Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “CEMENTING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,027 records · Page 57

A history of pore water oxygen isotope evolution in the Cretaceous Travis Peak Formation in East Texas

Oxygen isotope analyses of diagenetic cements can provide detailed evidence of sedimentary burial processes and conditions, as the δ 18 O values of precipitating minerals reflect contemporaneous local δ 18 O water and temperature conditions. Uncertainties in the timing and rates of pore water δ 18 O evolution in sedimentary basins can complicate interpretation of these records. Fracture-bridging (0.5–1 mm) quartz cements observed in sandstones of the Cretaceous Travis Peak Formation in the East Texas basin show clear growth-zoning by cathodoluminescence and contain detailed fluid inclusion records of temperature that make them excellent candidates for interrogating prolonged histories of basin temperature and the evolution of δ 18 O in basin pore water. New secondary ion mass spectrometer (SIMS) δ 18 O quartz isotopic data from fluid inclusion-rich quartz bridges in Travis Peak sandstones record a steady increase of pore water δ 18 O values from ~5 to 7‰ (VSMOW; Vienna Standard Mean Ocean Water) as the sandstone warms from ~130 to 150 °C. To help evaluate whether this trend could be generated solely from local water-rock interactions in response to burial compaction, a one-dimensional closed system isotopic burial model was created to simulate how δ 18 O water values change in a quartz-dominated sandstone during diagenesis. Using both directly measured and inferred rates of Travis Peak compaction, the magnitude of change in δ 18 O water that we calculate from quartz bridge geochemistry cannot be reasonably modeled solely by local quartz mechanical compaction, pressure solution, and cementation processes, necessitating significant fluxes of silica and high-δ 18 O water from outside of the sandstones prior to maximum burial. In conclusion, this indicates that even units which appear surrounded by significant barriers to fluid flow (i.e., mudrock-bounded channel sandstones) may have been infiltrated and diagenetically modified by large fluxes of fluid on geologic time scales.

58 GEOSCIENCES↗

The nature and origins of decametre-scale porosity in Ordovician carbonate rocks, Halahatang oilfield, Tarim Basin, China

At >7 km depths in the Tarim Basin, hydrocarbon reservoirs in Ordovician rocks of the Yijianfang Formation contain large cavities ( c . 10 m or more), vugs, fractures and porous fault rocks. Although some Yijianfang Formation outcrops contain shallow (formed near surface) palaeokarst features, cores from the Halahatang oilfield lack penetrative palaeokarst evidence. Outcrop palaeokarst cavities and opening-mode fractures are mostly mineral filled but some show evidence of secondary dissolution and fault rocks are locally highly ( c . 30%) porous. Cores contain textural evidence of repeated formation of dissolution cavities and subsequent filling by cement. Calcite isotopic analyses indicate depths between c . 220 and 2000 m. Correlation of core and image logs shows abundant cement-filled vugs associated with decametre-scale fractured zones with open cavities that host hydrocarbons. A Sm–Nd isochron age of 400 ± 37 Ma for fracture-filling fluorite indicates that cavities in core formed and were partially cemented prior to the Carboniferous, predating Permian oil emplacement. Repeated creation and filling of vugs, timing constraints and the association of vugs with large cavities suggest dissolution related to fractures and faults. In the current high-strain-rate regime, corroborated by velocity gradient tensor analysis of global positioning system (GPS) data, rapid horizontal extension could promote connection of porous and/or solution-enlarged fault rock, fractures and cavities. Supplementary material: Stable isotopic analyses and the velocity gradient tensor and principal direction and magnitude calculation are available at https://doi.org/10.6084/m9.figshare.c.4946046 Thematic collection: This article is part of the The Geology of Fractured Reservoirs collection available at: https://www.lyellcollection.org/cc/the-geology-of-fractured-reservoirs

Geology↗

Global, Regional, and National Fossil-Fuel CO2 Emissions: 1751-2017

This data product is a time series of Carbon Dioxide (CO2) emissions from fossil fuel combustion and cement manufacture. Estimates of CO2 emissions are included for the globe and by nation back to 1751, and include emissions from solid fuel consumption, liquid fuel consumption, gas fuel consumption, cement production, and gas flaring. Per capita CO2 emissions and emissions from international trade (bunker fuels) are included as well; bunker fuels are not included in country totals, but are assigned to the country in which loading took place. Estimates are generated using the United Nations Energy Statistics database and the United States Geologic Survey’s cement statistics. Datasets produced from this group at Appalachian State University are located here, and are also located at https://energy.appstate.edu/research/work-areas/cdiac-appstate. Historic CDIAC data from Oak Ridge National Laboratory are located here: https://data.ess-dive.lbl.gov/view/doi:10.3334/CDIAC/00001_V2017. This dataset is the foundational dataset for the annual global carbon budget and other carbon cycle analyses that need relevant fossil fuel CO2 data. Within this data package are spreadsheets (.csv) of global and national estimates of CO2 emissions as well as text files of the ranking of each country’s total CO2 emissions and per capita for that year.

