Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Project Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,027 records · Page 57

The Umatilla Basin Natural Production Monitoring and Evaluation Project, 2008 Annual Progress Report.

The Umatilla Basin Natural Production Monitoring and Evaluation Project (UBNPMEP) is funded by Bonneville Power Administration (BPA) as directed by section 4(h) of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 (P.L.96-501). This project is in accordance with and pursuant to measures 4.2A, 4.3C.1, 7.1A.2, 7.1C.3, 7.1C.4 and 7.1D.2 of the Northwest Power Planning Council's (NPPC) Columbia River Basin Fish and Wildlife Program (NPPC 1994). Work was conducted by the Fisheries Program of the Confederated Tribes of the Umatilla Indian Reservation (CTUIR). The UBNPMEP is coordinated with two Oregon Department of Fish and Wildlife (ODFW) research projects that also monitor and evaluate the success of the Umatilla Fisheries Restoration Plan. This project deals with the natural production component of the plan, and the ODFW projects evaluate hatchery operations (project No. 1990-005-00, Umatilla Hatchery M & E) and smolt outmigration (project No. 1989-024-01, Evaluation of Juvenile Salmonid Outmigration and Survival in the Lower Umatilla River). Collectively these three projects monitor and evaluate natural and hatchery salmonid production in the Umatilla River Basin. The need for natural production monitoring has been identified in multiple planning documents including Wy-Kan-Ush-Mi Wa-Kish-Wit Volume I, 5b-13 (CRITFC 1996), the Umatilla Hatchery Master Plan (CTUIR & ODFW 1990), the Umatilla Basin Annual Operation Plan, the Umatilla Subbasin Summary (CTUIR & ODFW 2001), the Subbasin Plan (CTUIR & ODFW 2004), and the Comprehensive Research, Monitoring, and Evaluation Plan (CTUIR and ODFW 2006). Natural production monitoring and evaluation is also consistent with Section III, Basinwide Provisions, Strategy 9 of the 2000 Columbia River Basin Fish and Wildlife Program (NPPC 1994, NPCC 2004). The Umatilla Basin M&E plan developed along with efforts to restore natural populations of spring and fall Chinook salmon, (Oncorhynchus tshawytsha), coho salmon (O. kisutch), and enhance summer steelhead (O. mykiss). The need for restoration began with agricultural development in the early 1900's that extirpated salmon and reduced steelhead runs (Bureau of Reclamation, BOR 1988). The most notable development was the construction and operation of Three Mile Falls Dam (TMD) and other irrigation projects which dewatered the Umatilla River during salmon migrations. CTUIR and ODFW developed the Umatilla Hatchery Master Plan to restore fisheries to the basin. The plan was completed in 1990 and included the following objectives which were updated in 1999: (1) Establish hatchery and natural runs of Chinook and coho salmon. (2) Enhance existing summer steelhead populations through a hatchery program. (3) Provide sustainable tribal and non-tribal harvest of salmon and steelhead. (4) Maintain the genetic characteristics of salmonids in the Umatilla River Basin. (5) Increase annual returns to Three Mile Falls Dam to 31,500 adult salmon and steelhead. In the past the M&E project conducted long-term monitoring activities as well as two and three-year projects that address special needs for adaptive management. Examples of these projects include adult passage evaluations, habitat assessment surveys (Contor et al. 1995, Contor et al. 1996, Contor et al. 1997, Contor et al. 1998), and genetic monitoring (Currens & Schreck 1995, Narum et al. 2004). The project's goal is to provide quality information to managers and researchers working to restore anadromous salmonids to the Umatilla River Basin. The status of completion of each of BPA's standardized work element was reported in 'Pisces'(March 2008) and is summarized.

13 HYDRO ENERGY↗

Development of a national center for hydrogen technology. A summary report of activities completed at the national center hydrogen technology from 2005 to 2010

