Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Phase 1”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,027 records · Page 57

A Reassessment of Complementary Access Tools for Chemical Indicators

The Complementary Access Working Group (CAWG) was set up as a multi-laboratory team with members from Brookhaven National Laboratory (BNL), Idaho National Laboratory (INL), Los Alamos National Laboratory (LANL), and Sandia National Laboratories (SNL) under the direction and funding provided by National Nuclear Security Administration (NNSA) through NA-241, Next Generation Safeguards Initiative (NGSI). During FY 13 the CAWG evaluated proliferation indicators based largely on a review of the 1996 version of the IAEA’s Physical Model (Phase 1). During FYs 13 and 14, the CAWG then selected technologies and specific portable and hand-held devices that could be used by the IAEA to identify the chemical compositions of materials found during complementary access (Phase 2). [Note that in this report “chemical” is used in a broad sense to include elements, metals, and alloys as well as chemical compounds.] In November 2014, the CAWG issued its Phase 3 report describing laboratory and field testing of three devices, each device representing a specific technology that the CAWG had selected as a result of the Phase 1 and Phase 2 activities. LANL and BNL continued measurements and analysis during FY15, leading to a reinterpretation of some of the Phase 3 results. This report serves a twofold purpose. The first section of the report compares and contrasts the Phase 3 testing with presently available preliminary results of the Karlsruhe workshop. The results of Phase 3 (and the reinterpretation of some of these results) as well as the preliminary results of the Karlsruhe workshop provide the rationale for the second section of this report. In Section 2 of this report, we revisit the combinations of signatures and technologies considered in Phases 2 and 3 of the CAWG effort. We do this to determine whether the three technologies and the matching instruments selected for the Phase 3 testing are more limited than initially thought. Based on this initial re-evaluation of the technologies considered under Phase 2, we provide a preliminary re-ranking of the suggested tools for detection of chemical indicators during complementary access.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Development of a Deployable Nonmetallic Boom for Reconfigurable Systems of Small Modular Spacecraft

Launch vehicle payload capacity and the launch environment represent two of the most operationally limiting constraints on space system mass, volume, and configuration. Large-scale space science and power platforms as well as transit vehicles have been proposed that greatly exceed single-launch capabilities. Reconfigurable systems launched as multiple small modular spacecraft with the ability to rendezvous, approach, mate, and conduct coordinated operations have the potential to make these designs feasible. A key characteristic of these proposed systems is their ability to assemble into desired geometric (spatial) configurations. While flexible and sparse formations may be realized by groups of spacecraft flying in close proximity, flyers physically connected by active structural elements could continuously exchange power, fluids, and heat (via fluids). Configurations of small modular spacecraft temporarily linked together could be sustained as long as needed with minimal propellant use and reconfigured as often as needed over extended missions with changing requirements. For example, these vehicles could operate in extremely compact configurations during boost phases of a mission and then redeploy to generate power or communicate while coasting and upon reaching orbit. In 2005, NASA funded Phase 1 of a program called Modular Reconfigurable High-Energy Technology Demonstrator Assembly Testbed (MRHE) to investigate reconfigurable systems of small spacecraft. The MRHE team was led by NASA's Marshall Space Flight Center and included Lockheed Martin's Advanced Technology Center (ATC) in Palo Alto and its subcontractor, ATK. One of the goals of Phase 1 was to develop an MRHE concept demonstration in a relevant 1-g environment to highlight a number of requisite technologies. In Phase 1 of the MRHE program, Lockheed Martin devised and conducted an automated space system assembly demonstration featuring multipurpose free-floating robots representing Spacecraft in the newly built Controls and Automation Laboratory (CAL) at the ATC. The CAL lab features a 12' x 24' granite air-bearing table and an overhead simulated starfield. Among the technologies needed for the concept demo were mating interfaces allowing the spacecraft to dock and deployable structures allowing for adjustable separation between spacecraft after a rigid connection had been established. The decision to use a nonmetallic deployable boom for this purpose was driven by the MRHE concept demo requirements reproduced in Table 1.

