Kennedy Space Center Launch Equipment Test Facility (LETF) Capabilities 2015
No abstract available
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
No abstract available
During the launch process of the Space Launch System (SLS), engineers in the Firing Room of the Launch Control Center (LCC) will be analyzing displays that show data and statistics about the vehicle and launch. These displays are subject to a battery of tests, but the custom components they use are not currently supported by any testing framework. My project is to modify a testing framework so that the custom components on these displays can be tested similarly to how a user would interact with them.
GRCop-84 is a precipitation strengthened alloy composed of Cu-8Cr-4Nb at % with Cr2Nb precipitates that provide dispersion and precipitation strengthening characteristics and limited solubility in the Cu matrix. The particle role of Cr2Nb(C15Laves) is unusual only contributing 1/3 of strengthening at high temperatures while the matrix provides the remainder. The particles mechanically and thermally stabilize the matrix retaining purity and preventing coarsening and loss of strength. At high temperatures (50-85%TmCu), GRCop-84 provides the best thermal and mechanical properties of available alloys. GRCop-84 is currently in development for reusable launch vehicles including the Space Launch System (SLS) with a focus on fabrication with additive manufacturing (AM) techniques. GRCop-84 is an optimal material for consolidating with AM. The base material is costly, the production times are long, and more geometry control can considerably improve cooling efficiency. Development of AMGR Cop-84 with selective laser melting (SLM) has rapidly progressed due to ease of printing and limited operator adjustment between builds, but the necessary knowledge-base of thermal history and stress state during builds is still under development.
The 2018 Marshall Faculty Fellowship Program involved 16 faculty in the laboratories and departments at Marshall Space Flight Center. These faculty engineers and scientists worked with NASA collaborators on NASA projects, bringing new perspectives and solutions to bear. This Technical Memorandum is a compilation of the research reports of the 2018 Marshall Faculty Fellowship program, along with the Program Announcement (Appendix A) and the Program Description (Appendix B). The research affected the following five areas: (1) Materials (2) Propulsion (3) Spacecraft systems (4) Vehicle systems (5) Space science The materials investigations includes Lunar Regolith for habitats, friction stir welding, and composite joints. Propulsion studies included cryogenic tank pressurization, transmitted torque in a cryogenic environment, and condensation in presence of noncondensables, Europa Lander Deorbit Stage, and catalyst development for a hybrid rocket. Spacecraft systems include wireless sensor networks and printed electronic inks. Vehicle systems studies were performed on Mars ascent vehicle analysis, architecture models, and Space Launch System manual steering. Space science studies included planetary lava flow. Our goal is to continue the Marshall Faculty Fellowship Program funded by Center internal project offices. Faculty Fellows in this 2018 program represented the following minority-serving institutions: Alabama A&M University, Southern University, Delgado Community College, and Dillard University.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
The Artemis I mission in 2022 accomplished humanity’s first venture beyond Low-Earth Orbit (LEO) with a human-rated spacecraft in over fifty years. Artemis comprises several key Program elements – Multi-Purpose Crew Vehicle (MPCV) Orion Crew Module, Service Module, Launch Abort System; the Space Launch System (SLS) and the Exploration Ground System (EGS). Much of our human spaceflight experience with crewed lunar missions is captured in historical program documents, but first-hand knowledge is limited to a few spaceflight veterans. Missions to LEO have offered the opportunity of direct, near-instantaneous communications and assistance, and the ability to return to Earth within a matter of hours in case of emergency. Outward-bound missions do not have these features and will require a more autonomous and reliable spacecraft. The assessment of compliance with applicable safety requirements and adequacy of hazard controls and verifications is the responsibility of the MPCV Safety and Engineering Review Panel (MSERP), along with a Joint [NASA/ESA] Safety and Engineering Review Panel (JSERP) for the review of the European Service Module (ESM). The MSERP has two features that are relatively unique amongst NASA safety panels. First, NASA Engineering was added as a Panel co-chair, which enhanced the Engineering organization’s engagement and level of understanding of hazard analysis methodology and results. The MSERP has representation from each office, including Flight Operations Directorate (FOD) and Health and Medical Technical Authority, supporting the Orion Program in addition to the Engineering and Safety Technical Authority co-chairs. Second, the JSERP has a second set of co-chairs from ESA Engineering and ESA Product Assurance and Safety organizations, which recognizes the international arrangement as one of partnership. This paper will focus on SMA processes, activities, and plans for the Orion element and explore unique challenges associated with Artemis II as we approach the flight of the first crewed Orion vehicle.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Safe, low-cost space transportation is the key enabler of the commercial development and civil exploration of space. Human space flight remains a hazardous endeavor in spite of advances in aerospace technology. NASA intends to reduce the resources devoted to routine space operations, thus enabling additional science research, technology development, and exploration activities. NASA developed the Integrated Space Transportation Plan (ISTP) to address the needs for space access. ISTP is a balanced and comprehensive plan that embodies strategies for achieving goals for earth-to-orbit and in-space transportation operations. ISTP calls for near-term safety related upgrades to the Space Shuttle, development of a Crew Return Vehicle, a new Space Launch Initiative (SLI), and development of an Aero-Space Base to provide foundation technology for future space systems. NASA formed the SLI to coordinate the development of the 2nd Generation Reusable Launch Vehicle (RLV) architecture, The SLI is implemented by the 2nd Generation RLV Program Office.
This paper presents viewgraphs on the Space Launch Initiative (SLI) space shuttle safety upgrades.
