Performance Audit Report: Automated Meteorological Monitoring Stations, Lawrence Livermore National Laboratory

The Waste and Air Quality Offices Group at the Lawrence Livermore National Laboratory operates two main meteorological monitoring sites near Livermore, California. The primary met tower (Site 200) is located in the northwest corner of the lab and consists of a fifty-two (52) meter tower with vertical wind speed sensors, horizontal wind speed and direction sensors and air temperature sensors at fifty-two (52) meters, twenty-three (23) meters and ten (10) meters. In addition, there is a temperature and humidity probe at ten (10) meters. At two (2) meters there are upward and downward facing solar and infrared radiation sensors, an air temperature sensor, barometric pressure sensor and a temperature and relative humidity probe. At ground level there is a tipping bucket rain gauge located to the southwest of the tower. The datalogger, communication peripherals and the barometric pressure sensor are housed in a small building near the tower. The Site 300 met site is located approximately 10 miles east of Livermore within the boundary of the LLNL blast test site. This site also consists of a 52-meter tower which is configured the same as the 52-meter tower at Site 200. There is also a building at this site that houses the datalogger, communication peripherals and the barometric pressure sensor. At both Site 200 and Site 300, data are collected by Ethernet with telephone modem collection as a backup. The data collection interval for both sites is fifteen (15) minutes via workstations running Loggernet software located at the main lab facility. The audits of the Lawrence Livermore National Laboratory’s two automated meteorological stations located near Livermore, California were performed on October 24 & 25, 2023. These audits were performed under the guidelines of the Quality Assurance Handbook for Air Pollution Measurement Systems, Volume IV, Version 2 and the On-Site Meteorological Program Guidance for Regulatory Modeling Applications, U.S. EPA.

54 ENVIRONMENTAL SCIENCES↗

Ultrasonic Piezoelectric Atomizers: Electromechanical Modeling and Performance Testing

Ultrasonic atomization of bulk liquids has received extensive attention in the past few decades due to the ability to produce controlled droplet sizes, a necessity for many industries such as spray coating and aerosol drug delivery. Despite the increase in attention, one novel application of this technology has been overlooked until recently, and that is the moisture removal capabilities of atomization. The first ever ultrasonic dryer, created by researchers at Oak Ridge National Lab in 2016, applies the mechanisms of atomization to mechanically remove moisture from clothing. The process utilizes the ultrasonic vibrations created by a piezoelectric transducer in direct contact with a wet fabric to rupture the liquid-vapor boundary of the retained water. Once ruptured, smaller droplets are ejected from the bulk liquid and are actively removed from the fabric pores. The mechanisms of droplet ejection from this event are related to both capillary waves forming on the liquid surface (Capillary Wave Theory), as well as the implosion of cavitation bubbles formed from the hydraulic shocks propagating from the transducer (Cavitation Theory). In this work, we present an analytical model for predicting the moisture removal rate of a wet fabric exposed to ultrasonic vibrations, and connect the atomization events to a global variable, acceleration, in order to decouple the nondeterministic relationship between the transducer and applied voltage. The acceleration governing atomization is predicted using a verified numerical model. The numerical model is shown to assist in developing ultrasonic drying by means of efficiently evaluating transducer design changes.

Dupuis, Eric D.↗

Results of the Analyses of SMECT Mercury Sample Collected During Mercury Pump (MB1) Functional Check

A pump added to remove mercury from the sump of the Slurry Mix Evaporator Condensate Tank (SMECT) in DWPF was successfully tested in 2020, resulting in a sample of contaminated mercury obtained from the Mercury Purification Process (MPP) cell. The mercury in the sump of the SMECT was present as a result of steam stripping of sludge slurry in the Sludge Receipt and Adjustment Tank (SRAT) at DWPF. A schematic of the MPP system provided by DWPF personnel is shown in Appendix A. DWPF personnel supplied the following detailed description of the Hg sampling: “The sample provided is the result of DWPF extraction of mercury by means of the Mercury Pump-Water Cart. The Mercury Pump extracted the sample from the SMECT mercury sump. The pump uses pressurized water to transfer a small amount of mercury to a leachate bucket located at the Lab Mercury cell. The mercury and water were allowed to be self separated, and mercury was gravity decanted from the leachate bucket.” DWPF personnel indicate that the leachate bucket is equipped with both a top stopcock/drain and a lower/bottom stopcock/drain from which the mercury was decanted or drained out, while the separated water layer remained above the mercury during draining. The DWPF customer requested SRNL to analyze the sample for the following: gross alpha/nonvolatile beta analysis and perform a Toxicity Characteristic Leaching Procedure (TCLP) per the Environmental Protection Agency's Test Methods for Evaluating Solid Waste: Physical/Chemical Methods, SW-846. While the TCLP was preferred, a Total Metals analysis of the eight Resource Conservation and Recovery Act (RCRA) metals was deemed acceptable.2 The analytical data collected on this mercury sample will be used in planning for sample disposition as well to start a profile for future Hg disposition of Hg collected from steam stripping.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CO2 Handling & Electrolyzer Efficiency Scaling Evaluator

