Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “MATING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,027 records · Page 57

Prenatal Centrifugation: A Mode1 for Fetal Programming of Body Weight?

'Fetal programming' is a newly emerging field that is revealing astounding insights into the prenatal origins of adult disease, including metabolic, endocrine, and cardiovascular pathophysiology. In the present study, we tested the hypothesis that rat pups conceived, gestated and born at 2-g have significantly reduced birth weights and increased adult body weights as compared to 1-g controls. Offspring were produced by mating young adult male and female rats that were adapted to 2-g centrifugation. Female rats underwent conception, pregnancy and birth at 2-g. Newborn pups in the 2-g condition were removed from the centrifuge and fostered to non-manipulated, newly parturient dams maintained at 1 -g. Comparisons were made with 1-g stationary controls, also crossfostered at birth. As compared to 1-g controls, birth weights of pups gestated and born at 2-g were significantly reduced. Pup body weights were significantly reduced until Postnatal day (P) 12. Beginning on P63, body weights of 2-g-gestated offspring exceeded those of 1-g controls by 7-10%. Thus, prenatal rearing at 2-g restricts neonatal growth and increases adult body weight. Collectively, these data support the hypothesis that 2-g centrifugation alters the intrauterine milieu, thereby inducing persistent changes in adult phenotype.

Baer, Lisa A.↗

Integrated Simulation Design Challenges to Support TPS Repair Operations

During the Orbiter Repair Maneuver (ORM) operations planned for Return to Flight (RTF), the Shuttle Remote Manipulator System (SRMS) must grapple the International Space Station (ISS), undock the Orbiter, maneuver it through a long duration trajectory, and orient it to an EVA crewman poised at the end of the Space Station Remote Manipulator System (SSRMS) to facilitate the repair of the Thermal Protection System (TPS). Once repair has been completed and confirmed, then the SRMS proceeds back through the trajectory to dock the Orbiter to the Orbiter Docking System. In order to support analysis of the complex dynamic interactions of the integrated system formed by the Orbiter, ISS, SRMS, and SSMS during the ORM, simulation tools used for previous ‘nominal’ mission support required substantial enhancements. These upgrades were necessary to provide analysts with the capabilities needed to study integrated system performance. Prevalent throughout this ORM operation is a dynamically varying topology. In other words, the ORM starts with the SRMS grappled to the mated Shuttle/ISS stack (closed loop topology), moves to an open loop chain topology consisting of the Shuttle, SRMS, and ISS, and then, at the repair configuration, extends the chain topology to one consisting of the Shuttle, SMS, ISS, and SSRMS/EVA crewman. The resulting long dynamic chain of vehicles and manipulators may exhibit significant motion between the Shuttle worksite and the EVA crewman due to the system flexibility throughout the topology (particularly within the SRMS/SSRMS joints and links). Since the attachment points of both manipulators span the flexible structure of the ISS, simulation analysis may also need to take that into consideration. Moreover, due to the lengthy time duration associated with the maneuver and repair, orbital effects become a factor and require the ISS vehicle control system to maintain active attitude control. Several facets of the ORM operation make the associated analytical efforts different from previous mission support, including: (1) the magnitude of the SRMS handled payload (Le., Orbiter class), (2) the orbital effects induced on the integrated system consisting of the large Shuttle and ISS masses connected by a light flexible SRMS, (3) long duration environmental consequences due to the lengthy operational times associated with the maneuver and repair of the TPS, (4) active attitude control (as opposed to free drift) interacting with the SRMS and SSRMS manipulators (also due to the length of the maneuver and repair), (5) relative dynamics between the EVA crewman and thc worksite influenced by the extended flexible topology. In order to meet these analysis challenges, an ORM simulation architecture was developed leveraging upon numerous pre-existing simulation elements to analyze the various subsystems individually. For example, core manipulator subsystem simulations for both the SRMS and SSRMS were originally combined to provide the dual-arm dynamics topology simulation (in the absence of orbital dynamics and vehicle control). This capability was later merged with the simulation used to analyze SRMS loading with a heavy payload in the orbital environment with an active payload control system (in this case, the ISS Attitude Control System (ACS)), configured for the ORM. The resulting worksite dynamics simulation, based off of the modified ORM simulation, provided the extended topological chain of vehicles and manipulators, while taking into account the orbital effects of both the Shuttle and ISS (as well as its ACS). Verification and validation (V&V) of these integrated simulations became a challenge in itself. A systematic approach needed to be developed such that integration simulation results could be tested against previous constituent simulations upon which these simulations were built. General V&V categories included: (1) core orbital state propagation, (2), stand-alone SRMS, (3) stand-alone SSRMS, (4) stand-alone ISS ACS, (5) integrated Shuttle, SRMS, ISS (with active ACS) in the orbital environment, and (5) dual-arm SRMS/SSRMS dynamics topology. Integrated simulation V&V run suites were created and correlated to verification runs from subsystem simulations, in order to establish the validity of the results. This paper discusses the simulation design challenges encountered while developing simulation capabilities to mirror the ORM operations. The paper also describes the incremental build approach that was utilized, starting with the subsystem simulation elements and integration into increasing more complex simulations until the resulting ORM worksite dynamics simulation had been assembled. Furthermore, the paper presents an overall integrated simulation V&V methodology based upon a subsystem level testing, integrated comparisons, and phased checkout.

