Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “system planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,009 records · Page 56

Advancing Asset Management in Water Infrastructure Systems

Aging water system infrastructure, including drinking water, wastewater, and stormwater, poses a growing challenge for utilities and municipalities. These water systems have well documented challenges with respect to their age, condition, and level of service. ASCE annual report cards consistently rate these infrastructure systems in the United States as underfunded, overcapacity, or past service life (ASCE 2025 Report Card). For example, Chini and Stillwell (2017) estimated that the mean water loss in drinking water systems, i.e., non-revenue water, is approximately 16% across the United States. These concerns are not just relegated to the United States, with Courtenay, British Columbia, identifying 17% of their water main pipes as in a ‘poor’ condition state, defined as a category condition 5 out of 5 (City of Courtenay, 2024). These cases illustrate the challenges utilities are facing to manage extensive networks of infrastructure to deliver a consistent and high level of service. For buried infrastructure such as water systems, studies suggest that preventative interventions can lead to lower maintenance costs and fewer service disruptions (Mazumder et al, 2018; Li et al, 2014). The demonstrated need and benefit of appropriately applied asset management is juxtaposed against the relatively sparse literature that evaluates water systems within an asset management construct. Since 2020, just 37 papers specifically reference asset management in the Journal of Water Resources Planning and Management. Of those, only a few specifically look to develop strategies for improved asset management. Therefore, we highlight four key research areas that represent opportunities for advancement of asset management research for water systems. First, advances in condition assessment and forecasting are needed to better estimate asset deterioration using diverse datasets. Second, machine learning (ML) and artificial intelligence (AI) hold promise for predictive maintenance and investment prioritization, though questions of generalizability and model transparency remain. Third, applying a value of information framework can guide utilities in making cost-effective sensor deployment and data collection decisions, to direct monitoring strategies towards data-informed asset management decisions. Finally, integrated infrastructure management is critical, requiring coordinated planning with other infrastructure systems and stakeholder engagement to reduce costs and enhance service delivery.

Chini, Christopher M.↗

A Vehicle-to-Grid planning framework incorporating electric vehicle user equilibrium and distribution network flexibility enhancement

The rapid surge in electric vehicle (EV) adoption, coupled with advancements in charging technologies, emphasizes the critical necessity for expanding EV recharging infrastructure. Simultaneously, the Distribution Network (DN) encounters escalating challenges in meeting charging demand during peak traffic periods. Consequently, there is a mounting demand for the deployment of innovative Vehicle-to-Grid (V2G) technologies to augment the DN’s flexibility in power dispatch and alleviate travel costs for EV users. Hence, this paper proposes an EV-user-equilibrium-(UE)-constrained V2G planning framework that enhances flexibility in the DN. The framework aims to ascertain the optimal placement and capacity of EV charging stations (EVCSs) and V2G charging piles within the Transportation Network (TN). It takes into account the equilibrium condition stemming from competitive EV charging and routing behaviors alongside the optimal expansion of DN energy resources to accommodate the electricity supplied by the V2G piles. This study commences by analyzing EV drivers’ travel decisions, considering the influence of charging and V2G pile locations and sizes. Subsequently, we tackle the Traffic Assignment Problem with User Equilibrium (TAP-UE) model to characterize the steady-state traffic flow distribution of EVs. Following this, we formulate the optimization model for the Coordinated Power and Transportation Network (CPTN), which encompasses the optimal expansion of DN facilities and traffic flow regulation under UE conditions. To mitigate the computational complexity associated with the V2G planning model, we introduce a series of linearization methods to obtain a manageable Mixed-Integer Linear Programming (MILP) solution. Finally, to validate the efficacy of our proposed planning framework, we apply it to two test systems, including a real-world case study. Through these case studies, we explore the necessity and potential benefits of V2G technologies.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Risk-Averse Approach for Distribution Grid Expansion Planning

Recent episodes of natural disasters have challenged the resilience of power grids. Adequate distribution grid planning that properly captures the risk aversion of the utility system planner is a key factor to increase the flexibility of distribution networks to circumvent these events. In this paper, we propose a methodology to determine the optimal portfolio of investments in lines and storage devices in order to minimize a convex combination between expected value and CVaR of operational costs, including energy not served, while taking into account the multistage nature of the energy storage management within this context. While the expected value of energy not served has been traditionally employed to tackle routine failures, we also minimize the CVaR of energy not served to address high-impact, low-probability (HILP) events. We illustrate the performance of the proposed methodology with a 54-Bus system test case.

