaminant flux to Fourmile Branch. The introduction of nitric acid into the groundwater over a long time effectively reduced the retardation of metal migration from the basins to the groundwater and in the groundwater to Fourmile Branch, because most negatively charged surfaces on the aquifer materials were filled with hydrogen ion. Two large pump and treat systems were constructed in 1997 and operated until 2003 in an attempt to capture and control the releases to Fourmile Branch. The operating cost, including waste disposal, for the two systems was ∼$1.3 M/month. Both systems employed reinjection of tritiated water up gradient of the extraction, and produced large quantities of waste from non-tritium isotopes and metals removal prior to reinjection. Both systems were determined to be ineffective and potentially detrimental with respect to limiting the flux of contaminants to Fourmile Branch. After it became apparent that there was very little benefit to continued operation of the systems, and the staggering cost of operations was recognized by the SRS and regulators, a new remedy was developed. The new system uses vertical subsurface barriers to redirect groundwater flow to limit the transport of contaminants to the stream. The barriers were constructed of acid resistant grout using deep soil mixing techniques. The grout mixture used low swelling clay, fly ash, and sodium hydroxide to form a pozzolana material with low permeability and low strength. The SRS and regulators agreed to a series of remedial goals, with the first goal to reduce tritium flux to the stream by 70% and bring constituents other than tritium to groundwater protection standards. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of an Integrated Waste Plan for Chalk River Laboratories - 13376

To further its Strategic Planning, the Atomic Energy of Canada Limited (AECL) required an effective approach to developing a fully integrated waste plan for its Chalk River Laboratories (CRL) site. Production of the first Integrated Waste Plan (IWP) for Chalk River was a substantial task involving representatives from each of the major internal stakeholders. Since then, a second revision has been produced and a third is underway. The IWP remains an Interim IWP until all gaps have been resolved and all pathways are at an acceptable level of detail. Full completion will involve a number of iterations, typically annually for up to six years. The end result of completing this process is a comprehensive document and supporting information that includes: - An Integrated Waste Plan document summarizing the entire waste management picture in one place; - Details of all the wastes required to be managed, including volume and timings by waste stream; - Detailed waste stream pathway maps for the whole life-cycle for each waste stream to be managed from pre-generation planning through to final disposition; and - Critical decision points, i.e. decisions that need to be made and timings by when they need to be made. A waste inventory has been constructed that serves as the master reference inventory of all waste that has been or is committed to be managed at CRL. In the past, only the waste that is in storage has been effectively captured, and future predictions of wastes requiring to be managed were not available in one place. The IWP has also provided a detailed baseline plan at the current level of refinement. Waste flow maps for all identified waste streams, for the full waste life cycle complete to disposition have been constructed. The maps identify areas requiring further development, and show the complexities and inter-relationships between waste streams. Knowledge of these inter-dependencies is necessary in order to perform effective options studies for enabling facilities that may be necessary for multiple related waste streams. The next step is to engage external stakeholders in the optioneering work required to provide enhanced confidence that the path forward identified within future iterations of the IWP will be acceptable to all. (authors)

54 ENVIRONMENTAL SCIENCES↗

Savannah River Site Eastern Transportation Hub: A Concept For a DOE Eastern Packaging, Staging and Maintenance Center - 13143