CHEESE is an interactive dashboard tool for estimating the performance and material requirements of carbon dioxide electrolysis systems. It helps users evaluate how electrode area, current density, product selectivity, gas flow, cell voltage, and the number of cells in a stack affect system operation. The dashboard provides simple and advanced modes so it can be used for both quick estimates and more detailed engineering analysis. Users can estimate product output, carbon dioxide use, electrical power, electrode area, gas and liquid flow rates, energy efficiency, material cost per test, and the effect of scaling from a single cell to a multi cell stack. It also includes tools for examining carbon balance, equipment durability, component replacement, and changes in performance over time. This is intended to help both academia and industry researchers who are either getting into CO2 electrolysis on lab-scale or are trying to establish a larger footprint. CHEESE presents results through tables, charts, and simplified cell and stack diagrams. It is intended to support research planning, experimental design, comparison of operating conditions, and early stage scale up studies.

Prajapati, Aditya [Lawrence Livermore National Lab↗

Beam study on low dispersion CEBAF arcs

The Continuous Electron Beam Accelerator Facility (CEBAF) at Jefferson Lab employs recirculating linac SRF technology to generate a high polarization 12 GeV electron beam for nuclear physics users. New opportunities to study multipass energy recovery have also emerged with the proposal of a 5-pass energy recovery demonstration, ER@CEBAF. New beam optics with minimized beta functions have been developed and tested to avoid collective beam instabilities for multi-pass beams and meet the beam requirements of the nuclear physics community. To enable energy recovery for a common arc beam transport of five passes, achromatic and isochronous arc optics conditions were satisfied by re-designing the transverse optics of CEBAF. This paper focuses on beam studies conducted to study the newly-designed, low-dispersion, lowest energy arcs for CEBAF operations and ER@CEBAF.

Neththikumara, I.↗

Green Methanol via an Integrated Direct Air Capture, CO 2 Electrolyzer, and Hydrogenation Reactor

This project pioneered a groundbreaking reactor design to produce green methanol by harnessing the electrochemical CO 2 reduction reaction (eCO 2 RR), a cornerstone of power-to-fuels technology. The effort integrated three innovative technologies to achieve carbon-neutral methanol production at a target cost of under $\$$800/ton: 1. Direct Air Capture (DAC): Using a cutting-edge sorbent material developed at Holocene, scalable models were developed to integrate captured atmospheric CO₂ into the reactor system. 2. Intermediate-Temperature CO 2 Electrolyzer: Developed by the University of Tennessee (UTK), this electrolyzer utilizes a cost-effective, proton-conducting solid acid electrolyte (CsH 2 PO 4 , CDP) and a mixed-metal oxide cathode. It achieves high faradaic efficiencies (>98%) by effectively suppressing hydrogen evolution at high current densities, converting CO 2 to CO with remarkable selectivity. 3. Catalysis and Reactor Engineering: Oak Ridge National Laboratory (ORNL) contributed world-class expertise in heterogeneous catalysis and reactor design. Their advanced ASPEN modeling drove systems integration and supported techno-economic and life cycle analyses. This effort was further bolstered by partnerships with industry leaders Air Company and Plug Power, who provided critical guidance on scaling, systems engineering, and the integration of water electrolyzers into large-scale operations. During Phase 1, the team focused on modeling and validating a lab-scale reactor demonstrating the feasibility of the integrated approach. Key accomplishments include a 52% increase in current density at 0.8 V while maintaining >98% CO faradaic efficiency, successful 10× scale-up of the electrolyzer with performance within 5% of coin-cell results, best-in-class durability (168-hour test at 0.6 V with 0.14 mA/cm 2 -h degradation), validated TEA confirming the $\$$800/ton methanol target, and completed preliminary LCA showing potential for net-negative GHG emissions under renewable energy scenarios.