24 POWER TRANSMISSION AND DISTRIBUTION↗

System modeling for grid-interactive efficient building applications

Despite the abundance of research applications of system modeling in grid-interactive efficient buildings (GEBs), the transfer of those applications to real-world practices is still in its early stages. This is partially due to the lack of a summary on how system modeling should be established for a given application of GEBs. Here, we fill this gap by providing an extensive survey of the literature on system modeling for different GEBs that have been produced in the past decade. This survey involves over 300 relevant journal articles from the building community, the power system community, and the society of control. Specifically, we first identified key requirements of system modeling for GEBs based on various types of applications discussed in those publications. We then summarized the system modeling applications from those publications, in terms of their assumptions, modeling approach, and simulation. After that, we analyzed different assumptions made for various applications, the extent to which those modeling approaches satisfied the key requirements, and how those approaches can be scaled up for large-scale applications, which are quite common in GEBs. In addition, we gave insights on how to use system modeling for different applications in GEBs. At the end, we provided recommended directions for future studies to fully unleash the potentials of system modeling to support GEBs.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Comparison of temporal resolution selection approaches in energy systems models

Capacity expansion models for the power sector are used to project future decisions over the coming decades by simulating investment and operation decisions for the use of electricity. Due to model performance constraints, these models typically do not explicitly simulate every hour within a year, but instead simulate representative time segments (groups of hours). This paper evaluates different approaches for selecting time segments across three methods: sequential, categorical, and clustering, across a wide range of time-segment quantities, for a total of 204 temporal profiles. To measure the performance of each profile's ability to accurately represent data, the root-mean-square-error of each profile's time segments are compared to the data's original hourly data. The temporal alignment across regions is also measured (i.e., how often windy days align across regions). Different spatial resolutions were applied for a subset of the temporal selection methods to investigate the impact spatial resolution has on performance. This paper provides a framework for measuring the value of different temporal selection methods and of adding more granular data to energy system models. Overall, multi-criteria clustering yields the lowest root-mean-square-error across all datasets evaluated and provides a holistic view of the intertwined relationships between renewable generation and electricity demand.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

State Spotlight on Resilience: The Washington Utilities and Transportation Commission’s Wildfire Mitigation Plans

Wildfires present a significant risk to critical infrastructure, endangering energy systems by damaging transmission lines and imposing a variety of costs on utilities and their customers. Wildfires have increased nationally in both extent and intensity as vegetation conditions become drier and wind patterns become more turbulent. Aging infrastructure may also cause transmission lines to ignite vegetation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Energy Management Information Systems Technical Resources Report

Guide supports federal facility staff in understanding, designing, procuring, and implementing Energy Management Information Systems (EMIS) as a valuable component of their portfolio-level energy and water planning and management strategies. As a broad and rapidly evolving family of tools that monitor, analyze, and control building energy use and system performance, EMIS tools present significant opportunities for federal sector energy savings and improved operational performance. EMIS are at the forefront of transforming energy management best practices by providing building owners and operators with well-organized building performance and energy consumption data, enabling a host of analytic capabilities. These capabilities include portfolio-wide energy benchmarking, data visualization, and key performance indicator tracking; automated fault detection and diagnostics (AFDD); artificial intelligence for predictive analytics and control; automated measurement and verification of energy conservation measures; and supervisory control enabling automated system optimization and demand management.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

