General Services Administration Reclamation Yard, SWMU 010, 2021 Groundwater Monitoring Report

This report presents a summary of the groundwater monitoring activities that occurred in November and December 2021 at General Services Administration Reclamation Yard, Solid Waste Management Unit 010, located at the John F. Kennedy Space Center (KSC), Florida. The site is monitored under KSC’s Resource Conservation and Recovery Act Corrective Action Program. This approach also meets the requirements of Chapter 62-780, Florida Administrative Code. For the purposes of this report, two separate plumes, known as the Polychlorinated Biphenyl (PCB)/Volatile Organic Aromatic (VOA) Plume and the Chlorinated Volatile Organic Compound (VOC) Plume, were identified for this site. The contaminants of concern (COCs) for the PCB/VOA Plume consists of PCBs, 1,2,4-trichlorobenzene, and breakdown products of 1,2,4-trichlorobenzene. The COCs for the Chlorinated VOC Plume are tetrachloroethene, trichloroethene, cis-1,2-dichloroethene, and vinyl chloride. The activities presented in this report include two field events: (1) November 2021 – PCB/VOA Plume groundwater sampling via Direct Push Technology – 70 groundwater samples were collected from 10 locations at varying intervals; and (2) December 2021 – Site-wide semi-annual water level measurements of 54 monitoring wells, redevelopment of 5 monitoring wells, and sampling of 35 monitoring wells. Results for the PCB/VOA plume demonstrated COCs have not rebounded since the 2018 source removal, with groundwater cleanup target levels (GCTLs) exceeded in the 10-30 ft. below ground surface interval only. In the Chlorinated VOC plume area, there were no detections of COCs above a GCTL for at least the second consecutive sampling event for the sampled wells. Cleanup objectives have been met, and it is recommended that VOC monitoring be discontinued. Underground injection control parameters will continue to be monitored in three wells until those analytes return to background concentrations.

GSA Reclamation Yard↗

Contractors Road Heavy Equipment Area (SWMU 055) 2021 Annual Groundwater Monitoring Report

This document presents a summary of activities completed at the Contractors Road Heavy Equipment (CRHE) Area, located at Kennedy Space Center (KSC), Florida, from January through December 2021. The activities conducted at the CRHE Area include: - Annual groundwater sampling activities associated with site-wide plume monitoring and Underground Injection Control (UIC) monitoring in the former bioremediation Interim Measures (IM) Hot Spot 1 (HS1) area; - Direct push technology (DPT) groundwater investigation; and - Semi-annual vapor intrusion (VI) evaluation activities. This facility is designated Solid Waste Management Unit (SWMU) Number 055 (SWMU 055) under KSC’s Resource Conservation and Recovery Act Corrective Action program. This report was prepared by HydroGeoLogic, Inc. (HGL) for the National Aeronautics and Space Administration (NASA) under contract number 80KSC019F0096. The annual groundwater sampling results demonstrated that the footprint where chlorinated volatile organic compounds (VOC) are present above their State of Florida groundwater cleanup target levels (GCTLs) is not expanding overall. One non-chlorinated VOC (1,4-dioxane) is found above its GCTL at isolated points within the chlorinated VOC plume. The DPT groundwater investigation is being used to delineate the horizontal and vertical boundaries where chlorinated VOCs are present at levels above natural attenuation default concentrations. That data supports an evaluation of potential additional remedial actions. The potential for VI into the CRHE Area Office (K6-1996H) is evaluated by collected sub-slab vapor samples from four locations twice a year (once in the wet season and once in the dry season). The results for 2021 were all below the Environmental Protection Agency's vapor intrusion screening levels (VISLs) for both commercial and residential settings. The path forward for the site is to continue annual monitoring for chlorinated VOCs and 1,4-dioxane until additional remedies are implemented or the site is transitioned to long-term monitoring.

