Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “waste management system”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,009 records · Page 56

Pantex Plant Ogallala Aquifer and Perched Groundwater Contingency Plan

The Pantex Plant Ogallala Aquifer and Perched Groundwater Contingency Plan has been developed in accordance with the requirements identified in the: • Interagency Agreement for the Pantex Superfund Site, Article 8.5 Work to be Performed, • Compliance Plan Provision of Hazardous Waste Permit No. 50284, and • Record of Decision for Groundwater, Soil, and Associated Media, Pantex Plant. A Long‐Term Monitoring System Design has been designed to monitor conditions in the perched groundwater including changes in the perched aquifer as a result of implementing the response actions. Monitoring is required for verifying the effectiveness of perched groundwater response actions (i.e., conditions in the perched aquifer are being affected as intended) and for confirming that the perched aquifer and Ogallala Aquifer characterization as defined in the Resource Conservation and Recovery Act Facility Investigation Report and the Corrective Measure Studies/Feasibility Study remains accurate. If monitoring results obtained through the monitoring network identify an unexpected condition or deviation, contingent actions will be considered and implemented as necessary to ensure continued protection of the Ogallala Aquifer and human health and the environment. Potential deviations to expected technology performance may be encountered for each of the four primary response actions that compose the selected remedy for perched groundwater; Playa 1 Pump and Treat System, Southeast Area Pump and Treat System, Southeast Area In‐Situ Bioremediation System (comprised of the Southeast In‐Situ Bioremediation System Original System, Southeast Area In‐Situ Bioremediation System Extension System, Offsite In‐Situ Bioremediation System, Perchlorate/Chromium ISB, Northeast ISB and County Road 8 ISB), and Zone 11 In‐Situ Bioremediation System. Monitoring will also be conducted to determine if there are deviations to the expected characterization, e.g., contaminants not expected as a result of the RCRA Facility Investigation characterization. Deviations to expected conditions in the Ogallala Aquifer could also be encountered if the response actions in the perched groundwater are not performing as expected, i.e., preventing contaminants from migrating to the Ogallala Aquifer. Currently, Pantex has begun investigation of detections of high explosives above groundwater protection standards in wells on the Texas Tech University property and a plume that is moving to the northeast from that area. Due to those detections, this Plan recognizes the fact that future detections in the Ogallala will be focused on first‐ time detections of analytes. After a remedy is determined, this Plan will require modification to address-deviations and contingent actions. This Plan was developed to identify the contingent actions necessary to mitigate impacts resulting from deviations to site conditions or response action performance. The Plan defines the environmental problem being addressed by the response actions, clarifies the expected conditions and objectives of the response actions, and identifies the potential deviations to the response actions (due to site conditions or technology performance) that could be encountered. The deviations were evaluated to determine the likelihood of occurrence, potential impact, and time to respond to avoid impact. The Plan also identifies the monitoring outlined in the Long‐Term Monitoring System Design Report (Consolidated Nuclear Security, 2024) and Sampling Analysis Plan (PanTeXas Deterrence, 2024) that will be used to detect the deviations. Lastly, the Plan specifies the contingent actions that could be implemented in response to the deviations. Because each response focuses on a discrete portion of the perched aquifer and contaminant plume, each response action has a different set of expected conditions, and therefore differing impacts from deviations to the site and technology expectations. As a result, the contingent actions are identified for each response action and potential deviation including specific constituents, location, and conditions. If deviations are encountered that impact the ability of the response action to meet performance objectives, the contingent actions will be focused on ensuring the response action can meet the performance objective. Contingent actions may be implemented as interim actions (ISMs/removal actions) in accordance with the Record of Decision, Interagency Agreement, and Hazardous Waste Permit‐50284, if warranted by the specific circumstances. For deviations to site characterization expected conditions, the contingent action will focus on determination of the source of the deviation, determination of the appropriate response, and evaluation of additional work to be completed. However, if the deviation to characterization impacts the performance of the response action, the contingent action will again focus on ensuring performance objectives can be met. Early source term removals and cleanup actions have been implemented to protect the Ogallala Aquifer. Because of these actions and based on modeling results, the expected conditions in the Ogallala Aquifer are that constituents of concern will not be detected above the Groundwater Protection Standards (GWPSs) nor will they reach potential points of exposure above the GWPS. The primary deviation of concern for the Ogallala is if constituents are detected in the Ogallala Aquifer near or above GWPSs. If it occurs, this change in expected conditions would require further evaluation of site and contaminant characteristics to determine an appropriate course of action. The evaluation would include additional monitoring, source identification, implementation of interim protective measures (if necessary), and delineation of extent. These evaluations are necessary to determine an appropriate response action for the Ogallala. The primary goal of the Plan is to provide for the continued protection of the Ogallala Aquifer and the health of its consumers. In recognition, this Plan presents a flexible and rational approach for making future decisions associated with confirming the change in perched and Ogallala aquifer conditions and identifying a response (technical activities, changes to response actions, regulatory oversight, and public involvement).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ORNL Input to GDSA Repository Systems Analysis FY21

This document satisfies the M3 milestone M3SF-21OR010304082 titled “ORNL Input to GDSA Repository Systems.” This document describes the current status of Oak Ridge National Laboratory’s (ORNL’s) efforts related to analyses of dual-purpose canister (DPC) disposal in unsaturated alluvium with a focus on thermal hydrological constraints on criticality timing and power output. This analysis updates previous analyses of thermal hydrological constraints on timing and power output of a potential criticality event in Dual-Purpose Canisters (DPCs) in a hypothetical repository in unsaturated alluvium using a more realistic representation of heat transport inside dry DPCs. PFLOTRAN was used for the simulations of multiphase thermal hydrology near a single DPC. The scenario considers a DPC failure at 9000 years, allowing water to enter and eventually fill the DPC. Once the DPC is filled to a level that could support a criticality event, different values for criticality power output were added to the decay heat. The main objective is to bound the power output that could be produced by a criticality event without driving water out of the package. For the conditions analyzed here, following a package breach, the alluvial formation could supply enough water to allow enough accumulation in the DPC to support a criticality event. However, the power output that would be generated is limited to modest values by loss of water moderator due to evaporation and vapor diffusion. In the reference case scenario, the DPC would not start to fill with water until about 16,000 years post closure and would not fill to a level that allows a criticality event until approximately 25,000 years post closure. The long-term average power output that could be sustained without driving off the water and terminating the criticality event is limited to approximately 100 W. Sensitivity to assumed conditions and parameters in the reference case, especially the deep percolation rate, need to be addressed but could not be undertaken because of numerical failures of the PFLOTRAN code running in general mode in the dry conditions of an unsaturated alluvium repository

