Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “siting”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,009 records · Page 56

AmeriFlux FLUXNET-1F US-Ne1 Mead - irrigated continuous maize site

This is the AmeriFlux Management Project (AMP) created FLUXNET-1F version of the carbon flux data for the site US-Ne1 Mead - irrigated continuous maize site. This is the FLUXNET version of the carbon flux data for the site US-Ne1 Mead - irrigated continuous maize site produced by applying the standard ONEFlux (1F) software. Site Description - The study site is one of three fields (all located within 1.6 km of each other) at the University of Nebraska Eastern Nebraska Research, Education and Extension Center near Mead, Nebraska. This site is irrigated with a center pivot system. Prior to the initiation of the study, the irrigated site had a 10-yr history of maize-soybean rotation under no-till. A tillage operation (disking) was done just prior to the 2001 planting to homogenize the top 0.1 m of soil, incorporate P and K fertilizers, as well as previously accumulated surface residues. This field was planted with maize every growing season. Since the 2001 tillage operation, the site has been under no-till management until the harvest of 2005. Following harvest, a conservation-plow tillage operation was initiated where a small amount of N fertilizer is sprayed on the residue immediately prior to the plow operation. Approximately 1/3 of the crop residue is left on the surface. The post-harvest conservation-plow operation continued until 2022. Since 2022, the site management has changed such that the field is now a strictly no-till, maize-soybean rotation (maize odd years and soybean even years).

Suyker, Andy↗

AmeriFlux FLUXNET-1F US-SD1 Shatto Ditch Paired Cropland - Site 1 (Corn/Soy; No Cover Crops)

This is the AmeriFlux Management Project (AMP) created FLUXNET-1F version of the carbon flux data for the site US-SD1 Shatto Ditch Paired Cropland - Site 1 (Corn/Soy; No Cover Crops). This is the FLUXNET version of the carbon flux data for the site US-SD1 Shatto Ditch Paired Cropland - Site 1 (Corn/Soy; No Cover Crops) produced by applying the standard ONEFlux (1F) software. Site Description - US-SD1, located on mostly flat terrain with some gentle hills, is an actively managed farmland operated by working farmers following a conventional no-till corn–soybean rotation in the U.S. Midwest. US-SD1 is one of two paired working farm sites which are relatively close by; both are managed using similar conventional practices with the key difference being that the paired site (US-SD2) incorporates cover crops into its rotation, along with minor differentiating terrain and soil type, where US-SD2 is located on a gently sloped site with more sandy soils. This paired design enables direct site-to-site comparisons to assess the impacts of cover cropping on carbon, water, and energy fluxes.

Key, Kesondra [Indiana University - Bloomington]↗

NGNP SITE 2 HAZARDS ASSESSMENT

The Next Generation Nuclear Plant (NGNP) Project initiated at Idaho National Laboratory (INL) by the U.S. Department of Energy pursuant to the 2005 Energy Policy Act, is based on research and development activities supported by the Generation IV Nuclear Energy Systems Initiative. The principal objective of the NGNP Project is to support commercialization of the high temperature gas-cooled reactor (HTGR) technology. The HTGR is a helium-cooled and graphite-moderated reactor that can operate at temperatures much higher than those of conventional light water reactor (LWR) technologies. Accordingly, it can be applied in many industrial applications as a substitute for burning fossil fuels, such as natural gas, to generate process heat in addition to producing electricity, which is the principal application of current LWRs. Nuclear energy in the form of LWRs has been used in the U.S. and internationally principally for the generation of electricity. However, because the HTGR operates at higher temperatures than LWRs, it can be used to displace the use of fossil fuels in many industrial applications. It also provides a carbon emission-free energy supply. For example, the energy needs for the recovery and refining of petroleum, for the petrochemical industry and for production of transportation fuels and feedstocks using coal conversion processes require process heat provided at temperatures approaching 800 C. This temperature range is readily achieved by the HTGR technology. This report summarizes a site assessment authorized by INL under the NGNP Project to determine hazards and potential challenges that site owners and HTGR designers need to be aware of when developing the HTGR design for co-location at industrial facilities, and to evaluate the site for suitability considering certain site characteristics. The objectives of the NGNP site hazard assessments are to do an initial screening of representative sites in order to identify potential challenges and restraints to be addressed in design and licensing processes; assure the HTGR technology can be deployed at variety of sites for a range of applications; evaluate potential sites for potential hazards and describe some of the actions necessary to mitigate impacts of hazards; and, provide key insights that can inform the plant design process. The report presents a summary of the process methodology and the results of an assessment of hazards typical of a class of candidate sites for the potential deployment of HTGR reactor technology. The assessment considered health and safety, and other important siting characteristics to determine the potential impact of identified hazards and potential challenges presented by the location for this technology. A four reactor module nuclear plant (2000 to 2400 MW thermal), that co-generates steam, electricity for general use in the plant, and hot gas for use in a nearby chemical processing facility, to provide the requisite performance and reliability was assumed for the assessment.