Contractors Road Heavy Equipment↗

Firex Water Tank, SWMU 069, Confirmatory Sampling Report: Revision 2

The National Aeronautics and Space Administration (NASA) Resource Conservation and Recovery Act (RCRA) permit requires identification and evaluation of known Solid Waste Management Units (SWMU) located at the Kennedy Space Center (KSC). Firex Water Tank (FWT), or the “site,” is designated as SWMU 069 under the NASA RCRA permit. This report summarizes the results of the Confirmatory Sampling (CS) field activities carried out during Fall 2021, at FWT, SWMU 069, KSC, Florida. Three locations of concern (LOCs) were identified by screening historical sample results to current State of Florida soil cleanup target levels (SCTL). A total of 18 soil samples were collected to investigate the historical exceedance locations. Samples at LOC 1 and 2 were analyzed for arsenic and the results for all were below the SCTL. Samples at LOC 3 were analyzed for polynuclear aromatic hydrocarbons and it was determined that certain locations have results that remain above the SCTL. The current land use controls will remain in place at FWT to mitigate potential risks.

Firex↗

Sewage Treatment Plant #1 Area, SWMU 117 Per- and Polyfluoroalkyl Substances (PFAS) Site Assessment Progress Report

This Per- and Polyfluoroalkyl Substances (PFAS) Site Assessment (SA) Progress Report (SAPR) discusses the investigation activities and findings for the Sewage Treatment Plant #1 (STP1) Area located at Kennedy Space Center (KSC), Florida (Figure 1-1). This site has been designated Solid Waste Management Unit (SWMU) 117 under KSC’s Resource Conservation and Recovery Act (RCRA) Corrective Action Program, as the sewage treatment plant and associated areas were identified as a potential source of PFAS to the environment. This PFAS SAPR was prepared by Tetra Tech, Inc., for the National Aeronautics and Space Administration (NASA) under Indefinite Delivery Indefinite Quantity Contract 80KSC019D0011-80KSC019F0070. This is the first progress report to document on-going SA activities; supplemental progress reports will be provided as additional data is collected. PFAS SA activities were conducted between April 2020 and March 2022 to collect additional data to supplement the existing datasets to better understand the extent of PFAS impacts to the environment in the STP1 Area. The SA for the STP1 Area covers an approximately 130-acre investigation area with multiple structures and buildings. The focus of the SA is the STP1 Complex and associated structures, including the former Polishing Pond, former Sludge Disposal8 Area, and former Spray Field. The STP1 Complex is located in the KSC Industrial Area, at the southwest corner of 4th Street SE and C Avenue SE. The STP1 Complex is located approximately ¼-mile south and downgradient of the Fire Station #1 site (SWMU 116), which is also currently undergoing a PFAS SA because of potential releases of PFAS-containing aqueous film-forming foam (AFFF). During the SA, a total of seven soil, 131 groundwater direct push technology (DPT), 24 groundwater monitoring well, and 11 surface water samples were collected between April 2020 and March 2022. Monitoring well samples were analyzed for 18 PFAS compounds, with all other samples analyzed for 28 PFAS compounds. The SA sample results were used along with historical results to evaluate the extent of PFAS impacts to the environment in the STP1 Area. Data generated to date and prior results were screened against the United States Environmental Protection Agency (USEPA) May 2022 Tap Water Regional Screening Levels (RSL) for groundwater and residential RSLs for soil (hazard quotient of 0.1). Surface water results were screened against the State of Florida Human Health Surface Water Screening Levels (SWSLs). Results from the SA showed exceedances of the applicable screening criteria for groundwater and surface water. Considering the current and historical dataset, PFOS is the prevalent PFAS compound. Based on these results, additional groundwater DPT and surface water sampling should be considered for PFAS analysis, focused on evaluating surface water bodies in the southeast portion of the Industrial Area, which discharge into the Banana River. Additionally, installation of monitoring wells should be considered to evaluate the interaction between the groundwater and surface water at the site. Collection of additional samples for TOC analysis should also be considered from representative groundwater (saturated soils) and surface water locations to further evaluate potential correlations between PFAS and TOC to provide a more comprehensive dataset to assist in fate and transport analyses.

