Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “REMEDIATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,027 records · Page 57

Explanation of Significant Differences for the Record of Decision for Interim Actions in Zone 1, East Tennessee Technology Park, Oak Ridge, Tennessee

Zone 1 is a 1400-acre area outside the fence of the main plant at The East Tennessee Technology Park (ETTP) in Oak Ridge, Tennessee. The Record of Decision for Interim Actions in Zone, ETTP (Zone 1 Interim ROD) (DOE 2002) identifies the remedial actions for contaminated soil, buried waste, and subsurface infrastructure necessary to protect human health and to limit further contamination of groundwater. Since the Zone 1 Interim Record of Decision (ROD) was signed, new information has been obtained that requires the remedy to be modified as follows: (1) Change the end use in Contractor's Spoil Area (CSA) from unrestricted industrial to recreational; (2) Remove Exposure Units (EU5) ZI-50, 51, and 52 from the scope of the Zone I Interim ROD; (3) Change the end use of the duct bank corridor from unrestricted industrial to restricted industrial; and (4) Remove restriction for the disturbance of soils below 10 feet in Exposure Unit (EU) Z1-04. In accordance with 40 Code of Federal Regulations (CFR) 300.435, these scope modifications are a 'significant' change to the Zone 1 Interim ROD. In accordance with CERCLA Sect. 117 (c) and 40 CFR 300.435 (c)(2)(i), such a significant change is documented with an Explanation of Significant Differences (ESD). The purpose of this ESD is to make the changes listed above. This ESD is part of the Administrative Record file, and it, and other information supporting the selected remedy, can be found at the DOE Information Center, 475 Oak Ridge Turnpike, Oak Ridge, Tennessee 37830, from 8:00 a.m. to 5:00 p.m., Monday through Friday. The ORR is located in Roane and Anderson counties, within and adjacent to the corporate city limits of Oak Ridge, Tennessee. ETTP is located in Roane County near the northwest corner of the ORR. ETTP began operation during World War II as part of the Manhattan Project. The original mission of ETTP was to produce enriched uranium for use in atomic weapons. The plant produced enriched uranium from 1945 until 1985. Uranium production was terminated in 1987. ORR was placed on the National Priorities List in 1989, so remediation activities are conducted under CERCLA. The primary contaminants of concern at ETTP follow: (1) In groundwater - volatile organic compounds (VOCs) at multiple locations (trichloroethene is generally the most prevalent compound); (2) In sediment - inorganic elements, radionuclides, and polychlorinated biphenyls; (3) In soil - inorganic elements, radionuclides, semivolatile organic compounds (particularly the polycyclic aromatic hydrocarbons), and VOCs; and (4) In facilities - radionuclides and polychlorinated biphenyls (abandoned facilities also pose a safety and health hazard to workers.) The purposes of the remedial actions selected in the Zone 1 Interim ROD are to allow unrestricted industrial use down to 10 feet and to remediate potential sources of groundwater contamination. Following is a summary of the major components of the Zone 1 Interim ROD remedy: (1) Excavation of the Blair Quarry burial area and associated contaminated soil; (2) Excavation of miscellaneous contaminated soil in the K-895 Cylinder Destruct Facility area and in the Powerhouse Area; (3) Removal of sludge and demolition of the K-710 sludge beds and Imhoff tanks; (4) Implementation of land use controls (LUCs); and (5) Characterization of soil and remediation of areas that exceed remediation levels.

54 ENVIRONMENTAL SCIENCES↗

FEASIBILITY STUDY REPORT FOR THE 200-ZP-1 GROUNDWATER OPERABLE UNIT

The Hanford Site, managed by the U.S. Department of Energy (DOE), encompasses approximately 1,517 km{sup 2} (586 mi{sup 2}) in the Columbia Basin of south-central Washington State. In 1989, the U.S. Environmental Protection Agency (EPA) placed the 100, 200, 300, and 1100 Areas of the Hanford Site on the 40 Code of Federal Regulations (CFR) 300, 'National Oil and Hazardous Substances Pollution Contingency Plan' National Contingency Plan [NCPD], Appendix B, 'National Priorities List' (NPL), pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). The 200 Areas NPL sites consist of the 200 West and 200 East Areas (Figure 1-1). The 200 Areas contain waste management facilities, inactive irradiated fuel reprocessing facilities, and the 200 North Area (formerly used for interim storage and staging of irradiated fuel). Several waste sites in the 600 Area, located near the 200 Areas, also are included in the 200 Areas NPL site. The 200 Areas NPL site is in a region referred to as the 'Central Plateau' and consists of approximately 700 waste sites, excluding sites assigned to the tank farm waste management areas (WMAs). The 200-ZP-1 Groundwater Operable Unit (OU) consists of the groundwater located under the northern portion of the 200 West Area. Waste sources that contributed to the 200-ZP-1 OU included cribs and trenches that received liquid and/or solid waste in the past from the Z Plant and T Plant aggregate areas, WMA-T, WMA-TX/TY, and the State-Approved Land Disposal Site (SALDS). This feasibility study (FS) for the 200-ZP-1 Groundwater OU was prepared in accordance with the requirements of CERCLA decision documents. These decision documents are part of the Administrative Record for the selection of remedial actions for each waste site and present the selected remedial actions that are chosen in accordance with CERCLA, as amended by the Superfund Amendments and Reauthorization Act of 1986, and to the extent practicable, the NCP. This FS conforms to the conditions set forth in the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) (Ecology et al. 2003) and amendments, signed by the Washington State Department of Ecology (Ecology), EPA, and DOE Richland Operations Office (RL). This also includes Tri-Party Agreement Milestone M-015-00C for completing all 200 Area non-tank farm OU pre-Record of Decision (ROD) documents on or before December 31, 2011. This FS supports the final remedy selection for the 200-ZP-1 OU, as described in the Remedial Investigation/Feasibility Study Work Plan for the 200-ZP-1 Groundwater Operable Unit (referred to as the 200-ZP-1 RI/FS work plan) (DOE/RL-2003-55), as agreed upon by RL and EPA. Tri-Party Agreement Milestone M-015-48B required Draft A of the 200-ZP-1 OU FS and proposed plan to be transmitted to EPA by September 30, 2007. As agreed to with EPA in the 200 Area Unit Managers Meeting Groundwater Operable Unit Status (FH-0503130), the baseline risk assessment (BRA) was delayed from inclusion in the remedial investigation (RI) report and is completed and documented in this FS. The Remedial Investigation Report for 200-ZP-1 Groundwater Operable Unit (referred to as the 200-ZP-1 RI report) (DOE/RL-2006-24) included an evaluation of human health and ecological risks and hazards. The RI report identified the radiological and chemical contaminants of potential concern (COPCs) that represent the primary risks to human health and the environment. The complete risk assessment in this FS incorporates additional analytical data from the unconfined aquifer that were obtained during or after preparation of the RI report, particularly for carbon tetrachloride and technetium-99. This FS also includes the initial results from an ongoing study of technetium-99 contamination near WMA-T, the sampling of new wells near the 216-W-LC laundry waste crib and T Plant, updated Hanford vadose zone fate and transport modeling, and groundwater particle-tracking analysis. The purpose of this FS is to develop and evaluate alternatives for remediation of the groundwater in the 200-ZP-1 OU. The alternatives considered provide a range of potential response actions (i.e., no action; institutional controls and monitored natural attenuation [MNA]; and pump-and-treat with MNA, flow-path control, and institutional controls) that are appropriate to address site-specific conditions. The alternatives are evaluated against seven of the nine CERCLA evaluation criteria defined in Guidance for Conducting Remedial Investigations and Feasibility Studies Under CERCLA (EPA/540/G-891004). The remaining two CERCLA criteria will be formally assessed during the public comment period. The FS evaluation serves as the basis for identifying a remedy to mitigate potential risks to human health and the environment. A preferred alternative (or alternatives) will be presented to the public for review and comment in the proposed plan.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Vertical Extraction Process Implemented at the 118-K-1 Burial Ground for Removal of Irradiated Reactor Debris from Silo Structures - 12431

