Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “PROJECT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,027 records · Page 57

WE-AB-303-01: FEATURED PRESENTATION: A Dual-Detector Phase-Matched Digital Tomosynthesis (DTS) Imaging Scheme Using Aggregated KV and MV Projections for Intra-Treatment Lung Tumor Tracking

Purpose: To develop a dual-detector phase-matched DTS technique for continuous and fast intra-treatment lung tumor localization. Methods: Tumor localization accuracy of limited-angle DTS imaging is affected by low inter-slice resolution. The dual-detector DTS technique aims to overcome this limitation through combining orthogonally acquired beam’s eye view MV projections and kV projections for intra-treatment DTS reconstruction and localization. To aggregate the kV and MV projections for reconstruction, the MV projections were linearly converted to synthesize corresponding kV projections. To further address the lung motion induced localization errors, this technique uses respiratory phase-matching to match the motion information between on-board DTS and reference DTS to offset the adverse effects of motion blurriness in tumor localization.A study was performed using the CIRS008A lung phantom to simulate different on-board target variation scenarios for localization. The intra-treatment kV and MV acquisition was achieved through the Varian TrueBeam Developer Mode. Four methods were compared for their localization accuracy: 1. the proposed dual-detector phase-matched DTS technique; 2. the single-detector phase-matched DTS technique; 3. the dual-detector 3D-DTS technique without phase-matching; and 4. the single-detector 3D-DTS technique without phase-matching. Results: For scan angles of 2.5°, 5°, 10°, 20° and 30°, the dual-detector phase-matched DTS technique localized the tumor with average(±standard deviations) errors of 0.4±0.3 mm, 0.5±0.3 mm, 0.6±0.2 mm, 0.9±0.4 mm and 1.0±0.3 mm, respectively. The corresponding values of single-detector phase-matched DTS technique were 4.0±2.5 mm, 2.7±1.1 mm, 1.7±1.2 mm, 2.2±0.9 mm and 1.5±0.8 mm, respectively. The values of dual-detector 3D-DTS technique were 6.2±1.7 mm, 6.3±1.2 mm, 5.3±1.3 mm, 2.0±2.2 mm and 1.5±0.5 mm, respectively. And the values of single-detector 3D-DTS technique were 9.7±8.9 mm, 9.8±8.8 mm, 10.0±9.7 mm, 3.9±2.7 mm and 2.2±1.3 mm, respectively. Conclusion: The dual-detector phase-matched DTS technique substantially improves the tumor localization accuracy, which can be applied to real-time intra-treatment lung tumor localization. The research was funded by the National Institutes of Health Grant No. R01-CA184173 and a grant from Varian Medical Systems.

60 APPLIED LIFE SCIENCES↗

Understanding Diverse Model Projections of Future Extreme El Niño

The majority of future projections in the Coupled Model Intercomparison Project (CMIP5) show more frequent exceedances of the 5 mm day -1 rainfall threshold in the eastern equatorial Pacific rainfall during El Niño, previously described in the literature as an increase in “extreme El Niño events”; however, these exceedance frequencies vary widely across models, and in some projections actually decrease. Here we combine single-model large ensemble simulations with phase 5 of the Coupled Model Intercomparison Project (CMIP5) to diagnose the mechanisms for these differences. The sensitivity of precipitation to local SST anomalies increases consistently across CMIP-class models, tending to amplify extreme El Niño occurrence; however, changes to the magnitude of ENSO-related SST variability can drastically influence the results, indicating that understanding changes to SST variability remains imperative. Future El Niño rainfall intensifies most in models with 1) larger historical cold SST biases in the central equatorial Pacific, which inhibit future increases in local convective cloud shading, enabling more local warming; and 2) smaller historical warm SST biases in the far eastern equatorial Pacific, which enhance future reductions in stratus cloud, enabling more local warming. Additionally, these competing mechanisms complicate efforts to determine whether CMIP5 models under- or overestimate the future impacts of climate change on El Niño rainfall and its global impacts. However, the relation between future projections and historical biases suggests the possibility of using observable metrics as “emergent constraints” on future extreme El Niño, and a proof of concept using SSTA variance, precipitation sensitivity to SST, and regional SST trends is presented.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Intercomparison of Dynamically and Statistically Downscaled Climate Change Projections over the Midwest and Great Lakes Region