Sewage Treatment Plant↗

Stand Alone Electrical Equipment PRL 227a (Formerly PRL 227 LOC3) Confirmatory Sampling Report Addendum

HydroGeoLogic, Inc. (HGL) prepared this Confirmatory Sampling Report Addendum (CSRA) for the National Aeronautics and Space Administration (NASA), Kennedy Space Center (KSC), Florida. PRL 227a Location of Concern (LOC) 3 is located on 10th Street, west of the former Vertical Processing Facility (M7-1469), SWMU 077. The Load Break Switches (LBS) were installed in 1986 and are suspected to have formerly contained dielectric fluid that contained polychlorinated biphenyls (PCBs). The LBS were replaced in 1993 with new LBSs that do not contain PCBs. The LBS are located on a concrete pad surrounded by grass that is mowed and maintained. A total of 330 soil samples were collected between June 2020 and December 2022 from 88 locations at depths ranging from 0-0.5 to 19-20 ft bls. In general, soil samples collected from depths less than 5 ft were collected via hand auger and samples collected beyond 5 ft bls were collected using a direct-push technology drill rig. Soil samples collected from greater than 5 ft bls to 20 ft bls were collected to confirm PCBs were not present at depth in the aquifer matrix. Delineation samples were collected using an approximately 20 ft horizontal spacing. PCB impacted soil has been completely delineated to the State of Florida residential soil cleanup target level (SCTL) at PRL 227a horizontally and vertically. PCB concentrations have been identified above the residential and industrial SCTL as well as concentrations greater than or equal to 50 ppm requiring coordination with EPA and disposal at a facility authorized under TSCA. Based upon the CSRA sampling, an interim measure is recommended to remove PCB impacted soil above the residential SCTL. The total volume of PCB impacted soil to be removed is 591.6 cubic yards. This includes approximately 9.3 cubic yards of soil with PCB concentrations greater than or equal to 50 ppm. An interim measure work plan is included as an attachment to this report.

electrical equipment↗

Sources, frequency, and chemical nature of dust events impacting the United States East Coast

This study examines 14 years (2004–2017) of surface aerosol composition data from the EPA IMPROVE network with a focus on the monthly profile, sources, and chemical nature of extreme dust events (>92nd percentile of fine soil concentration each month) impacting ten sites along the United States East Coast ranging in latitude from Florida to Maine. Based on trajectory, remote sensing, and reanalysis data, dust events were categorized into four source categories: African, Asian, Mix (African + Asian), and Other (anything other than African and Asian). The results reveal that extreme dust events account for between 3.3% and 4.6% of total available days depending on the site. March-April-May (MAM) had the most (174) dust events, followed by June-July-August (JJA) with 172, and then by September-October-November (SON) with 160 and December-January-February (DFJ) with 150. There is a variability in the predominant dust sources based on latitude, with African and Other sources more influential from North Carolina to the south, while Asian and Other were most important from New Jersey to the north. The Mix category is consistently the least frequent dust category at all sites. The African dust category was linked to the highest fine soil levels across the entire East Coast relative to other sources regardless of location. JJA is mostly impacted by African dust for sites ranging from Florida to New Jersey, while MAM is dominated by Asian dust for all sites. Mix events occurred mostly between April and October and Other events were most common outside of MAM and JJA seasons. Seven out of ten sites had Other as the most dominant source. Aerosol constituents organic carbon (OC) and elemental carbon (EC) had higher average concentrations in Other events (2.39 ± 0.78 μg m -3 and 0.79 ± 0.81 μg m -3 , respectively) as compared to the other three source categories, suggestive of regional anthropogenic emissions. Moreover, the ratios of elements (Si:Al, K:Fe, Fe:Ca, Al:Ca) contributing to fine soil and PM 2.5 :PM 10 exhibited distinct values depending on the dust source category and the site. This study builds on the growing evidence of the importance of long-range transport of dust in impacting distant regions and how a variety of sources can impact the U.S. East Coast at all times of the year.