The Energy & Environmental Research Center (EERC) located in Grand Forks, North Dakota, has operated the National Center for Hydrogen Technology® (NCHT®) since 2005 under a Cooperative Agreement with the U.S. Department of Energy's (DOE) National Energy Technology Laboratory (NETL). The EERC has a long history of hydrogen generation and utilization from fossil fuels, and under the NCHT Program, the EERC has accelerated its research of hydrogen generation and utilization topics. Since the NCHT's inception, the EERC has received more than $65 million in funding of hydrogen-related projects ($20 million for the NCHT project which includes federal and corporate development partner funds) involving more than 85 partners (27 with the NCHT). The NCHT project's 19 activities span a broad range of technologies that align well with the Advanced Fuels Program goals and, specifically, those described in the Hydrogen from Coal Program research, development, and demonstration (RD&D) plan. A number of projects have been completed which range from technical feasibility of several hydrogen generation and utilization technologies to public and technical education and outreach tools. Projects under the NCHT have produced hydrogen from natural gas, coal, liquid hydrocarbons, and biomass. The hydrogen or syngas generated by these processes has also been purified to transportation-grade quality in many of these instances or burned directly for power generation. Also, several activities are still undergoing research, development, demonstration, and commercialization at the NCHT. This report provides a summary overview of the projects completed in the first 5 years of the NCHT. Individual activity reports are referenced as a source of detailed information on each activity.

08 HYDROGEN↗

Session 3: Agrivoltaics Pathways [Slides]

This presentation was developed for a webinar series for the USAID's South Asia Group for Energy (SAGE) and South Asia Regional Energy Partnership (SAREP). The presentation includes insights into agrivoltaic site assessment planning, including what is needed for a farm assessment, solar panel system design from the agricultural perspective, variables that go into crop selection, and environmental impact, sustainability, and agritourism, technical parameters for developing an agrivoltaics project, including what makes up a PV feasibility study, understanding variables that go into technology and equipment selection, agrivoltaic installation and agricultural integration, and monitoring and maintenance throughout the life of the project, and agrivoltaic financial planning, risk mitigation, and debt equity issues.

14 SOLAR ENERGY↗

The Northwest Geysers EGS Demonstration Project Phase 1: Pre-stimulation coupled geomechanical modeling to guide stimulation and monitoring plans

This paper presents activities and results associated with Phase 1 (pre-stimulation phase) of an Enhanced Geothermal System (EGS) demonstration project at the northwest part of The Geysers geothermal field, California. The paper presents development of a 3-D geological model, coupled thermal-hydraulic-mechanical (THM) modeling of proposed stimulation injection as well as current plans for stimulation and monitoring of the site. The project aims at creating an EGS by directly and systematically injecting cool water at relatively low pressure into a known High Temperature (about 280 to 350 C) Zone (HTZ) located under the conventional (240 C) steam reservoir at depths of {approx}3 km. Accurate micro-earthquake monitoring initiated before the start of the injection will be used as a tool for tracking the development of the EGS and monitoring changes in microseismicity. We first analyzed historic injection and micro-earthquake data from an injection well (Aidlin 11) located about 3 miles to the west of the new EGS demonstration area. Thereafter, we used the same modeling approach to predict the likely extent of the zone of enhanced permeability for a proposed initial injection in two wells (Prati State 31 and Prati 32) at the new EGS demonstration area. Our modeling indicates that the proposed injection scheme will provide additional steam production in the area by creating a zone of permeability enhancement extending about 0.5 km from each injection well which will connect to the overlying conventional steam reservoir, in agreement with the conclusions of Nielson and Moore (2000).

15 GEOTHERMAL ENERGY↗

Developing a monitoring and verification plan with reference to the Australian Otway CO2 pilot project

The Australian Cooperative Research Centre for Greenhouse Gas Technologies (CO2CRC) is currently injecting 100,000 tons of CO{sub 2} in a large-scale test of storage technology in a pilot project in southeastern Australia called the CO2CRC Otway Project. The Otway Basin, with its natural CO{sub 2} accumulations and many depleted gas fields, offers an appropriate site for such a pilot project. An 80% CO{sub 2} stream is produced from a well (Buttress) near the depleted gas reservoir (Naylor) used for storage (Figure 1). The goal of this project is to demonstrate that CO{sub 2} can be safely transported, stored underground, and its behavior tracked and monitored. The monitoring and verification framework has been developed to monitor for the presence and behavior of CO{sub 2} in the subsurface reservoir, near surface, and atmosphere. This monitoring framework addresses areas, identified by a rigorous risk assessment, to verify conformance to clearly identifiable performance criteria. These criteria have been agreed with the regulatory authorities to manage the project through all phases addressing responsibilities, liabilities, and to assure the public of safe storage.

