Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Design technology”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,027 records · Page 57

PSR Upgrade Overview

Explore the source record for details and available documents.

Accelerator Design, Technology, and Operations↗

Financial Planning as a Tool for Efficient and Timely Decommissioning of Nuclear Research Facilities

It is generally recognized in the technical and economical literature that reliable cost evaluations with adequate estimates also of the errors and uncertainties involved are necessary in order for rational and appropriate management decisions to be made on any major plant investment. Such estimates are required for the selection of technologies to be applied and for selection to be made between alternative technologies and designs as well as for the overall financing issues including the one of whether to go ahead with the project. Inadequacies in the cost calculations typically lead to suboptimal decisions and ultimately substantial overruns and/or needs for retrofits. Actually, a very strict discipline has to be applied with adaptation of the approach used with regard to the stage of the planning. Deviations from the expected tend to raise the estimated cost much more frequently than they lower it. The same rationale applies to planning and cost calculations for decommissioning of nuclear research facilities. There are, however, many reasons why such estimations may be very treacherous to carry out. This will be dealt with in the following. The knowledge base underlying the present paper has been developed and accumulated as a result of the research that the Swedish Nuclear Power Inspectorate (SKI) has carried out in support of its regulatory oversight over the Swedish system of finance. The findings are, however, equally applicable and appropriate for implementers in their planning, decision, monitoring and evaluation activities. In the nineteen fifties and sixties, Sweden had a comprehensive program for utilization of nuclear power including uranium mining, fuel fabrication, reprocessing and domestically developed heavy water reactors. Examples of facilities are presented in Figures 1-5. Eventually, the development work lead to the present nuclear program with ten modern light water reactors in operation at present. According to Swedish law, those who benefit from the use of these plants must pay a fee which is accumulated in a fund so that all future costs for decommissioning and waste management can be covered. Each year, estimates on all future costs are submitted to the SKI for review. The Government then decides on the size of the fee, based on the results of the review. In conclusion: it has been concluded in the SKI work - in spite of the difficulties pointed out above - that cost calculations with the precision needed for a system of finance can be achieved even at early stages provided that the various features of the task are adequately dealt with.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Brownfields to Brightfields: A Sustainability Initiative at DOE'S East Tennessee Technology Park Cleanup - 16120

As DOE works toward completing their cleanup mission at the East Tennessee Technology Park (ETTP), the ultimate goal is to return property no longer needed for government use to the community for beneficial re-use. The vision for ETTP is to transform the former gaseous diffusion facility into a commercial industrial park, leveraging the site's infrastructure to attract businesses to the site. While hundreds of acres at ETTP have been transferred for re-use, areas within the former production footprint of the site have future use restricted due to the presence of residual contamination, underground structures and utilities and/or physical features that limit their reuse potential. Brownfield redevelopment with solar energy generation has proven to be an excellent option for beneficial reuse and sustainability thanks to the flexible nature of solar photovoltaic technology and design that can address the restrictions and limitations of the site. Developing a solar project on a cleanup site can be challenging due to a large number of stakeholders and regulatory compliance issues of the environmental legacy at DOE cleanup sites; however, the challenges can be offset by the available infrastructure and low cost property. The requirement for large amounts of land or surface area is a major constraint to the growth of photovoltaic solar systems. An average solar generating facility requires 2 or more hectares (5 acres) for each megawatt (MW) of power generated. Re-using land that is otherwise un-developable provides a cost effective site for renewable energy generation to innovative solar developers. At ETTP, DOE's Oak Ridge Office of Environmental Management and the community reuse organization (Community Reuse Organization of East Tennessee - CROET) supported a local small business (Restoration Services, Inc. - RSI) familiar with the site and environmental regulations to secure a power purchase agreement with the regional electric provider (Tennessee Valley Authority - TVA) for a 1 MW utility-scale photovoltaic solar facility. The solar facility, Powerhouse Six, was developed through a commercial partnership (RSI and Vis Solis, Inc.) that worked closely with the lead ETTP site cleanup contractor (URS-CH2M Oak Ridge LLC - UCOR) and the local government. The selected site at ETTP had limitations on subsurface disturbance to 10 feet below ground surface because of utility ducts and residual contamination. Near surface relics (facility foundation remnants) were also found to prohibit ground penetration. A photovoltaic solar design using a ballasted ground mount system was developed to conform to the restrictions. The ballasted system could follow existing land contours, eliminating the need for any extensive site preparation and avoiding the risk of ground penetration. The lead cleanup contractor's role in facilitating the completion of this project included making the necessary environmental assessment documentation available to obtain the construction notice to proceed from the regional electric provider. They accelerated the transfer of ETTP power lines and electric demand to the city electric department to accommodate connection to the electric grid and supplied the communication connection required for metering the electric power generation. DOE's support along with their cleanup contractor's re-industrialization program and power integration group provided regular communication with the project stakeholders for more than six months to facilitate the early transfer of the utility infrastructure. Powerhouse Six sustainability benefits: - Generates enough clean energy to power more than 100 homes or prevents pollution equivalent to removing 240 cars from the road annually (1,141 metric tons of carbon dioxide); - Provides Brownfield reuse/redevelopment at ETTP; - Eliminates the generation of wastes through excavation and saves money to cleanup other areas for re-use; - Supports regional electric provider's renewable energy initiative; - Offers community economic development/ jobs and property tax income to the City of Oak Ridge; - Demonstrates benefit of ETTP re-industrialization; - Provides long-term lease payments to the community reuse organization; - Supports DOE renewable energy goals; - Demonstrates collaboration between DOE and a public utility for renewable energy development. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remote In-bore Laser Cutting and Welding Tools for use in Future Nuclear Fusion Reactors - 18348