10 SYNTHETIC FUELS↗

Understanding the I/O Performance Gap Between Cori KNL and Haswell

The Cori system at NERSC has two compute partitions with different CPU architectures: a 2,004 node Haswell partition and a 9,688 node KNL partition, which ranked as the 5th most powerful and fastest supercomputer on the November 2016 Top 500 list. The compute partitions share a common storage configuration, and understanding the IO performance gap between them is important, impacting not only to NERSC/LBNL users and other national labs, but also to the relevant hardware vendors and software developers. In this paper, we have analyzed performance of single core and single node IO comprehensively on the Haswell and KNL partitions, and have discovered the major bottlenecks, which include CPU frequencies and memory copy performance. We have also extended our performance tests to multi-node IO and revealed the IO cost difference caused by network latency, buffer size, and communication cost. Overall, we have developed a strong understanding of the IO gap between Haswell and KNL nodes and the lessons learned from this exploration will guide us in designing optimal IO solutions in many-core era.

97 MATHEMATICS AND COMPUTING↗

Dense granular flows with MFIX-Exa

This report extends the linear spring dashpot collision model the discrete element method available in MFIX-Exa to include static a static tangential friction force. Additionally, two rolling friction models frequently used in the literature are also implemented. The governing equations are provided with an emphasis on the new terms. The new model is validated by comparison to existing experimental data of single particle oblique collisions. The model is then tested on three dense granular flow problems: the formation of static piles, the discharge from a flat-bottom hopper and the self-induced granular Rayleigh-Taylor instability.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

U.S. Efforts in Support of Examinations at Fukushima Daiichi - September 2024 Meeting Notes

Information obtained from Fukushima Daiichi Nuclear Power Station (Daiichi) is required to inform future Decontamination and Decommissioning (D&D) activities, improving the ability of the Tokyo Electric Power Company Holdings, Incorporated (TEPCO Holdings) to characterize potential hazards and to ensure the safety of workers involved with cleanup activities. This information also has important implications for the safety and operation of U.S. Commercial nuclear power plants. A collaborative U.S. and Japanese effort was initiated in 2014 by the Department of Energy Office of Nuclear Energy to identify Daiichi examination needs and evaluate recent Daiichi examination data to address these needs. This document summarizes information presented at and findings, action items, and recommendations by U.S. and Japanese experts in reactor safety and plant operations during the September 2024 Forensics Effort meeting. Significant safety insights were obtained in several areas: system and component performance, radionuclide surveys and sampling, debris end-state location, combustible gas effects, and plant operations and maintenance. In addition to reducing uncertainties and knowledge gaps in severe accident modeling progression, these insights continue to be used to assess whether additional updates are needed in guidance for severe accident prevention, mitigation, and emergency planning. Furthermore, Daiichi-related activities, such as code modeling improvements and analysis, testing, and new technology deployment efforts, have the potential to offer additional safety and economic benefits to the operating fleet and new light water reactor (LWR) and non-LWR designs.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Destructive PIE and Safety Testing of Six AGR-2 UO 2 Capsule 3 Compacts