UPF and Y-12 Criticality Accident Alarm System (CAAS) Radiation Testing Report

This report documents the experimental conditions and results for the testing of the Mirion Technologies CAAS-3S Criticality Accident Alarm System (CAAS) for the Y-12 National Security Complex (Y-12) and Uranium Processing Facility (UPF). The testing was conducted at the Godiva IV Burst Reactor at the National Criticality Experiments Research Center (NCERC) at the Nevada National Security Site (NNSS) during the week of January 11, 2021. The testing was conducted in accordance with 25774-QL-POA-JR00-00002-VDE-27.0, CAAS-3S Radiation Testing of Cabinet Components Test Plan. The tests subjected the CAAS-3S system to intense and short duration mixed neutron and gamma radiation fields and to high integrated radiation doses. The purpose of the test was to environmentally qualify various CAAS-3S components in a radiation environment. Successful completion of the tests was predicated on the collaborative efforts of several organizations. Sandia National Laboratory (SNL) and Lawrence Livermore National Laboratory (LLNL) provided dosimetry to estimate photon and neutron dose. Los Alamos National Laboratory (LANL) manages the NCERC facility, operated the Godiva IV reactor, and provided field support for CAAS-3S placement and communications interface for data acquisition systems supplied by Mirion Technologies. Throughout the test campaign, Y-12 and UPF personnel provided technical support in determining changes to the test schedule, as needed, interpretation of the results, and comparison between the measured dosimetry data and predicted results. Throughout the test campaign, Mirion personnel provided technical support in the operation of the CAAS-3S system itself.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Surveillance Workload Divinator (SWORD)

The LANL Surveillance Workload Divinator (SWORD) is a high-level decision support tool that reproduces and predicts the annual values for stockpile and production disassembly and inspections (D&I) and rebuilds. SWORD, a spreadsheet-based tool, can be used to assess the surveillance workload under various planning scenarios. Results are shown graphically and updated dynamically for each weapon system or for the entire stockpile. Surveillance workload is calculated from stockpile surveillance guidance1 and from Production and Planning Directive (P&PD) data.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Timber Harvesting Economics in Early Commercial Thinning and Group Selection Prescriptions

Forest management decisions that consider both short- and long-term objectives are becoming more challenging and costly, due to market uncertainty, labor shortages, and the evolving forest industry. Under such unpredictable circumstances, a better understanding of the production economics of various silvicultural prescriptions is crucial in implementing sound forest management activities. The objectives of this study were to: a) estimate stump to landing productivity and cost for Early Commercial Thinning (ECT) and Group Selection (GS) prescriptions; and b) compare the harvest system cost ($/PMH) using machine rate and PATH (Planning and Analysis in Timber Harvesting) methods. Detailed time-motion studies were conducted in the spruce-fir forest of Northern Maine, USA, during the summer of 2019. The results, as expected, indicated the harvesting costs were 23% higher for ECT (21.08 $/m3) compared to GS (16.32 $/m3). The average productivity of the harvester and forwarder were reduced by 15 and 37%, respectively, for ECT compared to GS. The estimated harvesting system cost ($/PMH) was 4% higher as indicated by PATH compared to machine rate method. Higher operational productivity in GS can be attributed to the larger volume of logs, and shorter travel loaded distance than ECT. These findings can help forest managers make more informed decisions while implementing appropriate silvicultural prescriptions under varying conditions based on management objectives and market conditions.

Forestry↗

Evaluation of Component Reliability in Photovoltaic Systems using Field Failure Statistics

Ongoing operations and maintenance (O&M) are needed to ensure photovoltaic (PV) systems continue to operate and meet production targets over the lifecycle of the system. Although average costs to operate and maintain PV systems have been decreasing over time, reported costs can vary significantly at the plant level. Estimating O&M costs accurately is important for informing financial planning and tracking activities, and subsequently lowering the levelized cost of electricity (LCOE) of PV systems. This report describes a methodology for improving O&M planning estimates by using empirically-derived failure statistics to capture component reliability in the field. The report also summarizes failure patterns observed for specific PV components and local environmental conditions observed in Sandia's PV Reliability, Operations & Maintenance (PVROM) database, a collection of field records across 800+ systems in the U.S. Where system-specific or fleet-specific data are lacking, PVROM-derived failure distribution values can be used to inform cost modeling and other reliability analyses to evaluate opportunities for performance improvements.

14 SOLAR ENERGY↗

Introduction to the Minitrack on Monitoring, Control, and Protection.

This minitrack is on topics related to the monitoring, control, and protection of electric power systems for real-time operations and short-term operations planning. This year the emphasis has been on recent developments in the area of large-scale dynamic research for power systems and on hybrid and distributed control concepts for decentralized command and control of existing critical energy infrastructures.