The Department of Energy (DOE) is working to de-inventory sites and consolidate hazardous materials for processing and disposal. The DOE administers a wide range of certified shipping packages for the transport of hazardous materials to include Special Nuclear Material (SNM), radioactive materials, sealed sources and radioactive wastes. A critical element to successful and safe transportation of these materials is the availability of certified shipping packages. There are over seven thousand certified packagings (i.e., Type B/Type AF) utilized within the DOE for current missions. The synergistic effects of consolidated maintenance, refurbishment, testing, certification, and costing of these services would allow for efficient management of the packagings inventory and to support anticipated future in-commerce shipping needs. The Savannah River Site (SRS) receives and ships radioactive materials (including SNM) and waste on a regular basis for critical missions such as consolidated storage, stabilization, purification, or disposition using H-Canyon and HB-Line. The Savannah River National Laboratory (SRNL) has the technical capability and equipment for all aspects of packaging management. SRS has the only active material processing facility in the DOE complex and is one of the sites of choice for nuclear material consolidation. SRS is a logical location to perform maintenance and periodic testing of the DOE fleet of certified packagings. This initiative envisions a DOE Eastern Packaging Staging and Maintenance Center (PSMC) at the SRS and a western hub at the Nevada National Security Site (NNSS), an active DOE Regional Disposal Site. The PSMC's would be the first place DOE would go to meet their radioactive packaging needs and the primary locations projects would go to disposition excess packaging for beneficial reuse. These two hubs would provide the centralized management of a packaging fleet rather than the current approach to design, procure, maintain and dispose of packagings on a project-by-project basis. This initiative provides significant savings in packaging costs and acceleration of project schedules. In addition to certified packaging, the PSMC would be well suited for select designs of 7A Type A packaging and Industrial Packaging. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of a Performance and Processing Property Acceptance Region for Cementitious Low-Level Waste Forms at Savannah River Site - 13174

The Saltstone Production and Disposal Facilities (SPF and SDF) at the Savannah River Site (SRS) have been treating decontaminated salt solution, a low-level aqueous waste stream (LLW) since facility commissioning in 1990. In 2012, the Saltstone Facilities implemented a new Performance Assessment (PA) that incorporates an alternate design for the disposal facility to ensure that the performance objectives of DOE Order 435.1 and the National Defense Authorization Act (NDAA) of Fiscal Year 2005 Section 3116 are met. The PA performs long term modeling of the waste form, disposal facility, and disposal site hydrogeology to determine the transport history of radionuclides disposed in the LLW. Saltstone has been successfully used to dispose of LLW in a grout waste form for 15 years. Numerous waste form property assumptions directly impact the fate and transport modeling performed in the PA. The extent of process variability and consequence on performance properties are critical to meeting the assumptions of the PA. The SPF has ensured performance property acceptability by way of implementing control strategies that ensure the process operates within the analyzed limits of variability, but efforts continue to improve the understanding of facility performance in relation to the PA analysis. A similar understanding of the impact of variability on processing parameters is important from the standpoint of the operability of the production facility. The fresh grout slurry properties (particularly slurry rheology and the rate of hydration and structure formation) of the waste form directly impact the pressure and flow rates that can be reliably processed. It is thus equally important to quantify the impact of variability on processing parameters to ensure that the design basis assumptions for the production facility are maintained. Savannah River Remediation (SRR) has been pursuing a process that will ultimately establish a property acceptance region (PAR) to incorporate elements important to both processability and long-term performance properties. This process involves characterization of both emplaced product samples from the disposal facility and laboratory-simulated samples to demonstrate the effectiveness of the lab simulation. With that basis confirmed, a comprehensive variability study using non-radioactive simulants will define the acceptable PAR, or 'operating window' for Saltstone production and disposal. This same process will be used in the future to evaluate new waste streams for disposal or changes to the existing process flowsheet. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Determination of the Distribution and Inventory of Radionuclides within a Savannah River Site Waterway - 13202