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

FY24 Status of Engineered Barrier Systems Research

This report describes research and development (R&D) activities conducted during Fiscal Year 2024 (FY24) specifically related to the Engineered Barrier System (EBS) R&D Work Package in the Spent Fuel and High-Level Waste Disposition Campaign supported by the United States (U.S.) Department of Energy (DOE). The R&D activities focus on understanding EBS component evolution and interactions within the EBS, as well as interactions between the host media and the EBS. The R&D team represented in this report consists of individuals from Sandia National Laboratories, Lawrence Berkeley National Laboratory (LBNL), Los Alamos National Laboratory (LANL), and Vanderbilt University. EBS R&D work also leverages international collaborations to ensure that the DOE program is active and abreast of the latest advances in nuclear waste disposal.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Measurement Acceptance Region (MAR) Assessment Results Based On Sludge Batch 10 Projections from December 2021, February 2022 and August 2022

The Defense Waste Processing Facility (DWPF) is currently preparing to initiate processing of Sludge Batch 10 (SB10), which is comprised of material from Tanks 11H, 13H, 15H, and 26F, Alternate Feed Stock-2 and Sodium Reactor Experiment material from H-Canyon. Frit 473 (8B 2 O 3 -8Li 2 O-5Na 2 O-79SiO 2 , in weight percent) was recommended for sludge-only (SO) and coupled processing with the Salt Waste Processing Facility (SWPF) based on previous assessments of SB10 projections with the DWPF Product Composition Control System (PCCS) glass property models and their associated Measurement Acceptance Region (MAR) constraints. Due to the lower processing rate of Sludge Batch 9 (SB9), the heel in Tank 40 is anticipated to be greater than 40 inches at the projected start of SB10 processing to meet the upcoming Accelerated Basin Deinventory addition dates in Tank 51 for Sludge Batch 11. In December 2021 and February 2022, Savannah River Remediation System Planning provided updated SB10 Tank 40 blend projections based on heels of 74 inches, 84 inches, 94 inches and 103.4 inches. Savannah River Mission Completion (SRMC) subsequently pursued Wash Cycle Y to further reduce the total sulfur in the sludge batch and increase processing flexibility at DWPF. In August 2022, SRMC System Planning provided an updated SB10 Tank 40 blend projection with a 76 inch-heel representing Decant Y2 and 60 kilogallons of bearing water inleakage that is anticipated during the Tank 51 to Tank 40 transfer. The objectives of this task were to: • Determine the impact on the operating windows for SO and coupled processing • Determine whether any composition gaps exist between the already completed SB10 variability study and the reprojected SB10 glass composition region • Compare the SB10 reprojected glass composition region to the DWPF PCCS model development and validation ranges to ensure that compositional gaps do not exist between the data sets. This report documents the results of these evaluations. Calculation-based frit assessments were performed using the DWPF PCCS glass property models and their associated MAR constraints. Evaluated parameters for coupled processing included the following transfer volumes per Sludge Receipt and Adjustment Tank batch: 5700 gallons of Tank 40 sludge, 2400-4500 gallons of the SWPF monosodium titanate (MST) and sludge solids stream, and 15,000 gallons of strip effluent. Based on these MAR assessment results, Frit 473 remains viable for SB10 processing. A target waste loading (WL) of 36% is possible for SO operation and single strike (0.4 g/L MST) coupled processing up to 600 mg/L of SB9 insoluble sludge solids at a nominal transfer volume of ~2800 gallons. Increasing the single strike transfer volume to 4500 gallons may reduce the maximum WL below 40%. Operating windows are 12 percentage points for SO processing and 14-16 percentage points for coupled processing. Frit 625 allows for a target WL of 36% and is acceptable for use during the SB9 to SB10 transition to deplete remaining inventory as needed. Operating windows are 8 percentage points for SO processing and 12-14 percentage points for coupled processing. Predictive PCCS evaluations performed at DWPF will provide insight into batch-specific acceptability at desired WLs for compositions having expected oxide ratios during processing versus the extreme vertices (corner points) evaluated in this study. The reprojected SB10 glass composition region generally overlaps the previously evaluated SB10 variability study composition region. Thus, the minor composition shift of these updated SB10 projections indicates that no additional glasses are necessary to demonstrate acceptability relative to the chemical durability of the Environmental Assessment benchmark glass and predictability using the current PCCS models for durability. Based on a comparison of the PCCS model development and validation data to the reprojected SB10 glass composition region, the viscosity and liquidus temperature models will reliably predict SB10 compositions. No additional glasses are necessary to demonstrate predictability of these models.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Cesium Ion Exchange Testing Using Crystalline Silicotitanate with Hanford Tank Waste 241-AP-107