The primary objective of a remediation project is the safe extraction and disposition of diverse waste forms and materials. Remediation of a solid waste burial ground containing reactor hardware and irradiated debris involves handling waste with the potential to expose workers to significantly elevated dose rates. Therefore, a major challenge confronted by any remediation project is developing work processes that facilitate compliant waste management practices while at the same time implementing controls to protect personnel. Traditional burial ground remediation is accomplished using standard excavators to remove materials from trenches and other excavation configurations often times with minimal knowledge of waste that will be encountered at a specific location. In the case of the 118-K-1 burial ground the isotopic activity postulated in historic documents to be contained in vertical cylindrical silos was sufficient to create the potential for a significant radiation hazard to project personnel. Additionally, certain reported waste forms posed an unacceptably high potential to contaminate the surrounding environment and/or workers. Based on process knowledge, waste management requirements, historic document review, and a lack of characterization data it was determined that traditional excavation techniques applied to remediation of vertical silos would expose workers to unacceptable risk. The challenging task for the 118-K-1 burial ground remediation project team then became defining an acceptable replacement technology or modification of an existing technology to complete the silo remediation. Early characterization data provided a good tool for evaluating the location of potential high exposure rate items in the silos. Quantitative characterization was a different case and proved difficult because of the large diameter of the silos and the potential for variable density of attenuating soils and waste forms in the silo. Consequently, the most relevant information supporting job planning and understanding of the conditions was the data obtained from the gross gamma meter that was inserted into each casing to provide a rough estimate of dose rates in the tubes. No added value was realized in attempting to quantify the source term and/or associate the isotopic activity with a particular actual waste form (e.g., sludge). Implementing the WRM system allowed monitoring of worker and boundary exposure rates from a distance, maintaining compliance with ALARA principles. This system also provided the project team early knowledge of items being removed that had high exposure rates associated with them, thus creating an efficient method of acknowledging an issue and arriving at a solution prior to having an upset condition. An electronic dosimeter with telemetry capability replaced the excavator mounted AMP-100 system approximately half way through remediation of the silos. Much higher connectivity efficiency was derived from this configuration. Increasing the data feed efficiency additionally led to less interruption of the remediation effort. Early in system testing process a process handicap on the excavator operator was acknowledged. A loss of depth perception resulted when maneuvering the excavator and bucket using the camera feed to an in-cab monitor. Considerable practice and mock-up testing allowed this handicap to be overcome. The most significant equipment failures involved the cable connection to the camera mounted between the clamshell bucket jaws and the video splitter in the excavator cab. Rotation of the clamshell bucket was identified as the cause of cable connection failures because of the cyclic twisting motion and continuous mechanical jarring of the connection. In-cab vibration was identified as the culprit in causing connection failures of the video splitter. While these failures were repaired, substantial production time was lost. Ultimately, the decision was made to purchase a second cable and higher quality video splitter eliminate the down time. An engineering improvement for future operations would be inserting cable pig tails at more stressed cable connection points to facilitate rapid change out of the cable should that be required. Overall, the system performed better than expected in a safe and efficient manner. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Radiological data consolidation and 3D modeling of a building - 15473

A portion of a building at an industrial facility that conducted monazite sands-processing operations in the 1950's under contract to the Atomic Energy Commission (AEC) became contaminated. Subsequently the U.S. Department of Energy designated the facility for remedial action under the Formerly Used Sites Remedial Action Program (FUSRAP). Remedial investigation, remedial actions and post-remediation surveys have been conducted in portions of the building. Radiological data for the interior of the building were compiled, evaluated and presented in a three dimensional (3-D) model (the model) created by AMEC Foster Wheeler in order to identify areas that meet the Record of Decision (ROD) cleanup criteria, and identity areas that may require remedial action or may require additional investigation due to data gaps. The data from different phases of investigation and remediation cover different portions of the building and in some cases overlap. In addition, the data were collected over a period of more than ten years, for different objectives, and thus the instruments and methods for establishing efficiency were not necessarily consistent. The data consolidation process included determining the relative quality of data points to include in the model and the development of rationale associated with assigning a quality level (i.e. ranking) to each data point. The rationale for ranking data quality included, as the primary determining factors, chronological order of the data (most recent was ranked as more reliable), certainty of the sample locations within the building, and analytical data quality. A 3-D model of the building was created using a laser point cloud scan which was then converted into a 3-D design model. Sample locations were then entered into the model and linked with the analytical database to allow display of the radiological results in the model. The visual model allows both strategic and tactical decisions to be made, depending on the level of detail examined. The evaluation process allowed maximum use of the historical data set, rather than requiring older data to be disregarded, and provided at a minimum a qualitative sense of data quality/confidence in the data. The (authors)process also highlights the importance of collecting high quality data from the very beginning with a consistent locational coordinate system, and the need for a good visualization model in order to assess contaminant locations during remedial action or post-remediation surveys.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Preparing the FUSRAP Colonie Interim Storage Site for Transfer Back to the US Department of Energy Office of Legacy Management - 19215

