Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Procurement”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,027 records · Page 57

Supplement to M&V Guidelines: Measurement and Verification for Performance-Based Contracts Version 4.0

Measurement and verification (M&V) are key to determining and confirming the continued operation of, and savings associated with, performance-based contracts. The Federal Energy Management Program (FEMP) updates these guidelines to reflect the evolution of M&V to incorporate industry best practices and ensure that savings from these performance-based projects are properly planned, communicated, and realized. FEMP released M&V Guidelines: Measurement and Verification for Federal Energy Projects Version 3.0 in 2008. This document was developed with input from industry-government working groups, previous M&V guideline authors, and national laboratory subject matter experts. The document provided the methods and guidelines, with a focus on federal energy savings performance contracts (ESPCs). When FEMP released M&V Guidelines: Measurement and Verification for Performance-Based Contracts Version 4.0 in 2015, FEMP expanded the intended audience to include anyone (energy managers, procurement officers, and contractors) involved in implementing performance-based contracts. The streamlined M&V Guidelines Version 4.0 provided the procedures and guidelines needed to quantify savings resulting from installing energy-efficient equipment, water conservation, improved operation and maintenance (O&M), renewable energy, and cogeneration projects with a performance-based contract; however, it removed some of the associated details on topics such as developing regression models and sampling plans. The details and information provided in M&V Guidelines v. 3.0 are still pertinent to M&V for performance-based contracts. The objective is to keep FEMP M&V version 4.0 condensed, providing the reference document for specifying M&V methods and procedures and a resource for developing project-specific M&V plans; this supplement provides additional details. The content of this supplement has been updated to include pertinent revisions between M&V version 3.0 and M&V version 4.0 by providing details and updating the content to ensure relevancy.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Progress on Design and Production of Oxide Dispersion–Strengthened Alumina-Forming Austenitic Alloys for Nuclear Applications

Alumina-forming austenitic (AFA) alloys are a promising class of nuclear materials due to their high-temperature oxidation/corrosion resistance and mechanical properties. Unfortunately, these alloys are limited in use for core material applications, specifically in their use as nuclear fuel cladding. Improving these alloys through a fine dispersion of oxide precipitates and thus increasing the effective irradiation sink strength of the alloy system may mitigate many of the degradation phenomena expected during alloy deployment (such as high-temperature helium embrittlement for lead-cooled fast reactor applications). This work package has started using a combination of conventional and advanced manufacturing approaches to the fabrication of oxide dispersion–strengthened (ODS) AFA materials. As such, this report summarizes progress to date in the fabrication of new compositions of these ODS AFA materials with a focus on reactor-specific design and a multifaceted manufacturing approach. Two different compositions of AFA gas-atomized powders were procured, and 200 g of each have been prepared using mechanical alloying with the expectation of high-temperature consolidation in Q1 of FY24. In addition, an approach to use reactive cover gases to promote additional precipitate formation has been developed for implementation in FY24 as a direct comparison with conventionally manufactured alloys.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Epithermal and Fast Neutron Radiography Facility HFIR Futures – Enhanced Capabilities Series (Vol. 8)

The Sustaining and Enhancing Nuclear Science Initiative at Oak Ridge National Laboratory (ORNL) was created to explore potential enhancements to scientific capabilities in the High Flux Isotope Reactor as part of a reactor pressure vessel replacement project. One proposed scientific enhancement included creation of an epithermal and fast neutron radiography station on the HB-3 beam tube with the capability to image highly radioactive specimens such as irradiated nuclear fuel rods, isotope production targets, or spallation neutron target materials. This document summarizes findings and recommendations from a working group of ORNL staff tasked with conceptualizing such a facility and includes a background of similar instruments at other research facilities, technical specifications, and an estimate of procurement cost and schedule.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Bench-Scale Testing of a High Efficiency, Ultra-Compact Process for Pre-Combustion CO 2 Capture (Final Report)