An investigation was conducted to evaluate the radionuclide inventory within the Lower Three Runs (LTR) Integrator Operable Unit (IOU) at the U.S. Department of Energy's (DOE's) Savannah River Site (SRS). The scope of this effort included the analysis of previously existing sampling and analysis data as well as additional stream bed and flood plain sampling and analysis data acquired to delineate horizontal and vertical distributions of the radionuclide as part of the ongoing SRS environmental restoration program, and specifically for the LTR IOU program. While cesium-137 (Cs-137) is the most significant and abundant radionuclide associated with the LTR IOU it is not the only radionuclide, hence the scope included evaluating all radionuclides present and includes an evaluation of inventory uncertainty for use in sensitivity and uncertainty analyses. The scope involved evaluation of the radionuclide inventory in the P-Reactor and R-Reactor cooling water effluent canal systems, PAR Pond (including Pond C) and the flood plain and stream sediment sections of LTR between the PAR Pond Dam and the Savannah River. The approach taken was to examine all of the available Sediment and Sediment/Soil analysis data available along the P- and R-Reactor cooling water re-circulation canal system, the ponds situated along those canal reaches and along the length of LTR below Par Pond dam. By breaking the IOU into a series of sub-components and sub-sections, the mass of contaminated material was estimated and a representative central concentration of each radionuclide was computed for each compartment. The radionuclide inventory associated with each sub-compartment was then aggregated to determine the total radionuclide inventory that represented the full LTR IOU. Of special interest was the inventory of Cs-137 due to its role in contributing to the potential dose to an offsite member of the public. The overall LTR IOU inventory of Cs-137 was determined to be 2.87 E+02 GBq, which is similar to two earlier estimates. This investigation provides an independent, ground-up estimate of Cs-137 inventory in LTR IOU utilizing the most recent field data. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Performance Assessment Program for the Savannah River Site Liquid Waste Facilities - 13610

The Liquid Waste facilities at the U.S. Department of Energy's (DOE) Savannah River Site (SRS) are operated by Liquid Waste Operations contractor Savannah River Remediation LLC (SRR). A separate Performance Assessment (PA) is prepared to support disposal operations at the Saltstone Disposal Facility and closure evaluations for the two liquid waste tank farm facilities at SRS, F-Tank Farm and H-Tank Farm. A PA provides the technical basis and results to be used in subsequent documents to demonstrate compliance with the pertinent requirements identified in operations and closure regulatory guidance. The Saltstone Disposal Facility is subject to a State of South Carolina industrial solid waste landfill permit and the tank farms are subject to a state industrial waste water permit. The three Liquid Waste facilities are also subject to a Federal Facility Agreement approved by the State, DOE and the Environmental Protection Agency (EPA). Due to the regulatory structure, a PA is a key technical document reviewed by the DOE, the State of South Carolina and the EPA. As the waste material disposed of in the Saltstone Disposal Facility and the residual material in the closed tank farms is also subject to reclassification prior to closure via a waste determination pursuant to Section 3116 of the Ronald W. Reagan National Defense Authorization Act of Fiscal Year 2005, the U.S. Nuclear Regulatory Commission (NRC) is also a reviewing agency for the PAs. Pursuant to the Act, the NRC also has a continuing role to monitor disposal actions to assess compliance with stated performance objectives. The Liquid Waste PA program at SRS represents a continual process over the life of the disposal and closure operations. When the need for a PA or PA revision is identified, the first step is to develop a conceptual model to best represent the facility conditions. The conceptual model will include physical dimensions of the closed system, both the engineered and natural system, and modeling input parameters associated with the modeled features, both initial values (at the time of facility closure) and degradation rates/values. During the development of the PA, evaluations are conducted to reflect not only the results associated with the best available information at the time but also to evaluate potential uncertainties and sensitivities associated with the modeled system. While the PA will reflect the modeled system results from the best available information, it will also identify areas for future work to reduce overall PA uncertainties moving forward. DOE requires a PA Maintenance Program such that work continues to reduce model uncertainties, thus bolstering confidence in PA results that support regulatory decisions. This maintenance work may include new Research and Development activities or modeling as informed by previous PA results and other new information that becomes available. As new information becomes available, it is evaluated against previous PAs and appropriate actions are taken to ensure continued confidence in the regulatory decisions. Therefore, the PA program is a continual process that is not just the development of a PA but seeks to incorporate new information to reduce overall model uncertainty and provide continuing confidence in regulatory decisions. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Operation of Bubblers in the Savannah River Site Defense Waste Processing Facility Melter - 12166