Downscaling of global climate model (GCMs) simulations is a key element of regional-to-local-scale climate change projections that can inform impact assessments, long-term planning, and resource management in different sectors. Here, we conduct an intercomparison between statistically and dynamically downscaled GCMs simulations using the hybrid delta (HD) and the Weather Research and Forecast (WRF) Model, respectively, over the Midwest and Great Lakes region to 1) validate their performance in reproducing extreme daily precipitation (P) and daily maximum temperature (T max ) for summer and winter and 2) evaluate projections of extremes in the future. Our results show the HD statistical downscaling approach, which includes large-scale bias correction of GCM inputs, can reproduce observed extreme P and T max reasonably well for both summer and winter. However, raw historical WRF simulations show significant bias in both extreme P and T max for both seasons. Interestingly, the convection-permitting WRF simulation at 4-km grid spacing does not produce better results for seasonal extremes than the WRF simulation at 12 km using a parameterized convection scheme. Despite a broad similarity for winter extreme P projections, the projected changes in the future summer storms are quite different between downscaling methods; WRF simulations show substantial increases in summer extreme precipitation, while the changes projected by the HD approach exhibit moderate decreases overall. The WRF simulations at 4 km also show a pronounced decoupling effect between seasonal totals and extreme daily P for summer, which suggests that there could be more intense summer extremes at two different time scales, with more severe individual convective storms combined with longer summer droughts at the end of the twenty-first century.

54 ENVIRONMENTAL SCIENCES↗

Developing a monitoring and verification plan with reference to the Australian Otway CO2 pilot project

The Australian Cooperative Research Centre for Greenhouse Gas Technologies (CO2CRC) is currently injecting 100,000 tons of CO{sub 2} in a large-scale test of storage technology in a pilot project in southeastern Australia called the CO2CRC Otway Project. The Otway Basin, with its natural CO{sub 2} accumulations and many depleted gas fields, offers an appropriate site for such a pilot project. An 80% CO{sub 2} stream is produced from a well (Buttress) near the depleted gas reservoir (Naylor) used for storage (Figure 1). The goal of this project is to demonstrate that CO{sub 2} can be safely transported, stored underground, and its behavior tracked and monitored. The monitoring and verification framework has been developed to monitor for the presence and behavior of CO{sub 2} in the subsurface reservoir, near surface, and atmosphere. This monitoring framework addresses areas, identified by a rigorous risk assessment, to verify conformance to clearly identifiable performance criteria. These criteria have been agreed with the regulatory authorities to manage the project through all phases addressing responsibilities, liabilities, and to assure the public of safe storage.

54 ENVIRONMENTAL SCIENCES↗

Induced seismicity potential based on probabilistic geomechanics for the San Juan Basin CarbonSAFE project

Although geologic carbon sequestration projects have yet to induce — or may never induce — a damaging earthquake, experiences from other deep injection industries such as hydraulic fracturing, enhanced geothermal systems, and saltwater disposal suggest that effective quantitative seismic risk assessment is necessary for deep saline carbon capture and sequestration (CCS) projects. One such imminent CCS project is the San Juan Basin CarbonSAFE Phase III program. We use Monte Carlo probabilistic geomechanical analyses combined with observations of the geologic and operational parameters of the San Juan Basin site and suggest that this project is of low-induced seismic risk. The primary analysis is split into four sections. First, we assess the literature for faults and past seismicity, and at least five faulting scenarios are directly relevant. Second, we develop and calibrate an integrated earth model for the project site. Third, we perform Monte Carlo simulations that consider reasonable uncertainties of the geomechanical parameters. Of five tested faulting scenarios, only one presents high Coulomb failure functions, but fourth, we determine the risk to be low based on the combined lack of historical seismicity, the geologic framework of the faulting scenario, and the presence of saltwater injection at the same depth as the proposed supercritical carbon dioxide injection. The most sensitive parameters in the geomechanical calculations are the fault dip and the coefficient of friction. The least sensitive are the fault strike and the orientation of the maximum horizontal principal stress.