The overarching objective of this bench-scale study is to field-validate the technical feasibility of a membrane- and adsorption-enhanced water gas shift (WGS) reaction process that employs a carbon molecular sieve (CMS) membrane reactor (MR) followed by an adsorption reactor (AR) for pre-combustion CO 2 capture while demonstrating progress towards achievement of the overall performance goals of CO 2 capture with 95% CO 2 purity at a cost of electricity (COE) of 30% less than the baseline capture approaches. The main goal of this bench-scale project is to advance the proposed MR-AR transformative CO 2 capture technology to a sufficient maturity level so that our present industrial partners (M&PT and Worley) can potentially adapt the technology for further small pilot-scale testing. The project began at TRL 4, as the system prototype had already been validated in the laboratory on simulated syngas (as part of project DE-FE0026423). The project ended at TRL 5, via scaling-up of the prototype system and testing it on actual syngas at a host site (CAER at the University of Kentucky (UKy)). The project was carried-out in two different phases: In Phase I (during BP1 of the project), the team designed, constructed, and assembled the bench-scale experimental MR-AR system, prepared the membranes, adsorbents, and catalysts, tested the bench-scale unit with simulated syngas to validate functionality, and prepared a preliminary TEA of the technology. In Phase II (during BP2 of the project), the team installed the unit at the test site at the UKy site and completed all utility connections and hookups, field-tested the novel MR-AR process in the bench-scale system using real syngas, collected and analyzed experimental data, and completed a detailed TEA of the technology. A key aim of the project was to identify and address the technical and process risks and to generate information to advance the technology to the next stage of development. All project milestones and success criteria were met. Specifically, the team: (i) designed, constructed and assembled a bench scale system that handled 1 – 5 scfm syngas and tested its functionality with simulated syngas; (ii) prepared high performance CMS membrane tubes (ID: 3.5 mm, OD: 5.7 mm, 30” long) that meet the target H 2 permeance ( > 1 m 3 /(m 2 .hr.bar) or (> 370.3 GPU)) and a target H 2 /CO selectivity >80 at the relevant temperature (up to 300oC) and pressure conditions (up to 25 bar) with a <10% decline in performance over each 250 hr. testing period (iii) procured commercial sour-shift catalyst in sufficient quantity and prepared up to 10 kg of pelletized adsorbent for use at relevant conditions (250oC 2.5wt.% and target sorbent attrition rate < 0.2; (iv) installed the bench-scale unit at the test site (UKy) and tested the MR-AR technology using real syngas for over 250 hr. for both static and flow experiments; (v) updated the TEA analysis based on bench-scale data and met CO 2 capture goals of 95% CO 2 purity at a cost of electricity 30% less than baseline capture approaches. The CMS membranes, HTC adsorbents and catalysts employed all exhibited very robust and stable performance during the long-term run (over a >250 hr live syngas run). Furthermore, the proposed MR-AR IGCC system achieved a LCOE with a N 2 sale price of $\$$ 30/ton, with N 2 compression (no N 2 compression) of 101.2 $\$$/MWh (95.3 $\$$/MWh), which represents a 29.8% (33.9%) LCOE reduction in the baseline IGCC with carbon capture of 144.2 $\$$/MWh. The proposed MR-AR IGCC delivers a CO 2 capture cost of 44.8 $\$$/tonne (39.9 $\$$/tonne) vs 98.1 $\$$/tonne of the baseline capture case and a net power production of 586 MWe (623 MWe) vs 556 MWe of the baseline capture case.

01 COAL, LIGNITE, AND PEAT↗

Final Design for Thermal/Epithermal eXperiments (TEX) with Chloride Absorbers to Provide Validation Benchmarks for Y-12 Electrorefining Facility