Savannah River Remediation (SRR) LLC acquired the liquid waste contract at the Savannah River Site (SRS) in the summer of 2009. In order to achieve the main goal of the contract, closing of High Level Waste (HLW) tanks, it was necessary to process more waste throughout the SRS liquid waste facilities. The Defense Waste Processing Facility (DWPF) would need to increase its production rate of radioactive waste glass filled canisters as a part of the plan to achieve this commitment. To attain the increased production rate, four bubblers were installed in the DWPF Melter in September 2010 to agitate the DWPF Melter glass pool. The four bubblers were designed to be installed in existing nozzles on the top-head of the DWPF Melter. The design and fabrication of the four (4) bubblers was accomplished through SRR critical subcontractor EnergySolutions LLC. In addition to the existing bubbler design, a new design concept has been approved and is in the process of fabrication. The new design will allow for the lower end (inside melter) of the bubbler to be replaced while the upper end (outside melter) of the bubbler is reused to minimize cost and waste at the DWPF. The bubblers have been operating in the DWPF Melter for approximately 1 year. The originally installed bubbler set was replaced in January 2011. The bubblers were visually examined once removed from the melter and showed minimal signs of wear. Material testing of the Inconel 690 is being performed to determine if the bubblers operational life can be extended. The use of the bubblers has changed the dynamics within the melter glass pool. This is shown through indications that the bubblers have increased the glass pool circulation. Overall, performance of the bubblers has been encouraging and the DWPF Melter has seen a significant improvement in its ability to process waste since the bubbler installation. The installation of the bubblers accomplished the goal of increasing the glass production capability of DWPF Melter. Currently the DWPF Melter is producing glass at a rate of 91 to 93 kg of glass/hour (200 to 205 lbs of glass/hour). As a result of this increased glass production rate the DWPF has been able to produce the most canisters since radioactive operations began in 1996. These accomplishments can be directly attributed to the bubblers ability to increase mixing/convection within the glass melt pool thereby improving the heat transfer from melt pool to the cold cap. Further, this has helped SRR take a significant step forward toward closing the HLW tanks at the aggressive pace set forth in the most recent liquid waste contract at the SRS. As a path forward, the DWPF is continuing work with SRNL to complete the final metallurgical examination of the bubbler samples to help determine methods to increase the design life of the bubblers beyond the current 6-month restriction. Also, the DWPF is continuing work with EnergySolutions on a new bubbler design concept to minimize cost and waste at the DWPF. The new design will allow for the lower end (inside melter) of the bubbler to be replaced while the upper end (outside melter) of the bubbler is reused. This new design is currently in the final design approval phase and EnergySolutions will be selecting a fabricator to begin the work to build bubbler sets 5 and 6 using the new design. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

F-Tank Farm Performance Assessment Updates through the Special Analysis Process at Savannah River Site - 12169