58 GEOSCIENCES↗

Considering uncertainties expands the lower tail of maize yield projections

Crop yields are sensitive to extreme weather events. Improving the understanding of the mechanisms and the drivers of the projection uncertainties can help to improve decisions. Previous studies have provided important insights, but often sample only a small subset of potentially important uncertainties. Here we expand on a previous statistical modeling approach by refining the analyses of two uncertainty sources. Specifically, we assess the effects of uncertainties surrounding crop-yield model parameters and climate forcings on projected crop yield. We focus on maize yield projections in the eastern U.S.in this century. We quantify how considering more uncertainties expands the lower tail of yield projections. We characterized the relative importance of each uncertainty source and show that the uncertainty surrounding yield model parameters is the main driver of yield projection uncertainty.

59 BASIC BIOLOGICAL SCIENCES↗

Dixie Valley Engineered Geothermal System Exploration Methodology Project, Baseline Conceptual Model Report

The Engineered Geothermal System (EGS) Exploration Methodology Project is developing an exploration approach for EGS through the integration of geoscientific data. The overall project area is 2500km2 with the Calibration Area (Dixie Valley Geothermal Wellfield) being about 170km2. The Final Scientific Report (FSR) is submitted in two parts (I and II). FSR part I presents (1) an assessment of the readily available public domain data and some proprietary data provided by terra-gen power, llc, (2) a re-interpretation of these data as required, (3) an exploratory geostatistical data analysis, (4) the baseline geothermal conceptual model, and (5) the EGS favorability/trust mapping. The conceptual model presented applies to both the hydrothermal system and EGS in the Dixie Valley region. FSR Part II presents (1) 278 new gravity stations; (2) enhanced gravity-magnetic modeling; (3) 42 new ambient seismic noise survey stations; (4) an integration of the new seismic noise data with a regional seismic network; (5) a new methodology and approach to interpret this data; (5) a novel method to predict rock type and temperature based on the newly interpreted data; (6) 70 new magnetotelluric (MT) stations; (7) an integrated interpretation of the enhanced MT data set; (8) the results of a 308 station soil CO2 gas survey; (9) new conductive thermal modeling in the project area; (10) new convective modeling in the Calibration Area; (11) pseudo-convective modeling in the Calibration Area; (12) enhanced data implications and qualitative geoscience correlations at three scales (a) Regional, (b) Project, and (c) Calibration Area; (13) quantitative geostatistical exploratory data analysis; and (14) responses to nine questions posed in the proposal for this investigation. Enhanced favorability/trust maps were not generated because there was not a sufficient amount of new, fully-vetted (see below) rock type, temperature, and stress data. The enhanced seismic data did generate a new method to infer rock type and temperature (However, in the opinion of the Principal Investigator for this project, this new methodology needs to be tested and evaluated at other sites in the Basin and Range before it is used to generate the referenced maps. As in the baseline conceptual model, the enhanced findings can be applied to both the hydrothermal system and EGS in the Dixie Valley region).

15 GEOTHERMAL ENERGY↗

Permafrost Thaw, Uneven Subsidence and Projected Drying of Ice-wedge Polygon Tundra: Modeling Archive