The Formerly Utilized Sites Remedial Action Program (FUSRAP) Colonie Interim Storage Site was transferred from the US Department of Energy (US DOE) to the US Army Corps of Engineers (USACE) in 1997. The USACE initiated remediation efforts at the Site under FUSRAP. The Site was separated into three distinct operable units (OU) to more efficiently manage the remedial process: 1) Groundwater OU, 2) Main Site Soils OU, and 3) Vicinity Property OU. The USACE has completed remedial actions at each of these three OUs and has advanced the OU remedies at the Site to the long-term stewardship stage to be executed by the US DOE Office of Legacy Management (LM). The US DOE LM is the current real property owner of record of the Colonie Main Site. A summary of each OU and the activities needed to prepare for site transfer follows: OU 1 - USACE issued the Colonie Groundwater OU Record of Decision (ROD) (USACE 2010a) on April 9, 2010. The Groundwater ROD remedy is monitored natural attenuation (MNA) and long-term monitoring (LTM) of groundwater after source removal completion. Results of groundwater monitoring indicate reductions in concentrations of contaminants of concern (COC). Based on the marked progress to date, USACE has optimized the groundwater LTM program (USACE, 2014) by reducing the well network, sampling frequency, and analytical parameters, and by abandoning wells that are no longer needed. A Groundwater ROD Five-Year Review report was submitted to the New York State Department of Environmental Conservation (NYSDEC) for review in 2018. NYSDEC agreed that MNA is still an appropriate remedial method although it is progressing at a slower rate than predicted. OU 2 - From 1999 to 2007, USACE completed the large-scale removal of soil at the Main Site, which included the adjacent Town of Colonie Vicinity Property. Radioactively contaminated soil along with accessible metals-contaminated soil and soil containing volatile organic compounds (VOC) were removed during this effort. A total of 103,402 cubic meters (m{sup 3}) of soil was excavated and disposed offsite. On March 26, 2015, USACE signed the Main Site Soils OU ROD (USACE, 2015a). The ROD remedy included provisions for Land Use Controls (LUC) consisting of institutional controls (IC) through an Environmental Easement for management of three small and discrete inaccessible locations within three of the 27 Final Status Survey units of the Main Site. The Environmental Easement provides a means of protection based on both current and future land use by placing restrictions on soil excavation and reuse. The easement and a supporting Site Management Plan (SMP) will be finalized by LM in coordination with NYSDEC. OU 3 - the Vicinity Property OU ROD was signed on 20 September 2017. This ROD declared No Action (NA) for dust and No Further Action (NFA) for soil and other media for the Vicinity Properties. Prior to the ROD, USACE performed dust sampling and other characterization activities at representative commercial and residential Vicinity Property locations. These efforts were reported in the Colonie FUSRAP Site Vicinity Property Operable Unit Remedial Investigation Summary Report (USACE, 2016). A Site Closeout Report (SCOR) was issued to NYSDEC and approved in 2018. The approval of this report starts the transfer process back to the LM. Ongoing and future transfer activities include records retention and management, preparation and filing of real estate records, physical site management (fencing, landscape maintenance, well abandonment) and coordination with state regulators and LM staff. This presentation is intended to make all stakeholders aware of the necessary steps for site transfer from the USACE back to the LM. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Site Characterization and Adaptation - Lessons Learned from the Port Granby LLRW Project in Canada - 19255

The Port Hope Area Initiative (PHAI) is a community-based solution for the long-term management of historic low level radioactive waste (LLRW) resulting from 60 years of uranium and radium processing operations in the Town of Port Hope, Ontario. The Eldorado refinery, on the shores of Lake Ontario, began refining radium-226 from pitchblende ore, later transitioning to the refining of uranium ore. Process residues were deposited at the Welcome Waste Management Facility in the Town of Port Hope until the mid-1950's switching to the Port Granby Waste Management Facility (PGWMF), which continued to accept waste until the late 1980's. The Port Granby Project is part of the broader PHAI being completed by Canadian Nuclear Laboratories (CNL). The scope of remediation activities at Port Granby includes: 1) constructing a new, secure long-term waste management facility (LTWMF) and supporting infrastructure, and 2) excavating and relocating LLRW and marginally contaminated soil from the Port Granby Waste Management Facility (PGWMF) to the newly constructed LTWMF. Remediation design required extensive site investigations of waste buried in unmarked and unlined trenches across the PGWMF area. Investigations included reviews of historical records, interviews with past staff of Eldorado and Atomic Energy Canada Limited (the entity managing the PHAI cleanup prior to CNL), radiological surveys, and the advancement of boreholes across the site to facilitate the physical sampling of soil and groundwater contaminants indicative of the presence of LLRW. This paper describes the challenges associated with characterizing and quantifying waste prior to remediation and lessons-learned to adjust procedural adaptations during the characterization phase of a project to better anticipate the unanticipated nature and growth of the contamination profile that often occurs during remediation. Despite substantial pre-remediation investigative efforts, current PGWMF remediation activities have resulted in growth of both the areal and vertical extent of contamination. The contamination profile was shown to be dramatically influenced by leaching of contaminants deeper into native soils. In addition, remedial excavation discovered specific waste types such as unidentified compressed gas cylinders outside of the location indicated by historical records, as well as a quantity of unknown liquids and unmarked drums. These discoveries have resulted in higher waste quantity estimates and have required a partial redesign of the LTWMF mound (a higher final elevation and steeper slopes) to accommodate the increased waste volume. In addition, the means and methods necessary to execute the remedial construction had to be modified to account for the new conceptual model developed from the new contamination data. Despite extensive historical review and site characterization to define the nature and extent of LLRW buried at the PGWMF, actual conditions encountered during remediation efforts necessitated taking an adaptive approach to both the design of the LTWMF and the means and methods used for excavation and transport of waste. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Review of Amendment Delivery and Distribution Methods, and Relevance to Potential In Situ Source Area Treatment at the Hanford Site