Eto, Joseph H↗

Design of Multi-Engine Freight Locomotive

This final report documents the completed engineering design of a modular, multi-engine renewable natural gas (RNG) hybrid freight locomotive. The project delivered a full systems design, component selection, and production and test plans for a near-zero-emission, Tier 5–capable line-haul locomotive, but did not proceed to fabrication or field testing due to withdrawal of the designated engine supplier.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

THERMAL MODELING OF HANFORD CESIUM AND STRONTIUM CANISTERS DURING SIMULATED LOADING

A computational fluid dynamics (CFD) model was built to simulate planned testing of heater assemblies within a canister and overpack for the Hanford Lead Canister (HLC) project. The HLC is a canister storage system that will contain heaters to simulate the decay heat of nuclear material and provide the canister storage system with environmental conditions equivalent to the operating conditions on a dry storage pad. The HLC will be equipped with long-term data collection and monitoring systems to provide an early warning of corrosion, pitting, cracking, or other signs of canister degradation that might threaten the integrity of the containment boundary over the potentially long term of dry storage. An important part of the HLC development is to make pretest numerical predictions for the behavior of the heated canister during the simulated radiolytic decay heat testing, which simulates the dry storage system during loading operations. The simulated radiolytic decay heat test is planned for mid-2024 in a configuration that includes the heater assembly, overpack, and canister, but with the lids removed to allow loading cesium and strontium capsules into the canister. One of the goals of the test is to evaluate the thermal behavior of the canister and overpack assembly in the ambient air of the test facility, which will provide data critical to validating the thermal models and understanding how the HLC will perform as a system once deployed. To best approximate real-world conditions, the CFD model includes the full air volume of the mock-up truck bay the heated canister test will be performed in, enabling detailed investigation of how the heated canister affects airflow around it. Rigorous pre-deployment testing of the complete HLC cask and canister system is intended to be completed before the HLC is deployed in the 2028 timeframe. This study presents the pre-test temperature predictions of the simulated radiolytic decay heat test. A description of the heater assembly, canister, and overpack system is presented. The model was developed with the commercial CFD software STAR-CCM+. An uncertainty analysis was run with the CFD model to determine the uncertainty in the temperature predictions and provide a range over which the predicted temperatures are expected to vary. The uncertainty analysis was preformed by coupling STAR-CCM+ with the software Dakota, which provides advanced parametric analyses, including quantification of margins and uncertainty with computational models. This work is expected to provide insight into SNF canister behavior.