Abdulmonam M. Aldhaif↗

Former Central Heat Plant SWMU 045 Year 2 Air Sparge System Performance Monitoring Report

This Air Sparge (AS) Performance Monitoring (PM) Report (PMR) presents Year 2 operation, maintenance, and monitoring (OM&M) activities, PM results, and monitoring well installations supporting the AS Interim Measure (IM) at the Former Central Heat Plant (CHP) at Kennedy Space Center (KSC), Florida. CHP has been designated Solid Waste Management Unit 045 under the KSC Resource Conservation and Recovery Act Corrective Action Program. An AS IM was installed at CHP between 2019 and 2021, which included the installation of an AS system to treat a chlorinated solvent groundwater plume. Contaminants of concern (COCs) identified at CHP for the AS IM include tetrachloroethene (PCE), trichloroethene (TCE), cis-1,2-dichloroethene (cDCE), and vinyl chloride (VC). The completed AS system includes a network of 267 AS wells, which treat approximately 1.3 acres of contaminated groundwater. “Hot” compressor technology is used to treat the source zone, while a “cold” compressor is used to treat two hot spot (HS) areas (HS1 and HS2) and the high concentration plume (HCP). The AS system began operation in June-July 2021 and this document includes Year 2 of operation. The overall runtimes for the AS system for the Year 2 reporting period (October 2022 to September 2023) were approximately 69 percent for the cold trailer and 71 percent for the hot trailer. Air samples and vapor screening results collected during the reporting period showed concentrations less than applicable human health and air emissions permit criteria. Groundwater performance monitoring results show that AS treatment continues to be effective in reducing COC concentrations at CHP. At the shallow interval, COC concentrations were all non-detect, less than, or met their respective State of Florida Groundwater Cleanup Target Levels (GCTLs) at the end of Year 2 in September 2023. In the deep interval, 10 of the 15 PM wells detected COCs greater than their respective GCTLs, with two of these wells also exceeding the Natural Attenuation Default Concentration for VC. Based on Year 2 OM&M and PM results, continued operation of the AS system is required to meet the IM objective. It is therefore recommended to continue with AS IM operations at CHP with the following plan for Year 3.

Kevin Alex Murphy↗

Launch Complex 34 SWMU CC054 Hot Spot Area 6 Expansion - Phase Three Implementation Work Plan

This Hot Spot (HS) Area 6 Air Sparge Expansion – Phase Three Implementation Work Plan (IWP) was prepared by Tetra Tech, Inc., for the National Aeronautics and Space Administration (NASA) under the Indefinite Delivery Indefinite Quantity Contract 80KSC019D0011-80KSC019F0067, for the implementation of an Air Sparging (AS) Interim Measure (IM) at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. LC34 has been designated as Solid Waste Management Unit (SWMU) CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act (RCRA) operating permit. Expansion of the HS 6 IM will include installation of an additional 192 AS wells to depths of approximately 40 feet below land surface (bls) to remediate contaminated groundwater within two areas located west and northeast of the existing HS 6 AS treatment area. These areas were delineated via direct push technology investigations in September and October 2023. The expansion will target “hot spot” concentrations of cis-1,2-dichloroethene (cDCE) and vinyl chloride (VC), which are the contaminants of concern in these areas with concentrations greater than 10-times Florida Department of Environmental Protection Natural Attenuation Default Concentrations. The highest cDCE and VC concentrations detected in the proposed phase three expansion area were 58,000 micrograms per liter (μg/L) (32 to 36 feet bls) and 12,000 μg/L (23 to 27 feet bls), respectively. The objective for this expansion is to remediate contaminated groundwater within the treatment zone to support transition to long-term monitoring. This phase three expansion will add an additional 9.4 acres of treatment area to the HS 6 IM, which currently covers approximately 26.9 acres.