This dataset is a model archive of the paper Permafrost Thaw, Uneven Subsidence and Projected Drying of Ice-wedge Polygon Tundra (in prep) to support a modeling study investigating how projected increases in Arctic temperature and precipitation will jointly influence hydrologic conditions in ice-rich tundra landscapes. With this dataset, this study is to address the research question: Will Arctic tundra landscapes become wetter or drier with increasing precipitation and temperature in the future when thaw-induced ground subsidence and associated microtopographic evolution are represented? The simulations focus on ice-wedge polygon tundra, a widespread form of ice-rich permafrost terrain that is highly sensitive to thaw-driven landscape change. This dataset contains model input and output data for four study watersheds in Alaska: Anaktuvuk, Utqiagvik (formerly Barrow), Brooks Foothills, and Prudhoe Bay. Simulations were performed using the Advanced Terrestrial Simulator (ATS, v1.5), a physics-rich integrated surface–subsurface hydrologic model. For each watershed, ten modeling cases were performed representing two landscape evolution conditions (with subsidence and without subsidence) combined with five climate forcing scenarios derived from Shared Socioeconomic Pathways (SSP5, SSP5 with precipitation trend, SSP2, SSP2 with precipitation trend, and SSP2 with double precipitation trend). Particularly, for each watershed under the forcing SSP2 with precipitation trend, there are two additional simulations considering spatially heterogeneous subsidence distributions: one assumes randomly distributed scaling and the other includes elevation dependent distribution scaling. These simulations span 1980–2099 and include spin-up runs (1980–2009) followed by transient projections (2010–2099). To facilitate reproducibility of simulations, all datasets are organized by watershed. For each study watershed, the dataset contains: (1) Pre-partitioned mesh files for 32-core modeling (.par.32.XX), located in EACH_WATERSHED/mesh/basin; and also a non-partitioned mesh file (.exo) located in EACH_WATERSHED/mesh; (2) Climate forcings corresponding to the five SSP scenarios (.h5), located in EACH_WATERSHED/data; (3) Final states (.h5) from column spin-up modeling used to initialize historical watershed-scale spin-up runs from 1980 to 2009, located in EACH_WATERSHED/PreSpinupHistorical; (4) Final states (.h5) of historical watershed-scale spin-up runs from 1980 to 2009 used to initialize projection runs, located in EACH_WATERSHED/Spinup_daymetERA5; (5) ATS modeling input files (.xml), located in EACH_WATERSHED/EACH_SIMULATION_SCENARIO/inputfiles; (6) ATS modeling output files (.dat), located in in EACH_WATERSHED/EACH_SIMULATION_SCENARIO/combined_obs; (7) For the Brooks Foothills watershed, additional spatial model outputs are provided (.h5) for selected years (2033 and 2093) used to generate spatial figures in this study, located in Brooksfoothills/EACH_SIMULATION_SCENARIO/results-WITH/WITHOUT_SUBSIDENCE-year2033/2093. All data files with suffix .h5 can be accessible through Python h5py, and all data files with suffix of .dat can be imported by Python pandas. Mesh file with .exo can be visualized through Paraview or read by Python netCDF. The Next-Generation Ecosystem Experiments in the Arctic (NGEE Arctic) project is a research effort to reduce uncertainty in the Department of Energy’s Energy Exascale Earth System Model (E3SM) by developing a predictive understanding of Arctic tundra ecosystems underlain by permafrost and to quantify feedbacks from the Arctic tundra to the Earth system. NGEE Arctic is supported by the Department of Energy's Office of Biological and Environmental Research. Over Phases 1–3, observations made by the NGEE Arctic team across a gradient of permafrost landscapes in Arctic Alaska improved the representation of tundra processes in the land surface component of E3SM (the E3SM Land Model, ELM). Model improvements emphasized unique aspects of permafrost environments and explored reductions in model complexity while retaining predictive power. The Arctic-informed ELM developed by NGEE Arctic has been used to make novel predictions on processes ranging from permafrost thaw to soil biogeochemical cycling to Earth system feedbacks associated with the unique characteristics of tundra plants. In Phase 4, the NGEE Arctic team is evaluating our new predictive understanding under novel conditions across the Arctic domain. In collaboration with partners at long-term pan-Arctic research sites we are examining whether an Arctic-informed ELM can faithfully simulate interactions among surface and subsurface processes at site, regional, and pan-Arctic scales. In turn, we are using variety of tools to dynamically extend and evaluate ELM inference, with an emphasis on data synthesis and pan-Arctic model evaluation, reintegration of code with an evolving E3SM, scaling across heterogeneous Arctic landscapes, and the appropriate representation of the impacts of increasingly frequent Arctic disturbances.