The Advanced Gas Reactor (AGR) Fuel Development and Qualification Program’s second irradiation experiment (AGR-2) was irradiated in the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL) from June 2010 to October 2013 (Collin 2014). The fuel compacts in this experiment held either tristructural isotropic (TRISO)-coated spherical kernels of uranium oxide (UO2) or TRISO-coated kernels containing both uranium carbide and uranium oxide phases (UCO). There were six separately monitored and controlled capsules in the AGR-2 test train. Capsule 3 held twelve compacts containing UO2-TRISO particles fabricated by BWX Technologies Nuclear Operations Group. The AGR-2 TRISO particles were fabricated in a pilot-scale fluidized-bed chemical vapor deposition (FB-CVD) furnace with a coating chamber inner diameter of 150 mm (Phillips, Barnes, and Hunn 2010), which was a change from the first irradiation experiment (AGR-1) particles that had been coated in a lab-scale FB-CVD coating system with a chamber inner diameter of 50 mm (Lowden 2006). The TRISO particles were overcoated with resinated graphite flake at Oak Ridge National Laboratory (ORNL), and the overcoated particles were pressed into one-inch-long, half-inch-diameter cylinders (Hunn, Montgomery, and Pappano 2010). Each cylindrical compact held an average of 1,543 TRISO particles with 9.6% enriched UO2 kernels that had a nominal diameter of 500 μm (Hunn, Savage, and Silva 2012). Capsule 3 compacts were irradiated to average calculated burnups of 9.01–10.69% fissions per initial metal atom (FIMA), and the average calculated fluences of fast neutrons with energies E n > 0.18 MeV were 3.05–3.53×10 25 n/m 2 (Sterbentz 2014). The calculated time-average, volume-average Capsule 3 compact temperatures were 996–1,062°C. However, Capsule 3 compact temperatures varied several hundred degrees across each compact, and the timeaverage minimum (TA min ) and time-average maximum (TA max ) temperatures were between 889–999°C and 1,072–1,105°C, respectively (Hawkes 2014). After irradiation, the AGR-2 test train was transferred from ATR to the INL Materials and Fuels Complex for inspection and disassembly (Ploger, Demkowicz, and Harp 2015). The initial inspection included dimensional metrology of the compacts and graphite fuel holders. Like all the AGR-2 compacts, the compacts in Capsule 3 shrank slightly during irradiation, as expected, with an average length reduction of 1.07–1.24% and an average diameter reduction of 0.13–0.41%. Post-irradiation examination (PIE) of the capsule components was completed to measure select fission products ( 90 Sr, 110m Ag, 134 Cs, 137 Cs, 144 Ce, and 154 Eu) outside the compacts (Stempien and Demkowicz 2020). This involved gamma counting of the graphite and graphoil spacers at the top and bottom of each capsule, acid leaching for radiochemical analysis of fission products on the metallic capsule components, and burn-leach analysis of the graphite holders. The total amount of 110mAg measured on the Capsule 3 components was 13% of the calculated capsule inventory. This was significantly lower than the amount of 110m Ag measured on the three UCO capsule components, which ranged from 32–70%. The lower 110m Ag release in Capsule 3 was likely due to lower peak temperatures compared with the UCO fuel capsules (Hawkes 2014). Measured inventories of the other select fission products were also lower in Capsule 3.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Prediction of PbLi fluid flow and temperature field in a thermal convection loop for qualification of fusion materials

Two modeling tools, a thermohydraulics code and a computational model in COMSOL Multiphysics, have been developed, tested and then applied to the analysis of fluid flow and heat transfer in a thermal convection loop (TCL). Such a device has recently been used to experimentally evaluate corrosion compatibility of APMT (Fe–21Cr–5Al–3Mo) steel with high-temperature molten eutectic lead-lithium (PbLi) alloy at Oak Ridge National Lab, TN, USA. Here, the 1-D thermohydraulics code allows for rapid calculations of the loop parameters as a function of the applied heat flux. The supplemental COMSOL finite-element computations provide detailed 3-D velocity and temperature field data but are much more time consuming. Both modelling tools demonstrate an excellent agreement in the computed circulation velocity as well as maximum and minimum temperatures. The performed TCL analysis focuses on flow development in the “hot” and “cold” legs, formation of Dean vortices in corner regions, blocking effect of the immersed samples, and radiative and convective cooling effects under the experiment-relevant conditions for Prandtl number Pr = 0.015, Grashof numbers Gr ~10 7 , and Reynolds numbers Re ~10 4 .

36 MATERIALS SCIENCE↗

Particulate Study on Materials for Cleanroom Assembly of SRF Cavities

Reducing particulates is an important aspect for cleanroom operation. Knowing that it is impossible to completely eliminate all particulates in a clean room, efforts have been made to prevent particulate from entering SRF cavities during high pressure rinsing (HPR) and assembly. At Jefferson Lab, one practice to achieve this goal has been clamping covers to cavity open flanges during assembly. Several cover materials that have been used are examined and alternative candidate materials are under development. Clamps as a known particulate generator are carefully examined and cleaning efficiency of different methods is studied. Assembly and cover tests were done on a dummy flange as well as real cavity flanges, which may help further understand the generation of particulate during assembly. Authored by Jefferson Science Associates, LLC under U.S. DOE Contracts DE-AC05-06OR23177 and DE-AC02-76SF00515 for the LCLS-II Project.