Launch Complex 34↗

Components Cleaning Facility West, SWMU 030, 2023 Annual Long Term Monitoring Report

This report summarizes 2023 annual monitoring activities completed by HydroGeoLogic, Inc. (HGL) between April and September 2023 at CCF West to monitor chlorinated volatile organic compound-affected groundwater concentrations above the state of Florida groundwater cleanup target levels (GCTL) in Chapter 62-777, Florida Administrative Code.

CCF West↗

2024 Nasa Lunabotics University Competition: Site Preparation With Bulk Regolith

Introduction: Lunabotics provides accredited institutions of higher learning students (vocational-technical, college, university) an opportunity to apply the NASA systems engineering process to design and build a prototype robot. This robot would be capable of performing the proposed operations on the Lunar surface in support of future Artemis mission goals. Lunabotics features a systems engineering design challenge to engage students in the next phase of hu-man space exploration supporting the Artemis missions. This two-semester event encourages students to design and build an autonomous or telerobotic robot designed to traverse the simulated Lunar surface and complete the assigned construction tasks. The number of teams accepted into this challenge is not predetermined but is based on the scores and overall quality of the Project Management Plans received and other factors. The culmination of the Lunabotics virtual challenge will be the design, build and operation of a functional prototype Lunar robot. Teams are required to submit the following: (1) Project Management Plan, (2) Systems Engineering Paper, a (3) STEM Engage-ment Report, and a (4) Proof of Life Video. This is an optional item, but to qualify for the grand prize a team must also submit a: (5) Presentation and Demonstration. Background: The NASA Lunabotics University Competition was first held in 2010 as a follow on to the NASA Regolith Excavation Challenge [1]. The high level of interest and participation from over 50 universities each year has led to a sustained annual competi-ion cadence: it has been held every May for the past 14 years [2,3]. Over 6,000 students have participated and been inspired to pursue Science, Technology, En-gineering and Mathematics careers (STEM). 2024 Competition: The necessary lunar surface tasks are evolving to meet the NASA Artemis Mission requirements. In the past Lunabotics challenges we gathered data to support Lunar mining for consuma-bles in the Lunar regolith. Now, in 2024, the task is to gather data on Lunar site preparation and construction by designing and building a robot that will traverse the chaotic Lunar terrain and construct a regolith-based berm. The goal is to build a berm structure which would be useful to the Artemis Mission for blast and ejecta protection during lunar landings and launches, shading cryogenic propellant tank farms, providing radiation protection around a nuclear power plant and other mission critical uses. Lunabotics will consist of three separate events this year. The first event is NASA’s Lunabotics Project Development Challenge, where teams submit various deliverables to be scored by judges. The second event will be the University of Central Florida (UCF) Lunabotics Qualification challenge, in the Exolith laboratory, where teams will put their de-signs to the test. The top ten scoring teams from the Qualification challenge are then invited to the third and final event, NASA’s Lunabotics On-Site Challenge at Kennedy Space Center in Florida. This presentation will summarize the results and lessons learned from the NASA Lunabotics University Competition held in May 2024.