Rehnmark, Fredrik↗

MFIX DEM Enhancement for Industry-Relevant Flows (Final Report)

The overall goal of this two-phase project is to implement performance improvements of the Multiphase Flow with Interphase Exchanges (MFIX) Discrete Element Model (DEM) code that enable a transformative shift for industrial use. Prior to this effort, the largest simulations performed using MFIX are O(10 7 ) particles. This falls short of the O(10 9 ) particle simulations that must be completed on a timescale of days or weeks (vs. months or years) to enable simulations with physically-relevant domain sizes to be incorporated into industrial design cycles within five years. This was accomplished by tailoring best-in-class practices to bear on the unique challenges posed by the MFIX-DEM algorithm and code base. Scientific simulations (e.g., in cosmology, turbulent combustion) routinely use massively parallel computing to update far more particles in short wall clock times. Results from Phase 1 (1.5 years in duration) indicated significant gains in speed were possible for a wide range of benchmark cases. Moreover, a survey sent to >35 companies indicates that the timing is ideal for such an enhanced tool, with >80% of the respondents indicating that DEM is already value-added or will be within the next 5 years, and >70% of the respondents indicating that improved speed is the top computational priority. In Phase 2 (3.5 years in duration), the two major barriers that hinder industry from effectively using multiphase Computational Fluid Dynamics (CFD) to cut costs and improve performance, namely computational overhead and confidence in predictions, continued to be addressed. Regarding the former, the results from Phase 1 to guide the effort, with enhancements focused on an improved time-stepping algorithm and particle sorting. Four target problems of 1 billion particles each and increasing complexity were identified: homogeneous cooling, tumbler with continuous particle size distribution, discharge from a rectangular hopper and a cylindrical riser. Each of these were successfully simulated for relevant time scales (on order of seconds) using less than 24 hours of wall clock time. These represent the first 1-billion particle DEM simulations performed with MFIX, namely using the MFIX-Exa code. This code is currently under development at NETL in collaboration with Lawrence Berkeley National Laboratory. Regarding the second barrier on predictive uncertainty, experiments from Phase 1 (interacting nozzles - hydrodynamics only) and Phase 2 (very small-scale segregation experiments) were used to demonstrate the ability of two simplified approaches to uncertainty quantification (UQ). By limiting the number of particles, UQ based on the simplified treatment was compared to standard UQ, which was shown to have much higher computational demands. Experiments were also performed on a pilot-scale stripper unit to provide validation data for future CFD-DEM simulations and UQ.

20 FOSSIL-FUELED POWER PLANTS↗

An Analysis of Extended Reality Mockups for Use in Verification: Phase 2

NASA commercial providers are increasing their use of Virtual Reality (VR) and Hybrid Reality (HR) technologies in their system development process. The use of these technologies, collectively referred to as Extended Reality (XR) technologies, has been limited to the development phase, but there have been requests to integrate VR and HR mockups into verifications. Verifications require, at minimum, a high-fidelity mockup for activities involving human participation (tests, demonstrations, inspections). HR technology shares many of the strengths but may not share some of the critical shortcomings of VR. Specifically, HR allows for integrating physical objects, such as a suit, which may be critical to evaluating a system. Adopting HR technology still has many of the same challenges as VR. Namely, there is little to no data about the validity of evaluations conducted with HR mockups, an established process, or criteria for evaluating the appropriateness of HR mockups. Because verifications are final and only need to happen once, HR mockups must be adequately vetted before being approved for use in verifications. Further hindering the adoption of these technologies is the lack of consensus on what constitutes a high-fidelity XR mockup. Even for physical mockups, there are guidelines and common criteria, but nothing has been formalized. Discussion about when an XR mockup can be used would be greatly helped by clearly defining what a high-fidelity XR mockup is and how it might be measured. The team will engage with relevant stakeholders to learn more about the benefits and challenges of adopting hybrid reality mockups for verification. The team will build upon work from Phase 1 by maturing a framework to guide decisions for evaluating XR mockups for use in verifications. The team will also conduct experimental studies to evaluate advantages and tradeoffs of hybrid/mixed reality relative to physical and virtual reality mockups. Finally, data from Phase 1 and Phase 2 will be synthesized into a set of best practices for developing and validating XR mockups for verification. We will highlight the work conducted to date in Phase 2. We will present the status of the XR for Verification Framework, a summary of best practices identified thus far, and give a synopsis of future work.