At the time of this testing, the Low-Activity Waste Pretreatment System (LAWPS) was to provide for the initial production of immobilized low-activity waste by feeding Hanford tank supernate from tank farms to the Hanford Tank Waste Treatment and Immobilization Plant (WTP) Low-Activity Waste (LAW) Facility for immobilization. Washington River Protection Solutions requested that Hanford tank waste collected from tank 241-AP-107 (hereafter called AP-107) be processed using conceived pretreatment steps (suspended solids removal by filtration, Cs removal by ion exchange) then vitrified. A small-scale test platform to demonstrate the solids filtration, Cs removal, and LAW vitrification was constructed and installed at Pacific Northwest National Laboratory. Bench-scale ion exchange testing with approximately 9 L of AP-107 supernate was conducted using crystalline silicotitanate (CST) ion exchange media. The IONSIV R9140-B CST was provided by Honeywell UOP, LLC in 2018 (Batch 2081000057). The ion exchange media was first tested with simulant and was previously described. This report describes the Cs ion exchange batch contact and column test results with the AP-107 tank waste. Batch contact testing helps to evaluate CST performance on tank waste supernate prior to processing it in the ion exchange columns. Batch contacts were performed with the waste at four Cs concentrations at a phase ratio of 200 (liquid volume to exchanger mass) with AP-107. The distribution coefficient (K d ) at the equilibrium condition of 8.57 µg Cs/mL (AP-107 feed condition) was determined to be 669 mL AP-107/g CST. With a CST bed density of 1.00 g/mL, this K d corresponded to a predicted 50% Cs breakthrough of 669 bed volumes (BVs). The Cs load capacity at the equilibrium feed condition was determined to be 7.5 mg Cs/g dry CST. The column testing was prototypic to the intended LAWPS operations in a lead-lag column format, although on a small-scale basis with 10-mL CST beds. The feed was processed downflow through the lead column and then through the lag column at ~2.2 BV/h. Loading continued until the lag column reached the WTP waste acceptance criteria (WAC) for receiving supernatant waste for vitrification (a function of the Na and 137 Cs concentrations). For AP-107, the WAC is 0.114% of the influent 137 Cs concentration; this required a Cs decontamination factor of 876. The Cs effluent from the lag column reached the WAC after processing ~410 BVs. To keep the subsequent product effluent below the WAC, a replacement lag column was prepared, the lead column was removed from service (after processing a total of 471 BVs), the lag column was put into the lead column position, and the replacement lag column was installed. Feed processing continued and after another ~290 BVs the Cs effluent from the lag column again exceeded the WAC. In both cases, the lead columns only reached 25% Cs breakthrough before removal. Although 50% Cs breakthrough was not reached, this value was estimated and averaged based on extrapolation of the loading curves (640 BVs) and agreed within 4% of the predicted 50% Cs breakthrough from batch contact test results (669 BVs). Table ES.1 summarizes the observed column performance and relevant Cs loading characteristics.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Modeling Streamflow and Sediment Transport Under Current and Future Climates at the West Valley Site - 20231

Performance Assessment models often require inputs representing specific hydrologic processes such as streamflow and sediment flux. This paper details the development of a process-level hydrologic model and its use in a Probabilistic Performance Assessment (PPA) system-level model for the West Valley Site in western New York. For this PPA model, a watershed model was developed using SWAT (Soil and Water Assessment Tool) and used to evaluate water and sediment fluxes in nearby streams draining the Site. A particular challenge of probabilistic modeling over long periods of time is scaling parameters appropriately so that outcomes are not grossly over- or underestimated. This challenge is especially important when the spatial and temporal scales of process and system level models differ. In this instance, the SWAT watershed model and GoldSim PPA model have similar spatial scales of stream reaches and sub-catchments within a single watershed (approximately hundreds to tens of thousands of square meters, but the temporal scales differ considerably. The SWAT model calculates streamflow and sediment transport rates at the daily scale, while the PPA model requires long-term average values that are applied over hundreds to thousands of year-long periods. As such, distributions of daily climatic parameters such as average precipitation rate, temperature, wind speed, and relative humidity were developed to force a transient SWAT model that captures the dynamic behavior of the watershed in response to daily changes in the weather. Output from the model, which includes stream flow (m{sup 3}/y) and sediment transport rate (Mg/y) is then averaged over a 100-year period as an approximation for the long-term average values which can be applied in GoldSim. A single SWAT model was run 5000 times with varying climatic inputs and deterministic soil, land use, and elevation data, and the range of outputs were compiled into a distribution which can be implemented stochastically into the PPA Model. Additionally, this paper includes a high-level discussion of how changes in future climate affect weather input distributions, and a summary of how those changes in weather affect the outcomes from the SWAT model and the inputs into the PPA model. In this analysis, future climate distributions were developed based on climate research documenting the expected changes to precipitation and temperature in western New York. The 5,000 SWAT simulations were then repeated with these future climate distributions, and the resulting output was implemented into the PPA Model as hydrologic conditions under a future climate. In the current version of the PPA Model, hydrologic parameters change linearly from the 'current climate' conditions to the 'future climate' conditions over a period of 100 years, after which they remain constant. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Ion Exchange Processing of AW-105 Hanford Tank Waste through Crystalline Silicotitanate in a Staged 2- then 3-Column System

The Hanford Site stores an estimated 56 million gallons of mixed radioactive and chemically hazardous waste in large underground tanks. In support of the Direct Feed Low-Activity Waste (DFLAW) Program for expediting Hanford tank waste supernate treatment, laboratory-scale ion exchange processing using prototypic unit operations was conducted on AW-105 tank waste at the Pacific Northwest National Laboratory Radiochemical Processing Laboratory. This report describes the small-scale ion exchange testing with 9.2 L of diluted and filtered supernate from Tank 241-AW-105 (hereafter referred to as AW-105) at 16 °C (62 °F). One of the waste acceptance criteria (WAC) for the Waste Treatment Plant (WTP) Low-Activity Waste Facility is that the waste must contain less than 3.18×10 -5 Ci 137 Cs per mole of Na. For the AW-105 tank waste to meet this criterion, only 0.225% of the influent 137 Cs concentration may be delivered to the WTP; this requires a Cs decontamination factor of 445. Testing with AW-105 matched current Tank Side Cesium Removal (TSCR) facility prototypic operations where a lead-lag configuration was used until the lag column reached the WAC limit, then a polish column was brought online for continued processing in a lead-lag-polish column configuration. Feed was processed at 1.9 bed volumes (BVs) per hour; the flowrate, in terms of contact time with the crystalline silicotitanate (CST) bed, matched the expected flowrate at TSCR. The Cs-decontaminated product was retained for vitrification testing (to be reported separately). The lead column reached 83% Cs breakthrough after processing ~1500 BVs of feed; the 50% Cs breakthrough was interpolated from the breakthrough data and occurred at 1041 BVs. Despite the AW-105 having a significantly higher K concentration (0.55 M compared to 0.10 M), testing compared to previous AP-107 ion exchange column testing at 16 °C showed no difference in BVs processed to reach the WAC on the lead column and only an approximate ~20 BV decrease in volume processed to reach the WAC limit on the lag column. The negligible differences in capacity despite the 5x concentration differences in K was determined to be due to the significantly lower NO3 concentration in the AW-105 supernate compared to the AP-107 tank waste matrix. A comparison in breakthrough curves for the two tests also indicated slightly faster kinetic behavior in the AW-105, with the variations in feed matrices (lower NO3 concentration) likely responsible for the deviation. The Cs effluent from the lag column reached the WAC limit after processing 772 BVs. Anticipating this breakthrough point, the polish column was preemptively installed around 675 BVs. Cs breakthrough from the lag column began at 300 BVs, reaching 1.10×10 1 µCi/mL, or 14.13 % Cs breakthrough, after processing all 1500 BVs of feed. The polish column processed nominally 830 BVs and reached 2.10×10 -1 µCi/mL, or 0.27 % Cs breakthrough at the conclusion of the test. Table S.1 and Figure S.1 summarize the observed column performance and relevant Cs loading characteristics.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Skyshine Calculations for a Large Spent Nuclear Fuel Storage Facility with SCALE 6.2.3