EARTH SCIENCE > ATMOSPHERE > PRECIPITATION↗

Concerns in Marine Renewable Energy Projects

To accelerate the adoption of these emerging marine hydrokinetic technologies, navigational and environmental issues and concerns must be identified and addressed. As hydrokinetic projects move forward, various stakeholders will need to be engaged; one of the key issues that project proponents face as they engage stakeholders is that many conflicting uses and environmental issues are not well-understood. Much of this lack of understanding comes from a limited understanding of the technologies themselves. To address this issue, in September 2008, RE Vision consulting, LLC, was selected by the Department of Energy, under their market acceleration program, to apply a scenario-based assessment approach to the emerging hydrokinetic technology sector. The goal was to improve understanding of potential environmental and navigation impacts of these technologies and focus stakeholders on the critical issues. To meet this goal, the study established baseline scenarios for wave and tidal power conversion at potential future deployment sites. The scenarios captured variations in technical approaches and deployment scales and thus grounded the analysis in realistic constraints. The work conducted under this award provides an important foundation to other market acceleration activities carried out by the DOE and other stakeholders in this sector. The scenarios were then evaluated using a framework developed by H.T. Harvey & Associates to identify and characterize key environmental concerns and uncertainties. In collaboration with PCCI and the U.S. Coast Guard, navigation issues were assessed and guidelines developed to assure the safe operation of these systems. Finally, the work highlights “next steps” to take to continue development and adoption of marine hydrokinetic energy. Throughout the project, close collaboration with device developers, project developers and regulatory stakeholders was pursued to ensure that assumptions and constraints are realistic. Results concur with most of the permitting hurdles experienced by on-going projects in the U.S., and specific recommendations are provided for identifying and addressing them. While many areas of further research were identified, the study did not identify any major show-stoppers, largely because these technologies have a relatively low environmental risk-profile if compared to other activities routinely permitted in the marine environment. The frameworks and representative scenarios developed provide an objective and transparent tool for stakeholders, regulators and developers to assist in the decision-making process for siting wave and tidal energy plants, and meet our goal of improving understanding between all stakeholders. The final product consists of three reports: Report 1 - Wave Energy Scenarios. This report includes: A technology characterization of four different wave energy technologies, including major technical specifications, device performance, and technical siting considerations; A site characterization of two potential deployment sites located in Hawaii and California; Outlines of device installation, O&M and decommissioning activities; Navigational demarcation requirements; and, Deployment Scenarios, identifying all the major life-cycle-related impacts. Report 2 - Tidal Energy Scenarios. This report includes: A technology characterization of three tidal energy technologies, including major technical specifications, device performance, and technical siting considerations; A site characterization of one potential deployment location in the Puget Sound, Washington; Outlines of device installation, O&M and decommissioning activities; Navigational demarcation requirements; and, Deployment Scenarios, identifying all the major life-cycle-related impacts.Report 3 - Framework for Identifying Key Environmental Concerns. This report describes frameworks for identifying key environmental effects and applies them to the wave and tidal energy deployment scenarios described in the first two reports. It highlights critical issues and recommendations for future research.

16 TIDAL AND WAVE POWER↗

Final Technical Report on STTR Project DE-FG02-06ER86281 Particle Tracking in Matter-Dominated Beam Lines (G4beamline)

This project has been for software development of the G4beamline [1] program, which is a particle-tracking simulation program based on the Geant4 toolkit [2], optimized for beam lines. This program can perform more realistic simulations than most alternatives, while being significantly easier to use by physicists. This project has fostered the general acceptance of G4beamline within the muon community, and has assisted in expanding its role outside that community. During this project, the G4beamline user community has grown from about a half-dozen users to more than 200 users around the world. This project also validated our business decision to keep G4beamline an open-source program, judging that an STTR project would provide more development resources than would marketing and selling the program. G4beamline is freely available to the physics community, and has been well validated against experiments and other codes within its domain. Muons, Inc. continues to support and develop the program, and a major part of the company's continued success and growth is directly related to our expertise in applying this program to interesting applications.