Zhao, Liang↗

FOAS4GEO - Fiber Optic Acoustic Sensors for Geophysical Applications (Final Report)

The motivation was to enhance interpretation of signals measured by distributed fiber optic seismic sensors, with primary emphasis on subsurface applications in energy production such as hydrocarbon production and geothermal energy although applications also exist in areas such as explosion monitoring. The work consisted of two major elements: 1) computational-based simulation of subsurface signals, with emphasis on hydraulic stimulation, as observed by distributed Fiber Optic Acoustic Sensors (FOAS), and 2) development of a capability to conduct lab-based measurements of distributed fiber optic acoustic sensors using a custom interrogator. Both goals were successfully achieved. For the first topic, simulations of hydraulic fracturing as measured by distributed fiber optic sensors were modeling using a computational rock mechanics code. Work on the second major element consisted of the design, construction, and testing of a distributed fiber optic interrogator and development of testbed to evaluate custom fibers. The results of this three-year effort have led to multiple conference presentations, one per-reviewed publication, and several new externally funded projects on topics directly related to the LDRD. Two post-doctoral researchers worked on the project.

15 GEOTHERMAL ENERGY↗

Particulate Study on Materials for Cleanroom Assembly of SRF Cavities

Reducing particulates is an important aspect for cleanroom operation. Knowing that it is impossible to completely eliminate all particulates in a clean room, efforts have been made to prevent particulate from entering SRF cavities during high pressure rinsing (HPR) and assembly. At Jefferson Lab, one practice to achieve this goal has been clamping covers to cavity open flanges during assembly. Several cover materials that have been used are examined and alternative candidate materials are under development. Clamps as a known particulate generator are carefully examined and cleaning efficiency of different methods is studied. Assembly and cover tests were done on a dummy flange as well as real cavity flanges, which may help further understand the generation of particulate during assembly. Authored by Jefferson Science Associates, LLC under U.S. DOE Contracts DE-AC05-06OR23177 and DE-AC02-76SF00515 for the LCLS-II Project.

Zhao, Liang↗

Plasma-Assisted Pre-Chamber Ignition System for Highly Dilute Stoichiometric Heavy-Duty Natural Gas Engines (Final Technical Report)

This project explored advanced ignition technologies to significantly enhance efficiency and reduce operating costs for heavy-duty natural gas engines operating at stoichiometric conditions, while meeting ultra-low NOx emission standards. The main goal was to develop and validate a plasma-assisted pre-chamber ignition system that could deliver at least a 2% increase in brake thermal efficiency (BTE) and a 4% decrease in total cost of ownership (TCO) compared to a typical multi-cylinder engine with three-way catalyst aftertreatment, ensuring compatibility with the expected 2027 EPA/CARB regulations. In the first half of the project, the research team concentrated on developing and testing plasma-assisted pre-chamber ignition using nanosecond pulsed discharges. Extensive experiments were conducted in an optically accessible rapid-compression and expansion machine, a constant-volume chamber, and an optical single-cylinder engine. Experiments were coupled with CFD simulations. The work produced unique insights into pre-chamber flame formation, jet ignition, dilution effects, and flame quenching at pressures, temperatures, and dilution levels relevant to engines. Although plasma-assisted ignition showed promise in controlled lab settings, the research also identified fundamental and practical challenges when applying this technology to real engine conditions. Midway through the project, a crucial pivot was made, guided by three key findings. First, the power electronics required for nanosecond plasma discharges were found to be too costly for commercial use, undermining the project’s cost-of-ownership goals. Second, nanosecond plasma ignition was highly sensitive to turbulent flow in the pre-chamber, resulting in lower ignition reliability than traditional spark under engine-like conditions. Third, achieving a truly diffuse low-temperature plasma at high pressures near top dead center was not possible, reducing the anticipated chemical enhancement benefits. These results collectively suggested that continuing with plasma-assisted ignition was unlikely to meet both efficiency and cost objectives. In response, the project shifted focus to a more realistic approach: enhancing traditional spark-based pre-chamber ignition with significantly less spark energy. Using insights gained earlier in the project, the team redesigned the pre-chamber to maintain high dilution tolerance and quick combustion, even with lower ignition energy. Testing confirmed that with optimized pre-chamber design and combustion timing, a lower-energy spark could reliably ignite highly diluted stoichiometric mixtures, reduce burn time, and boost thermal efficiency. Final engine testing and techno-economic analysis verified that this revised approach successfully achieved the project goals. The optimized pre-chamber ignition system provided over a 2% increase in calculated brake thermal efficiency compared to the baseline engine. Notably, the lower ignition energy and simplified hardware reduced component stress, extended maintenance intervals, and lowered the total cost of ownership. When used with stoichiometric operation and traditional three-way aftertreatment, the system remained compatible with near-zero NOx emissions targets without increasing cost or complexity in the emissions control system. In summary, although the project deviated from its initial plasma-assisted ignition idea, the work produced a more practical and commercially viable solution. The results show that precisely optimized, low-energy pre-chamber spark ignition can significantly improve efficiency and reduce overall ownership costs for heavy-duty natural gas engines. This directly aligns with DOE goals for cleaner, more efficient, and cost-effective transportation technologies.