54 ENVIRONMENTAL SCIENCES↗

Advanced Numerical Model for Irradiated Concrete

In this report, we establish a numerical model for concrete exposed to irradiation to address these three critical points. The model accounts for creep in the cement paste and its coupling with damage, temperature and relative humidity. The shift in failure mode with the loading rate is also properly represented. The numerical model for creep has been validated and calibrated against different experiments in the literature [Wittmann, 1970, Le Roy, 1995]. Results from a simplified model are shown to showcase the ability of numerical homogenization to simulate irradiation effects in concrete. In future works, the complete model will be applied to the analysis of the irradiation experiments of Elleuch et al. [1972] and Kelly et al. [1969]. This requires a careful examination of the experimental environmental conditions as in both cases certain critical information are missing, including the relative humidity history. A sensitivity analysis will be conducted to provide lower and upper bounds of the concrete expansion under irradiation, and check if the scatter in the simulated results matches the one found in experiments. The numerical and experimental results will be compared in terms of expansion and loss of mechanical stiffness and strength. Both effects should be captured accordingly by the model to validate it. Once the model has been validated on these two experiments, it can be applied to simulate concrete from nuclear power plants. To do so, the materials used in these concrete must be as well characterized as possible. The main parameters required are the mechanical properties of each constituent in the concrete (aggregates, cement paste), namely the elastic modulus, the creep properties, the tensile and compressive strength, the thermal expansion coefficient, and the drying shrinkage. These can be either measured experimentally, estimated from the initial composition in the case of cement paste, or back-calculated from mechanical tests on concrete. If some are unknown, a sensitivity analysis must be carried out to provide lower and upper bounds of the material behaviour. Finally, the model can be used as a basis to formulate a macroscopic material model for concrete subject to irradiation, which later can be used in structural analyses to estimate the structural impact of irradiation on nuclear power plants.

36 MATERIALS SCIENCE↗

Carbon Mineralization by Aqueous Precipitation for Beneficial Use of CO 2 from Flue Gas

The objective of this project was to demonstrate an innovative process to mineralize CO 2 from flue gas directly to reactive carbonates and maximize the value and versatility of its beneficial use products. The program scope includes the design, construction, and testing of a CO 2 Conversion to Material Products (CCMP) Pilot Demonstration Plant utilizing CO 2 from the flue gas of a power production facility in Moss Landing, CA as well as flue gas from coal combustion. This final report details all development, analysis, design and testing of the project. Also included in the final report are an updated Techno-Economic Analysis and CO 2 Lifecycle Analysis. The subsystems included in the pilot demonstration plant are the mineralization subsystem, the Alkalinity Based on Low Energy (ABLE) subsystem, the waste calcium oxide processing subsystem, and the fiber cement board production subsystem. The fully integrated plant was proven to be capable of capturing CO 2 from various sources (gas and coal) and mineralizing it into a reactive calcium carbonate binder and subsequently producing commercial size (4ftx8ft) fiber cement boards. The final report provides a description of the “as built” design of these subsystems and the results of the commissioning activities that have taken place to confirm operability. The report also discusses the results of the fully integrated operation of the facility. Fiber cement boards have been produced in this facility exclusively using reactive calcium carbonate from captured CO 2 from flue gas. These boards meet all US and China appropriate acceptance standards. Use demonstrations for these boards are now underway.