Carpenter-Graffy, Dina E.↗

Liquid Salt Combined-Cycle Pilot Plant Design

The work described in this report is responsive to the Office of Fossil Energy program ‘Energy Storage for Fossil Power Generation.’ This Phase I report has been prepared by Pintail Power LLC, with support from Nexant ECA, Electric Power Research Institute (EPRI) and Southern Company Services as a deliverable for the U.S. Department of Energy for NETL Award DE-FE-00320016. The Liquid Salt Combined Cycle™ (LSCC™) technology provides large-scale energy storage integrated with Fossil Electric Generating Units (FEGUs) to meet critical needs in the energy transition by providing: • the lowest cost large-scale storage for time-shifting of renewable energy, • superior fuel efficiency to reduce GHGs from dispatchable resources, • flexible capacity and ramping to balance variability of wind and solar resources, • essential grid stability services to assure reliability of a low-carbon grid. The LSCC approach: • employs equipment that has already been proven in utility service, • uses safe, non-toxic, non-degrading, perpetual-life storage medium, • leverages and repurposes existing FEGU assets, • expands the value stack of energy storage to reduce market, financing, and commodity risks. Pintail Power has developed the LSCC technology to meet the need for reliable, efficient, and cost-effective integration of Variable Renewable Energy (VRE) into a low-carbon electric grid by coupling proven thermal energy storage with proven gas turbines, steam turbines, and heat transfer equipment. This novel approach is intended to address the key issues facing the grid and operators of renewable and fossil generating units including: • Overgeneration and curtailment of renewables, • Need for fast ramping dispatchable resources, • Improved efficiency and flexibility of fossil units, • Additional peaking capacity to support electrification of transportation and heating, • Provision of reliability services to support high penetration of VRE, especially synchronous inertia and fast frequency response. A Technology Readiness assessment by EPRI confirmed that LSCC technology consists of commercially proven hardware used in industrial and utility applications. Although the novel LSCC approach has not yet been demonstrated as a complete system, interfaces between major components have been conservatively specified. A Phase III pilot is planned to demonstrate equipment integration and operation. The patented innovation is removal of the evaporator section from the exhaust heat recovery system, with the evaporation performed by stored energy in a separate steam generator. This arrangement couples renewable and fossil power generation via long-duration energy storage to deliver cost, performance, and operational synergies, including superior charging and discharging flexibility, reduced fuel consumption and lower CO 2 emissions compared to conventional Combined Cycle Power Plants, and low-cost, large-scale energy storage. The LSCC technology is composed of proven equipment integrated with gas turbine exhaust heat in a novel system. During charging, electric heaters raise the salt temperature as it flows from the Cold Salt Tank to the Hot Salt Tank. During discharging, hot salt produces steam from feedwater that is heated with gas turbine exhaust, which also superheats steam to drive a steam turbine. LSCC technology can be added to any combustion-turbine to integrate renewable energy, provide needed grid services, and increase the value of fossil electric generating units based on the technology’s following attributes: • Long-duration storage enables time-shifting of VRE to avoid curtailment and impairment of renewable assets. • Long storage duration combined with fast-charging capability increases arbitrage opportunities by storing more energy when the price is low and discharging more hours when the price is high. • Long storage duration allows resource adequacy to be supplied across multiple days to increase reliability and reduce risk. • The stored energy reduces fuel heat rate and GHG emissions, and increases merit, so the LSCC dispatches earlier and longer to increase the plant’s capacity factor and asset value. • The stored energy enables pre-heating and startup of the steam cycle, without operating the gas turbine, to enable fast startup and ramping when dispatched for discharge. • The steam turbine can operate without the gas turbine so it can provide valuable synchronous inertia during charging without consuming fuel. • Fast frequency response and regulation services can be provided during charging using solid-state heater and pump controls to vary the charge power input in response to grid signals. • The LSCC system can be configured for resilience including black start, islanded/micro-grid operation, and even self-recharging of storage using either gas turbine power or gas turbine exhaust heat. The commercialization plan is to add LSCC technology to existing simple cycle gas turbine power plants with the 50MW GE LM6000 aero-derivative gas turbine as the reference design basis. A Techno-economic assessment of the reference design evaluated the benefits (Levelized Avoided Cost of Energy) and costs (Levelized Cost of Energy). The plant definition included all major systems and budgetary vendor quotes. Pintail Power and NexantECA developed the overall cost estimate for the LSCC plant up to the total plant cost level, following the DOE-NETL cost estimate guidelines at AACE Class 3 (-20%/+30%). This includes the equipment cost, bulk material, direct and indirect labor costs to arrive at the bare erected cost. Engineering costs are factored from the BEC and added to it to arrive at the EPC cost. Process and project contingencies were then factored from the EPC cost and rolled-up to yield the total plant cost of $\$$184 million for 1746 MWh of discharge electricity. • At $\$$105/kWh, the reference plant costs less than any of the Energy Storage Systems evaluated by PNNL in 2020 for the Energy Storage Grand Challenge. Operations and Maintenance cost estimates were scaled from combined cycle practice, assuming that the LSCC unit was co-located with and sharing some labor expense with other units, to arrive at $\$$2.2 million per year. Plant economics were evaluated using prices from the ERCOT Day-Ahead Market for calendar year 2019 (excluding the market disruptions from the COVID pandemic and the February 2020 deep freeze event). Assuming economic dispatch in the ERCOT Day-Ahead market, the reference plant capacity factor would have discharged for 2777 hours at 91.9 MW, a 31.66% capacity factor, with a marginal cost of $\$$25.59/MWh, and a LACE of $\$$82.41/MWh. Fixed charges were calculated according to EIA guidelines to arrive at an LCOE of $\$$83.48. The benefit-to-cost ratio of 0.99 suggests that the reference plant would have been cost-effective and competitive in the market. EPRI interviewed selected utilities to gauge the need for, applicability of and interest in the LSCC system. Several utilities are currently managing increased load growth along with the inclusion of increasing levels of renewable generation, putting pressure on conventional generation by requiring increased turndown requirements and ultimately lower capacity factors. All of the utilities interviewed have CO 2 reduction targets in the 2030-2050 timeframe that will severely limit the participation of fossil generation and require better utilization of carbon free generation. While there is limited opportunity for storage in the current markets, the utilities interviewed stated that there will be a substantial need for long duration energy storage in the future given the expected trends. Utilizing an energy storage system will generally be preferred over new gas capacity in some cases, with the capabilities of the LSCC system being a potential option for retrofit to existing simple cycle gas turbine units, allowing them to deliver greater participation in the market with lower carbon intensity. A technology gap assessment and technology maturation plan identified a pilot-scale demonstration as the final step before commercialization. Key gaps to be addressed during the Phase II FEED (Front-End Engineering Design) are component selection and design, commissioning procedures, and operational procedures and the control system for LSCC charging and discharging. The project team has been expanded to include Wood Group PLC as EPC. The proposed Phase II work leads to a pilot-scale engineering demonstration (TRL 6) to be conducted at Southern Company’s Plant Rowan, where the prototype system will perform “all the functions that will be required of the operational system.” The proposed pilot will facilitate commercialization (TRL-9) by scale-up to utility-scale systems integrated with peaking GTs or directly to facility scale systems using industrial GTs. The conceptual design for the pilot plant focuses on the novel integration aspects of LSCC technology. A slipstream of gas turbine exhaust will feed a waste heat recovery unit coupled to a molten salt steam generator heated by stored energy. The pilot is intended to demonstrate all key operating modes of the LSCC technology during charging, discharging and standby. The pilot equipment will be approximately one-seventh scale of the LM6000 commercial target and is expected to have commercial off-ramp potential for facility-scale applications.