03 NATURAL GAS↗

Findings on Subtask 3.1 - Bakken Rich Gas Enhanced Oil Recovery Project

Total in-place oil for the Bakken petroleum system (BPS) (which includes the Bakken and Three Forks Formations) has been estimated to be 600 billion barrels (bbl). However, BPS wells have decline rates as high as 85% over the first 3 years of their lives, and primary recovery factors typically range from 3% to 10% of original oil in place. Given the low initial recovery rates, even small incremental productivity improvements could dramatically increase technically recoverable oil in the BPS. One potential solution is enhanced oil recovery (EOR) using gas injection, such as carbon dioxide (CO2) or hydrocarbon (HC) gases. While commonly used in conventional reservoirs, CO2 EOR in unconventional tight oil reservoirs has been limited to pilot tests. EOR using rich gas (mixture of methane, ethane, and propane) has also been employed in numerous pilots in several unconventional plays and has recently been successfully applied in the Eagle Ford play. If successful, large-scale gas-based EOR in the BPS could dramatically increase oil productivity and recovery factors and extend the life of the play for decades. While CO2 may be a technically suitable working fluid for EOR in the BPS, supplies are limited and costs for using CO2 in EOR pilots are prohibitively high. Meanwhile, produced gas flaring has presented challenges for BPS operators in North Dakota. Analysis conducted by the North Dakota Pipeline Authority indicates that the current gas-gathering infrastructure in North Dakota is insufficient to accommodate all of the associated gas that is produced from the BPS. The geographically isolated location of North Dakota relative to large natural gas markets, combined with suppressed natural gas prices, has made it economically challenging for industry to invest capital in expanding gas-gathering infrastructure in the state. These circumstances led to a research program conducted by the Energy & Environmental Research Center (EERC) in partnership with Liberty Resources Management Company LLC (LR) to examine the potential to use rich gas injection for EOR and mitigate flaring. A rich gas EOR pilot test was designed and executed by LR at its Stomping Horse development area in Williams County, North Dakota. From July 2018 through May 2019, a total of 160 million standard cubic feet (MMscf) of rich produced gas was injected into the BPS using five different wells in a sequential injection strategy. LR’s Leon–Gohrick drill spacing unit (DSU) was used as the test site. Regulatory oversight was provided by the North Dakota Industrial Commission (NDIC). Technical support was provided by the EERC through a series of laboratory, modeling, and field-based activities, and additional post-pilot research activities incorporated learnings from the test, developed new laboratory data, improved fracture modeling methods, and developed machine learning and big data analytics. The results from the Stomping Horse rich gas EOR pilot activities indicate that developing an effective, economical EOR approach for the BPS will require more field tests. Another key lesson learned from the Stomping Horse tests is that detailed pre- and posttest data on reservoir conditions and fluids production are essential. Robust reservoir characterization provides information that is crucial to creating realistic geomodels and conducting valid dynamic simulations of potential EOR scenarios. A detailed understanding of the completions and production history of offset wells is also necessary for valid test result interpretations. This knowledge is essential to designing the operational parameters of injectivity tests and interpreting the results. A conformance control strategy is also essential to success. Laboratory-based examinations of