20 FOSSIL-FUELED POWER PLANTS↗

De-Inventory Plan for Transuranic Waste Stored at Area G

This report describes the strategy and detailed work plan developed by Los Alamos National Laboratory (LANL) to disposition transuranic (TRU) waste stored at its Area G radioactive waste storage site. The focus at this time is on disposition of 3,706 m 3 of TRU waste stored above grade by June 30, 2014, which is one of the commitments within the Framework Agreement: Realignment of Environmental Priorities between the Department of Energy (DOE) National Nuclear Security Administration (NNSA) and the State of New Mexico Environment Department (NMED), Reference 1. A detailed project management schedule has been developed to manage this work and better ensure that all required activities are aligned and integrated. The schedule was developed in conjunction with personnel from the NNSA Los Alamos Site Office (LASO), the DOE Carlsbad Field Office (CBFO), the Central Characterization Project (CCP), and Los Alamos National Security, LLC (LANS). A detailed project management schedule for the remainder of the above grade inventory and the below grade inventory will be developed and incorporated into the De-Inventory Plan by December 31, 2012. This schedule will also include all newly-generated TRU waste received at Area G in FYs 2012 and 2013, which must be removed by no later than December 31, 2014, under the Framework Agreement. The TRU waste stored above grade at Area G is considered to be one of the highest nuclear safety risks at LANL, and the Defense Nuclear Facility Safety Board has expressed concern for the radioactive material at risk (MAR) contained within the above grade TRU waste inventory and has formally requested that DOE reduce the MAR. A large wildfire called the Las Conchas Fire burned extensive areas west of LANL in late June and July 2011. Although there was minimal to no impact by the fire to LANL, the fire heightened public concern and news media attention on TRU waste storage at Area G. After the fire, New Mexico Governor Susana Martinez also requested that LANL accelerate disposition of TRU waste stored above grade at Area G. The 3,706 m 3 volume of TRU waste stored above grade consists of 4,495 containers that include all above grade non-cemented waste as well as above grade cemented waste that was ready for characterization on October 1, 2011. This volume includes all newly-generated TRU waste currently stored at Area G as of October 1, 2011. This volume does not include the Bolas Grandes spheres, mixed low level waste (MLLW) containers, empty containers, cemented waste that requires remediation, projected newly generated TRU waste from FY 2012 and later, or TRU waste stored below grade. The 3,706 m 3 volume represents about 86 per cent of the total volume of TRU waste stored above grade on October 1, 2011. The De-Inventory Plan supports the DOE Office of Environmental Management (EM) goal to disposition 90% of the Legacy TRU waste within the DOE complex by the end of 2015 as stated in its Roadmap for EM’s Journey to Excellence (Reference 2). The plan also addresses precursor actions for disposition of TRU waste that are necessary for compliance with the Compliance Order on Consent issued by the NMED in 2005 (Reference 3).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Statistical Analysis of CO 2 Exposed Wells to Predict Long Term Leakage through the Development of an Integrated Neural-Genetic Algorithm

The objective of this project is to develop a computerized statistical model with the Integrated Neural-Genetic Algorithm (INGA) for predicting the probability of long-term leak of wells in CO 2 sequestration operations. This object has been accomplished by conducting research in three phases: 1) data mining of CO 2 -explosed wells, 2) INGA computer model development, and 3) evaluation of the predictive performance of the computer model with data from field tests. Data mining was conducted for 510 wells in two CO 2 sequestration projects in the Texas Gulf Coast region. They are the Hasting West field and Oyster Bayou field in the Southern Texas. Missing wellbore integrity data were estimated using an analytical and Finite Element Method (FEM) model. The INGA was first tested for performances of convergence and computing efficiency with the obtained data set of high dimension. It was concluded that the INGA can handle the gathered data set with good accuracy and reasonable computing time after a reduction of dimension with a grouping mechanism. A computerized statistical model with the INGA was then developed based on data pre-processing and grouping. Comprehensive training and testing of the model were carried out to ensure that the model is accurate and efficient enough for predicting the probability of long-term leak of wells in CO 2 sequestration operations. The Cranfield in the southern Mississippi was select as the test site. Observation wells CFU31F2 and CFU31F3 were used for pressure-testing, formation-logging, and cement-sampling. Tools run in the wells include Isolation Scanner, Slim Cement Mapping Tool (SCMT), Cased Hole Formation Dynamics Tester (CHDT), and Mechanical Sidewall Coring Tool (MSCT). Analyses of the obtained data indicate no leak of CO 2 cross the cap zone while it is evident that the well cement sheath was invaded by the CO 2 from the storage zone. This observation is consistent with the result predicted by the INGA model which indicates the well has a CO 2 leak-safe probability of 72%. This comparison implies that the developed INGA model is valid for future use in predicting well leak probability.