The U.S. Department of Energy’s Hanford Site in southeastern Washington State is a complex of multiple facilities where historical release events in the Central Plateau area have resulted in subsurface contamination of the vadose zone, a perched-water zone, and underlying aquifer. Although some contaminants have already migrated through the vadose zone into the groundwater, contaminants remaining in the unsaturated zone are a potential long-term risk as a source for further groundwater contamination. Moreover, a perched-water zone located in the 200-DV-1 Operable Unit at Hanford creates further remediation difficulties. Remediation options are limited for contaminants located in the vadose and perched-water zones within the Central Plateau due to considerable depth, co-located contaminants, and complexities associated with physical and biogeochemical heterogeneities. Existing comprehensive reviews discuss potential remedial technologies relevant to Hanford Site conditions (e.g., deep vadose zone and perched water) and provide treatment technology recommendations. Many of the recommended in situ remediation technologies rely on introduction of amendments into the subsurface to achieve remedial goals. However, there are currently few review or guidance documents that provide a comprehensive look at mechanisms and considerations related to amendment delivery and distribution. This document summarizes amendment types, delivery techniques, subsurface access methods, and the applicability of delivery methods and amendments for specific subsurface target zones, including in the context of Hanford Central Plateau applications. Guidance on the appropriateness of a remedial technology for a specific site and contaminant is not included within this document. Rather, this document is intended to be used when considering remediation technologies and the associated amendments. An overview of amendment types (i.e., liquid, gas, and solids) and access/distribution methods used in subsurface remediation is provided, along with discussion of the maturity level (low, medium, or high), advantages, and limitations that relate to the potential effectiveness of each approach in the context of site-specific factors (subsurface geology, geochemistry, contaminant properties, etc.). There are many Hanford Site-specific factors that influence the suitability and appropriateness of amendment delivery strategies. Excluding amendment delivery approaches that are unsuitable for the Hanford context, each approach was assessed for applicability to the following target zones: unsaturated high permeability, unsaturated low permeability, perched water, saturated high permeability, and saturated low permeability zones. This compilation and discussion related to amendment delivery mechanisms provides a useful resource for evaluating remedial alternatives for source area contamination in the Hanford Central Plateau.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Decision Aid for Conjunction Risk Mitigation by Differential Drag

In the previous five years, the rate of conjunctions that the NASA Conjunction Assessment Risk Analysis (CARA) team processed and analyzed has more than tripled. (NASA CARA, 2024) New missions in the early development phases are now required to plan for dealing with conjunctions under the present space environment, and also projecting forward into a future likely with even further increased utilization of the space environment. Some missions are investigating the possibility of using differential drag to remediate conjunctions without expending limited fuel or for missions without propulsive capabilities. The NASA CARA team studied the historical record of conjunctions to evaluate the circumstances under which differential drag may be successfully applied and have developed a series of tables to use as a decision aid for missions considering differential drag. Currently, if a CARA-protected mission with maneuvering capabilities is predicted to have a conjunction with probability of collision (Pc) greater than 7E-5 (the default value of the ‘yellow threshold’, which may have some other value agreed by CARA and the mission during the Orbital Collison Avoidance Planning (OCAP) process), CARA will use its Maneuver Trade Space (MTS) tool to evaluate and recommend options for the timing and magnitude of a risk mitigation maneuver (RMM), based on the mission’s capabilities. If the conjunction’s Pc is greater than 1E-4, the ‘red threshold’, then an RMM must be executed per NASA Procedural Requirements (NPR) 8079.1 (NASA, 2023), although missions may execute an RMM even if the Pc is lower. The magnitude of the maneuver is typically a few cm/s, and CARA estimates how many will be required for the mission’s nominal lifetime – typically a few per year – during the OCAP process, to inform the mission’s delta-V requirement. For traditional satellites, this is usually smaller than other requirements for orbit insertion, maintenance, and disposal, but for CubeSats or other small satellite missions, a propulsion system may not provide much more than a few cm/s of delta-V or may not fit at all within the available budget of money, time, size, weight, and/or power (SWaP). Conversely, CubeSats often have deployable solar panels, which offer the capacity to have much higher areas facing some directions than others. Such a mission can instead use ‘differential drag’ to remediate a conjunction -- in other words, change its drag area (usually increasing) to deviate from the predicted collision course. This is how Planet’s Dove spacecraft maintain their formations and remediate conjunction risks without having on-board propulsion (Foster, et al., 2017) (Griffith, et al., 2021). CARA has been developing improvements to MTS to support differential-drag for NASA's missions -- where it is effective. CARA records all conjunctions of their protected payloads, with historical records starting in 2005 (with significant conjunction events starting to occur on or after 2013). From this record, approximately 7,300 had a Pc greater than 1E-4 at 3 days prior to the time of closest approach, the time analyzed for differential drag efficacy. Of those, approximately 4,300 had fully-defined covariance matrices stored for both the primary and secondary objects; this set of conjunctions is the basis for the analysis of this work. CARA’s MTS tool was used to propagate the primary satellite forward from that decision point with varying degrees of increase to ballistic coefficient (BC). Because these conjunctions came from multiple missions, the nondimensional ‘delta-BC’ factor was used to quantify and normalize the increase in ballistic coefficient, defined as follows: Delta-BC = BC_new / BC_old - 1 Positive delta-BC factors represent an increase in drag compared to the nominal attitude, while negative delta-BC factors (to a minimum of -1) represent a decrease in drag. At the conclusion of the differential-drag ‘maneuver’, the Pc was recalculated to evaluate whether or not the conjunction was mitigated (Pc < 3E-6). These results were then binned and sorted along several axes, including altitude, amount of delta-BC, and (pre-maneuver) rate of energy dissipation (EDR), to identify underlying patterns. The altitude plot is shown in Figure 1. To validate this analysis, we consulted the record of a NASA mission which uses differential drag to maintain its orbit and remediate conjunction risk. CARA’s empirical record of the mission’s orbit history suggests it achieves a delta-BC of 2.2. Of the twenty-one RMM plans that were submitted by this mission, eighteen were matched with conjunctions in the historical record; of those, twelve were successfully remediated (final measured Pc < 3E-6), and six were not. This is consistent with the expected efficacy for missions orbiting at that altitude. We are presently simulating this mission’s RMMs with MTS; this work is ongoing, but so far, the MTS results are qualitatively in agreement with the empirical results -- correctly predicting that a maneuver would or would not remediate a conjunction, if not exactly matching the final post-remediation Pc value. We found that differential drag was most successful for satellites with perigees below 560 km, and which could adopt an average delta-BC of 2 or greater (that is, increasing their ballistic coefficient by a factor of 3). However, this is a difficult threshold for a mission to clear; very few spacecraft are capable of adopting a high-drag configuration for 72 hours continuously. Planet’s Dove spacecraft use differential drag to remediate conjunctions (Griffith, et al., 2021), and they have a maximum delta-BC factor of 9, but in practice (with mission and charging constraints) they achieve a time-averaged delta-BC that is closer to 2 (Foster, et al., 2017). A mission’s differential drag utility strongly depends on the operational constraints that has the capacity to limit the time-averaged delta-BC. A mission with a high maximum delta-BC of 5 or more can have an effective delta-BC of less than 1 due to operational constraints such as instrument and solar panel pointing, especially if this constraint results in holding an intermediate drag value for most of its orbit. CARA has developed tables that can be used as decision aids to advise missions-in-development about the best way to utilize their differential drag capabilities. For missions below 560 km with the operational flexibility to devote multiple days to holding a high-drag configuration (or a sufficiently high drag ratio to compensate for limitations on that time), they are -- more likely than not -- able to successfully remediate high-risk conjunctions. Conversely, missions that do not meet these exacting criteria -- most missions -- can instead be advised to use on-board propulsion systems to perform RMMs, or to turn their minimum-area face towards the approach vector, thereby reducing Pc at the moment of conjunction due to the decreased Hard-Body Radius (HBR), that is a strongly correlated variable in the Pc calculations. (NASA, 2023)