01 COAL, LIGNITE, AND PEAT↗

Energy-Storing Cryogenic Carbon Capture™ for Utility and Industrial-scale Processes (Final Report)

This project leverages work completed under funding from previous U.S. Department of Energy (DOE) projects and other sources of funding around the Cryogenic Carbon Capture Process™ (CCC). The purpose of this project is to further develop a perturbation of the CCC process that stores energy called the Cryogenic Carbon Capture™ Energy Storing (CCC-ES) process. The successful completion of the tasks in this project has prepared the CCC-ES process for scaling and developed initial plans and a feasibility analysis for an engineering-scale or small-commercial scale system that can store at least 10 MWh of energy. The specific areas of work in this project are: (1) Develop a conceptual, site-specific integrated process flow diagram: Sustainable Energy Solutions (SES) developed a conceptual, site-specific plan including a process flow diagram for integrating CCC-ES at a specific location. The proposed system was based on a typical engineering-scale CCC system designed to capture 30-50 metric tonnes of CO 2 per day (TPD), with modifications and additional changes and equipment put in place to add the energy storage element to the system. The 30-50 TPD scale corresponds to the required 10 MWh of stored energy. This task includes updating simulation software for transient analysis. SES also coordinated with the Jim Bridger Power Plant in Point of Rocks, Wyoming to get site-specific data. Using these data, SES completed site-specific preliminary process flow diagrams, estimated capital and operating costs for the CCC-ES system, and used the upgraded software package to estimate the primary figures of merit. (2) Complete a technoeconomic analysis (TEA): SES completed a full-scale TEA of the CCC-ES system to meet specific success criteria. This TEA used process information from the host site selected above. (3) Technology and data gap assessment for the CCC-ES process: As part of the technology gap assessment, SES performed an assessment of the best alternative energy storage solutions including figures of merit and operational strengths and weaknesses. SES then compared the proposed system with a discussion of how it addresses the weaknesses of alternative systems, showing for example a cost of stored energy at less than $50/MWh and with a roundtrip efficiency of greater than 95%. This assessment includes technical and other risk analyses and technology gaps with research and development needs to commercialize the process by 2030. Finally, work includes a commercialization roadmap/development pathway outlining the major milestones to move to a commercially operating CCC-ES system. (4) Phase II pre-FEED project plan: SES completed a project plan for the Phase II pre-FEED analysis using the same host site as in the Phase I conceptual study.

03 NATURAL GAS↗

AGGREGATE: dAta-driven modelinG preservinG contRollable dEr for outaGe mAnagemenT and rEsiliency (Report for Task 14: Model Verification/Validation Test Plan (Deliverable D10))

This report summarizes the technical progress and validation plan for each of AGGREGATE project modules, and integrated modules. The overall validation plan can be divided into two major parts. Firstly, it provides offline validation results of each module using the IEEE-123 node distribution system with certain modifications to support individual module results verification. The offline validation plan tentatively validated the usability and practicability of developed AGGREGATE tools. Secondly, the realworld test system - Seattle City Light (SCL) test feeder for verifying each module and the integrated modules using GE advanced distribution management system (ADMS) software.

42 ENGINEERING↗