97 MATHEMATICS AND COMPUTING↗

Saltstone third quarter calendar year 2019 (3QCY19) toxicity characteristic leaching procedure (TCLP) results

The aqueous waste from Tank 50 (salt solution) is sampled quarterly for transfers to the Saltstone Production Facility (SPF). Salt solution is treated at SPF and disposed of in the Saltstone Disposal Facility (SDF). Per request of customer, X-TAR-Z-00008, Revision 01, two SDF waste form (saltstone) samples were prepared in the Savannah River National Laboratory (SRNL) from the Tank 50 Waste Acceptance Criteria (WAC) sample and Z-Area premix material for the third quarter of calendar year 2019 (3QCY19). One sample contained a Full Premix which included 10:45:45 (by weight) of cement, slag and fly ash. The second sample contained 60:40 (by weight) of slag and fly ash only referred to as the “Cement-Free grout sample”. Results from this technical report support Task 2: ‘Grout Leaching Analyses’ of the Task Technical Request (TTR) prepared by Savannah River Remediation (SRR). After a 28 day cure, a sample of each of the SDF waste forms was collected and shipped to a certified laboratory for analysis using the Toxicity Characteristic Leaching Procedure (TCLP). The 3QCY19 saltstone (Full Premix) and the Cement-Free grout samples met the South Carolina (SC) Code of Regulations for Hazardous Waste Management Regulations (HWMR) 61-79.261.24 and 61-79-268.48 requirements for a non-hazardous waste form with respect to Resource Conservation and Recovery Act (RCRA) metals and Underlying Hazardous Constituents (UHCs), and also met the SPF WAC.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Engineered Barrier System R&D and International Collaborations – LANL (FY20): Spent Fuel and Waste Disposition

The United States Department of Energy’s Spent Fuel and Waste Disposition (SFWD) program is investigating the design and safety function of generic nuclear geologic repositories in a variety of geologic settings (salt, argillite, and crystalline rock). Different configurations and loadings of spent nuclear fuel and waste within disposal canisters are also being investigated, some of which have the potential to generate repository temperatures higher than previously considered (i.e., temperatures >100ºC) by foreign and domestic concepts. This report expands on engineered barrier material stability in a high temperature crystalline rock repository through high temperature hydrothermal experiments. Experiments were designed to develop engineered barrier system (EBS) concepts in a hightemperature crystalline environment in 1) bentonite-Grimsel Granodiorite interactions, 2) bentonite-cement reactions, and 3) interaction between waste canister materials and bentonite. Experiment results are applied to understanding long-term repository performance in terms of radionuclide isolation. One hydrothermal experiment was completed in the rocking autoclaves at LANL in FY-20: IEBS-6 (Grimsel Granodiorite + Wyoming bentonite + cured ordinary Portland cement + Grimsel Granodiorite synthetic groundwater, 250ºC/150 bar, 8 weeks). Several other experiments were planned but were delayed due to the COVID-19 pause in laboratory work. In addition, some characterization of the reaction products of experiments conducted in FY-20 was prevented by COVID-19. Mineral phase chemistry was not measured via electron microprobe analyses for IEBS-6. Quantitative X-ray diffraction results from IEBS-6 and HBT-1 were not completed. The missing analyses and discussion of the results will be included in next year’s report. New characterization that was completed includes scanning electron microscopy of reaction products from IEBS-6, quantitative X-ray diffraction results are presented from IEBS-1 through IBES-5, preliminary scanning electron microscope images and chemical analyses for IEBS-6, X-ray diffraction of the clay fraction from all experiments, measurement/imaging of mineral growth on the surface of steel coupons. Major observations pertaining to bentonite stability in a Grimsel Granodiorite environment include the stability of Na-montmorillonite at 250°C, the formation of trace CSH phases, and the formation of bentonite colloids on experiment cooling. The addition of a cured chip of Portland cement to the bentonite-Grimsel system results in slightly higher pH values and the formation of diverse secondary mineral phases that were not observed in the previous experiments (e.g., analcime, garronite, CSH phases). The new characterization efforts related to the interaction of stainless-steel coupons and bentonite clay focused on thickness and mineralogy of phases that formed at the steel surface. In Wyoming bentonite + Grimsel Granodiorite systems, newly formed minerals at the bentonitesteel coupon interface included alteration of the outermost steel edge to Fe,Cr-oxide phases, followed by Fe-rich phyllosilicates (Fe-saponite, chlorite) and interbedded Fe,Cr,Ni-sulfide phases (pentlandite). Hydrothermal experiments were completed to assess uranium-carbonate complexation at conditions relevant to high-temperature disposal. Autoclave solubility experiments were conducted at 150 to 250ºC with a range of carbonate and uranium concentrations. The experiment results were characterized via situ UV-Visible spectroscopy and synchrotron-based in situ XAS techniques. Results show a significant decrease in the stability of uranyl-carbonate complexes at temperatures above 100ºC along with the precipitation of uranium oxides. Further, at T > 200ºC, results show that uranyl-hydroxyl complexes control solubility of uranium instead of the previously predicted uranyl-carbonate species. These results are significant for understanding the mobility of uranium in the EBS, which will likely contain carbonate-rich fluids. International research efforts focused on three main areas: 1) participation in international conferences, 2) building collaborations with foreign repository programs, and 3) the initiation of an experimental program to complement the full-scale HotBENT test at the Grimsel test site. This experiment included Wyoming bentonite + low carbon steel + Grimsel Granodiorite synthetic groundwater and was run at the planned maximum temperature of the HotBENT test (200°C). Complete characterization of reaction products was hindered by disruptions to laboratory work but will be reported in the next FY. The experimental results obtained in FY-20 continue to document the wide-ranging effects of bulk composition and pressure-temperature conditions in the mineralogical and geochemical evolution of a high-temperature repository environment. Concepts developed will be used to inform models of long-term material stability in a generic crystalline rock-hosted repository.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Resiliency of Degraded Built Infrastructure