conjunction assessment↗

Application of Biochemical and Physiological Indicators for Assessing Recovery of Fish Populations in a Disturbed Stream

Recovery dynamics in a previously disturbed streamwere investigated to determine the influence of a series of remedial actions on stream recovery and to evaluate the potential application of bioindicators as an environmental management tool. A suite of bioindicators, representing five different functional response groups, were measured annually for a sentinel fish species over a 15 year period during which a variety of remedial and pollution abatement actions were implemented. Trends in biochemical, physiological, condition, growth, bioenergetic, and nutritional responses demonstrated that the health status of a sentinel fish species in the disturbed stream approached that of fish in the reference stream by the end of the study. Two major remedial actions, dechlorination and water flow management, had large effects on stream recovery resulting in an improvement in the bioenergetic, disease, nutritional, and organ condition status of the sentinel fish species. A subset of bioindicators responded rather dramatically to temporal trends affecting all sites, but some indicators showed little response to disturbance or to restoration activities. In assessing recovery of aquatic systems, application of appropriate integrative structural indices along with a variety of sensitive functional bioindicators should be used to understand the mechanistic basis of stress and recovery and to reduce the risk of false positives. Understanding the mechanistic processes involved between stressors, stress responses of biota, and the recovery dynamics of aquatic systems reduces the uncertainty involved in environmental management and regulatory decisions resulting in an increased ability to predict the consequences of restoration and remedial actions for aquatic systems.

54 ENVIRONMENTAL SCIENCES↗

Hybrid Sorbents for 129 I Capture from Contaminated Groundwater

Radioiodine ( 129 I) poses a risk to the environment due to its long half-life, toxicity, and mobility. It is found at the U.S. Department of Energy Hanford Site due to legacy releases of nuclear wastes to the subsurface where 129 I is predominantly present as iodate (IO 3 – ). To date, a cost-effective and scalable cleanup technology for 129 I has not been identified, with hydraulic containment implemented as the remedial approach. Here, novel high-performing sorbents for 129 I remediation with the capacity to reduce 129 I concentrations to or below the US Environmental Protection Agency (EPA) drinking water standard and procedures to deploy them in an ex-situ pump and treat (P&T) system are introduced. Furthermore, this includes implementation of hybridized polyacrylonitrile (PAN) beads for ex-situ remediation of IO 3 – -contaminated groundwater for the first time. Iron (Fe) oxyhydroxide and bismuth (Bi) oxyhydroxide sorbents were deployed on silica substrates or encapsulated in porous PAN beads. In addition, Fe–, cerium (Ce)–, and Bi–oxyhydroxides were encapsulated with anion-exchange resins. The PAN–bismuth oxyhydroxide and PAN–ferrihydrite composites along with Fe- and Ce-based hybrid anion-exchange resins performed well in batch sorption experiments with distribution coefficients for IO 3 – of >1000 mL/g and rapid removal kinetics. Of the tested materials, the Ce-based hybrid anion-exchange resin was the most efficient for removal of IO 3 – from Hanford groundwater in a column system, with 50% breakthrough occurring at 324 pore volumes. The functional amine groups on the parent resin and amount of active sorbent in the resin can be customized to improve the iodine loading capacity. These results highlight the potential for IO 3 – remediation by hybrid sorbents and represent a benchmark for the implementation of commercially available materials to meet EPA standards for cleanup of 129 I in a large-scale P&T system.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

TECHNICAL EVALUATION OF THE INTERACTION OF GROUNDWATER WITH THE COLUMBIA RIVER AT THE DEPARTMENT OF ENERGY HANFORD SITE 100-D AREA