43 PARTICLE ACCELERATORS↗

Underground Test Area Quality Assurance Project Plan Nevada National Security Site, Nevada, Revision 0

This Quality Assurance Project Plan (QAPP) provides the overall quality assurance (QA) program requirements and general quality practices to be applied to the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Underground Test Area (UGTA) Sub-Project (hereafter the Sub-Project) activities. The requirements in this QAPP are consistent with DOE Order 414.1C, Quality Assurance (DOE, 2005); U.S. Environmental Protection Agency (EPA) Guidance for Quality Assurance Project Plans for Modeling (EPA, 2002); and EPA Guidance on the Development, Evaluation, and Application of Environmental Models (EPA, 2009). The QAPP Revision 0 supersedes DOE--341, Underground Test Area Quality Assurance Project Plan, Nevada Test Site, Nevada, Revision 4.

54 ENVIRONMENTAL SCIENCES↗

Safety Design Strategy for the Advanced Test Reactor Primary Coolant Pump and Motor Replacement Project

In accordance with the requirements of U.S. Department of Energy (DOE) Order 413.3B, “Program and Project Management for the Acquisition of Capital Assets,” safety must be integrated into the design process for new or major modifications to DOE Hazard Category 1, 2, and 3 nuclear facilities. The intended purpose of this requirement involves the handling of hazardous materials, both radiological and chemical, in a way that provides adequate protection to the public, workers, and the environment. Requirements provided in DOE Order 413.3B and DOE Order 420.1B, “Facility Safety,” and the expectations of DOE-STD-1189-2008, “Integration of Safety into the Design Process,” provide for identification of hazards early in the project and use of an integrated team approach to design safety into the facility. This safety design strategy provides the basic safety-in-design principles and concepts that will be used for the Advanced Test Reactor Reliability Sustainment Project. While this project does not introduce new hazards to the ATR, it has the potential for significant impacts to safety-related systems, structures, and components that are credited in the ATR safety basis and are being replaced. Thus the project has been determined to meet the definition of a major modification and is being managed accordingly.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Safety Design Strategy for the Advanced Test Reactor Emergency Firewater Injection System Replacement Project

In accordance with the requirements of U.S. Department of Energy (DOE) Order 413.3B, “Program and Project Management for the Acquisition of Capital Assets,” safety must be integrated into the design process for new or major modifications to DOE Hazard Category 1, 2, and 3 nuclear facilities. The intended purpose of this requirement involves the handling of hazardous materials, both radiological and chemical, in a way that provides adequate protection to the public, workers, and the environment. Requirements provided in DOE Order 413.3B and DOE Order 420.1B, “Facility Safety,” and the expectations of DOE-STD-1189-2008, “Integration of Safety into the Design Process,” provide for identification of hazards early in the project and use of an integrated team approach to design safety into the facility. This safety design strategy provides the basic safety-in-design principles and concepts that will be used for the Advanced Test Reactor Reliability Sustainment Project. While this project does not introduce new hazards to the ATR, it has the potential for significant impacts to safety-related systems, structures, and components that are credited in the ATR safety basis and are being replaced. Thus the project has been determined to meet the definition of a major modification and is being managed accordingly.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Safety Design Strategy for the Advanced Test Reactor Diesel Bus (E-3) and Switchgear Replacement Project

In accordance with the requirements of U.S. Department of Energy (DOE) Order 413.3B, “Program and Project Management for the Acquisition of Capital Assets,” safety must be integrated into the design process for new or major modifications to DOE Hazard Category 1, 2, and 3 nuclear facilities. The intended purpose of this requirement involves the handling of hazardous materials, both radiological and chemical, in a way that provides adequate protection to the public, workers, and the environment. Requirements provided in DOE Order 413.3B and DOE Order 420.1B, “Facility Safety,” and the expectations of DOE-STD-1189-2008, “Integration of Safety into the Design Process,” provide for identification of hazards early in the project and use of an integrated team approach to design safety into the facility. This safety design strategy provides the basic safety-in-design principles and concepts that will be used for the Advanced Test Reactor Reliability Sustainment Project. While this project does not introduce new hazards to the ATR, it has the potential for significant impacts to safety-related systems, structures, and components that are credited in the ATR safety basis and are being replaced. Thus the project has been determined to meet the definition of a major modification and is being managed accordingly.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