Thermal Protection System↗

ISS Commercial Cargo Service: Requirements and Constraints Summary

A viewgraph presentation describing the fundamental requirements and constraints necessary to begin the acquisition of an International Space Station commercial cargo service is presented. The topics include: 1) Background; 2) Philosophy; 3) Cargo Balance; 4) Cargo Types; 5) ICCS Flight Rate; 6) Late and Early Access; 7) Power to Payloads; 8) Mating Locatin Options; 9) ISS Docking and Berthing; 10) Vehicle Stay Time; 11) ISS Resource Availability; 12) Robotic and EVA Compatability; 13) Return Cargo; and 14) Key Requirements Summary.

Thorn, Valin↗

Metallic Seal Development for Advanced Docking/Berthing System

Feasibility of metal-to-metal androgenous seals has been demonstrated. Techniques to minimize surface irregularities must be examined. Two concepts investigated: 1) Flexible metal interface with elastomeric preloader; 2) Flexibility will accommodate any surface irregularities from the mating surface. Rigid metal interface with elastomeric preloader. Rigidity of the metal surface will prevent irregularities (waves) from occurring.

Oswald, Jay↗

Advanced Docking Berthing System Update

In FY05 the Exploration Systems Technology Maturation Program selected the JSC advanced mating systems development to continue as an in-house project. In FY06, as a result of ESAS Study (60 Day Study) the CEV Project (within the Constellation Program) has chosen to continue the project as a GFE Flight Hardware development effort. New requirement for CEV to travel and dock with the ISS in 2011/12 in support of retiring the Shuttle and reducing the gap of time where US does not have any US based crew launch capability. As before, long-duration compatible seal-on-seal technology (seal-on-seal to support androgynous interface) has been identified as a risk mitigation item.

Lewis, James↗

Common Cause Case Study: An Estimated Probability of Four Solid Rocket Booster Hold-Down Post Stud Hang-ups