Groundwater beneath much of Hanford's 100 Areas is contaminated with hexavalent chromium (Cr{sup +6}) as a consequence of treating reactor cooling water to prevent corrosion. Several treatment systems are in place to remove Cr{sup +6} from the groundwater; however, these systems currently do not reduce Cr{sup +6} to concentrations below aquatic standards. Of concern is the transport of Cr{sup +6} to areas within the channel of the river, as sensitive species inhabit the river and its associated transition zone. The aquatic standard for Cr{sup +6} is currently 11 ug/l under the Record of Decision (ROD) for Interim Action and Department of Energy (DOE) currently plans to pursue remediation of the groundwater to achieve the 11 ug/l standard. Because the compliance wells used to monitor the current remediation systems are located some distance from the river, they may not provide an accurate indication of Cr{sup +6} concentrations in the water that reaches the riverbed. In addition, because salmon spawning areas are considered a high priority for protection from Hanford contaminants, it would be advantageous to understand (1) to what extent Cr{sup +6} discharged to the near-shore or river ecosystems is diluted or attenuated and (2) mechanisms that could mitigate the exposure of the river ecosystems to the discharging Cr{sup +6}. The current concentration target for Cr{sup +6} at near-river groundwater monitoring locations is 20 {micro}g/L; it is assumed that this groundwater mixes with river water that contains virtually no chromium to meet Washington Department of Ecology's (Ecology) water quality standard of 10 {micro}g/L in the river environment. This dynamic mixing process is believed to be driven by daily and seasonal changes in river stage and groundwater remediation system operations, and has been validated using analytical data from numerous groundwater samples obtained adjacent to and within the banks of the river. Although the mean mixing factor of river water and site groundwater in this zone has been estimated to be equal parts of groundwater and river water, a wide range of mixing ratios likely occurs at various times of the day and year. The degree of mixing and dilution appears to be greatly influenced by the river stage and other groundwater/surface water interaction. The extent of mixing, thus, has implications for the design and operation of the groundwater remediation systems. Improved understanding of this 'dilution' mechanism is needed to design an optimum 'systems approach' to accelerate remediation of the near-shore contaminant plumes. More information on the pathway from near-river mapped plumes to riverbed receptor locations is also needed to develop a defensible proposed plan for a future ROD for final remedial action of contaminated groundwater. In April 2008, an expert panel of scientists was convened to review existing information and provide observations and suggestions to improve the current understanding of groundwater surface water interactions in the 100 Areas (primarily focusing on 100-D Area), and to identify what additional analyses or approaches may provide critical information needed to design and implement remediation systems that will minimize impacts to river aquatic systems. Specific objectives provided to the panel included: (1) comment on approaches and methods to improve the current understanding of groundwater-surface water interactions, specifically how contaminated groundwater enters the riverbed and how this relates to remediation of chromate in the groundwater in the 100 Areas; (2) evaluate past and current data collection methods, data analysis techniques, assumptions, and groundwater transport and mixing mechanisms; (3) evaluate the current monitoring network (monitoring wells, aquifer tubes, and shoreline/river monitoring); (4) evaluate the role played by modeling; and (5) suggest additional research to fill data gaps and perform modeling.

54 ENVIRONMENTAL SCIENCES↗

Fiscal Year 2008 Phased Construction Completion Report for EU Z2-33 in Zone 2, East Tennessee Technology Park, Oak Ridge, Tennessee

The Record of Decision for Soil, Buried Waste, and Subsurface Structure Actions in Zone 2, East Tennessee Technology Park, Oak Ridge, Tennessee (DOE/OR/01-2161&D2) (Zone 2 ROD) acknowledged that most of the 800 acres in Zone 2 were contaminated, but that sufficient data to confirm the levels of contamination were lacking. The Zone 2 ROD further specified that a sampling strategy for filling the data gaps would be developed. The Remedial Design Report/Remedial Action Work Plan for Zone 2 Soils, Slabs, and Subsurface Structures, East Tennessee Technology Park, Oak Ridge, Tennessee (DOE/OR/01-2224&D3) (Zone 2 RDR/RAWP) defined the sampling strategy as the Dynamic Verification Strategy (DVS), generally following the approach used for characterization of the Zone 1 exposure units (EUs). The Zone 2 ROD divided the Zone 2 area into seven geographic areas and 44 EUs. To facilitate the data quality objectives (DQOs) of the DVS process, the Zone 2 RDR/RAWP regrouped the 44 EUs into 12 DQO scoping EU groups. These groups facilitated the DQO process by placing similar facilities and their support facilities together and allowing identification of data gaps. The EU groups were no longer pertinent after DQO planning was completed and characterization was conducted as areas became accessible. As the opportunity to complete characterization became available, the planned DVS program and remedial actions (RAs) were completed for EU Z2-33. Remedial action was also performed at two additional areas in adjacent EU Z2-42 because of their close proximity and similar nature to a small surface soil RA in EU Z2-33. Remedial actions for building slabs performed in EU Z2-33 during fiscal year (FY) 2007 were reported in the Fiscal Year 2007 Phased Construction Completion Report for the Zone 2 Soils, Slabs, and Subsurface Structures at East Tennessee Technology Park, Oak Ridge, Tennessee (DOE/OR/01-2723&D1). Recommended RAs for EU Z2-42 were described in the Fiscal Year 2006 Phased Construction Completion Report for the Zone 2 Soils, Slabs, and Subsurface Structures at East Tennessee Technology Park, Oak Ridge, Tennessee (DOE/OR/01-2317&D2). Remedial actions performed in the Balance of Site (BOS) Laboratory Area of EU Z2-33 and two small areas in EU Z2-42 are described in Sects. 5 through 10 of this Phased Construction Completion Report (PCCR). The purpose of this PCCR is to address the following: (1) Document DVS characterization results for EU Z2-33; (2) Describe and document the risk evaluation and determine if the EU meets the Zone 2 ROD requirements for unrestricted industrial use to 10 ft bgs; (3) Identify additional areas not defined in the Zone 2 ROD that require remediation based on the DVS evaluation results; and (4) Describe RAs performed in the EU Z2-33 BOS Laboratory Area and two small areas in EU Z2-42. Approximately 18 acres in EU Z2-33 are addressed in this PCCR. Based on the results of the DVS evaluation and RAs performed, all 18 acres are recommended for unrestricted industrial use to 10 ft bgs. Three Federal Facility Agreement sites are addressed and recommended for no further action within this acreage, including: (1) K-1004-L Recirculating Cooling Water Lines Leak Sites; (2) K-1044 Heavy Equipment Repair Shop; and (3) K-1015-A Laundry Pit. Remedial actions for EU Z2-33 were developed in response to DVS characterization results described in the EU Z2-33 Technical Memorandum (Appendix A) and to support reindustrialization of the East Tennessee Technology Park as a commercial industrial park. Remediation criteria were designed for the protection of a future industrial worker who normally would not have the potential for exposure to soil below 10ft bgs. Accordingly, the Zone 2 ROD required land use controls to prevent disturbance of soils below 10 ft deep and to restrict future land use to industrial/commercial activities. In response to stakeholder comments, the U.S. Department of Energy agreed to re-evaluate the need for such land use restrictions. This document includes a screening evaluation to determine the likelihood of land use controls in EU Z2-33 being modified to: (1) eliminate the restriction on disturbance of soils below 10 ft bgs where data indicate the absence of residual contamination at any depth that would result in an unacceptable risk to the future industrial worker, and (2) permit alternative land uses that would be protective of future site occupants. Results of this screening evaluation indicate a low probability that restrictions on disturbing soil below 10 ft bgs could be safely eliminated for EU Z2-33. A qualitative screening evaluation considered the likelihood of unrestricted land use being protective of future site occupants. Based on this qualitative assessment, all 18 acres addressed in this PCCR were assigned a low probability for consideration of release for unrestricted land use.