The SCALE code system developed at Oak Ridge National Laboratory includes state-of-the-art capabilities for radiation source term and radiation transport simulations that can be used in numerous applications, including dose rate analyses of complex consolidated interim storage facilities (CISFs). A licensed CISF could be used to store tens of thousands of tonnes of spent nuclear fuel discharged from commercial power reactors using various cask and storage pad designs. A CISF design must comply with the regulatory requirements provided in 10 CFR Part 72, including requirements related to annual dose limits applicable to real individuals located beyond the area controlled by the licensee. Therefore, calculating a dose to the public is a necessary part of the licensing process for the construction of a CISF. These calculations are very challenging because of the complexity of the CISF design and the low magnitude of dose rate at large distances from the facility. This paper describes detailed far-field dose rate calculations performed for a proposed CISF using MAVRIC, the Monte Carlo radiation shielding sequence in SCALE 6.2.3, with automated variance reduction based on discrete ordinates calculations. The method presented in this paper uses a detailed Monte Carlo radiation transport simulation in one step from source to dose rate. A series of independent simulations was made using the complete site geometry (all casks present), but with only one cask containing radiation sources to obtain the dose rate maps produced by each storage cask. The CISF dose rate map was obtained by adding the dose rate maps produced by the independent individual cask simulations. Ample volumes of air and soil extending beyond the location of interest for dose rate calculation were included in the calculation model to properly simulate important radiation attenuation and scattering events that affect far-field dose rates. Furthermore, a comprehensive sensitivity study is included in this paper to illustrate the importance of selecting appropriate air volume, mass density, and composition for CISF skyshine dose rate calculations. Dry soil and soil containing water were analyzed to determine their effects on groundshine radiation.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Conceptual Model Update of Mercury Sources and Flux at Y-12 and Upper East Fork Poplar Creek, Oak Ridge,Tennessee

The interactions between the key processes that control the fate and transport of mercury (Hg) in the sediments, groundwater, and stream water within the Y-12 National Security Complex (Y-12) in Oak Ridge, Tennessee are complex, and many aspects are not well understood. In contaminated environments such as Y-12, conceptual models are frequently developed to aid in visualizing and understanding the dynamic nature of the hydrologic, geochemical, and physical environment. These conceptual models integrate data in an internally consistent manner to understand processes that control the fate and transport of contaminants. Over the past few decades of environmental investigation at Y-12, a number of conceptual models have been developed to identify and define various technical processes at various scales. The main purpose of the activities described in this report is to update the 2011 conceptual model for Upper East Fork Poplar Creek using the most recent Hg concentration and flux data and informed scientific interpretation. Emphasis was placed on improving the previous model by implementing a more detailed spatial and temporal approach to visualize transport pathways in the watershed and trends in flux and concentration over time, and to compare baseflow and stormflow system dynamics. Detailed descriptions of historical and current Hg sources and transport pathways are also provided for the east and west ends of the facility. This conceptual model will allow the US Department of Energy to evaluate past and present remedial activities and provide a strong technical basis for prioritizing and optimizing remedial responses in a cost-effective and efficient manner. Twenty years ago, Hg flux from Outfall (OF) 200 at the headwaters of East Fork Poplar Creek represented approximately 20% of the overall flux leaving Y-12. By the time of the 2011 conceptual model report, that percentage had increased to 70%–80%. Flux estimates compiled for this report using data from 2009 to 2018 show that OF200 accounted for roughly 60% of the flux leaving Y-12. The relative role of the four storm drain conduits to OF200 appeared similar to 2011, with OF163 being the greatest contributor to downstream flux. An increase in Hg concentrations and flux occurred throughout and downstream of west end storm drains in 2011 in response to a storm drain cleanout. Leading up to the 2011 storm drain cleanout, annual baseflow flux was higher at OF200A6 than at Station 17. From 2011 to 2018, the trend reversed with concentrations and flux being higher at Station 17 than at OF200A6. A spike in concentrations occurred in July 2018, potentially due to a one-time influx of Hg that occurred during COLEX decontamination and decommissioning activities at Y-12. This report includes recommendations for improving our conceptual understanding of Hg sources, transport pathways, and flux at Y-12. Important recommendations include further evaluation of transport pathways, concurrent measurement of Hg concentration and flux under baseflow and stormflow conditions at multiple sites, and research to understand the connections among periphyton and methylmercury concentration, bioavailability, and bioaccumulation. Ongoing facility decontamination and decommissioning efforts, site characterization, remedial actions, and research are facilitating the collection of new Hg data at Y-12. The conceptual model update provided herein takes advantage of the extensive recent Hg sampling to provide an updated assessment of Hg mass balance and support a refined understanding of Hg behavior at or near Y-12. This assessment should assist in future environmental management decisions and in mitigating the impacts of Hg on the surrounding environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Effect of Anoxic Iron Corrosion on WIPP Brine Geochemistry FY23 Final Report (U)

