Window to the Hot Cell: The Challenges of Repairing a Specialized Nuclear Containment
Here, at the Idaho National Laboratory (INL) nuclear R&D site we come across a myriad of challenges and health hazards. Recently, a first time activity for the INL was to replace a hot cell window put in place circa 1977. This job evolution was complex in nature and involved several health and safety hazards. A hot cell is a containment designed to protect workers from radioactivity yet continue to allow work with remote handled tools and windows for visibility. The hot cell window weighed approximately 14,000 lbs. and was held in place by 1.6 cubic yards of high density grout. Removal of the window required abrasive grout removal techniques, radiological control efforts, specialized ventilation, and personal protective equipment utilization. In order to contain the large amounts of dust from the removal of concrete and potential contamination exposure a special containment tent and ventilation system was designed to protect workers in the surrounding areas from dust and debris. Once the window was removed it had to be further taken apart for shipment. While performing this activity, several lead sheets and lead wool was required to be removed. Overall it took 38 days to accomplish this task and had several organizations involved. There were no injuries or unexpected conditions that occurred during this job task. This was the first time this activity was performed at the INL and was completed in a successful manner. Further windows are set to be replaced in the near future.