SkyMine Carbon Mineralization Pilot Project

This Topical Report addresses accomplishments achieved during Phase 1 of the SkyMine{reg_sign} Carbon Mineralization Pilot Project. The primary objectives of this project are to design, construct, and operate a system to capture CO{sub 2} from a slipstream of flue gas from a commercial coal-fired cement kiln, convert that CO{sub 2} to products having commercial value (i.e., beneficial use), show the economic viability of the CO{sub 2} capture and conversion process, and thereby advance the technology to a point of readiness for commercial scale demonstration and proliferation. The project will also substantiate market opportunities for the technology by sales of chemicals into existing markets, and identify opportunities to improve technology performance and reduce costs at commercial scale. The primary objectives of Phase 1 of the project were to elaborate proven SkyMine{reg_sign} process chemistry to commercial pilot-scale operation and complete the preliminary design ('Reference Plant Design') for the pilot plant to be built and operated in Phase 2. Additionally, during Phase 1, information necessary to inform a DOE determination regarding NEPA requirements for the project was developed, and a comprehensive carbon lifecycle analysis was completed. These items were included in the formal application for funding under Phase 2. All Phase 1 objectives were successfully met on schedule and within budget.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Observation Targeting for the Tehachapi Pass and Mid-Columbia Basin: WindSENSE Phase III Project Summary Report

The overall goal of this multi-phased research project known as WindSENSE is to develop an observation system deployment strategy that would improve wind power generation forecasts. The objective of the deployment strategy is to produce the maximum benefit for 1- to 6-hour ahead forecasts of wind speed at hub-height (~80 m). In Phase III of the project, the focus was on the Mid-Columbia Basin region which encompasses the Bonneville Power Administration (BPA) wind generation area shown in Figure 1 that includes Klondike, Stateline, and Hopkins Ridge wind plants. The typical hub height of a wind turbine is approximately 80-m above ground level (AGL). So it would seem that building meteorological towers in the region upwind of a wind generation facility would provide data necessary to improve the short-term forecasts for the 80-m AGL wind speed. However, this additional meteorological information typically does not significantly improve the accuracy of the 0- to 6-hour ahead wind power forecasts because processes controlling wind variability change from day-to-day and, at times, from hour-to-hour. It is also important to note that some processes causing significant changes in wind power production function principally in the vertical direction. These processes will not be detected by meteorological towers at off-site locations. For these reasons, it is quite challenging to determine the best type of sensors and deployment locations. To address the measurement deployment problem, Ensemble Sensitivity Analysis (ESA) was applied in the Phase I portion of the WindSENSE project. The ESA approach was initially designed to produce spatial fields that depict the sensitivity of a forecast metric to a set of prior state variables selected by the user. The best combination of variables and locations to improve the forecast was determined using the Multiple Observation Optimization Algorithm (MOOA) developed in Phase I. In Zack et al. (2010a), the ESA-MOOA approach was applied and evaluated for the wind plants in the Tehachapi Pass region for a period during the warm season. That research demonstrated that forecast sensitivity derived from the dataset was characterized by well-defined, localized patterns for a number of state variables such as the 80-m wind and the 25-m to 1-km temperature difference prior to the forecast time. The sensitivity patterns produced as part of the Tehachapi Pass study were coherent and consistent with the basic physical processes that drive wind patterns in the Tehachapi area. In Phase II of the WindSENSE project, the ESA-MOOA approach was extended and applied to the wind plants located in the Mid-Columbia Basin wind generation area of Washington-Oregon during the summer and to the Tehachapi Pass region during the winter. The objective of this study was to identify measurement locations and variables that have the greatest positive impact on the accuracy of wind forecasts in the 0- to 6-hour look-ahead periods for the two regions and to establish a higher level of confidence in ESA-MOOA for mesoscale applications. The detailed methodology and results are provided in separate technical reports listed in the publications section below. Ideally, the data assimilation scheme used in the Phase III experiments would have been based upon an ensemble Kalman filter (EnKF) that was similar to the ESA method used to diagnose the Mid-Columbia Basin sensitivity patterns in the previous studies. However, running an EnKF system at high resolution is impractical because of the very high computational cost. Thus, it was decided to use a three-dimensional variational (3DVAR) analysis scheme that is less computationally intensive. The objective of this task is to develop an observation system deployment strategy for the mid Columbia Basin (i.e. the BPA wind generation region) that is designed to produce the maximum benefit for 1- to 6-hour ahead forecasts of hub-height (~80 m) wind speed with a focus on periods of large changes in wind speed. There are two tasks in the current project effort designed to validate the ESA observational system deployment approach in order to move closer to the overall goal: (1) Perform an Observing System Experiment (OSE) using a data denial approach. (2) Conduct a set of Observing System Simulation Experiments (OSSE) for the Mid-Columbia basin region.