A 280-day study was completed to evaluate the effect of zero-valent iron (Fe 0 ) on the Waste Isolation Pilot Plant (WIPP) brine geochemistry under anticipated reducing conditions. Hydrogen (H 2 ) gas is expected to be present in the repository after closure due to the anoxic corrosion of a vast quantity of iron contained in the waste forms disposed at WIPP; therefore, a background argon atmosphere containing H 2 was chosen for this study. WIPP groundwater brine pH and E h will impact the mobility and fate of plutonium within the repository. Modeling and laboratory results for Castile WIPP brine indicate that equilibrium fa values relative to the standard hydrogen electrode (SHE) are 40 mV more reducing (i.e., more negative) than those for Salado WIPP brine (-480 mV vs. -440 mV, respectively) because of the higher pH of the Castile brine (pH 9 .3 for Castile vs. pH 8.8 for Salado). The E h and pH data were corrected for the effects of high ionic strength. The experimental results for both brines are consistent with thermodynamic predictions using OLI Systems' Mixed Solvent Electrolyte chemical equilibrium model. The measured and corrected pH and E h data from this study are provided in Table ES-I and Table ES-2, respectively. The experimental study, with four test conditions in triplicate, was performed in a dual glovebox with a nominally 3 vol.% H 2 in argon atmosphere (target H 2 range: 3 ± I vol.%). Simulants containing MgO only ( experimental control) and MgO+Fe 0 (WIPP base case) were prepared for both the Salado and Castile brines. MgO was included in all simulants to account for the use of bulk magnesium oxide in the WIPP repository. Fe 0 was included in some simulants to incorporate the effects of the anoxic corrosion of iron and in-situ hydrogen generation in the study. The brine compositions were developed by Sandia National Laboratory (SNL; Xiong, 2008) and have been used in previous WIPP evaluations. The test method (agitation, etc.) is partially based on ASTM D3987-12. Twelve rounds of periodic measurements of pH and E h were performed over the course of the study. Chemical analysis results for liquids and solids (ICP-MS, ICP-ES, IC Anion, TIC, SEM-EDX) are consistent with the pH, E h , and thermodynamic modeling results. This study included the following conditions that deviate from anticipated post-closure conditions following brine intrusion, but were selected to facilitate bench-scale testing to validate modeling of pH and E h for the post-closure WIP P repository: an anoxic glove box atmosphere containing ≤ 4 vol. % H 2 vs. substantially higher H 2 gas concentrations assumed in the WIPP Performance Assessment (PA); a significantly higher liquid-to-solid test ratio compared to the much lower phase ratio anticipated in the WIP P repository; agitation of the simulant bottles to maximize mass transfer; and finally the use of Fe 0 reagents having a much greater surface area than expected in the WIP P repository. Non-representative conditions were chosen for various reasons such as: to provide bounding conservative results, to provide a margin of safety for testing, or to facilitate simulant sub-sampling and analysis. In a parallel effort, aqueous electrolyte thermodynamic models were developed for the synthetic Salado and Castile brines to inform the experimental design, facilitate laboratory data interpretation, and allow extension of evaluations beyond the parameters tested. Thermodynamic modeling simulations including the MgO and Fe 0 additives that are directly relevant to the experimental measurements (e.g., pH calibration curve, ORP corrections) are included in this report. The measured fa of the simulants was close to the OLI model predictions for both brines and was largely controlled by the background H 2 partial pressure in the vapor phase as well as H 2 generated in situ in the aqueous phase by the Fe 0 corrosion. The H 2 gas-phase concentration tested and thermodynamically evaluated was much lower than is assumed in the WIPP PA; however, H 2 (g) concentrations significantly below this level are still predicted to result in very reducing conditions. In conclusion: • The experimental results are consistent with thermodynamic model predictions for fa, pH, and the effects of high ionic strength. • Evidence to date suggests that the H2 concentration in the glovebox atmosphere ultimately determined the final E h values of the simulants and resulted in highly reducing conditions. As a result, little difference was observed between the control simulants containing only MgO and the WIPP base-case simulants that contained MgO and Fe 0 . • This test methodology is recommended for future studies evaluating WIPP repository conditions. The methodology includes: (1) background H 2 in argon with agitation ( or could alternatively include in-situ-generated H 2 in sealed bottles); (2) carefully measured and corrected ORP data ( with much effort focused on allowing the probes to fully stabilize); and (3) ionic-strength-corrected pH data. Other best practices, such as simulant sparging/handling, ORP probe replacement, etc., should also be considered. • The coupling of experimental studies and thermodynamic modeling is also highly recommended because these methods inform and direct one another leading to greater confidence in and understanding of the results.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Testing of Microchannels and Lab-Grown Stress Corrosion Cracks for Quantification of Aerosol Transmission

The formation of a stress corrosion crack (SCC) in the canister wall of a dry cask storage system (DCSS) has been identified as a potential issue for the long-term storage of spent nuclear fuel. The presence of an SCC in a storage system could represent a through-wall flow path from the canister interior to the environment. Modern, vertical DCSSs are of particular interest due to the commercial practice of using higher backfill pressures in the canister, up to approximately 800 kPa, compared to their horizontal counterparts. This pressure differential offers a relatively high driving potential for blowdown of any particulates that might be present in the canister. In this study, the rates of gas flow and aerosol transmission of a spent fuel surrogate through an engineered microchannel with dimensions representative of an SCC were evaluated experimentally using coupled mass flow and aerosol analyzers. The microchannel was formed by mating two gage blocks with a linearly tapering slot orifice nominally 13 μm (0.005 in.) tall on the upstream side and 25 μm (0.0010 in.) tall on the downstream side. The orifice is 12.7 mm (0.500 in.) wide by 8.86 mm (0.349 in.) long (flow length). Surrogate aerosols of cerium oxide, CeO 2 , were seeded and mixed with either helium or air inside a pressurized tank. The aerosol characteristics were measured immediately upstream and downstream of the simulated SCC at elevated and ambient pressures, respectively. These data sets are intended to add to previous testing that characterized SCCs under well-controlled boundary conditions through the inclusion of testing improvements that establish initial conditions in a more consistent way. While the engineered microchannel has dimensions similar to actual SCCs, it does not reproduce the tortuous path the aerosol laden flow would have to traverse for eventual transmission. SCCs can be rapidly grown in a laboratory setting given the right conditions, and initial characterization and clean-flow testing has begun on lab grown crack samples provided to Sandia National Laboratories (SNL). Many such samples are required to produce statistically relevant transmission results, and SNL is developing a procedure to produce samples in welded steel plates. These ongoing testing efforts are focused on understanding the evolution in both size and quantity of a hypothetical release of aerosolized spent fuel particles from failed fuel to the canister interior and ultimately through an SCC.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Calibration and Uncertainty Estimation Using the Ensemble Kalman Filter with a Large Subsurface Flow and Transport Model - 20321