Until Solid Rocket Motor ignition, the Space Shuttle is mated to the Mobil Launch Platform in part via eight (8) Solid Rocket Booster (SRB) hold-down bolts. The bolts are fractured using redundant pyrotechnics, and are designed to drop through a hold-down post on the Mobile Launch Platform before the Space Shuttle begins movement. The Space Shuttle program has experienced numerous failures where a bolt has hung up. That is, it did not clear the hold-down post before liftoff and was caught by the SRBs. This places an additional structural load on the vehicle that was not included in the original certification requirements. The Space Shuttle is currently being certified to withstand the loads induced by up to three (3) of eight (8) SRB hold-down experiencing a "hang-up". The results of loads analyses performed for (4) stud hang-ups indicate that the internal vehicle loads exceed current structural certification limits at several locations. To determine the risk to the vehicle from four (4) stud hang-ups, the likelihood of the scenario occurring must first be evaluated. Prior to the analysis discussed in this paper, the likelihood of occurrence had been estimated assuming that the stud hang-ups were completely independent events. That is, it was assumed that no common causes or factors existed between the individual stud hang-up events. A review of the data associated with the hang-up events, showed that a common factor (timing skew) was present. This paper summarizes a revised likelihood evaluation performed for the four (4) stud hang-ups case considering that there are common factors associated with the stud hang-ups. The results show that explicitly (i.e. not using standard common cause methodologies such as beta factor or Multiple Greek Letter modeling) taking into account the common factor of timing skew results in an increase in the estimated likelihood of four (4) stud hang-ups of an order of magnitude over the independent failure case.

Cross, Robert↗

Quiet Spike(TradeMark) Build-up Ground Vibration Testing Approach

Flight tests of Gulfstream Aerospace Corporation s Quiet Spike(TradeMark) hardware were recently completed on the NASA Dryden Flight Research Center F-15B airplane. NASA Dryden uses a modified F-15B airplane as a testbed aircraft to cost-effectively fly flight research experiments that are typically mounted underneath the F-15B airplane, along the fuselage centerline. For the Quiet Spike(TradeMark) experiment, however, instead of a centerline mounting, a relatively long forward-pointing boom was attached to the radar bulkhead of the F-15B airplane. The Quiet Spike(TradeMark) experiment is a stepping-stone to airframe structural morphing technologies designed to mitigate the sonic-boom strength of business jets over land. The Quiet Spike(TradeMark) boom is a concept in which an aircraft s noseboom would be extended prior to supersonic acceleration. This morphing effectively lengthens the aircraft, thus reducing the peak sonic-boom amplitude, but is also expected to partition the otherwise strong bow shock into a series of reduced-strength, noncoalescing shocklets. Prior to flying the Quiet Spike(TradeMark) experiment on the F-15B airplane several ground vibration tests were required to understand the Quiet Spike(TradeMark) modal characteristics and coupling effects with the F-15B airplane. However, due to the flight hardware availability and compressed schedule requirements, a "traditional" ground vibration test of the mated F-15B Quiet Spike(TradeMark) ready-for- flight configuration did not leave sufficient time available for the finite element model update and flutter analyses before flight testing. Therefore, a "nontraditional" ground vibration testing approach was taken. This paper provides an overview of each phase of the "nontraditional" ground vibration testing completed for the Quiet Spike(TradeMark) project which includes the test setup details, instrumentation layout, and modal results obtained in support of the structural dynamic modeling and flutter analyses.

Spivey, Natalie D.↗

EXPRESS Pallet Payload Interface Requirements

A viewgraph presentation describing the EXPRESS Pallet Space Station payload interface requirements is shown. The topics include: 1) External Payload Sites; 2) EXPRESS Pallet with Six Payload Envelopes; 3) EXPRESS Pallet in Payload Bay Representative Layout; 4) EXPRESS Pallet Installation SSRMS positions pallet for PAS mating on S3 truss; 5) EXPRESS Pallet Major Components; 6) EXPRESS Pallet Adapter; 7) EXPRESS Pallet Center Location Payload Envelope; 8) Envelope Restriction for EXPRESS Pallet Corner Payload Locations; 9) EXPRESS Pallet-PAS Truss Configuration; and 10) EXPRESS Pallet Payload Services and Specifications.