54 ENVIRONMENTAL SCIENCES↗

Advanced Modeling and Simulation to Characterize Advanced Boiling Water Reactor Source Terms to Support a Regulatory Approval Pathway for Right-Sized Emergency Planning Zone. Advanced Boiling Water Reactor (A-BWR) Project Phase 2

The United States Department of Energy (US DOE) is currently supporting the development of various small modular reactor (SMR), microreactor and advanced reactor designs. These reactors have improved safety features as compared to conventional Large Light Water Reactors (LLWRs), which include features that improve potential reduction of radiological source terms in the event of design and beyond-design basis accidents. Specifically, some reactors feature a relatively smaller containment volume with respect to the available surface area for fission product deposition; these include Integrated Pressurized Water Reactors (iPWRs), such as the NuScale SMR and SMR-type Boiling Water Reactors (BWRs) such as General Electric-Hitachi’s BWRX-300 design.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Lawrence Livermore National Laboratory Experimental Test Site 300 (S300): S300 Roadway Improvements - 817 Complex Soil Sampling and Analysis Plan, Addendum 1 (June 2023)

The purpose of this addendum is to amend and update the S300 Roadway Improvements – 817 Complex [project] Soil Sampling and Analysis Plan (SAP) dated May 2023. Field activities to implement the SAP were completed in May 2023 except for SB-17. SB-17 is therefore included in this addendum. In addition, this addendum amends the SAP by covering an expanded scope of work and project limits. The project limits have been expanded to include areas around Building 818. Sampling at the expanded project area is addressed in this addendum by two additional borings for geotechnical and environmental analyses. The project area consists of the access gate and existing access roads for the Process Area complex. Excavation depths are anticipated to be no deeper than 5 feet from current grade. None of the proposed disturbance areas are within known areas of contamination or mapped controlled excavation area (LLNL 2008). Therefore, this addendum proposes a sampling spacing in the vicinity of Building 818 of about 172 feet (Tier 2) in accordance with the Soil Screening and Management Plan (LLNL 2022). The information contained in this addendum supersedes the May 2023 SAP. However, this addendum only addresses elements of the May 2023 SAP that were modified. Elements of the May 2023 SAP that have not been modified are relevant and will remain in effect.

54 ENVIRONMENTAL SCIENCES↗

TRACER-MAP: Mapping Aerosol Processes Across Houston During Convective Cell Events

The Houston, TX Metropolitan area was selected for the 2022 Tracking Aerosol Convection Interactions Experiment (TRACER) due to its high convective storm activity and broad range of polluted aerosol conditions. With the overall TRACER project in mind, we planned TRACER-MAP, a related investigation of the impacts of convective storms on atmospheric composition, chemistry and aerosol processing in Houston. Because the Houston metroplex is large and has a wide range of atmospheric conditions, this project has “MAP-ped” the air chemistry conditions across Houston while atmospheric scientists working in the TRACER project monitor convective storm activity overhead. Specifically, we conducted a series of aerosol, gas, and meteorological measurements in the summer of 2022 that matches measurements from the Department of Energy (DOE) Atmospheric Radiation Measurement (ARM) Mobile Facilities. The TRACER-MAP campaign extended from Jul 1 – Sept 3, 2022. TRACER-MAP included two urban sites: Aldine and University of Houston (UH); two industrial sites: San Jacinto Battleground and the main DOE TRACER site at the La Porte Municipal Airport (ARM/La Porte AMF); and one background site in WG Jones State Forest north of Houston.

54 ENVIRONMENTAL SCIENCES↗

Assessing the health equity impacts of regional land-use plan making: An equity focussed health impact assessment of alternative patterns of development of the Whitsunday Hinterland and Mackay Regional Plan, Australia (Short report)

Health service and partners completed an equity focussed health impact assessment to influence the consideration of health and equity within regional land-use planning in Queensland, Australia. This project demonstrated how an equity oriented assessment matrix can assist in testing regional planning scenarios. It is hoped that this HIA will contribute to the emerging interest in ensuring that potential differential health impacts continue to be considered as part of land-use planning processes.

54 ENVIRONMENTAL SCIENCES↗

NEET Enhanced Micro-Pocket Fission Detector for High Temperature Reactors - FY16 Status Report