Uranium electrorefining operations at Y-12 require validation for chlorine absorption and reflection. Plutonium chloride solution operations at Los Alamos National Laboratory require chlorine absorption validation. The growing need for chlorine validation is evident to the wider criticality safety community, with multiple attendees at the recent TEX 2.0 meeting at Lawrence Livermore National Laboratory (May 2023) requesting validation for chlorine (Idaho National Laboratory (INL), Institute de radioprotection et de surete nucleaire (IRSN), Savannah River Nuclear Site (SRNS), LANL, and Y-12). Los Alamos National Laboratory has recently performed, and benchmarked, an experiment titled Chlorine Worth Study (CWS) for the internal operations at the lab, but due to the difficulties in precisely characterizing the material compositions of the chlorine absorbers it is advantageous to perform a complimentary study with a different chlorine-based absorber material. Furthermore, having a uranium-based vs plutonium-based experiment provides a separate and important validation basis for criticality safety and nuclear data evaluation. The original final design report for the study of chlorine absorption using the TEX-HEU experimental base was presented in 2022, but used the same chlorine-bearing materials that were found to be difficult to characterize in the LANL benchmark. A complete redesign of the experiment has been performed looking at alternative absorber materials in various forms to produce an experiment that is fully characterizable. This report presents five novel chlorine experiments using the TEX-HEU test bed which provides direct comparison to the Y-12 and INL/Terrapower application needs, utilizing sodium chloride (NaCl) absorber plates. The absorber plates will consist of granulated NaCl (≥99.5% pure), which will be fully encapsulated in aluminum tins, providing a simple but effective chlorine-based absorber material that can be completely characterized. Of the five configurations presented in this report, it is expected that two or three configurations will be down selected for the actual experiment, with the other configurations being alternates. Three of the configurations are in the standard configuration, where the absorber is placed directly on the HEU fuel plates, and two in the sandwich configuration, where the absorber is surrounded by polyethylene moderators to force additional neutron thermalization prior to reaching the absorber. There are two thicknesses of NaCl absorber plates: 3/16” and 1/4” active thicknesses (i.e. not including the encapsulation). Both variations of the absorbers have an active absorber radius of 6” and a total radius of 7.5” to match the diameter of the HEU plates, with the outer 1.5” being aluminum encapsulation. The high-density polyethylene (HDPE) moderators are of the thicknesses: 27/16”, 7/4”, 1/8”, 11/16”, and 3/4”. The final configurations have six (one sandwich and one standard configuration), eight (one sandwich and one standard configuration), and 18 total fuel layers (standard configuration). The standard and sandwich configurations were designed such that the differences in moderator thicknesses are 1” HDPE, which were already procured for the original CED-2. The proposed configurations were precisely tuned to closely match the sensitivity profiles and neutron spectra of the Y-12 upset cases and were also compared to the INL/Terrapower upset cases. The assessment of experimental uncertainties of the non-absorber components was predicted to be 0.00114 Δk eff . The assessment of uncertainties resulting from the absorbers was predicted to be 0.00029 Δk eff . This results in a total uncertainty of 0.00118 Δk eff . Many of the largest uncertainties, namely the moderator densities, may be reduced with precision dimensional inspection of the components. The 1” HDPE moderators as well as the HDPE reflectors from the original CED-2 were incorporated in the final designs presented here. Additional HDPE moderator plates must be fabricated to complete the configurations. NaCl absorber plates will by fabricated at LLNL. The total additional cost is expected to be $\$$54,250 for the remaining components. Precise inspection, including dimensional, mass, density, and impurity, is recommended for all components. LLNL estimates that these costs are around $\$$12,000. It is expected, based on previous TEX-HEU experiments, that three weeks of experimental facility time is needed to complete the experiments.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

FY23 Drone RFID (Final Report)

The Drone RFID project successfully completed proof-of-concept testing to demonstrate the potential of a drone-based inventory system for high value remote materials at Los Alamos National Laboratory. Multiple drone platforms were procured, flight authorizations were received, and the vehicles were flown demonstrating what was initially perceived as the most difficult part of the project, successfully flying drones at the lab. Three commercial RFID inventory systems were also purchased, and ground testing performed to determine their suitability. Ultimately, one system was chosen for flight testing and successfully demonstrated the drone's ability to execute inventory with great potential for a relatively low-cost implementation.

42 ENGINEERING↗

Optical Imaging for Machine Vision [Slides]

This slide deck is intended for proper specification and procurement of cameras and (thin) lenses for machine vision applications. This will include equations that allow one to calculate image size, field of view, depth of field, and length of extension tubes required to focus the image. This requires knowledge of the camera sensor, lens, distance to imaged object, and visual acuity.