17 WIND ENERGY↗

Hualapai Wind Project Feasibility Report

The Hualapai Department of Planning and Economic Development, with funding assistance from the U.S. Department of Energy, Tribal Energy Program, with the aid of six consultants has completed the four key prerequisites as follows: 1. Identify the site area for development and its suitability for construction. 2. Determine the wind resource potential for the identified site area. 3. Determine the electrical transmission and interconnection feasibility to get the electrical power produced to the marketplace. 4. Complete an initial permitting and environmental assessment to determine the feasibility for getting the project permitted. Those studies indicated a suitable wind resource and favorable conditions for permitting and construction. The permitting and environmental study did not reveal any fatal flaws. A review of the best power sale opportunities indicate southern California has the highest potential for obtaining a PPA that may make the project viable. Based on these results, the recommendation is for the Hualapai Tribal Nation to move forward with attracting a qualified wind developer to work with the Tribe to move the project into the second phase - determining the reality factors for developing a wind project. a qualified developer will bid to a utility or negotiate a PPA to make the project viable for financing.

17 WIND ENERGY↗

White Paper on the Use of Team Calendars with the JIRA Issue Tracking System and Confluence Collaboration Tools for the xLPR Project

ORNL was tasked by xLPR project management to propose a team calendar for use within the xLPR consortium. Among various options that were considered, the approach judged by ORNL to best fit the needs of the xLPR project is presented in this document. The Atlassian Team Calendars plug-in used with the Confluence collaboration tool was recommended for several reasons, including the advantage that it provides for a tight integration between Confluence (found at https://xlpr.ornl.gov/wiki ) and xLPR s JIRA issue tracking system (found at https://xlpr.ornl.gov/jira ). This document is divided into two parts. The first part (Sections 1-6) consists of the white paper, which highlights some of the ways that Team Calendars can improve com mun ication between xLPR project managers, group leads, and team members when JIRA is applied for both issue tracking and change-management activities. Specific points emphasized herein are as follows: The Team Calendar application greatly enhances the added value that the JIRA and Confluence tools bring to the xLPR Project. The Team Calendar can improve com mun ication between xLPR project managers, group leads, and team members when JIRA is applied for both issue tracking and change-management activities. The Team Calendar works across different email tools such as Outlook 2011, Outlook 2010, Outlook 2007, Google Calendars and Mac s iCalendar to name a few. xLPR users can now access the wiki Confluence (with embedded Team Calendars) directly from JIRA without having to re-validate their login. The second part consists of an Annex (Section 7), which describes how users can subscribe to Team Calendars from different calendar applications. Specific instructions are given in the Annex that describe how to Import xLPR Team Calendar to Outlook Version Office 2010 Import xLPR Team Calendar to Outlook Version Office 2007 Subscribe to Team Calendar from Google Calendar The reader is directed to Section 4 for instructions on adding events to the Team Calendar or accessing ORNL staff for assistance with such additions. To seek help with your questions and problems regarding the content of this document, please contact Hilda Klasky at klaskyhb@ornl.gov

97 MATHEMATICS AND COMPUTING↗