Infrastructure resiliency depends on the ability of infrastructure systems to withstand, adapt, and recover from chronic and extreme stresses. In this white paper, we address the resiliency of infrastructure assets and discuss improving infrastructure stability through development of our understanding of cement and concrete degradation. The resiliency of infrastructure during extreme events relies on the condition, adaptability, and recoverability of built infrastructure (roads, bridges, dams), which serves as the backbone of existing infrastructure systems. Much of the built infrastructure in the US has consistently been rated D+ by the American Society of Civil Engineers (ASCE). Aged infrastructure introduces risk to the system, since unreliable infrastructure increases the likelihood of failures under chronic and extreme stress and are particularly concerning when extreme events occur. To understand and account for this added risk from poor infrastructure quality, more research is needed on (i) how the changing environment alters the aging of new and existing built infrastructure and (ii) how degradation causes unique failure mechanisms. The aging of built infrastructure is based on degradation of the structural materials, such as concrete and steel supports, which causes failure. Current work in cement/concrete degradation is based on (i) the development of high strength and degradation resistance concrete mixtures, (ii) methods of assessing the age and reliability of existing structures, and (3) modeling of structural stability and the microstructural evolution of concrete/cement from degradation mechanisms (sulfide attack, carbonation, decalcification). Sandia National Laboratories (SNL) has made several investments in studying the durability and degradation of cement based materials, including using SNL-developed codes and methodologies (peridynamics, PFLOTRAN) to focus on chemo-mechanical fracture of cement for energy applications. Additionally, a recent collaboration with the University of Colorado Boulder has included fracture of concrete gravity dams, scaling the existing work to applications in full sized infrastructure problems. Ultimately, SNL has the experience in degradation of cementitious materials to extend the current research portfolio and answer concerns about the resilience of aging built infrastructure.

36 MATERIALS SCIENCE↗

A Scalable Process for Upcycling Carbon Dioxide (CO 2 ) and Coal Combustion Residues into Construction Products

Anthropogenic sources of carbon dioxide are generated from a number of sources, but the key among these are ordinary Portland cement (OPC) production and combustion of fossil fuels. Cement production is the largest global CO 2 source from the mineral decomposition of carbonates. Combination of the limestone decomposition and thermal requirements of the clinkering process causes cement production to contribute 8-9% of annual global CO 2 emissions. Combustion of fossil fuels (coal, oil and gas) was shown to contribute a much larger portion of global CO 2 emissions. As of 2018, combustion of fossil fuels accounted for 65% of global CO 2 , where 41% was derived from stationary sources for electricity and heat generation and the other 24% was related to transport. To reduce these contributions, key steps forward in CO 2 utilization technologies are required. The purpose of this project is to demonstrate the feasibility of the Reversa process evolving from a TRL-3 technology at the bench-scale up to TRL-6 technology at the pilot-scale. The reliability of the Reversa technology was tested to prove the effective production of concrete masonry units (CMUs) at bench scale, where the units exceeded the required 13.8 MPa compressive strength requirements. The overall goal of this project was to accelerate the development of a CO 2 mineralization process that synergistically utilizes CO 2 in flue gas and coal combustion residues (CCRs) to synthesize carbonated concrete, a functional replacement for traditional concrete. The culmination of this work resulted in 12 successful production runs at the Integrated Test Center (ITC), Gillette, WY using coal flue gas as a CO 2 source. This was followed by 6 production runs which were completed at the National Carbon Capture Center (NCCC), Wilsonville, AL, using coal-fired and natural gas (NG) flue gas as the CO 2 source. Over the course of the production runs at NCCC and ITC, the CO 2 utilization as a function of time, 24-h CO 2 uptake, electricity usage, and 28-d net area compressive strength recorded for each run. The ITC and NCCC demonstrations achieved an average of 0.19 and 0.1 g CO 2 /g reactant, respectively. Both demonstrations exceeded the project’s target goals of uptake > 0.05 g CO 2 /g reactant. Average compressive strength of the ITC blocks was 18.24 MPa at 28-days. This exceeded the target strength of 13.8 MPa specified by ASTM C90. ITC and NCCC produced an average CO 2 utilization efficiency of 74.9 and 57.9%, respectively. Both demonstration averages were within the target range of 50 to 90% utilization efficiency. For some production runs the NCCC demo did exceeded the a CO 2 utilization efficiency of 75%. An LCA of the Reversa process compared to an industry standard product revealed a net CO 2 reduction of 39% to 42%. This exceeded the target requirement of >25% net CO 2 reduction. Collection of this data was used to determine that the project was successful as the demonstration goals were achieved: (1) achieving in excess of 75% CO 2 utilization efficiency, (2) utilizing greater than 250 kg of CO 2 per production batch/run, and (3) ensuring compliance of carbonated blocks with industry standard specifications (ASTM C90).