The F-Area Tank Farm (FTF) is owned by the U.S. Department of Energy and operated by Savannah River Remediation, LLC (SRR), Liquid Waste Operations contractor at DOE's Savannah River Site (SRS). The FTF is in the north-central portion of the SRS and occupies approximately 22 acres within F-Area. The FTF is an active radioactive waste storage facility consisting of 22 carbon steel waste tanks and ancillary equipment such as transfer lines, evaporators and pump tanks. An FTF Performance Assessment (PA) was prepared to support the eventual closure of the FTF underground radioactive waste tanks and ancillary equipment. The PA provides the technical basis and results to be used in subsequent documents to demonstrate compliance with the pertinent requirements identified below for final closure of FTF. The FTank Farm is subject to a state industrial waste water permit and Federal Facility Agreement. Closure documentation will include an F-Tank Farm Closure Plan and tank-specific closure modules utilizing information from the performance assessment. For this reason, the State of South Carolina and the Environmental Protection Agency must be involved in the performance assessment review process. The residual material remaining after tank cleaning is also subject to reclassification prior to closure via a waste determination pursuant to Section 3116 of the Ronald W. Reagan National Defense Authorization Act of Fiscal Year 2005. The projected waste tank inventories in the FTF PA provide reasonably bounding FTF inventory projections while taking into account uncertainties in the effectiveness of future tank cleaning technologies. As waste is removed from the FTF waste tanks, the residual contaminants will be sampled and the remaining residual inventory is characterized. In this manner, tank specific data for the tank inventories at closure will be available to supplement the waste tank inventory projections currently used in the FTF PA. For FTF, the new tank specific data will be evaluated through the Special Analysis process. The FTF Special Analyses process will be utilized to evaluate information regarding the final residual waste that will be grouted in place in the FTF Tanks and assess the potential impact the new inventory information has on the FTF PA assumptions and results. The Special Analysis can then be used to inform decisions regarding FTF tank closure documents. The purpose of this paper is to discuss the Special Analysis process and share insights gained while implementing this process. An example of an area of interest in the revision process is balancing continuous improvement versus configuration control of agreed upon methodologies. Other subjects to be covered include: 1) defining the scope of the revisions included in the Special Analysis, 2) determining which PA results should be addressed in the Special Analysis, and 3) deciding whether the Special Analysis should utilize more qualitative or quantitative assessments. For the SRS FTF, an FTF PA has been prepared to provide the technical basis and results to be used in subsequent documents to demonstrate compliance with the pertinent requirements for final closure of FTF. The FTF Special Analyses process will be utilized to evaluate the impact new information has on the FTF PA assumptions and results. The Special Analysis can then be used to inform decisions regarding FTF tank closure documents. In preparing SAs, it is crucial that the scope of the SA be well defined within the SA, since the specific scope will vary from SA to SA. Since the SAs are essentially addendums to the PA, the SA scope should utilize the PA as the baseline from which the SA scope is defined. The SA needs to focus on evaluating the change associated with the scope, and not let other changes interfere with the ability to perform that evaluation by masking the impact of the change. In preparing the SA, it is also important to let the scope determine whether the Special Analysis should utilize more qualitative or quantitative assessments and also which results from the PA should be addressed in the Special Analysis. These decisions can vary from SA and should not be predetermined. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Control of the Reduction/Oxidation State of the High Level Waste Form in the Defense Waste Processing Facility at the Savannah River Site - 12451

The Defense Waste Processing Facility at the Savannah River Site treats and immobilizes High Level Waste into a durable borosilicate glass for safe, permanent storage. Among the parameters important to the overall process is the reduction/oxidation state of the glass. Control strategies for the reduction/oxidation state of the glass have been developed and evolved over the last 20 years to provide a current strategy which is both accurate and robust. A description of the methodologies implemented to control, evaluate, and validate the reduction/oxidation state of the glass is discussed along with the impact of future facility changes (made to pursue a more aggressive program to empty High Level Waste tanks at the Savannah River Site) on the reduction/oxidation state of glass. The reduction/oxidation state of the glass is an important parameter to the operation of the Defense Waste Processing Facility. Control, evaluation, and validation of the reduction/oxidation state of the glass is of particular importance for melter operation. Melter feed which is too oxidizing can negatively impact production, while feed which is too reducing can result in catastrophic failure of the melter. Control strategies for the reduction/oxidation state of the glass have been developed and evolved over the last 20 years to provide a current strategy which is both accurate and robust. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

NRC Waste Incidental to Reprocessing Program: Overview of Consultation and Monitoring Activities at the Idaho National Laboratory and the Savannah River Site - What We Have Learned - 12470