At routinely monitored groundwater contamination sites, periodically measured environmental conditions such as groundwater levels and contaminant concentrations are used to inform and confirm a conceptual site model (CSM) and guide the development and calibration of a numerical groundwater flow and transport model. The calibration of groundwater flow and transport models after each measurement (sampling) event can illuminate deficiencies in a CSM, identify areas where additional monitoring is warranted, and predict the behavior of the system to guide decision making. However, manual and automated (e.g. PEST) model calibration tools can be time-consuming and computationally expensive to implement after each sampling event. Perhaps as a result, such calibration tools generally utilize all available monitoring data simultaneously rather than sequentially assimilating monitoring data one sampling event at a time as the results from sampling become available. A more real-time data assimilation approach may reduce parameter uncertainty, quantify the value of additional monitoring data, and produce a usable model more quickly and with less effort. To mitigate the potential time-consuming aspects of manual and widely applied automated calibration techniques, a data assimilation algorithm called the ensemble Kalman filter (EnKF) was evaluated as a relatively efficient method of model calibration and uncertainty assessment via the sequential integration of monitoring data into a model. The EnKF was able to successfully and efficiently assimilate monitoring and modeling data to calibrate a complex flow and transport model at a real-world site with significant subsurface heterogeneity, uncertainty, and 12 years of monitoring data (over 4,000 individual measurements of groundwater levels and over 2,500 measurements of contaminant concentrations). Starting with an uncalibrated model data from annual sampling events were sequentially assimilated, and the resultant predication errors and estimated parameter uncertainties were tracked. After all monitoring data were assimilated, both flow and transport residuals at the end of the EnKF process were comparable to those produced via a concurrent PEST calibration effort but required fewer model simulations. Both uncertainty and prediction errors decreased over time. In a real-time application, the adequacy of the model could be assessed after each sampling event. The benefits of such a real-time approach to utilizing monitoring data include reduced costs (in the form of model updates or site characterization efforts), early flagging of possible errors in the CSM, and a reduced risk of overfitting and corresponding increased confidence in model predictions. This tool may be particularly useful compared to other calibration techniques (e.g. manual, PEST) when model runtimes are long, calibration parameters are many, or parameter uncertainty is large. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Assessing subtle variations in the actinyl oxo reactivity through characterization of neptunyl complexes. Final Report

Formation of the actinyl cation, [An(V,VI)O 2 ] n+ (n = 1,2), imparts unique chemical properties to the lighter actinide elements (U, Np, and Pu) that has yet to be fully understood. The axial O atoms (oxo) of the [An(VI)O 2 ] 2+ are considered weak Lewis bases that exhibit only meager interact with other metal cations and regarded as poor hydrogen acceptors for nearby water molecules. Oxo atoms of [An(V)O 2 ] + should engage in stronger bonding interactions due to a higher degree of Lewis basicity, but the actual interactions have yet to be fully explored. Intermolecular interactions can impact radionuclide separations, corrosion of spent fuel, and mobility of actinides in environmental systems; there is, therefore, a critical need to understand how the subtle difference in electronic properties of the An(V) and An(VI) metal center influence actinyl chemistry. The objective of this proposal was to determine the chemical components that influence the intermolecular interactions occurring between neptunyl ([Np(V)O 2 ] + and [Np(VI)O 2 ] 2+ ) cations and neighboring species. My overall hypothesis was that the intermolecular attraction that occurs between the neptunyl oxo atoms and neighboring species (H atoms, low-valent cations, actinyl cations) is primarily controlled by the electronic properties of the actinyl cation, but can be further influenced by the electron donating properties of the equatorial ligands. The hypothesis was tested through the following research objectives: (1) Determine the fundamental differences in H-bonding between Np(V)O 2+ and Np(VI)O 2 2+ and neighboring donor molecules; (2) Identify the major differences in bonding between low-valence metal cations and neptunyl oxo groups, and (3) Assess the impact of the equatorial ligand on the formation of cation-cation interactions within molecular species. Major outcomes of the research include: (1) More precisely identifying oxo interactions (actinyl-cation; actinyl-actinyl, actinyl-hydrogen) and the factors that impact the vibrational modes for actinyl cation; (2) Identification of H-bonding modes for the [An(V,VI)O 2 ] n+ (n = 1,2), with direct H-bonding interactions to the oxo group of the Np(V)O 2+ cation more prevalent than in hexavalent species and recognition of the importance of H-bonding networks, that can impart bond asymmetry and activation of vibrational modes with the actinyl moiety; (3) Delineation of the importance of charge density for engaging the cation-oxo interaction for both pentavalent and hexavalent species; (4) Determining the importance of sterics and ligand binding in formation of specific actinyl-actinyl interactions and the resulting vibrational modes associated with this bonding motify and (5) Understanding how the functionalization of the ligand can impact redox stability of neptunyl cations. Deliverables from this work include 11 peer-reviewed manuscripts and 13 (including six by graduate students) oral/poster presentations.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Five Year Comparison of Mixing Height Determinations at the Savannah River Site