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Saltstone First Quarter Calendar Year 2021 (1QCY21) Toxicity Characteristic Leaching Procedure (TCLP) Results

The aqueous waste from Tank 50 (salt solution) is sampled quarterly for transfers to the Saltstone Production Facility (SPF). Salt solution is treated at SPF and disposed of in the Saltstone Disposal Facility (SDF). Per request of customer, X-TTR-Z00023, Revision 0, two SDF waste form (saltstone) samples were prepared in the Savannah River National Laboratory (SRNL) from the Tank 50 Waste Acceptance Criteria (WAC) sample and Z-Area premix material for the first quarter of calendar year 2021(1QCY21). One sample contained a Full Premix which included 10:45:45 (by weight) of cement, slag and fly ash. The second sample contained 60:40 (by weight) of slag and fly ash only referred to as the “Cement-Free grout sample”. Results from this technical report support Task 2: ‘Grout Leaching Analyses’ of the Task Technical Request (TTR) prepared by Savannah River Remediation (SRR). After at least 28 days cured, a sample of each of the SDF waste forms was collected and shipped to a certified laboratory for analysis using the Toxicity Characteristic Leaching Procedure (TCLP). The 1QCY21 saltstone (Full Premix) and the Cement-Free grout samples met the South Carolina (SC) Code of Regulations for Hazardous Waste Management Regulations (HWMR) 61-79.261.24 and 61-79-268.48 requirements for a non-hazardous waste form with respect to Resource Conservation and Recovery Act (RCRA) metals and Underlying Hazardous Constituents (UHCs), and also met the SPF WAC that was in effect at the time of the tank sampling.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Saltstone Third Quarter Calendar Year 2021 (3QCY21) Toxicity Characteristic Leading Procedure (TCLP) Results

The aqueous waste from Tank 50 (salt solution) is sampled quarterly for transfers to the Saltstone Production Facility (SPF). Salt solution is treated at SPF and disposed of in the Saltstone Disposal Facility (SDF). Per request of customer, X-TTR-Z-00023, Revision 0, two SDF waste form (saltstone) samples were prepared in the Savannah River National Laboratory (SRNL) from the Tank 50 Waste Acceptance Criteria (WAC) sample and Z-Area premix material for the third quarter of calendar year 2021(3QCY21). One sample contained a Full Premix which included 10:45:45 (by weight) of cement, slag and fly ash. The second sample contained 60:40 (by weight) of slag and fly ash only referred to as the “Cement-Free grout sample”. Results from this technical report support Task 2: ‘Grout Leaching Analyses’ of the Task Technical Request (TTR) prepared by Savannah River Remediation (SRR). After at least 28 days cured, a sample of each of the SDF waste forms was collected and shipped to a certified laboratory for analysis using the Toxicity Characteristic Leaching Procedure (TCLP). The 3QCY21 saltstone (Full Premix) and the Cement-Free grout samples met the South Carolina (SC) Code of Regulations for Hazardous Waste Management Regulations (HWMR) 61-79.261.24 and 61-79-268.48 requirements for a non-hazardous waste form with respect to Resource Conservation and Recovery Act (RCRA) metals and Underlying Hazardous Constituents (UHCs), and also met the SPF WAC that was in effect at the time of the tank sampling.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