Lunabotics↗

KSC Child Development Center (Potential Release Location 149) Confirmatory Sampling Report and Interim Measures Work Plan

This Confirmatory Sampling (CS) Report and Interim Measures (IM) Work Plan was prepared for the National Aeronautics and Space Administration (NASA), Kennedy Space Center (KSC), Florida, by HydroGeoLogic, Inc. (HGL) under Contract Number 80KSC019D0012, Task Order 80KSC019F0118. This document presents the results of the CS activities performed in March 2022, and May 202, at the KSC Child Development Center (KCDC), Potential Release Location (PRL) 149, KSC, Florida. This report additionally presents the results of an assessment conducted in July 2023 to determine whether construction activities in 2023 to replace certain playground equipment and the rubberized play surface allowed soil contaminated by arsenic (As) to migrate from beneath the play surface.

arsenic↗

Land Use Control Implementation Plan

This Land Use Control Implementation Plan (LUCIP) has been prepared to inform current and potential future users of the Corrosion Atmospheric Exposure Facility (CAEF) of institutional controls that have been implemented at the site. 1 Although most areas at CAEF do not pose current unacceptable risks to human health or the environment, areas of arsenic-impacted soil exceeding the Florida Department of Environmental Protection (Florida DEP) residential soil cleanup target levels (SCTLs) have been identified. Institutional land use controls (LUCs) are necessary to prevent contact with surface and subsurface soils at the site. Controls will include periodic inspection, condition certification, and agency notification.

soil↗

Hydrocarbon Burn Facility, SWMU 007 Per- and Polyfluoroalkyl Substances (PFAS) Assessment Report Addendum

This document discusses the Per-and Polyfluoroalkyl Substances (PFAS) assessment activities performed from May through August 2023 at the Hydrocarbon Burn Facility (HBF) located at Kennedy Space Center (KSC), Florida. HBF was used for firefighting training between 1966 and 1994. Aqueous film-forming foams (AFFFs) that contained PFAS were used as suppressants for fighting petroleum fuel fires during training. PFAS sampling was first completed at HBF in 2015. This PFAS Assessment Report Addendum (ARA) is a continuation of sampling efforts, with an overall objective to further delineate PFAS concentrations in groundwater to the pGCTLs and the United States Environmental Protection Agency (EPA) Tapwater Regional Screening Levels (RSLs) dated November 2023 and better understand groundwater to surface water interaction at the Site. The field activities presented in this PFAS ARA were conducted between May and August 2023 and included the collection of 132 direct push groundwater samples and the collection of five colocated surface water, sediment, and pore water samples from locations south/southeast of HBF in August 2023. Exceedances of the pGCTLs and Tapwater RSLs were observed in the direct push groundwater results; however, groundwater has been delineated to the pGCTLs. Exceedances of the Florida provisional Surface Water Screening Levels (pSWSLs) were observed in surface water and porewater, and concentrations of PFAS in these media confirm PFAS migration within surface channels to the south of the HBF site area. Maximum sediment concentrations, which correlate with the maximum surface water and porewater concentrations, demonstrate that PFAS impacted surface water is the source of sediment impacts. Overall, elevated concentrations of PFAS are centered on the HBF site area that trend north and south along the surface water filled swales and along the edge of Banana River. Based on analytical results, not all surface water features in this area exhibit evidence of transport. PFAS migration/transport appears to be more dominant in surface water features during the wet season. Discharges to the Banana River primarily occur where surface water facilitates transport. In contrast, groundwater transport is more effective during the dry season. During precipitation events in either the dry season or the wet season, there appears to be migration from the intermediate groundwater zone to the shallow zone into the surface water features. Additional sampling and data collection is recommended to support further refinement of PFAS groundwater delineation, a remedial alternative evaluation, and the fate and transport model.

Jennifer Buel↗

Components Cleaning Facility West SWMU 030 2024 Annual Long Term Monitoring Report

This document presents and summarizes the 2024 groundwater monitoring activities and the results of a localized direct-push technology investigation at CCF West in order to monitor the natural attenuation of chlorinated volatile organic compound (CVOC)-affected groundwater with concentrations above the state of Florida Chapter 62-777, Florida Administrative Code, groundwater cleanup target levels.