The introduction of the Space Launch System will provide NASA with a new means of access to space beyond low Earth orbit (LEO), creating opportunities for scientific research in a range of spacecraft sizes. This presentation describes the preliminary design of the BioSentinel spacecraft, a CubeSat measuring 10cm x 20cm x 30cm, which has been manifested for launch on the maiden voyage of the Space Launch System in 2017. BioSentinel will provide the first direct experimental data from a biological study conducted beyond LEO in over forty years, which in turn will help to pave the way for future human exploration missions. The combination of an advanced biology payload with standard spacecraft bus components required for operation in deep space within a CubeSat form factor poses a unique challenge, and this paper will describe the early design trades under consideration. The baseline spacecraft design calls for the biology payload to occupy four cube-units of volume (denoted 4U), with all spacecraft bus components occupying the remaining 2U.
On April 1, NASA launched the Artemis II mission – the first crewed mission of the Artemis campaign. The nine-day lunar flyby launched on the agency’s SLS (Space Launch System) rocket and had four astronauts test the Orion spacecraft in high Earth orbit and in deep space. Four 12U CubeSats also launched on the mission, housed within the SLS’s Orion stage adapter (OSA). The spacecraft were deployed approximately five-and-a-half hours into the flight, following Orion separation and departure from SLS, as the SLS interim cryogenic propulsion stage (ICPS) and the attached OSA were in a high Earth orbit on an atmospheric disposal trajectory. All four CubeSats were successfully deployed from the launch vehicle. Deployment statuses of the spacecraft, along with updates about the SLS rocket and Artemis missions, are reported in this paper. The paper will also discuss opportunities for CubeSat payloads on future Artemis missions.
On April 1, NASA launched the Artemis II mission – the first crewed mission of the Artemis campaign. The nine-day lunar flyby launched on the agency’s SLS (Space Launch System) rocket and had four astronauts test the Orion spacecraft in high Earth orbit and in deep space. Four 12U CubeSats also launched on the mission, housed within the SLS’s Orion stage adapter (OSA). The spacecraft were deployed approximately five-and-a-half hours into the flight, following Orion separation and departure from SLS, as the SLS interim cryogenic propulsion stage (ICPS) and the attached OSA were in a high Earth orbit on an atmospheric disposal trajectory. All four CubeSats were successfully deployed from the launch vehicle. Deployment statuses of the spacecraft, along with updates about the SLS rocket and Artemis missions, are reported in this paper. The paper will also discuss opportunities for CubeSat payloads on future Artemis missions.
The Universal Propellant Servicing System (UPSS) is a dedicated mobile launcher propellant delivery method that will minimize danger and complexity in order to allow vehicles to be serviced and ultimately launched from a variety of locations previously not seen fit for space launch. The UPPS/G2 project is the development of a model, simulation, and ultimately a working application that will control and monitor the cryogenic fluid delivery to the rocket for testing purposes. To accomplish this, the project is using the programming language/environment Gensym G2. The environment is an all-inclusive application that allows development, testing, modeling, and finally operation of the unique application through graphical and programmatic methods. We have learned G2 through classes and trial-and-error, and are now in the process of building the application that will soon be able to be tested on apparatuses here at Kennedy Space Center, and eventually on the actual unit. The UPSS will bring near-autonomous control of launches to those that need it, as well it will be a great addition to NASA and KSC's operational viability and the opportunity to bring space launches to parts of the world, and in time constraints, once not thought possible.
With the ever-growing desire for mankind to reach destinations whose distances had been deemed impossible to transit, the largest rocket known to man was designed and is being developed. The Space Launch System (SLS), National Aeronautics and Space Administration’s (NASA) solution for deep space travel, will begin its missions with the launch of Exploration Mission 1 (EM-1) and Exploration Mission 2 (EM-2). In order to accommodate the larger rocket, Kennedy Space Center made crucial upgrades to its existing facilities. At Launch Complex 39B, an entirely new Environmental Control System (ECS) was developed to supply the vehicle with the appropriate air or nitrogen gas mixture for launch. The new ECS displays must undergo Validation and Verification (V&V) using testing procedures developed to meet this requirement.
The Space Launch System, NASA's new large launch vehicle for long range space exploration, is presently in the final design and construction phases, with the first launch scheduled for 2019. A dynamic model of the system has been created and is critical for calculation of interface loads and natural frequencies and mode shapes for guidance, navigation, and control (GNC). Because of the program and schedule constraints, a single modal test of the SLS will be performed while bolted down to the Mobile Launch Pad just before the first launch. A Monte Carlo and optimization scheme will be performed to create thousands of possible models based on given dispersions in model properties and to determine which model best fits the natural frequencies and mode shapes from modal test. However, the question still remains as to whether this model is acceptable for the loads and GNC requirements. An uncertainty propagation and quantification (UP and UQ) technique to develop a quantitative set of validation metrics that is based on the flight requirements has therefore been developed and is discussed in this paper. There has been considerable research on UQ and UP and validation in the literature, but very little on propagating the uncertainties from requirements, so most validation metrics are "rules-of-thumb;" this research seeks to come up with more reason-based metrics. One of the main assumptions used to achieve this task is that the uncertainty in the modeling of the fixed boundary condition is accurate, so therefore that same uncertainty can be used in propagating the fixed-test configuration to the free-free actual configuration. The second main technique applied here is the usage of the limit-state formulation to quantify the final probabilistic parameters and to compare them with the requirements. These techniques are explored with a simple lumped spring-mass system and a simplified SLS model. When completed, it is anticipated that this requirements-based validation metric will provide a quantified confidence and probability of success for the final SLS dynamics model, which will be critical for a successful launch program, and can be applied in the many other industries where an accurate dynamic model is required.