January 2022 Semiannual Saltstone Toxicity Characteristic Leaching Procedure (TCLP) Results

The aqueous waste from Tank 50 (salt solution) is sampled semiannually for transfers to the Saltstone Production Facility (SPF). Salt solution is treated at SPF and disposed of in the Saltstone Disposal Facility (SDF). Per request of customer, X-TTR-Z-00025, Revision 0, two SDF waste form (saltstone) samples were prepared in the Savannah River National Laboratory (SRNL) from the Tank 50 Waste Acceptance Criteria (WAC) sample and Z-Area premix material for the January 2022 semiannual Toxicity Characteristic Leaching Procedure (TCLP) samples. One sample contained a Full Premix which included 10:45:45 (by weight) of cement, slag and fly ash. The second sample contained 60:40 (by weight) of slag and fly ash only referred to as the “Cement-Free grout sample.” Results from this technical report support Task 2: ‘Grout Leaching Analyses’ of the Task Technical Request (TTR) prepared by Savannah River Mission Completion (SRMC). After at least 28 days cured, a sample of each of the SDF waste forms was collected and shipped to a certified laboratory for analysis using the Toxicity Characteristic Leaching Procedure (TCLP). The January 2022 semiannual saltstone (Full Premix) and the Cement-Free grout samples met the South Carolina (SC) Code of Regulations for Hazardous Waste Management Regulations (HWMR) 61-79.261.24 and 61-79-268.48 requirements for a non-hazardous waste form with respect to Resource Conservation and Recovery Act (RCRA) metals and Underlying Hazardous Constituents (UHCs), and also met the SPF WAC that was in effect at the time of the tank sampling.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

LH CO 2 MENT Colorado Project (Final Report)

The objective of Electricore’s pre-FEED project “LH CO 2 MENT COLORADO PROJECT” is to accelerate the implementation of a 1.5 million tonnes per year (TPY), and first-of-a-kind (FOAK) at world scale, Svante VeloxoTherm™ carbon capture plant. This project represents a quantum leap to a large-scale facility that will launch Svante’s carbon capture technology into the next era of accomplishments and market acceptance. By completing the Front-End Loading (FEL) Feasibility Study Report (FEL-2) for a fit-for-purpose design at the HOLCIM cement plant, located near Florence Colorado, USA, this technology can be proven as the future of large-scale deployment for carbon capture and storage. This carbon capture plant was designed with the goal of reaching a target of near Net Zero Emissions by capturing 90% of the carbon dioxide (CO 2 ) emissions from the HOLCIM cement plant and from the boiler which produces steam required to regenerate the adsorbent. Additionally, this project will be leveraging a renewable Power Purchase Agreement (PPA) using solar energy to acquire power at the target price of 0.04 $/kWh or less. In its current configuration CO 2 emissions from the HOLCIM cement plant is around 700 – 800 kg/ton of clinker produced. The proposed new carbon capture plant will allow a reduction of CO 2 emissions to about 100 kg/ton of clinker produced. The scope of work consists of the process design and capital & operating cost estimation (Class IV) for a total plant capacity of 4,750 TPD of pipeline grade CO 2 . The Svante VeloxoTherm™ technology is comprised of a Rotary Adsorption Machine (RAM) for intensified Thermal Swing Adsorption (TSA) using Structured Adsorbent Beds (SABs) and related Balance of Plant (BOP), including CO 2 compression. A business case (financial analysis) evaluation has been undertaken for the Owner’s management review. Recommendations on how best to proceed to the next stage of the project have been conveyed and are documented within this report. This analysis has relied on a detailed and comprehensive Project Financial Model, evaluating the Total Project IRR (after tax, unlevered, and including all forecast 45Q PTCs and 100% tax efficiency) – the project financial analysis (as opposed to standard TEA analysis) only considered a 12 year plant economic lifetime as a result of 45Q being the sole driver considered at this stage. The Total Project IRR was evaluated across a large number of potential scenarios. The evaluation demonstrated that if the 45Q PTD is increased to $85/MT for sequestration, there are a large number of feasible scenarios which demonstrate economic returns.