rich gas interactions with reservoir fluids and rocks were conducted, with an emphasis on determining the ability to mobilize oil in the tight reservoir rocks and shales of the BPS. Injection fluid composition was shown to have a positive impact on reducing reservoir oil minimum miscibility pressure (MMP), reducing interfacial tension (IFT), and altering wettability. IFT and contact angle measurements demonstrated that wettability can be altered in the presence of rich gas, suggesting the potential to improve oil recovery. Iterative modeling of surface infrastructure and reservoir performance using data generated by the various project activities was conducted. A geologic model of the Stomping Horse area was built; history-matched oil, gas, and water production was used in simulations of various EOR scenarios. Early programmatic modeling results were used to support LR’s design and operation of the EOR pilot and to provide insight regarding optimization of future commercial-scale BPS EOR design and operations. Post-pilot modeling focused on alternative methods of understanding complex fracture networks and accelerating simulation time. These led to improved simulation run times and provide excellent history-matching results. Several of these iterative models were used as the bases for developing algorithms into machine learning and big data analytics. History matching in reservoir simulation is time-consuming and computer processing-intensive. Machine learning algorithms were created, and an automated history-matching tool was developed. A large set of synthetic reservoir simulations were created to generate well responses (oil, gas, and water production, well bottomhole pressure [BHP], and tracer or propane breakthrough) for a set of EOR operating parameters that included offset well status (open or closed), injectate (rich gas or propane), injection rate, and injection well BHP. A user interface was developed to provide real-time visualization. Machine learning-based models were developed to provide rapid forecasting of well performance given a set of user-defined EOR operating parameters. These predictive models allow the user to modify the offset well status, injection rate, and injection well BHP and rapidly forecast future production performance. The combination of real-time visualization tools with real-time forecasting tools provides a framework for real-time control—operational changes that the EOR site operator can enact (e.g., changing gas injection rates) to affect the observed performance and potentially improve the EOR outcome. There is great reason to be optimistic about the future of EOR in the Bakken. The results of the laboratory studies suggest significant potential for high rates of oil mobilization using produced field gas injection under the right conditions. The results of the lab studies, combined with rigorous statistical analysis of well production data and associated modeling efforts, confirm the notion that fluid mobility within the reservoir is controlled by fractures. As more knowledge is gained about the nature and distribution of fracture networks in the Bakken, the industry will be in a better position to predict and, ultimately, influence fluid mobility. New field tests are necessary to develop a more complete understanding of those conditions. Thoughtful and creatively engineered field tests within a well-characterized geologic setting will yield the fundamental knowledge needed to take Bakken oil production to the next level. This subtask was cofunded through the EERC–U.S. Department of Energy Joint Program on Research and Development for Fossil Energy-Related Resources Cooperative Agreement No. DE-FE0024233. Nonfederal funding was provided by the North Dakota Industrial Commission’s Oil and Gas Research Program and Computer Modelling Group.