verification testing↗

Task 4 supporting technology. Densification requirements definition and test objectives. Propellant densification requirements definition

The primary challenge of the X-33 CAN is to build and test a prototype LO2 and LH2 densification ground support equipment (GSE) unit, and perform tank thermodynamic testing within the 15 month phase 1 period. The LO2 and LH2 propellant densification system will be scaled for the IPTD LO2 and LH2 tank configurations. The IPTD tanks were selected for the propellant technology demonstration because of the potential benefits to the phase 1 plan: tanks will be built in time to support thermodynamic testing; minimum cost; minimum schedule risk; future testing at MSFC will build on phase 1 data base; and densification system will be available to support X-33 and RLV engine test at IPTD. The objective of the task 1 effort is to define the preliminary requirements of the propellant densification GSE and tank recirculation system. The key densification system design parameters to be established in Task 1 are: recirculation flow rate; heat exchanger inlet temperature; heat exchanger outlet temperature; maximum heat rejection rate; vent flow rate (GN2 and GH2); densification time; and tank pressure level.

Lak, Tibor↗

Advanced Collaborative Emissions Study (ACES)

The objective of the Advanced Collaborative Emissions Study (ACES) was to determine before widespread commercial deployment whether or not the new, energy-efficient, heavy duty diesel engines (2007 and 2010 EPA Emissions Standards Compliant) may generate anticipated toxic emissions that could adversely affect the environment and human health. ACES was planned to take place in three phases. In Phase 1, extensive emissions characterization of four production-intent prototype engine and control systems designed to meet 2007 standards for nitrogen oxides (NOx) and particulate matter (PM) was conducted at an existing emissions characterization facility: Southwest Research Institute (SwRI). One of the tested engines was selected (at random, after careful comparison of results) for health testing in Phase 3. In Phase 2, extensive emission characterization of three production-intent prototype engine and control systems meeting the 2010 standards (including more advanced NOx controls to meet the more stringent 2010 NOx standards) was conducted at the same test facility. In Phase 3, one engine/aftertreatment system selected from Phase 1 was further characterized during health effects studies (at an existing inhalation toxicology laboratory: Lovelace Respiratory Research Institute, [LRRI]) to form the basis of the ACES safety assessment. The Department of Energy (DOE) award provided funding for emissions characterization in Phases 1 and 2 as well as exposure characterization in Phase 3. The main health analyses in Phase 3 were funded separately and are not reported here.

54 ENVIRONMENTAL SCIENCES↗

Large-Scale Additive Manufacturing for Low Cost Small-Scale Wind Turbine Manufacturing (CRADA NFE-18-07065)

Oak Ridge National Laboratory’s (ORNL) Manufacturing Demonstration Facility (MDF) worked with XZERES Wind to fabricate small (in comparison to traditional wind energy systems) wind turbine blades using large-scale polymer additive manufacturing (AM) in Phase 1 of this project. The results of Phase 1 showed promise for the use of AM in the production of small wind energy systems. Although, the large-scale polymer AM systems available for this project proved to be too large for this application, ORNL and XZERES Wind were able to prove that AM is a viable opportunity to improve small wind turbine blades. The goal for Phase 2 was for XZERES to design tooling for their existing blade geometry and for ORNL to manufacture the tooling and a blade section using advanced manufacturing techniques. Unfortunately, due to personnel turnover at XZERES, Phase 2 was not completed.

17 WIND ENERGY↗

Multilayer Pressure Vessel Materials Testing and Analysis Phase 2

To provide NASA with a suite of materials strength, fracture toughness and crack growth rate test results for use in remaining life calculations for the vessels described above, Southwest Research Institute® (SwRI®) was contracted in two phases to obtain relevant material property data from a representative vessel. An initial characterization of the strength, fracture and fatigue crack growth properties was performed in Phase 1. Based on the results and recommendations of Phase 1, a more extensive material property characterization effort was developed in this Phase 2 effort. This Phase 2 characterization included additional strength, fracture and fatigue crack growth of the multilayer vessel and head materials. In addition, some more limited characterization of the welds and heat affected zones (HAZs) were performed. This report