01 COAL, LIGNITE, AND PEAT↗

Pinellas County, Florida, Site Environmental Restoration Project Sitewide Environmental Monitoring Semiannual Progress Report for the Young - Rainey STAR Center June Through November 2016, January 2017

The Young - Rainey STAR Center (Science, Technology, and Research Center) at the Pinellas County, Florida, Site is a former U.S. Department of Energy (DOE) facility constructed in the mid-1950s. The 96-acre STAR Center is located in Largo, Florida, and lies in the northeast quarter of Section 13, Township 30 South, Range 15 East (Figure 1). While it was owned by DOE, the purpose of the site was to develop and manufacture components for the nation’s nuclear weapons program. In 1987, the U.S. Environmental Protection Agency (EPA) performed a Resource Conservation and Recovery Act Facility Assessment (EPA 1988) at the site to gather information on potential releases of hazardous materials. In February of 1990, EPA issued a Hazardous and Solid Waste Amendments permit to DOE, requiring DOE to investigate and perform remediation activities in those areas designated as solid-waste management units (SWMUs) contaminated by hazardous materials resulting from DOE operations. A total of 17 SWMUs were identified and investigated at the STAR Center. By 1997, 13 of the 17 SWMUs had been remediated or approved for no further action. More recently, the Florida Department of Environmental Protection (FDEP) executed Conditional Site Rehabilitation Completion Orders for the Northeast Site and the Wastewater Neutralization Area on July 27, 2016, stating that no further action is required for those SWMUs. The Building 100 Area (a combination of the Old Drum Storage Site and the Building 100-Industrial Drain Leaks SWMUs) comprises the only two active SWMUs at the STAR Center (Figure 2). This document serves as the semiannual progress report for the SWMUs by providing the results of recent monitoring activities and a summary of ongoing and projected work. The STAR Center is owned by the Pinellas County Industrial Development Authority, but DOE is responsible for remediation activities at the site. Additional background information for the site is contained in the Long-Term Surveillance and Maintenance Plan for the Pinellas Site (DOE 2016a). That document and other site-related documents can be accessed at this website: http://www.lm.doe.gov/Pinellas/Sites.aspx.