01 COAL, LIGNITE, AND PEAT↗

July 2022 Semiannual Saltstone Toxicity Characteristic Leaching Procedure (TCLP) Results

The aqueous waste from Tank 50 (salt solution) is sampled semiannually for transfers to the Saltstone Production Facility (SPF). Salt solution is treated at SPF and disposed of in the Salstone Disposal Facility (SDF). Per request of customer, X-TTR-Z-00025, Revision 0, two SDF waste form (salstone) samples were prepared in the Savannah River National Laboratory (SRNL) from the Tank 50 Waste Acceptance Criteria (WAC) sample and Z-Area premix material for the July 2022 Semiannual Toxicity Characteristic Leaching Procedure (TCLP) samples. One sample contained a Full Premix which included 10:45:45 (by weight) of cement, slag and fly ash. The second sample contained 60:40 (by weight) of slag and fly ash only referred to as the "Cement-Free grout sample." Results from this technical report support Task 2: 'Grout Leaching Analyses' of the Task Technical Request (TTR) prepared by Savannah River Mission Completion (SRMC). After at least 28 days cured, a sample of each of the SDF waste forms was collected and shipped to a certified laboratory for analysis using Toxicity Characteristic Leaching Procedure (TCLP). The July 2022 semiannual salstone (Full Premix) and the Cement-Free grout samples met the South Carolina (SC) Code of Regulations for Hazardous Waste Management Regulations (HWMR) 61-79.261.24 and 61-79-268.48 requirements for the non-hazardous waste form with respect to Resource Conservation and Recovery Act (RCRA) metals and Underlying Hazardous Constituents (UHCs), and also met the SPF WAC that was in effect at the time of the tank sampling.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

January 2023 Semiannual Saltstone Toxicity Characteristic Leaching Procedure (TCLP) Results

The aqueous waste from Tank 50 (salt solution) is sampled semiannually for transfers to the Saltstone Production Facility (SPF). Salt solution is treated at SPF and disposed of in the Saltstone Disposal Facility (SDF). Per request of customer, X-TTR-Z-00027, Revision 0, two SDF waste form (saltstone) samples were prepared in the Savannah River National Laboratory (SRNL) from the Tank 50 Waste Acceptance Criteria (WAC) sample and Z-area premix material for January 2023 semiannual Toxicity Characteristic Leaching Procedure (TCLP) samples. One sample contained a Full Premix which included 10:45:45 (by weight) of cement, slag, and fly ash. The second sample contained 60:40 (by weight) of slag and fly ash only referred to as the “Cement-Free grout sample.” Results from the technical report support Task 2: ‘Grout Leaching Analyses’ of the Task Technical Request (TTR) prepared by Savannah River Mission Completion (SRMC). After at least 28 days cured, a sample of each of the SDF waste forms was collected and shipped to a certified laboratory for analysis using the Toxicity Characteristic Leaching Procedure (TCLP). The January 2023 semiannual saltstone (Full Premix) and the Cement-Free grout samples met the South Carolina (SC) Code of Regulations for Hazardous Waste Management Regulations (HWMR) 61-79.261.24 and 61-79.268.48 requirements for a non-hazardous waste form with respect to the Resource Conservation and Recovery Act (RCRA) metals and Underlying Hazardous Constituents (UHCs), and also met the SPF WAC that was in effect at the time of the tank sampling.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ASSESSMENT OF HIGH-VOLUME HARVESTED FLY ASH BLENDS FOR USE IN PRECAST CONSTRUCTION

Declining supplies of fresh fly ashes in some regions have further driven the importance of using harvested fly ash as a supplementary cementitious material and thus replacement for more energy-intensive ordinary Portland cement (OPC). Higher replacement rates of OPC with fly ash in general has traditionally been limited in precast operations due to stringent early-age strength requirements necessitated by initial prestress and lifting/handling of hardened components – often well within 24 hours after fresh concrete placement. Therefore, a series of mix designs were developed, as part of a larger framework for reassessing high-volume fly ash (HVFA) use in the context of precast construction, to demonstrate the feasibility of using larger fractions of harvested fly ash in concrete formulations suitable for precast fabrication demands. More specifically, a target minimum 24-hour compressive strength of 24.1 MPa (3500 psi) was set, in accordance with conventional precast structural design checks, while increasing the fly ash content to 40% replacement of OPC – at least a 15% increase above the traditional limit of 25%. The effect of using more sustainable Type IL cement in contrast to conventional Type III Portland cement (the traditional standard for precast use) – both in conjunction with HVFA use – was also examined. Early-age mechanical properties including compressive strength, modulus of rupture, and modulus of elasticity were evaluated within the aforementioned early-age window. Lastly, corresponding design equations were then reassessed for their applicability with respect to the high-early strength HVFA mixes examined herein.

Gombeda, Matthew J.↗