Popelar, Carl F.↗

ATD-2 Benefits Mechanism

NASA has been developing and demonstrating a suite of decision support capabilities for integrated arrival, departure, and surface (IADS) operations in a metroplex environment. The effort is being made in three phases, under NASA’s Airspace Technology Demonstration 2 (ATD-2) sub-project, through a close partnership with the Federal Aviation Administration (FAA), air carriers, airport, and general aviation community. The Phase 1 Baseline IADS capabilities provide enhanced operational efficiency and predictability of flight operations through data exchange and integration, tactical surface metering, and automated coordination of release time of controlled flights for overhead stream insertion. The Phase 2 Fused IADS capabilities include the fusion of strategic and tactical surface metering, Atlanta Center airspace tactical scheduling, Electronic Flight Data (EFD) integration, Terminal Flight Data Manager (TFDM) Terminal Publication (TTP) prototype, and Mobile App for General Aviation (GA) community. In the Phase 2 field evaluation, strategic surface metering provides advance notice of metering and additional stability to the assigned gate holds. The users of the IADS system in Phases 1 and 2 include the personnel at Charlotte Douglas International Airport (CLT) air traffic control tower, American Airlines ramp tower, CLT terminal radar approach control (TRACON), and Washington and Atlanta Center. This document describes the ATD-2 benefits mechanism used to assess the Phases 1 and 2 IADS capabilities and field evaluation conducted at CLT since September 2017. The ATD-2 benefits mechanism mainly consists of surface metering and overhead stream insertion. This document provides detailed calculation methods of major benefit metrics, such as fuel savings, gas emissions savings, and engine runtime reduction, which can be obtained through surface metering, gate hold of Approval Request (APREQ) flights prior to pushback, and the renegotiation of release time while taxiing. As of March 31, 2020, it is estimated that 5,075,981 pounds of fuel savings and 15,634,022 pounds of CO2 emission reduction have been achieved so far, with a reduction of 3,832 hours in total engine runtime. The amount of CO2 savings is estimated to be equivalent to planting 116,254 urban trees. The pre- and post-metering comparison results using FAA’s Aviation System Performance Metrics (ASPM) data have also shown that the surface metering had no negative impact on the on-time arrival performance of both outbound and inbound flights at CLT.

ATD-2↗

ATD-2 Benefits Mechanism

NASA has been developing and demonstrating a suite of decision support capabilities for integrated arrival, departure, and surface (IADS) operations in a metroplex environment. The effort is being made in three phases, under NASA’s Airspace Technology Demonstration 2 (ATD-2) sub-project, through a close partnership with the Federal Aviation Administration (FAA), air carriers, airport, and general aviation community. The Phase 1 Baseline IADS capabilities provide enhanced operational efficiency and predictability of flight operations through data exchange and integration, tactical surface metering, and automated coordination of release time of controlled flights for overhead stream insertion. The Phase 2 Fused IADS capabilities include the fusion of strategic and tactical surface metering, Atlanta Center airspace tactical scheduling, Electronic Flight Data (EFD) integration, Terminal Flight Data Manager (TFDM) Terminal Publication (TTP) prototype, and Mobile App for General Aviation (GA) community. In the Phase 2 field evaluation, strategic surface metering provides advance notice of metering and additional stability to the assigned gate holds. The users of the IADS system in Phases 1 and 2 include the personnel at Charlotte Douglas International Airport (CLT) air traffic control tower, American Airlines ramp tower, CLT terminal radar approach control (TRACON), and Washington and Atlanta Center. This document describes the ATD-2 benefits mechanism used to assess the Phases 1 and 2 IADS capabilities and field evaluation conducted at CLT since September 2017. The ATD-2 benefits mechanism mainly consists of surface metering and overhead stream insertion. This document provides detailed calculation methods of major benefit metrics, such as fuel savings, gas emissions savings, and engine runtime reduction, which can be obtained through surface metering, gate hold of Approval Request (APREQ) flights prior to pushback, and the renegotiation of release time while taxiing. As of April 30, 2020, it is estimated that 5,097,173 pounds of fuel savings and 15,699,292 pounds of CO2 emission reduction have been achieved so far, with a reduction of 3,831 hours in total engine runtime. The amount of CO2 savings is estimated to be equivalent to planting 116,739 urban trees. The pre- and post-metering comparison results using FAA’s Aviation System Performance Metrics (ASPM) data have also shown that the surface metering had no negative impact on the on-time arrival performance of both outbound and inbound flights at CLT.