Richard Smith↗

Achieving Challenge Home in Affordable Housing in the Hot-Humid Climate

The Building America Partnership for Improved Residential Construction (BA-PIRC), one of the Building America research team leads, has partnered with two builders as they work through the Challenge Home certification process in one test home each. The builder partners participating in this cost-shared research are Southeast Volusia County Habitat for Humanity near Daytona, Florida and Manatee County Habitat for Humanity near Tampa, Florida. Both are affiliates of Habitat for Humanity International, a non-profit affordable housing organization. This research serves to identify viable technical pathways to meeting the CH criteria for other builders in the region. A further objective of this research is to identify gaps and barriers in the marketplace related to product availability, labor force capability, code issues, cost effectiveness, and business case issues that hinder or prevent broader adoption on a production scale.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Treatment of Chlorinated Solvents in Groundwater Beneath an Occupied Building at the Young-Rainey STAR Center, Pinellas, FL

Groundwater contamination, consisting of two dissolved-phase plumes originating from chlorinated solvent source areas, in the southeastern portion of the Young- Rainey Star Center (also known as the Pinellas County, Florida, Site) in Largo, Florida, has migrated beyond the property boundary, beneath the roadways, and beneath adjacent properties to the south and east. Groundwater contamination will persist as long as the onsite contaminant source remains. The origin of the contamination appears to be multiple long-term point sources beneath Building 100, a 4.5 ha (11 acre) building that housed manufacturing facilities during US DOE operations at the site. The site is now owned by Pinellas County, and most of the space inside the building is leased to private companies, so DOE chose not to conduct characterization or remediation through the floor of the building, instead choosing to conduct all work from outside the building. Injection of emulsified soybean oil and a microbial culture has been used at other areas of the site to accelerate naturally occurring bacterial processes that degrade groundwater contaminants to harmless compounds, and that same approach was chosen for this task. The technical approach consisted of installing horizontal wells from outside the building footprint, extending through and around the identified subsurface treatment areas, and terminating beneath the building. Two 107 m (350 ft) long wells, two 122 m (400 ft) long wells, and four 137 m (450 ft) long wells have been installed to intersect the inferred source areas and confirmed contaminant plumes beneath the building. DOE then injected emulsified vegetable oil and a microbial culture into the horizontal wells at each of several target areas beneath the building where the highest groundwater contaminant concentrations have been detected. The target areas are the northwest corner of the building between the old drum storage pad locations and monitoring well PIN12-S35B, the vicinity of former monitoring well PIN12-S57B, and hydraulically upgradient from the south plume and the east plume at the points where they exit from beneath the building. We describe the details of designing and constructing horizontal injection wells for bioremediation beneath a large, occupied industrial production facility, including lessons learned; technical, logistical, and environmental challenges; community relations; and regulatory relations. Because of the expected lag in biological acclimation and response, distance between the treatment areas and associated monitoring points, and low groundwater velocity, it will likely be years before the full impact of the project will be realized.

54 ENVIRONMENTAL SCIENCES↗

Building America Case Study: Side-by-Side Testing of Water Heating Systems: Results from the 2013–2014 Evaluation Final Report

The Florida Solar Energy Center (FSEC) has completed a fourth year-long evaluation on residential hot water heating systems in a laboratory environment (east central Florida, hot-humid climate). This report contains a summary of research activities regarding the evaluation of two residential electric heat pump water heaters (HPWHs), a solar thermal system utilizing a polymer glazed absorber and a high efficiency natural gas system.

BA-PIRC↗

Building America Case Study: Side-by-Side Testing of Water Heating Systems: Results from 2013-2014 Evaluation Final Report, Cocoa, FL

The Florida Solar Energy Center (FSEC) has completed a fourth year-long evaluation on residential hot water heating systems in a laboratory environment (east central Florida, hot-humid climate). This report contains a summary of research activities regarding the evaluation of two residential electric heat pump water heaters (HPWHs), a solar thermal system utilizing a polymer glazed absorber and a high efficiency natural gas system.

30 DIRECT ENERGY CONVERSION↗