Holt, Alan C.↗

Wind-Tunnel Results of the B-52B with the X-43A Stack

A low-speed wind-tunnel test was performed with a 3%-scale model of a booster rocket mated to an X-43A research vehicle, a combination referred to as the Hyper-X launch vehicle. The test was conducted both in freestream air and in the presence of a partial model of the B-52B airplane. The objectives of the test were to obtain force and moment data to generate structural loads affecting the pylon of the B-52B airplane and to determine the aerodynamic influence of the B-52B on the Hyper-X launch vehicle for evaluating launch separation characteristics. The windtunnel test was conducted at a low-speed wind tunnel in Hampton, Virginia. All moments and forces reported are based either on the aerodynamic influence of the B-52B airplane or are for the Hyper-X launch vehicle in freestream air. Overall, the test showed that the B-52B airplane imparts a strong downwash onto the Hyper-X launch vehicle, reducing the net lift of the Hyper-X launch vehicle. Pitching and rolling moments are also imparted onto the booster and are a strong function of the launch-drop angle of attack.

Davis, Mark C.↗

Sustainable Cooperative Robotic Technologies for Human and Robotic Outpost Infrastructure Construction and Maintenance

Robotic Construction Crew (RCC) is a heterogeneous multi-robot system for autonomous acquisition, transport, and precision mating of components in construction tasks. RCC minimizes resources constrained in a space environment such as computation, power, communication and, sensing. A behavior-based architecture provides adaptability and robustness despite low computational requirements. RCC successfully performs several construction related tasks in an emulated outdoor environment despite high levels of uncertainty in motions and sensing. Quantitative results are provided for formation keeping in component transport, precision instrument placement, and construction tasks.

multi-robot systems↗

Quiet Spike(TradeMark) Build-up Ground Vibration Testing Approach

Flight tests of the Gulfstream Aerospace Corporation s Quiet Spike(TradeMark) hardware were recently completed on the National Aeronautics and Space Administration Dryden Flight Research Center F-15B airplane. NASA Dryden uses a modified F-15B (836) airplane as a testbed aircraft to cost-effectively fly flight research experiments that are typically mounted underneath the airplane, along the fuselage centerline. For the Quiet Spike(TradeMark) experiment, instead of a centerline mounting, a forward-pointing boom was attached to the radar bulkhead of the airplane. The Quiet Spike(TradeMark) experiment is a stepping-stone to airframe structural morphing technologies designed to mitigate the sonic-boom strength of business jets flying over land. Prior to flying the Quiet Spike(TradeMark) experiment on the F-15B airplane several ground vibration tests were required to understand the Quiet Spike(TradeMark) modal characteristics and coupling effects with the F-15B airplane. Because of flight hardware availability and compressed schedule requirements, a "traditional" ground vibration test of the mated F-15B Quiet Spike(TradeMark) ready-for-flight configuration did not leave sufficient time available for the finite element model update and flutter analyses before flight-testing. Therefore, a "nontraditional" ground vibration testing approach was taken. This report provides an overview of each phase of the "nontraditional" ground vibration testing completed for the Quiet Spike(TradeMark) project.

Spivey, Natalie D.↗

Temperature-dependent Refractive Index of CaF2 and Infrasil 301

In order to enable high quality lens designs using calcium fluoride (CaF2) and Heraeus Infrasil 301 (Infrasil) for cryogenic operating temperatures, we have measured the absolute refractive index of these two materials as a function of both wavelength and temperature using the Cryogenic, High-Accuracy Refraction Measuring System (CHARMS) at NASA's Goddard Space Flight Center. For CaF2, we report absolute refractive index and thermo-optic coefficient (dn/dT) at temperatures ranging from 25 to 300 K at wavelengths from 0.4 to 5.6 pm, while for Infrasil, we cover temperatures ranging from 35 to 300 K and wavelengths from 0.4 to 3.6 pm. For CaF2, we compare our index measurements to measurements of other investigators. For Infrasil, we compare our measurements to the mate~al manufacturer's data at room temperature and to cryogenic measurements for fused silica from previous investigations including one of our own. Finally, we provide temperature-dependent Sellmeier coefficients based on our measured data to allow accurate interpolation of index to other wavelengths and temperatures.