ATD-2↗

Lessons Learned from Mir - A Payload Perspective

Among the principal objectives of the Phase 1 NASA/Mir program were for the United States to gain experience working with an international partner, to gain working experience in long-duration space flight, and to gain working experience in planning for and executing research on a long-duration space platform. The Phase 1 program was to provide to the US early experience prior to the construction and operation of the International Space Station (Phase 2 and 3). While it can be argued that Mir and ISS are different platforms and that programmatically Phase 1 and ISS are organized differently, it is also clear that many aspects of operating a long-duration research program are platform independent. This can be demonstrated by a review of lessons learned from Skylab, a US space station program of the mid-1970's, many of which were again "learned" on Mir and are being "learned" on ISS. Among these are optimum crew training strategies, on-orbit crew operations, ground support, medical operations and crew psychological support, and safety certification processes

Uri, John J.↗

Composite Interstage Structural Concept Down Select Process and Results

NASA's Advanced Composites Technologies (ACT) project evaluated several composite construction options for the Ares V Interstage to support the Constellation Program's goal of reducing the mass of vehicle dry structures. In Phase 1 of the project, eight candidate construction concepts were evaluated for the Ares V Interstage design. Trade studies were performed using finite element analyses to determine weight estimates for the construction concepts. An evaluation process was then used to down select the construction concepts down to two concepts for further consideration in Phase 2 of the project. In Phase 2 of the project, additional trade studies were performed using detailed finite element analyses of the Interstage and a final down select process was used to choose the recommended Interstage construction concept. The results of the study showed that a honeycomb sandwich design was the most favorable Interstage construction concept based on advantages in manufacturing cost. Details of the Phase 1 and Phase 2 trade studies and down select process with final results are presented in the paper.

Sleight, David W.↗

Measurement Techniques and Instruments Suitable for Life-prediction Testing of Photovoltaic Arrays

The validation of a 20-year service life for low-cost photovoltaic arrays is a critical requirement in the Low-Cost Solar Array (LSA) Project. The validation is accomplished through accelerated life-prediction tests. A two-phase study was conducted to address the needs before such tests are carried out. The results and recommended techniques from the Phase 1 investigation are summarized in the appendix. Phase 2 of the study is covered in this report and consisted of experimental evaluations of three techniques selected from these recommended as a results of the Phase 1 findings. The three techniques evaluated were specular and nonspecular optical reflectometry, chemiluminescence measurements, and electric current noise measurements.

Noel, G. T.↗

Determining the Efficiency of the Hanford Waste End Effecter through Proof of Concept Testing - 18165

The ability to effectively retrieve aged and hardened waste from leaking underground storage tanks at the Hanford Site is critical to achieving tank closure and Tank Farm mission success. DOE's Tank Operations Contractor, Washington River Protection Solutions (WRPS) is currently developing with Pacific Northwest National Laboratory (PNNL) a confined sluicing end effecter known as the Hanford Waste End Effecter (HWEE). The HWEE is a high-pressure rotating multi water-jet (for waste dislocation) with an eductor transfer system that is designed to both mobilize and extract the eroded waste settled on tank bottoms. This technology development is planned to be accomplished in four phases: 1) HWEE proof of concept testing using cold simulants (based on known Hanford tank waste hardness characteristics); 2) HWEE retrieval system development and testing using cold simulant; 3) full scale HWEE system testing using cold simulant; and 4) deployment into an actual Hanford Tank with the intent to successfully retrieve remaining waste in the tank. This paper discusses the viability of the HWEE based on how well it removed the simulated hardpan and the amount of liquid left in the test bed during Phase 1. Water usage and retrieval rate were closely monitored. This paper only discusses Phase 1 testing and results completed in October 2017. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The First Joint Report of the General Thomas P. Stafford Task Force and the Academician Vladimir F. Utkin Advisory Expert Council on the Shuttle-Mir Rendezvous and Docking Missions