54 ENVIRONMENTAL SCIENCES↗

Carnivore Survey Results for the Lawrence Livermore National Laboratory Site 300

ECORP Consulting, Inc. conducted a suite of carnivore surveys at the Lawrence Livermore National Laboratory’s (LLNL) Experimental Test Site (Site 300; project site). The project site is located east of the City of Livermore and southwest of the City of Tracy, Alameda and San Joaquin Counties, California. Mesocarnivore surveys were conducted on the project site in 2002 in preparation for the 2005 LLNL Site-Wide Environmental Impact Statement (SWEIS; Clark et al. 2003). The 2002 surveys included a combination of spotlighting, camera stations, and scat detection dog surveys. Additional scat detection dog surveys for San Joaquin kit fox (Vulpes macrotis mutica) were performed on Site 300 and the adjacent California Department of Fish and Wildlife’s (CDFW) Corral Hollow Ecological Reserve in 2018 and 2020 (Woollett 2019, 2021). A variety of species, including American badger (Taxidea taxus), coyote (Canis latrans), and bobcat (Lynx rufus), were detected during the previous surveys; however, no San Joaquin kit fox or mountain lion (Puma concolor) were detected. In support of the preparation of the new SWEIS, ECORP performed carnivore surveys to document the carnivores and other animals present on Site 300, with a focus on determining if the federally listed (endangered) and state listed (threatened) San Joaquin kit fox, CDFW Species of Special Concern (SSC) American badger, and/or mountain lion are present on Site 300. American badgers are known to occur on the property and there have been a few sporadic sightings of mountain lions, but San Joaquin kit fox have not been documented on Site 300. Although mountain lion were not detected during the 2002 survey, it has been added as a focal species for this survey because the southern and central coast evolutionary significant units of mountain lions were recently advanced by CDFW as a Candidate species for listing as “threatened” under the California Endangered Species Act.

54 ENVIRONMENTAL SCIENCES↗

Oak Ridge National Laboratory FY 2023 Site Sustainability Plan With FY 2022 Performance Data

At the close of each fiscal year, the US Department of Energy (DOE) Sustainability Performance Division (SPD) issues guidance documents and technical resource aids/tools necessary for DOE sites and national laboratories to complete sustainability reporting requirements. SPD is part of the DOE Office of Asset Management. As required by DOE Order 436.1, Departmental Sustainability, “each site will develop and commit to an annual Site Sustainability Plan (SSP) that identifies its respective contribution toward meeting the DOE’s sustainability goals.” SPD collects and compiles information reported by each site to develop an agency-wide Sustainability Report and Implementation Plan, which is used to report DOE sustainability progress to the federal government as required by all major federal agencies. DOE launched a formal Sustainability Office and annual SSP process in 2011. Each year, Oak Ridge National Laboratory (ORNL), in concert with the Office of Science (SC), provides the resources essential to fulfill its commitment to deliver a complete and accurate SSP report and quality performance data for entry into the DOE Sustainability Dashboard as managed by SPD. The performance data entered by each DOE site are then combined to disclose the progress of each DOE Program Office and are further combined to show comprehensive progress for the agency. The Office of Asset Management provides assistance to program offices in sustaining their missions, freeing up resources by reducing waste, avoiding excess expenditure on utilities, maximizing productivity, and improving the efficiency of facilities and processes. By focusing on mission needs, programs and associated DOE sites can help the agency meet its sustainability goals, as outlined in federal statutory and regulatory requirements. In FY 2022, the SSP guidance was updated to capture requirements from Executive Order (EO) 14008, Tackling the Climate Crisis at Home and Abroad, the Energy Act of 2020 (EAct 20), actions outlined in DOE’s Climate Adaptation & Resilience Plan and Sustainability Plan, and EO 14057, Catalyzing Clean Energy Industries and Jobs Through Federal Sustainability. Updates in SSP guidance help to minimize and streamline reporting while simultaneously addressing updated federal requirements. Per DOE, each SSP report should provide an overview of the site’s planned actions, as well as an overview of efforts and accomplishments during the reporting period. SPD collects and compiles information reported by each site to develop DOE’s Annual Sustainability Report, Climate Adaptation & Resilience Plan, and Annual Energy Management Report to Congress. The agency goal has been to lower the reporting burden for sites and increase and improve the consistency of information available to decision makers, allowing them to better identify projects and potential for increased efficiency, as well as to reduce waste, lower emissions, and enhance operational resilience. Sites may elect to produce a more polished publication for their leadership and stakeholders, but this step is no longer required. The ORNL SSP narrative report (this document) and the reporting of DOE SPD Sustainability Dashboard performance data is a collaborative effort of approximately 30 subject matter experts (SMEs) from ORNL facility management and research divisions. Annually, these associates come together to provide a report that can be used by DOE to demonstrate continued agency progress in energy efficiency and sustainable federal operations.