42 ENGINEERING↗

Applications of Alternate Actinide Calibration on Inductively Coupled Plasma Mass Spectrometry Analysis of H-Canyon Highly Enriched Uranium Legacy Material at the Savannah River Site

Alternate Actinide Calibration is beneficial for calibration using lower activity standards • ICP-MS and ICP-OES are valid complementary methods for U analysis • Recently procured Agilent 8900 ICP-QQQ-MS in radiological buffer area –installation in progress • Helium (kinetic energy discrimination) can be used for reducing polyatomic interferences • Installing hydrogen and oxygen (reaction gases) on 8900 ICP-MS systems to improve LODs of several challenging analytes

Jones, Mark A.↗

Imaging Intact Filamentous Fungi from Spore to Hyphal Tip on the Nanoscale

Previously, the Pacific Northwest National Laboratory was limited by a 3-order of magnitude gap in resolution for direct 2-D and 3-D imaging of chemical, biological, energy and materials science systems. Our imaging instrumentation could directly visualize 3-D ultrastructure without labeling at resolutions less than 10-nanometers or greater than 10-micrometers. To address this gap, we procured and commissioned a Sigray NanoFast Bio-Lambda laboratory-based x-ray nanotomography system. This equipment provides the capability to image through tens of micrometers of organic materials at down to 35-nanometer resolution to bridge the nanoscale to the mesoscale for biological systems, organic polymers, environmental and particulate samples.

47 OTHER INSTRUMENTATION↗

Los Angeles Air Force Base Vehicle-to-Grid Demonstration (Final Project Report)

Electrification of non-tactical vehicle fleets represents a key efficiency and energy security objective for the United States Department of Defense. To achieve electrification, the department targeted vehicle-to-grid services as a way to decrease the overall cost of operating the vehicle fleet and achieve rough parity with traditional internal combustion engine vehicle fleets. This report describes efforts to aggregate a fleet of bi-directional electric vehicles and charging stations to provide regulation up and regulation down in the California Independent System Operator ancillary services market. A 29-vehicle electric vehicle demonstration fleet, consisting of mixed purpose and duty vehicles such as sedans, pickups, vans, and medium-duty trucks, was deployed at the Los Angeles Air Force base. The fleet provided frequency regulation to the California Independent System Operator’s wholesale electricity market to determine the capability of recouping some of the additional costs of procuring electric vehicles and their supporting infrastructure. Lawrence Berkeley National Laboratory, with its partner Kisensum, LLC, developed the fleet scheduling, optimization, and control software to allow the vehicle fleet at the air force base to participate in the ancillary services markets. This report focuses on the control software and market interactions, the significant challenges faced and solutions devised to address them, and examines the potential of using the electric vehicle fleet as an energy storage resource for the base buildings, an application known as vehicle-tobuilding, in providing demand response and emergency backup power. The report discusses key findings related to providing frequency regulation to the California Independent System Operator market, electric vehicle fleet performance, compatibility of varying resource parameters of vehicle fleet aggregation, the need for automated methods for communicating hour-ahead energy bidding, challenges related to battery capacity and charge/discharge rates, and monthly settlement revenue.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Exhibit D Scope of Work and Technical Specifications MOX Rod Reduction

PROJECT/PROGRAM GOALS AND OBJECTIVES: The Los Alamos National Laboratory (LANL), here after referred to as the CONTRACTOR, plans to provide NQA-1 service and support for the disposition of PF-4 basement inventory of Areva fuel rods. These fuel rods need to be reduced in length for proper shipping and disposition. The objective of this acquisition is to enter into an agreement with a SUBCONTRACTOR that shall provide expertise, materials, input for procurement of specialized tooling to be identified, and mockups for size reduction and FS65 disposition. Handling and size reduction of the Areva rods would take place at LANL. Physical work at LANL will be performed by the CONTRACTOR’s field execution team, portions of this work will have expertise provided by the SUBCONTRACTOR. As cited below via an add alternative and supplemental site visit(s) to LANL the CONTRACTOR may request the SUBCONTRACTOR to ship the necessary transportation, handling and packaging equipment at the SUBCONTRACTOR’s location to the CONTRACTOR’s facility for size reduction activities at LANL by the CONTRACTOR’s self-perform field execution team. In addition, the SUBCONTRACTOR shall provide subject matter expertise to CONTRACTOR personnel cutting the mockup Areva Fuel Rod at LANL as a rehearsal prior to CONTRACTOR cutting the actual MOX Fuel Rod if this add alternative is exercised.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Experimental Testing of Personal Dosimetry Interference from a Portable X-ray Generator