A collaboration between the Idaho National Laboratory (INL), the Kansas State University (KSU), and the French Atomic Energy Agency, Commissariat à l'Énergie Atomique et aux Energies Alternatives, (CEA), has been initiated by the Nuclear Energy Enabling Technologies (NEET) Advanced Sensors and Instrumentation (ASI) program for developing and testing High Temperature Micro-Pocket Fission Detectors (HT MPFD), which are compact fission chambers capable of simultaneously measuring thermal neutron flux, fast neutron flux and temperature within a single package for temperatures up to 800 °C. The MPFD technology utilizes a small, multi-purpose, robust, in-core fission chambers and thermocouple. As discussed within this report, the small size, variable sensitivity, and increased accuracy of the MPFD technology represent a revolutionary improvement over current methods used to support irradiations in US Material Test Reactors (MTRs). Previous research conducted through NEET ASI1-3 has shown that the MPFD technology could be made robust and was successfully tested in a reactor core. This new project will further the MPFD technology for higher temperature regimes and other reactor applications by developing a HT MPFD suitable for temperatures up to 800 °C. This report summarizes the research progress for year two of this three year project. Highlights from research accomplishments include: • Continuation of a joint collaboration between INL, KSU, and CEA. Note that CEA is participating at their own expense because of interest in this unique new sensor. • An updated parallel wire HT MPFD design was developed. • Program support for HT MPFD deployments was given to Accident Tolerant Fuels (ATF) and Advanced Gas-cooled Reactor (AGR) irradiation test programs. • Quality approved materials for HT MPFD construction were procured by irradiation test programs for upcoming deployments. • KSU improved and performed electrical contact and fissile material plating. • KSU delivered fissile HT MPFD parts to INL for final construction of HT MPFD prototype. • A prototype HT MPFD was constructed and analyzed at INL. • The HT MPFD has been modeled in MCNP to optimize the amount of fissile material deposition. • The HT MPFD has been modeled in MCNP to optimize the sensor location in the irradiation test. • The fissile material deposition is undergoing independent verifications. • Detector amplifier electronics have been revised and tested by KSU. • Several project meetings were held at INL and KSU to discuss the roles and responsibilities between INL, KSU, and CEA for development and deployment of the HT MPFDs. As documented in this report, FY16 funding has allowed the project to meet year two planned accomplishments to develop a HT MPFD. In addition, the accomplishments of this project have attracted independent funding from other Department of Energy Office of Nuclear Energy (DOE-NE) programs for MTR irradiations of the MPFD technology. These are significant opportunities for this NEET Enhanced Micro-Pocket Fission Detector for High Temperature Reactors project because the irradiation expense of these experiments could not be included in the original project scope.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Importance of Upfront Preparatory Works for Vessel Internals Segmentation Projects - 16096

For more than thirty years, Westinghouse has been involved in reactor internals segmentation activities in the U.S. and Europe. Westinghouse completed in 2015 the segmentation of the reactor vessel and reactor vessel internals at the Jose Cabrera nuclear power plant in Spain and a similar project is on-going at Chooz A in France. Four more major reactor internals segmentation projects have been recently awarded in Sweden (Barsebaeck 1-2) and in Germany. (Philippsburg 1 and Neckarwestheim 1). For all reactor dismantling projects, it is essential that all activities are thoroughly planned and discussed upfront together with the customer. Detailed planning is crucial for achieving a successful project. One key activity in the preparation phase is the 'Segmentation and Packaging Plan' that documents the sequential steps required to segment, separate, and package each individual component, based on an activation analysis and component characterization study. Detailed procedures and specialized rigging equipment have to be developed to provide safeguards for preventing certain identified risks. The preparatory work can include some plant civil structure modifications for making the segmentation work easier and safer. Some original plant equipment is sometimes not suitable enough and need to be replaced. Before going to the site, testing and qualification are performed on full scale mock-ups in a specially designed pool for segmentation purposes. The mockup testing is an important step in order to verify the function of the equipment and minimize risk on site. This paper is describing the typical activities needed for preparing the reactor internals segmentation activities using under water mechanical cutting techniques. It will provide experiences and lessons learned that Westinghouse has collected from its recent projects and that will be applied for the new awarded projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

NREL Screens Universities for Solar and Battery Storage Potential

In support of the U.S. Department of Energy's SunShot initiative, NREL provided solar photovoltaic (PV) screenings in 2016 and 2017 for universities seeking to go solar. Fifteen universities were selected for screenings based on campus solar and sustainability goals, plans for future solar projects and solar deployment capacity (megawatts), regional diversity, energy costs, and availability of campus energy data for the analysis.

14 SOLAR ENERGY↗

Federal Energy Management Program’s Technical Resilience Navigator: Communications Plan

The Federal Energy Management Program is working to develop a standard, agency-neutral energy and water technical resilience navigator (TRN) to assist federal agencies with their resilience planning efforts, building on agency-expressed needs. The TRN Communications Plan defines how the project team and FEMP will generate awareness of the TRN, recruit validators, encourage its use across federal agencies, increase awareness among various audiences, and solicit user feedback on its usefulness including suggestions for improvement. In support of this purpose, the communications plan characterizes the key audiences, messages, communications channels, and activities needed to help ensure success. The role of communications is to define strategy and ensure leadership and consistency in messaging, writing, outreach, media relations, editing, and design related to the TRN.