04 OIL SHALES AND TAR SANDS↗

Assessment of the Electrical Substation-Grid Testbed with Inside/Outside Devices and Distributed Ledger Technology

The electrical substation-grid testbed was created to integrate the GOOSE and/or DNP (Distributed Network Protocol) messages with time synchronized sources and Distributed Ledger Technology (DLT). The objective was to study the impact of faults and cyber-events at an electrical substation with inside (protective relays) and outside (power meters) substation devices. The electrical substation-grid testbed was based on the design of a 34.5/ 12.47 kV electrical substation (sectionalized bus configuration) with two power transformers, connected to radial power lines and load feeders. The electrical substation-grid testbed was installed at 252 lab space (Advanced Power System Protection), Grid Research Integration and Deployment Center (GRID-C), Oak Ridge National Laboratory. This testbed was created for Task 5, DarkNet project. The electrical substation-grid testbed was created to simulate fault and/or cyber events that could potentially result in damage to the electrical infrastructure. In addition, tests were run that are usually not allowed to be performed in an operational electrical power grid, because these test scenarios could trip breakers and/or generate fault situations that could potentially damage equipment. The number of tests performed in the electrical substation-grid testbed were executed in a better way than in a real electrical substation and/or power grid, because multiple tests could be run in a short period of time, and complex permits, and safety/ schedule restrictions like in a real electrical substation environment were not needed. The electrical substation-grid testbed was created using real measurement, communication, and protection devices that are used by electrical utilities, to have same conditions that we could observe in a real power grid or electrical substation. The electrical substation-grid testbed was based on using a real time simulator and expansion box with amplifiers that were wired to electrical substation-grid devices. This hardware-in-the-loop (HIL) was provided by protective relays, power meters, ethernet switches, remote terminal units, synchronized timing network clock, DLT devices, workstations, and servers. This report includes the design, installation, and assessment of the electrical substation-grid testbed that was similar to an operational electrical substation, integrating the power system protection, communication, and control systems. The results for the electrical substation-grid testbed were based on:• verifying the analog signals for protective relays and power meters, • observing the synchronized time source frame at devices, • authenticating the GOOSE (IEC 61850) and DNP messages from power meters and protective relays, and • verifying the trip conditions of protective relays at fault tests with the power system fault event detection, using DLT devices. For future work, the electrical substation-grid testbed with protective relays and power meters, using DLT and synchronized time source from DarkNet, will be used to study the impact of cyber-events at inside and outside substation devices. Advanced algorithms for detecting cyber-events produced by non-desired protective relay settings will be studied, to improve the detection and reliability of protection, control, and communication systems at power grids.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Contaminant Transport Modeling for Technology Evaluation and Long-Term Monitoring in the Tims Branch Testbed, SC - 20343

Studies conducted at U.S. DOE sites have shown the presence of heavy metals, radionuclides, and volatile organic compounds in surface water, groundwater, and soil as a result of nuclear activity in the Cold War era. Since the 1990's, innovative cleanup methods have been implemented in the Tims Branch watershed at Savannah River Site (SRS) to limit the contaminant flux to the stream that have reduced the contaminant concentrations to acceptable regulatory levels in the dissolved phase. A tin-based treatment which effectively eliminated all local anthropogenic mercury inputs to this ecosystem resulted in a known step function addition of inert tin oxide particles which now serve as a potential tracer for sedimentation and particle transport processes in the stream. The long-term effectiveness of this and other remediation techniques and the potential for remobilization of adsorbed contaminant in sediment during extreme hydrologic conditions however remains unclear. It is therefore important to understand not only the fate and transport of dissolved contaminants, but also the movement of sediment and the relevant interactions with dissolved contaminant. To narrow this knowledge gap, a study is being conducted using the Tims Branch watershed as a stream-scale ecosystem test-bed to identify the primary transport processes of major contaminants of concern (such as mercury, nickel and uranium) with an emphasis on interactions with sediment transport. This involves the development of a fully distributed hydrologic watershed model of the Tims Branch watershed to predict streamflow under extreme weather conditions, as well as the development of a comprehensive contaminant transport model that can properly account for coupled contaminant and sediment transport. Review of relevant research reports and peer-reviewed journals revealed that aside from advection-dispersion transport of dissolved contaminants, adsorption and desorption with suspended solids and bed sediment also play an important role in the transport of those contaminants of concern. To develop the fully distributed hydrologic watershed model, the MIKE SHE 2-dimensional (2D) land surface/3D groundwater model that simulates surface/subsurface hydrologic processes (such as overland flow, evapotranspiration, and infiltration) was coupled with a 1D streamflow model that accounts for stream water hydraulics (such as hydraulic structures, cross-sections, and network). To model contaminant transport, the MIKE 11 streamflow component was coupled with the MIKE 11 AD module that simulates solute transport through advection and dispersion, and MIKE ECO Lab module that accounts for both sediment transport and interactions with dissolved contaminant. At this stage, the development and optimization of the fully distributed hydrologic model has been completed, achieving satisfactory statistical results between observed and predicted discharge as indicated by a root mean square error (RMSE) of 0.039 cms and a Nash-Sutcliffe efficiency coefficient (NSE) of 0.764. The ongoing development of the contaminant transport model has also yielded realistic results from preliminary tests. Results from this study are a key to evaluating the effectiveness of tin (II)-based mercury treatment of wetlands at the SRS site, and are also relevant to evaluating the potential of using this type of novel remediation technology in other mercury-contaminated stream systems. Knowledge acquired from this research will also support interpretation of historical data on the trends of contaminant concentration distribution in Tims Branch, particularly considering the effect of extreme hydrological events on the stream flow and pollutant transport. (authors)