Leviton, Douglas B.↗

Analysis and Design of a Double-Divert Spiral Groove Seal

This viewgraph presentation describes the design and analysis of a double spiral groove seal. The contents include: 1) Double Spiral Design Features; 2) Double Spiral Operational Features; 3) Mating Ring/Rotor Assembly; 4) Seal Ring Assembly; 5) Insert Segment Joints; 6) Rotor Assembly Completed Prototype Parts; 7) Seal Assembly Completed Prototype Parts; 8) Finite Element Analysis; 9) Computational Fluid Dynamics (CFD) Analysis; 10) Restrictive Orifice Design; 11) Orifice CFD Model; 12) Orifice Results; 13) Restrictive Orifice; 14) Seal Face Coning; 15) Permanent Magnet Analysis; 16) Magnetic Repulsive Force; 17) Magnetic Repulsive Test Results; 18) Spin Testing; and 19) Testing and Validation.

Zheng, Xiaoqing↗

Microwave powered sterile access port

A device and method for elimination of contamination during transfer of materials either into or from bioreactors, food containers, or other microbially vulnerable systems. Using microwave power, thermal sterilizations of mating fixtures are achieved simply, reliably, and quickly by the volatilization of small quantities of water to produce superheated steam which contacts all exposed surfaces.

Sauer, Richard L.↗

Space station architecture, module, berthing hub, shell assembly, berthing mechanism and utility connection channel

A space station (20) includes a plurality of modules (24) and berthing hubs (22), joined by interconnections (26) which are sideways connectable. The modules (24) and hubs (22) are fastened together in a triangular configuration in three dimensions. The interconnections (26) include a pair of opposed, axially aligned, flanged ports (50) and a clamp latch (52) formed from a plurality of sections (54, 56 and 58) hinged along their length and extending circumferentially around the flanged ports (50). A hermetic seal (63) is formed between the ports (50). A utilities connection channel (68) extends between the ports (50). The channel (68) has a shell (70) with utilities connectors (74) movable between an extended position to mating connectors in the modules (24) and a withdrawn position. Assembly sequence and common module shell structure is detailed.

Cohen, Marc M.↗

Method and apparatus for a Fabry-Perot multiple beam fringe sensor

A method and the resulting apparatus for implementing a unique multiple beam fringe sensor that is adapted to be interfaced with a low cost, compact fiber optic transmission system in order to provide an accurate digital representation of a physical parameter (e.g. temperature) of a remote sample. The sensor is fabricated so as to include a Fabry-Perot gap formed between the ends of two mated optical fibers. By examining the optical characteristics of light that is transmitted through the Fabry-Perot sensor gap, an indication of gap width can be ascertained. Accordingly, a change in Fabry-Perot sensor gap width is related to a change in the particular physical parameter to be measured.

James, Kenneth A.↗

Removable hand hold

A hand hold utilizes joining mechanisms which comprises two different mounting brackets that are permanently fastened to a supporting structure. A slide plate is disposed at one end of the hand rail or hand hold which mates with one of the mounting brackets. A securing member is disposed at the opposite end of the hand rail/hand hold which connects with the other mounting bracket by means of a locking device. The slide plate has a central tapered tongue with two matching slots disposed on each side thereof.

Corrigan, Robert D.↗

Power connect safety and connection interlock

A power connect safety and connection interlock system is shown for use with inverters and other DC loads (16) which include capacitor filter banks (14) at their DC inputs. A safety circuit (20) operates a spring (26) biased, solenoid (22) driven mechanical connection interference (24) which prevents mating and therefore electrical connection between the power contactor halves (11, 13) of the main power contacts (12) until the capacitor bank is safely precharged through auxiliary contacts (18). When the DC load (16) is shut down, the capacitor bank (14) is automatically discharged through a discharging power resistor (66) by a MOSFET transistor (60) through a discharging power resistor (66) only when both the main power contacts and auxiliary contacts are disconnected.

Rippel, Wally E.↗