99 GENERAL AND MISCELLANEOUS↗

Effect of different breathing patterns in the same patient on stereotactic ablative body radiotherapy dosimetry for primary renal cell carcinoma: A case study

Stereotactic ablative body radiotherapy (SABR) for primary renal cell carcinoma (RCC) targets requires motion management strategies to verify dose delivery. This case study highlights the effect of a change in patient breathing amplitude on the dosimetry to organs at risk and target structures. A 73-year-old male patient was planned for receiving 26 Gy of radiation in 1 fraction of SABR for a left primary RCC. The patient was simulated with four-dimensional computed tomography (4DCT) and the tumor internal target volume (ITV) was delineated using the 4DCT maximum intensity projection. However, the initially planned treatment was abandoned at the radiation oncologist's discretion after pretreatment cone-beam CT (CBCT) motion verification identified a greater than 50% reduction in superior to inferior diaphragm motion as compared with the planning 4DCT. This patient was resimulated with respiratory coaching instructions. To assess the effect of the change in breathing on the dosimetry to the target, each plan was recalculated on the data set representing the change in breathing condition. A change from smaller to larger breathing showed a 46% loss in planning target volume (PTV) coverage, whereas a change from larger breathing to smaller breathing resulted in an 8% decrease in PTV coverage. ITV coverage was similarly reduced by 8% in both scenarios. This case study highlights the importance of tools to verify breathing motion prior to treatment delivery. 4D image guided radiation therapy verification strategies should focus on not only verifying ITV margin coverage but also the effect on the surrounding organs at risk.

61 RADIATION PROTECTION AND DOSIMETRY↗

Toward Qualifications of HB and LB 650 MHz Cavities for the Prototype Cryomodules for the PIP-II Project

High-beta (HB) and low-beta (LB) 650 MHz cryomodules are key components of the Proton Improvement Plan II (PIP-II) project. In this contribution we present the results of several 5-cell HB650 cavities that have been processed and tested with the purpose of qualifying them for the prototype cryomodule assembly, which will take place later this year. We also present the first results obtained in LB650 single-cell cavities process optimization. Taking advantage of their very similar geometry, we are also analyzing the effect of different surface treatments in FRIB’s 5-cell medium-beta 644MHz cavities. Cavities processed with N-doping and mid-T baking showed very promising results in term of both Q-factors and accelerating gradient for these low-beta structures.

43 PARTICLE ACCELERATORS↗

Public Outreach in FUSRAP - 16201

The U. S. Army Corps of Engineers (USACE) is the lead federal agency for the Formerly Utilized Sites Remedial Action Program (FUSRAP) which was initiated in 1974 to address contamination remaining from Manhattan Engineer District and early U.S. Atomic Energy Commission activities. As the lead agency, USACE follows the protocols set forth in the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) to address FUSRAP sites. During certain project milestones of the CERCLA process, community outreach initiatives occur to communicate the status and/or findings from site investigations and project decision documents. The style of public interaction is tailored to match the project milestone, technical complexity of a project, the stakeholder involvement level, or type of decision being made on a particular project. Community involvement is one of the most important aspects of environmental work, and proactive and transparent communication can build meaningful relationships with the community and between project stakeholders. The USACE Buffalo District has experience using different stakeholder interaction techniques and providing information on projects through a variety of media. Rather than simply distributing information, the goal of community outreach is to encourage participation in the process and to provide opportunities for the public to fully understand, ask questions about, and provide feedback on the complex technical issues involved in decision-making for each FUSRAP site. The frequency and method of interaction depends on the project, and the USACE Buffalo District has worked to promote openness and transparency and to ensure the community is provided with many opportunities for public participation. Project information has been provided to stakeholders using multiple techniques, such as formal project workshops, poster sessions, site tours, news releases, storybooks, and videos. Aside from project-specific community relations plans, the USACE Buffalo District has participated in Science, Technology, Engineering and Math (STEM) programs established to inspire current and future generations of young people to pursue careers in STEM fields. Each year, the USACE Buffalo District performs outreach in the community to share information on our projects as well as to introduce students to various disciplines associated with environmental careers. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