In 2005 the U.S. Nuclear Regulatory Commission (NRC) began to implement a new set of responsibilities under the Ronald W. Reagan National Defense Authorization Act (NDAA) of Fiscal Year 2005. Section 3116 of the NDAA requires the U.S. Department of Energy (DOE) to consult with the NRC for certain non-high level waste determinations and also requires NRC to monitor DOE's disposal actions related to those determinations. In Fiscal Year 2005, the NRC staff began consulting with DOE and completed reviews of draft waste determinations for salt waste at the Savannah River Site. In 2006, a second review was completed on tank waste residuals including sodium-bearing waste at the Idaho Nuclear Technology and Engineering Center Tank Farm at the Idaho National Laboratory. Monitoring Plans were developed for these activities and the NRC is actively monitoring disposal actions at both sites. NRC is currently in consultation with DOE on the F-Area Tank Farm closure and anticipates entering consultation on the H-Area Tank Farm at the Savannah River Site. This paper presents, from the NRC perspective, an overview of how the consultation and monitoring process has evolved since its conception in 2005. It addresses changes in methods and procedures used to collect and develop information used by the NRC in developing the technical evaluation report and monitoring plan under consultation and the implementation the plan under monitoring. It will address lessons learned and best practices developed throughout the process. The NDAA has presented significant challenges for the NRC and DOE. Past and current successes demonstrate that the NDAA can achieve its intended goal of facilitating tank closure at DOE legacy defense waste sites. The NRC believes many of the challenges in performing the WD reviews have been identified and addressed. Lessons learned have been collected and documented throughout the review process. Future success will be contingent on each agencies commitment to consistently apply the lessons learned and continue to create an open and collaborative work environment to maintain the process of continuous improvement. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Deployment of large tank monosodium titanate strike to increase salt processing at the Savannah river site - 15115

The treatment of high level waste (HLW) salt solutions using the Actinide Removal Process (ARP) and Modular Caustic Side Solvent Extraction Unit (MCU) began at Savannah River Site (SRS) in 2008. Since that time, over 6 million gallons of liquid HLW have been treated and the resulting low level waste (LLW) effluent immobilized in cementitious grout at salt-stone. In addition to the continued stabilization of liquid HLW, operating experience from the ARP/MCU facilities has also been valuable in considering the design and construction of the Salt Waste Processing Facility (SWPF) which will utilize similar unit operations on a much larger scale. ARP removes actinides by contacting waste with monosodium titanate (MST) which is a solid adsorbent for soluble strontium and actinides. Once the sorption reaction is complete, the MST solids are separated from salt solution via ultrafiltration through a crossflow filter. The throughput of initial operations of ARP/MCU was limited by the flowrate through the extraction process. However, after the implementation of a new solvent flowsheet, filtration of MST will be the rate limiting step in salt processing. For the entirety of ARP/MCU operation, Savannah River Remediation (SRR) has sought to improve process efficiency and performance through optimization and modification of the original facility design. These efforts have resulted in a best-single-year throughput of 4.9 million liters of decontaminated salt solution. In keeping with these practices, SRR recently initiated a project to improve filtration throughput by relocating the MST strike from small batches immediately upstream of the filtration unit to the underground waste tank used to batch and store salt solution feed for ARP/MCU. This process change will allow the bulk of MST solids to decant in the waste tank prior to filtration which should improve both the nominal operational filter flux as well as the achieved utility of filter operation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Design of an effective radiological effluent and environmental surveillance program - history of Savannah River site environmental monitoring program design - 15308

An effective radiological effluent and surveillance program is critical for a nuclear facility to (1) comply with applicable regulations, (2) assess the potential impacts of operations to the environment and public, and (3) inform stakeholders and members of the public of any impacts. Radiological environmental monitoring includes three program elements - effluent monitoring, environmental surveillance, and dose assessments. The key to an effective program is defining the baseline and objectives based on regulatory requirements, identification of the critical exposure pathways, determining the spatial and temporal boundaries for the monitoring, and defining the reporting and action levels. Another key to an effective program is through continuous improvement by transforming the program based on operational facility changes and responding to technology advancements in the field of environmental monitoring. The history of the Savannah River Site's (SRS) environmental monitoring program is an example of an effective program that has transitioned, changed, and improved over the years based on the site missions and operations. From the beginning of five production reactors and two chemical separations facilities to the current Site missions of Environmental Stewardship, National Security, and Clean Energy, the SRS environmental monitoring program has evolved. SRS has a unique ecological environment with the Site area covering 80,300 hectares, five major streams that lead to the Savannah River, various water bodies, and varied meteorological conditions. Airborne and liquid pathways to human exposure are complex and it is necessary to use a graded approach when monitoring these pathways. The SRS environmental monitoring program is designed and effective in ensuring and verifying that there is a minimal exposure impact on the public and the environment from Site operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