54 ENVIRONMENTAL SCIENCES↗

Risk to Ecological Resources from Delaying Decommissioning and Waste Management: conceptualization and examples from the Hanford Site - 17156

Ecological evaluation is essential for remediation, restoration, and future land-use decisions for contaminated lands, and forms a basis for many management practices. Ecological evaluations or assessments can also be used to examine the efficacy of remediation and restoration methods, providing valuable data to plan and improve future restoration. Assessments can examine past activities, current conditions, and the effects of future remediation or restoration. In general, ecological evaluations have not been used to assess the effects of delaying remediation. Yet for complicated situations, such as at Hanford Site, where there are dozens of remediation sites still to be completed, understanding the effects of delaying remediation on ecological and eco-cultural resources adds measurably to making sound sequencing decisions. Ecological evaluations are inherently complex compared to human health risk assessment because there are hundreds of species, composing a great number of communities and ecosystems. Ecosystems are dynamic, undergoing changes in response to predictable environmental conditions (succession), as well as unforeseen events. Further, ecosystems respond to remediation and restoration actions, even when they are on adjacent areas. Conducting evaluations of the risk to ecological resources must account for the dynamic nature of ecosystems, and for the dynamic, changing landscape that results from remediation on nearby areas. The approach will provide information for sound decision-making with stakeholder participation. This project was partially funded by CRESP through the Department of Energy (DE-FC01-95EW55084). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An Integrated, Systems-Based Approach to Mercury Research and Technology Development - 17252

A 3-year strategic planning process was undertaken in Oak Ridge, Tennessee, to develop a research and technology development approach that can help guide mercury remediation in East Fork Poplar Creek (EFPC). Mercury remediation is a high priority for the US Department of Energy's (DOE's) Oak Ridge Office of Environmental Management because of large historical losses of mercury to the environment at the Y-12 National Security Complex (Y-12). Because of the extent of mercury losses and the complexities of mercury transport and fate in the stream environment, the success of conventional options for mercury remediation in the downstream sections of EFPC is uncertain. The overall Oak Ridge mercury remediation strategy focuses on mercury treatment actions at Y-12 in the short-term and research and technology development to evaluate longer-term solutions in the downstream environment. The technology development strategy is consistent with a phased, adaptive management paradigm and DOE's Technology Readiness Level guidelines. That is, early evaluation includes literature review, site characterization, and small-scale studies of a broad number of potential technologies. As more information is gathered, technologies that may have the most promise and potential remediation benefit will be chosen for more extensive and larger-scale pilot testing before being considered for remedial implementation. Field and laboratory research in EFPC is providing an improved level of understanding of mercury transport and fate processes in EFPC that will inform the development of site-specific remedial technologies. Technology development has centered on developing strategies that can mitigate the primary factors affecting mercury risks in the stream: (1) the amount of inorganic mercury available to the 1 This manuscript has been authored by UT-Battelle, LLC under Contract No. DE-AC05-00OR22725 with the U.S. Department of Energy. The United States Government retains and the publisher, by accepting the article for publication, acknowledges that the United States Government retains a non-exclusive, paid-up, irrevocable, world-wide license to publish or reproduce the published form of this manuscript, or allow others to do so, for United States Government purposes. The Department of Energy will provide public access to these results of federally sponsored research in accordance with the DOE Public Access Plan (http://energy.gov/downloads/doe-public-access-plan).stream system, (2) the conversion of inorganic mercury to methylmercury, and (3) the bioaccumulation of methylmercury through the food web. Given the downstream complexities and interdependencies between sources and processes in EFPC, no one task or approach is likely to solve the mercury problem in the creek, thus highlighting the importance of using an integrated, systems-based approach to develop remedial solutions. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A performance and closure evaluation approach for Pump-and-Treat systems - 15132

Pump-and-Treat (P and T) technology has been widely applied for groundwater remediation across many types of sites and for multiple types of contaminants. Decisions regarding major changes in the remediation approach are an important element of environmental remediation management for a site using P and T. An evaluation approach that includes an assessment of P and T system performance is under development to facilitate remediation decisions for P and T systems. The approach provides information on technical data and analyses that can be used to support remediation decisions. The document is organized to help decision makers distinguish between several categories of decision outcomes. These outcomes include 1) Initiate Remedy Closure, 2) Transition P and T to Monitored Natural Attenuation, 3) Continue P and T, 4) Supplement P and T with Another Treatment Technology, 5) Transition from P and T to Another Treatment Remedy, and 6) Transition P and T to an Alternative Closure or Contamination Management Approach. Key triggers that support selection of the appropriate outcome are provided, along with a description of suitable supporting data needed to formulate the technical basis for a remediation decision. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Environmental Restoration of Diesel-Range Organics from Project Chariot, Cape Thompson, Alaska - 16147