The maintenance, replacement and decommissioning of future nuclear fusion reactors will require quick and reliable cutting and joining of in-vessel pipework. Initial design studies for nuclear fusion reactors for power generation have estimated cutting and welding could account for up to 60% of the maintenance duration using conventional in-situ processing techniques (dry-mechanical cutting and arc welding) and that new methods are required to expedite the process. Additionally, the expected radioactivity and limited access at the cutting and welding sites mean that these processes cannot be done manually and robotic tools are required. To this end, remote in-bore laser cutting and welding tools have been developed for use in 90 mm internal diameter steel pipes. Here, we will present the designs of the remote in-bore laser cutting and welding tools, and how the tools fit within the overall remote maintenance strategy of a nuclear fusion reactor. Initial high-power laser trials were performed with prototype tools which successfully demonstrated their laser processing, thermal management and dust protection functionality. Although the tools described herein have been developed specifically for use within the fusion reactor environment, however the tool design and technology demonstrated here is readily transferable to many remote applications in challenging environments such as fission reactor maintenance, nuclear decommissioning and other in-accessible pipework. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

"Traffic smoothing using explicit local controllers"

The dissipation of stop-and-go waves attracted recent attention as a traffic management problem, which can be efficiently addressed by automated driving. As part of the 100 automated vehicles experiment named MegaVanderTest, feedback controls were used to induce strong dissipation via velocity smoothing. More precisely, a single vehicle driving differently in one of the four lanes of I-24 in the Nashville area was able to regularize the velocity profile by reducing oscillations in time and velocity differences among vehicles. Quantitative measures of this effect were possible due to the innovative I-24 MOTION system capable of monitoring the traffic conditions for all vehicles on the roadway. This paper presents the control design, the technological aspects involved in its deployment, and, finally, the results achieved by the experiment.

Hayat, Amaury↗

Measuring the Muon Neutrino Magnetic Moment in the NOvA Near Detector

Measuring an enhanced neutrino magnetic moment would be a clear indication of physics beyond the Standard Model, shedding light on the correct beyond Standard Model theory or the potential Majorana nature of neutrinos. It would manifest in the NOvA near detector as an excess of neutrino-on-electron elastic scattering interactions at low electron recoil energies. Leveraging an intense and highly pure muon neutrino beam, along with a finely segmented liquid scintillator detector technology specifically designed for electromagnetic shower separation, enables NOvA to achieve a potentially world-leading sensitivity in probing the effective muon neutrino magnetic moment. This analysis, based on neutrino data collected between 2014 and 2021, corresponding to an exposure of $13.8\times10^{20}$ protons-on-target, yields a result consistent with the Standard Model-only hypothesis with a p-value of 0.31. An upper limit on the effective muon neutrino magnetic moment is set at $\mu_{\nu_\mu}<19.1\times 10^{-10}\mu_B$ at $90\%$ confidence level. Despite facing statistical limitations stemming from low cross section of the signal process, systematic uncertainties have a significant impact on this result. To address these challenges, the NOvA Test Beam experiment focuses on mitigating some of the largest systematic uncertainties within NOvA by investigating particle interactions and energy deposition in a small-scale replica NOvA detector. This thesis describes the calibration of the NOvA Test Beam detector, which is a crucial step in analysing the Test Beam data before they can be utilised to reduce NOvA systematic uncertainties.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