The determination of the disposition route for a legacy drum in a nuclear facility at the Y-12 National Security Complex is supported by non-destructive testing of the drum and its contents. An advanced radiation measurements organization at the Y-12 National Security Complex proposed a series of active measurements using a portable x-ray generator, imaging the drum and its contents with 360-degree visualization. In rooms near the current storage location for the drum, Criticality Accident Alarm System (CAAS) annunciation is degraded, and Personal Radiation Dosimetry Instruments (PRDI’s) are routinely worn by personnel. The Y-12 Development Organization has procured advanced radiation detection devices and a variety of radiation sources for use in active measurements. These devices are being used to support Y-12 operations and safety engineering disciplines to safely address complex challenges throughout the complex. This paper presents the results of experimental testing of the PRDI’s used at Y-12 with the x-ray generator [1], and notes the unique utilization of a decommissioned facility for this work.

61 RADIATION PROTECTION AND DOSIMETRY↗

Engineering Scale Testing of Transformational Non-Aqueous Solvent-Based CO 2 Capture Process at Technology Center Mongstad

Progress is reported for the period from August 8, 2018 to June 30, 2023. This final report involves work performed under ten tasks spanning two budget periods. The tasks are Task 1 Project Management, Task 2 TCM EH&S Risk Evaluation and Permitting, Task 3 Solvent Qualification, Task 4 Preliminary Design of NAS Optimized System, Task 5 TCM Amine Plant Equipment Procurement, Modification and Commissioning, Task 6 Solvent Production, Task 7 NAS Modified Amine Plant Test Plan Development, Testing, and Data Analysis, Task 8 Decommissioning and Waste Handling, Task 9 Final Techno-Economic Assessment and EH&S Risk Assessment, and Task 10 Cost Benefit Analysis and Technology Maturation Planning.

01 COAL, LIGNITE, AND PEAT↗

Corrosion Testing of Refractory in Contact with Molten Glasses Designed for Waste Vitrification

It is known that the predictive life of the refractory ceramic liner of nuclear waste glass melters is conservative, as demonstrated by performance of these materials such as in the Defense Waste Processing Facility (DWPF). The motivation for this task is to maximize the useful life of the melters that will be operated at the Waste Treatment and Immobilization Plant (WTP), which will in turn minimize procurement and disposal costs and melter outage times, as well as to identify maximum loadings in the waste glass of those species that corrode melter components. This task was initiated jointly with Pacific Northwest National Laboratory (PNNL) with the objective to develop a methodology and model to enable more accurate prediction of refractory service life under prototypic conditions from laboratory-scale material corrosion tests.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

RECLAIM: Electrochemical Lithium and Nickel Extraction with Concurrent Carbon Dioxide Mineralization