Air quality dispersion modeling is performed for the Savannah River Site (SRS) to demonstrate compliance with applicable regulations. The AMS/EPA Regulatory Model (AERMOD) modeling system is an EPA recommended model for air quality applications with a data preprocessor (AERMET) to incorporate meteorological data collected on site. AERMET parameterizes or calculates meteorological variables that are not directly measured onsite. One of the parameters estimated by AERMET is the atmospheric mixing height. While the mixing height is not currently a measurement input into AERMET, SRS has the capability to measure the local mixing height. The Savannah River National Laboratory (SRNL) operates a Vaisala CL31 Lidar Ceilometer which estimates mixing height from aerosol backscatter. This study compares the parameterized mixing height from AERMET to the ceilometer estimated mixing height for the current regulatory period at SRS incorporating data from 2015-2019. Results from this study showed the average daily minimum values (morning) from AERMET were an order of magnitude lower than the commonly used Holzworth (1972) method and the ceilometer estimated mixing heights. Additionally, on average, the ceilometer exhibited a daily maximum mixing height value that occurred 1-3 hours later than the AERMET estimated maximum. This difference is likely due to the nighttime atmospheric mixing height assumptions and calculations used by AERMET. The AERMET algorithm cuts off mixing height growth at sunset while the ceilometer data show ongoing evening convection typical of the southeastern United States. These results suggest that the AERMET parametrization scheme assumptions may not be representative of a forested landscape and evening convection which could account for more mixing overnight. The results obtained in this study are significant for air dispersion modeling applications for regulatory purposes and worker safety. Mixing height can impact model estimated pollutant concentrations. A greater mixing height will provide more volume for pollutant dispersion. This report documents efforts to quantify the dependence of mixing height inputs toward a conservative estimated pollutant concentration.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation of Nuclear Spent Fuel Disposal in Clay-Bearing Rock - Process Model Development and Experimental Studies

The DOE R&D program under the Spent Fuel Waste Science Technology (SFWST) campaign has made key progress in modeling and experimental approaches towards the characterization of chemical and physical phenomena that could impact the long-term safety assessment of heat-generating nuclear waste disposition in deep clay/shale/argillaceous rock. International collaboration activities such as heater tests and postmortem analysis of samples recovered from these have elucidated key information regarding changes in the engineered barrier system (EBS) material exposed to years of thermal loads. Chemical and structural analyses of sampled bentonite material from such tests has as well as experiments conducted on these are key to the characterization of thermal effects affecting bentonite clay barrier performance and the extent of sacrificial zones in the EBS during the thermal period. Thermal, hydrologic, and chemical data collected from heater tests and laboratory experiments has been used in the development, validation, and calibration of THMC simulators to model near-field coupled processes. This information leads to the development of simulation approaches (e.g., continuum vs. discrete) to tackle issues related to flow and transport at various scales of the host-rock and EBS design concept. Consideration of direct disposal of large capacity dual-purpose canisters (DPCs) as part of the back-end SNF waste disposition strategy has generated interest in improving our understanding of the effects of elevated temperatures on the EBS design. This is particularly important for backfilled repository concepts where temperature plays a key role in the EBS behavior and long-term performance. This report describes multiple R&D efforts on disposal in argillaceous geologic media through development and application of coupled THMC process models, experimental studies on clay/metal/cement barrier and host-rock (argillite) material interactions, molecular dynamic (MD) simulations of water transport during (swelling) clay dehydration, first-principles studies of metaschoepite (UO 2 corrosion product) stability, and advances in thermodynamic plus surface complexation database development. Drift-scale URL experiments provides key data for testing hydrological-chemical (HC) model involving strong couplings of fluid mixing and barrier material chemical interactions. The THM modeling focuses on heater test experiments in argillite rock and gas migration in bentonite as part of international collaboration activities at underground research laboratories (URLs). In addition, field testing at an URL involves in situ analysis of fault slip behavior and fault permeability. Pore-scale modeling of gas bubble migration is also being investigated within the gas migration modeling effort. Interaction experiments on bentonite samples from heater test under ambient and elevated temperatures permit the evaluation of ion exchange, phase stability, and mineral transformation changes that could impact clay swelling. Advances in the development, testing, and implementation of a spent nuclear fuel (SNF) degradation model coupled with canister corrosion focus on the effects of hydrogen gas generation and its integration with Geologic Disposal Safety Assessment (GDSA). GDSA integration activities includes evaluation of groundwater chemistries in shale formations.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Perspective on the Successes of the NNSS Underground Test Area (UGTA) Activity - 20221

Between 1951 and 1992, 828 underground nuclear tests were performed at the Nevada National Security Site (NNSS). Underground testing was done in five major testing areas, which included (1) Frenchman Flat, (2) Rainier Mesa/Shoshone Mountain, (3) Yucca Flat/Climax Mine (4) Central Pahute Mesa, and (5) Western Pahute Mesa. About one third of the underground tests were detonated near, at or below the water table, and thus radioactive contamination was introduced to the groundwater system. The U.S. Department of Energy's Underground Test Area (UGTA) Activity was established in the late 1990's to address the fate and movement of residual radioactivity in groundwater, and characterize the risk that it may pose to NNSS workers and the offsite public. It has accomplished this goal through a process of iterative groundwater sampling and numerical groundwater flow and transport modeling, and long-term monitoring. The UGTA Activity draws on the expertise of scientists in the fields of geology, hydrology, radiochemistry, and risk assessment from the U.S. DOE staff, the lead contractor (currently Navarro) and many other organizations, in cooperation with the governing regulatory body, the State of Nevada's Division of Environmental Protection (NDEP). Los Alamos National Laboratory (LANL) is one of the participating research organizations involved with the UGTA Activity. Under the direction of DOE and the lead contractor, LANL's role in UGTA has evolved over time from an initial focus on geologic characterization, to conducting field and laboratory experiments, and finally to its current role of providing modeling and geochemistry expertise to characterize the rates and directions of groundwater and radionuclide movement. In its current role, LANL has either developed or provided the numerical tools for developing flow and transport models in each of the four major testing areas. In addition, LANL has provided an independent assessment of future groundwater flow and transport behavior through the analysis of naturally-occurring geochemical and isotopic tracers in groundwater. The five major testing areas are now in different stages of investigation or closure: (1) Frenchman Flat is in its fifth year of post closure modeling; (2) The Rainier Mesa/Shoshone Mountain Closure Report has been submitted to NDEP and is awaiting approval; (3) The Yucca Flat/Climax Mine Closure Report is under development; and (4) Central and (5) Western Pahute Mesa is still undergoing investigation and flow and transport model development. The success of the UGTA Activity in reaching or approaching closure in three of the five major testing areas is primarily due to the DoE's focus on regulatory closure requirements, but also is in part attributable to a rigorous internal review process and the involvement of NDEP and Nye County water professionals as participants and observers in the reviews. County and state involvement in the internal review process has promoted trust that the U.S. DOE is deeply committed to ensuring the present and future safely of NNSS workers and the surrounding communities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