In October 1992, the National Aeronautics and Space Administration (NASA) and the Russian Space Agency (RSA) formally agreed to conduct a fundamentally new program of human cooperation in space. The 'Shuttle-Mir Program' encompassed combined astronaut-cosmonaut activities on the Shuttle, Soyuz Test Module(TM), and Mir station spacecraft. At that time, NASA and RSA limited the project to: the STS-60 mission carrying the first Russian cosmonaut to fly on the U.S. Space Shuttle; the launch of the first U.S. astronaut on the Soyuz vehicle for a multi-month mission as a member of a Mir crew; and the change-out of the U.S.-Russian Mir crews with a Russian crew during a Shuttle rendezvous and docking mission with the Mir Station. The objectives of the Phase 1 Program are to provide the basis for the resolution of engineering and technical problems related to the implementation of the ISS and future U.S.-Russian cooperation in space. This, combined with test data generated during the course of the Shuttle flights to the Mir station and extended joint activities between U.S. astronauts and Russian cosmonauts aboard Mir, is expected to reduce the technical risks associated with the construction and operation of the ISS. Phase 1 will further enhance the ISS by combining space operations and joint space technology demonstrations. Phase 1 also provides early opportunities for extended U.S. scientific and research activities, prior to utilization of the ISS.

Source record↗

Effects Influencing Plutonium-Absorber Interactions and Distributions in Routine and Upset Waste Treatment Plant Operations

This report is the third in a series of analyses written in support of a plan to revise the Hanford Waste Treatment and Immobilization Plant (WTP) Preliminary Criticality Safety Evaluation Report (CSER) that is being implemented at the request of the U.S. Department of Energy (DOE) Criticality Safety Group. A report on the chemical disposition of plutonium in Hanford tank wastes was prepared as Phase 1 of this plan (Delegard and Jones 2015). Phase 2 is the provision of a chemistry report to describe the potential impacts on criticality safety of waste processing operations within the WTP (Freer 2014). In accordance with the request from the Environmental and Nuclear Safety Department of the WTP (Miles and Losey 2012), the Phase 2 report assessed the potential for WTP process conditions within and outside the range of normal control parameters to change the ratio of fissile material to neutron-absorbing material in the waste as it is processed with an eye towards potential implications for criticality safety. The Phase 2 study also considered the implications should WTP processes take place within the credible range of chemistry upset conditions. In the present Phase 3 report, the 28 phenomena described in the Phase 2 report were considered with respect to the disposition of plutonium and various absorber elements. The phenomena identified in the Phase 2 report are evaluated in light of the Phase 1 report and other resources to determine the impacts these phenomena might have to alter the plutonium/absorber dispositions and ratios. The outcomes of the Phase 3 evaluations then can be used to inform subsequent engineering decisions and provide reasonable paths forward to mitigate or overcome real or potential criticality concern in plant operations.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Field Evaluation of the Baseline Integrated Arrival, Departure, and Surface Capabilities at Charlotte Douglas International Airport

NASA is currently developing a suite of decision support capabilities for integrated arrival, departure, and surface (IADS) operations in a metroplex environment. The effort is being made in three phases, under NASA's Airspace Technology Demonstration 2 (ATD-2) sub-project, through a strong partnership with the Federal Aviation Administration (FAA), air carriers, airport, and general aviation community. The Phase 1 Baseline IADS capabilities provide enhanced operational efficiency and predictability of flight operations through data exchange and integration, tactical surface metering, and automated coordination of release time of controlled flights for overhead stream insertion. The users of the IADS system include the personnel at the Charlotte Douglas International Airport (CLT) air traffic control tower, American Airlines ramp tower, CLT terminal radar approach control (TRACON), and Washington Center. This paper describes the Phase 1 Baseline IADS capabilities and field evaluation conducted at CLT from September 2017 for a year. From the analysis of operations data, it is estimated that 538,915 kilograms of fuel savings, and 1,659 metric tons of CO2 emission reduction were achieved during the period with a total of 944 hours of engine run time reduction. The amount of CO2 savings is estimated as equivalent to planting 42,560 urban trees. The results have also shown that the surface metering had no negative impact on on-time arrival performance of both outbound and inbound flights. The technology transfer of Phase 1 Baseline IADS capabilities has been made to the FAA and aviation industry, and the development of additional capabilities for the subsequent phases is underway.

Jung, Yoon C.↗