This project aims to develop technologies toward the production of Li and Ni from CO 2 -reactive minerals and rocks that contain Ca and Mg, while sequestering CO 2 . The technologies include acoustic stimulation and electrolytic proton production, which use electricity to liberate valuable metal ions from the surrounding mineral matrix at sub-boiling temperatures (~20-80°C). Feedstocks include Li/Ni/Ca/Mg-rich igneous and sedimentary rocks and minerals such as holmquistite, hectorite, lateritic Ni ores enriched in Mg-rich serpentine. Other examples of feedstocks that could be used include coarse grained orthocumulate, mine tailings, etc. In the first step, the electrolytic breakdown of water to H + and OH – (as well as O 2 and H 2 ) will be induced by applying an electric potential to simultaneously produce acidity and alkalinity. The solid feedstocks will be dissolved in the acidic anolyte under acoustic stimulation. Solubilized species will then undergo separation using our unique Li + -selective membranes driven by electrodialysis, leading to concentration of Li as soluble lithium silicate, from which Li 2 CO 3 can be derived by reaction with CO 2(g) while supplying cathode alkalinity. Also at the cathode, stepwise electrolytic precipitation of metal hydroxides, including Ni(OH) 2 , Ca(OH) 2 , and Mg(OH) 2 is performed along a cascade reactor in which both the applied potential and pH increase downstream, thereby simultaneously extracting and separating the metals. Finally, exposure of Ca(OH) 2 and Mg(OH) 2 to dilute CO 2 will result in CO 2 uptake in the form of Ca and Mg carbonates. The primary accomplishments include sample procurement and characterization. Progress has been made on precursor identification and mapping, establishing protocols for assessing metal extractability under sonication, and preliminary technoeconomic analysis (TEA) and life cycle analysis (LCA).

36 MATERIALS SCIENCE↗

Highly Efficient Vacuum Smelting of Aluminum

The goal of this SBIR project was to develop and demonstrate an innovative aluminum smelting technology that will significantly increase the range of aluminum alloys that can be manufactured from recycling of scrap aluminum. This will result in reduction of need for primary aluminum with corresponding 95% energy and CO 2 emission benefits. The proposed melting of pre-sorted aluminum alloys using UHV’s patented high throughput sorter funded by ARPA-E METALS program in an energy efficient vacuum furnace avoids the typical 5% metal loss due to oxidation of molten metal. In addition, pre-sorting scrap into different categories (cast, wrought, extrusion and aerospace) allows lower cost production of high value aluminum alloys without the need for adding alloying elements to primary aluminum. During this SBIR project, pure aluminum and several different commercial alloys were procured and melted in a laboratory furnace in vacuum, CH4 and air environments. The slag and oxidation formation were measured using weight and cross-sectional scanning electron microscope. The results otained were mixed and did not show direct correlation between furnace pressure and oxidation. We believe that the results were tainted due to small furnace size and non-uniformity of oxidation layer. A more thorough investigation is required to prove the advantages of vacuum smelting which could not be performed due to the COVID-19 lockdowns during this project. The theoretical fact remains that in the absence of oxygen in the furnace, there should be no oxide after melting, however the team could not prove it experimentally, and thus decided to dis-continue the project.

36 MATERIALS SCIENCE↗

An Introductory Guide to Generating, Using, and Storing Energy: Understanding electricity, energy storage, microgrids, and related technologies

This guide was created to empower Energy Storage for Social Equity (ES4SE) community members to learn more about power systems, energy distribution, renewable energy, and battery storage systems. It was developed in an accessible format for audiences of varied backgrounds and requires no previous experience in energy storage. It is intended to serve readers as both an educational and reference document as they consider, procure, and deploy power systems that include battery energy storage technologies and microgrids in their communities. By providing an introductory overview of the basics of electricity, power generation, and household energy consumption and loads, this guide prepares readers to learn even more about battery energy storage, microgrid systems, and the sizing of solar and battery systems.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Hidden in Plain Sight: How Interior Furnishings Management Can Help Los Alamos National Laboratory Meet the United States Department of Energy's Sustainability Goals [Capstone Project]

In the last three years, LANL has purchased over $50 million in new interior products with a focus on sustainable building and high-quality interior furnishings, carpet, and paint. Purchasing interior products that focus on sustainable manufacturing, however, is only the beginning of properly operating and maintaining an interior space over its useable life. Sustainable commercial furniture, if well maintained and warrantied, can last well beyond the accounting depreciation of the asset, ultimately saving taxpayer dollars. Given DOE’s recently announced built environment sustainability goals, now is the time to look at interior products as an important part of the overall sustainability plan for LANL’s green building initiatives. The scope of this thesis provides an environmentally sustainable O&M process for the procurement, use, and proper decommissioning of interior products. The thesis also provides environmental and financial data to assist with LANL’s overall DOE Matrix milestones, currently due in 2030.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