FY21 Progress Report: SRNL Analysis of ICCWR LCM and WAMS data for Corrosion and Cracking

The development of algorithms for machine learning and data analysis for the 3013 Surveillance Program is a collaborative effort by the Savannah River National Laboratory (SRNL) and the University of South Carolina (USC). For corrosion detection, Laser Confocal Microscope (LCM) or Wide Area 3D Measurement System (WAMS) data is extracted from large binary files, with software written to convert the data to physical attributes (e.g., height, color and grayscale values; all as functions of a location in a plane projection). A user-friendly Matlab Graphical User Interface (GUI) that reads data from either LCM or WAMS files was developed to integrate input data with software developed for processing and evaluation. The GUI can selectively download binary data, interrogate data attributes, label data, flag significant features, execute Machine Learning (ML) algorithms, output parameters for trained ML algorithms, report ML model accuracy with respect to labeled data, and generate graphical representations for various analyses. Features can be called out by user-specified thresholds, manual labeling or machine learning algorithms when they have been completed. The ability to rapidly label data is important because of the volume of data required for training machine learning algorithms. The GUI has the flexibility to allow addition of improved ML algorithms, methods for data visualization, and statistical computations. Statistical analyses via the GUI include areas of pits within a defined range of pit depths, correlations between Red-Green-Blue (RGB) or grayscale intensity and relative surface height, covariances between values associated with features, and feature histograms. The development of supervised machine learning algorithms, however, has been hindered by a lack of training data. The machine learning algorithms for crack identification are being refined but require improvements to the true positive rate for crack detection. This shortcoming is an artifact of the limited training data currently available, perhaps more so than the structure of the neural networks. At present, the best results are had from a consensus over an ensemble of randomly generated Deep Neural Network (DNN) or Convolutional Neural Network (CNN) algorithms. Although the consensus accuracy method has yielded optimum true positive and true negative rates in excess of 80%, additional validation testing is necessary. In addition to the suite of LCM data that was initially used, and which represents the majority of the work presented in this report, WAMS image data was also reviewed at a preliminary level. The review included a comparison between image resolution and dynamic range for each method. WAMS (ZON file) image data was found to have a pixel pitch of 3.69μm compared to 1 μm for the LCM (vk4 file) data, which implies a lower resolution for the WAMS images. Conversely, the ratio of dynamic range of the WAMS data to the LCM data was approximately 41:20 for height data, suggesting that information from WAMS should more accurately determine the depth of pits. At present, the significance of the greater dynamic range of the WAMS data relative to the LCM data has not yet been evaluated.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sensor Development for Liquid Water Detection in Dry Storage Casks: FY 2023 Status

Modeling efforts were undertaken in fiscal year (FY) 2023 to evaluate the feasibility and capability for sensing of liquid water inside canister-based dry cask storage systems (DCSSs). The focus was on the development of full-scale finite element models (FEMs) of ultrasound propagation through DCSS canister components. For these initial investigations, simulation of the baseplate component was targeted, envisioning water collection at the bottom of a vertically oriented canister. The effects of internal canister components (i.e., fuel basket, fuel assemblies) on ultrasound propagation in the baseplate component were evaluated in these efforts. The environment inside a DCSS confinement is intended to be inert and free of water to prevent potential corrosion of used fuel cladding or other internal hardware. Spent fuel assemblies are dried, after storage in water pools, to make sure water has been removed from assembly cavities. However, there is some uncertainty about the amount of residual water potentially left behind in a DCSS after drying processes, because water can become trapped in cavities or other small crevices in the surfaces formed by the fuel cladding, fuel assemblies, and other internal hardware components. Considering the complex space- and time-dependent temperature profiles in DCSSs, water may be in a liquid or gas phase depending on its location in the cask and how long the cask has been in storage. Evacuating most water and oxidizing agents contained within a canister is recommended by NUREG-1536 (NRC 2010), which covers DCSSs. As summarized by Salazar et al. (2020), existing guidance typically relies on achievable vacuum pumping pressures sustained over a hold period as a signal of dryness and water removal. However, time series data about water removal from full-scale commercial drying procedures are lacking (Hanson and Alsaed 2019). A review of drying specifications from several vendors led to the conclusion that if the specifications are followed correctly, the residual moisture in DCSSs should present an insignificant risk of cladding degradation (Knoll and Gilbert 1987). A more recent analysis concluded that much larger quantities of residual water could remain in DCSSs, but the amount would still not be expected to lead to significant corrosion of fuel cladding or other internal components (Jung et al. 2013). Industry drying procedures are mostly prescriptive in nature, and operational issues arising during the process could result in incomplete drying. A summary of operational issues and potential negative effects of residual water is provided by Salazar et al. (2019). Experimental efforts are ongoing to validate the extent of water removal in a DCSS based on drying procedures used at nuclear power plants through well-designed investigations of drying process efficacy and water retention (Durbin et al. 2021; Pulido et al. 2022a, Pulido et al. 2022b). This has been approached by simulating limited portions of a DCSS internal volume and fuel assemblies. So far, these efforts have focused on the effects of potential water trapping in the dashpot region of control rod guide tubes but are expected to be expanded to include the effects of other internal hardware features and failed fuel rod cladding. A method for detection and measurement of liquid water (Meyer et al. 2022; Meyer et al. 2021), in tandem with the drying information gained through experimental investigations, provides comprehensive bases for understanding the internal conditions of DCSSs and provides technical information to support licensing decisions.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