Cape Thompson, Alaska, is located approximately 120 miles north of Kotzebue, Alaska, within the Ogotoruk Creek valley. The remote Alaskan location is also home to the US Atomic Energy Commission (AEC) Project Chariot study area. Project Chariot was part of the Plowshare Program, created in 1957 by the AEC to study peaceful uses for atomic energy. Project Chariot began in 1958 when a scientific field team chose Cape Thompson as a potential site to excavate a harbor using a series of nuclear explosions. Between 1959 and 1962, AEC was responsible for over 40 pretest bio-environmental and geotechnical studies of the Cape Thompson area. Strong public opposition to the tests developed, which caused the project to be cancelled with no nuclear explosions ever conducted at the site. In the early 1960's, several deep boreholes were drilled to obtain subsurface, temperature, and high-explosive testing data. Refrigerated diesel was used as a drilling fluid to keep the boreholes open so that thermistors could measure subsurface temperatures. The test boreholes were named Able, Baker, Charlie, Dog, and X-1. In the summer of 2014, the US Department of Energy, Office of Legacy Management (LM) completed the remediation of remnant diesel at these sites. Prior to the 2014 remediation activities, LM conducted two separate characterization field studies to determine the nature and extent of the contamination from the 1960's drilling activities. In 2013, LM developed a remediation plan that was submitted and approved by the Alaska Department of Environmental Conservation (ADEC). The 2014 Project Chariot remediation had some unique logistical challenges and historic issues with stakeholders to overcome. Many of the historic issues centered on previous AEC scientific actions and a general mistrust of the government by the local stakeholders. Prior to and during the 2014 remediation work, an outreach campaign was implemented to discuss prior activities at the site and include stakeholders from Point Hope, Alaska, in the remediation-planning process. The remoteness of the region also provided unique logistical challenges. Because of the short field season, LM initiated several subcontracts over a year in advance. The field camp, heavy equipment, and soil storage containers were shipped by barge to the site. Personnel, food, and small materials were flown in by bush plane from Kotzebue, Alaska. Previous site characterization had identified diesel-range organics (DROs) as the primary contaminant. The cleanup levels for the site were provided by the Alaska Administrative Code (AAC) for the Arctic Zone region. The AAC cleanup level for DROs on gravel pads is 500 mg/kg and 12,500 mg/kg tundra in the arctic-zone region. To help determine the extent and direct soil excavation in the field, photoionization detectors (PIDs) were used for field screening. While the PID results provided rough limits for excavation, laboratory confirmation sampling was required to provide actual excavation guidance. All excavation locations remained open until laboratory results met AAC criteria and ADEC approved closure. The laboratory sample protocol required the bush plane to pick up samples almost daily and transfer them to Anchorage for analysis. In order to meet holding time requirements, all laboratory samples were analyzed on an expedited basis. Analytical results and ADEC approval notifications were e-mailed back to the site via satellite connection. A total of 202 laboratory analyses were needed to complete the remediation effort. At each location (Able, Baker, Charlie, Dog, and X-1), the boreholes were plugged and abandoned in accordance with ADEC regulations. Contaminated soil was excavated, and the material was placed in super-sacks and hauled to connex boxes located near the sea shore. Approximately 786 tons of material was removed and shipped by barge to the Columbia Ridge Landfill in Arlington, Oregon, for disposal. The well casings were cut and sealed below ground surface. Each location was graded to its original contours and reclaimed with native vegetation, and a geodetic survey was conducted. Tours with leaders of the Village of Point Hope and the land owner (Arctic Slope Regional Corporation) were conducted prior to the final demobilization. All remediation equipment and camp facilities were removed at the completion of the project. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Assessing the Performance of Pump-and-Treat Systems - 16380

Pump-and-treat (P and T) is a common groundwater remedy. However, a challenge with P and T remedies has been in evaluating their performance. A structured approach can be applied to gathering the information needed to support assessment of P and T remedies and decisions to close the remedy, continue P and T, optimize the P and T system, or transition to other remedy approaches. Supportive decision elements include analysis of contaminant concentrations and trends, quantifying contaminant mass discharge of plume and source zone, quantifying the attenuation capacity of the aquifer, using tools to predict future plume behavior and time to reach remedial action objectives, and information about the current P and T system design and operations. Several sites have successfully conducted a P and T performance assessment and supported decisions to change their remedy approach. These case studies are discussed in relation to a recent document, Performance Assessment for Pump-and-Treat Closure or Transition, that provides guidance for the assessment process and associate remedy decisions. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Challenge of Achieving Site Closure of a Complex Groundwater Plume - 20531

Over the last three decades, DOE has made substantial progress in nearly every area of nuclear waste cleanup and has closed and transitioned 91 of the 107 sites in the EM complex. Several of the remaining groundwater plumes at Hanford, Los Alamos, Paducah, Oak Ridge, and Savannah River are complex and tend to have unique site or contaminant characteristics which provide an almost impossible challenge to remediate to regulatory levels. As a result, these complex sites will require a large investment to remediate. In order for DOE to achieve regulatory closure, a technically sound case must be developed and presented to regulators and stakeholders that clearly demonstrates that remedial goals have been or will be irreversibly achieved or that there is an alternate acceptable end-state. Five lines of evidence are required: - A conceptual site model that is as complete as possible, with the knowledge that it may continue to evolve with time; - Demonstration that trends in contaminant concentrations, or flux, versus time indicate that remedial goals will be achieved on schedule or within a reasonable time thereafter and that trends that deviate from this path are explainable by the conceptual model; - Demonstration that remobilization of attenuated contaminants is unlikely to occur in the future; - Explicit consideration of remedial contingencies, should deviations in the path toward remedial goals occur; - Development of an effective long-term monitoring plan to detect any conditions that might alter the path toward remedial goals. SRS has made significant progress in the remediation of contamination associated with the F-area and H-Area Seepage Basins, and it is currently developing a strategic closure path that addresses each of these lines of evidence and identifies both basic and applied scientific issues that will need to be addressed in order to obtain regulatory closure. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