99 GENERAL AND MISCELLANEOUS↗

Hanford Site Revegetation Monitoring Report for Fiscal Year 2019

This report describes the monitoring of areas revegetated by the River Corridor Closure Contractor (RCCC) and CH2M Hill Plateau Remediation Company (CHPRC) that were transitioned to and monitored by Mission Support Alliance (MSA) in 2019, along with sites revegetated by MSA. Site monitoring is a continuance of efforts performed by the RCCC from fiscal year (FY) 2004 through FY 2019. This report contains data collected in 2019 documenting the recovery of revegetation areas associated with the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 cleanup of National Priorities List waste sites and restoration of lands disturbed by ongoing site mission activities at the Hanford Site in Richland, Washington. It contains vegetation monitoring data for 55 sites selected to be representative sites for areas planted between the years of FY 2004 through FY 2019. Two revegetation site monitoring efforts occurred in 2019. The first effort was traditional revegetation monitoring, which analyzes the plant composition of representative revegetated sites for 5 years after they were planted. This monitoring is summarized in Section 3.0. The second effort evaluated the long-term trends of revegetated sites that were past their fifth year of growth. This monitoring is a continuation on the long-term trend monitoring that occurred in 2018 and is summarized in Section 4.0.

54 ENVIRONMENTAL SCIENCES↗

Hanford Site Revegetation Monitoring Report for Fiscal Year 2018

This report describes the monitoring of areas revegetated by the River Corridor Closure Contractor (RCCC) and CH2M Hill Plateau Remediation Company (CHPRC) that were transitioned to and monitored by Mission Support Alliance (MSA) in 2018, along with sites revegetated by MSA. Site monitoring is a continuance of efforts performed by the RCCC from Fiscal Year (FY) 2012 through FY 2018. This report contains data collected in 2018 documenting the recovery of revegetation areas associated with the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 cleanup of National Priorities List waste sites and restoration of lands disturbed by ongoing site mission activites at the Hanford Site in Richland, Washington. It contains vegetation monitoring data for 40 sites selected to be representative sites for areas planted between the years of FY 2012 through FY 2018. Two revegetation site monitoring efforts occurred in 2018. The first effort was traditional revegetation monitoring, which analyzes the plant composition of representative revegetated sites for 5 years after they were planted. This monitoring is summarized in Section 3.0. The second effort evaluated the long-term trends of revegetated sites that were past their fifth year of growth. This monitoring is summarized in Section 4.0.

54 ENVIRONMENTAL SCIENCES↗

Point Sensor Networks Struggle to Detect and Quantify Short Controlled Releases at Oil and Gas Sites

This study evaluated multiple commercially available continuous monitoring (CM) point sensor network (PSN) solutions under single-blind controlled release testing conducted at operational upstream and midstream oil and natural gas (O&G) sites. During releases, PSNs reported site-level emission rate estimates of 0 kg/h between 38 and 86% of the time. When non-zero site-level emission rate estimates were provided, no linear correlation between the release rate and the reported emission rate estimate was observed. The average, aggregated across all PSN solutions during releases, shows 5% of the mixing ratio readings at downwind sensors were greater than the site’s baseline plus two standard deviations. Four of seven total PSN solutions tested during this field campaign provided site-level emission rate estimates with the site average relative error ranging from −100% to 24% for solution D, −100% to −43% for solution E, −25% for solution F (solution F was only at one site), and −99% to 430% for solution G, with an overall average of −29% across all sites and solutions. Of all the individual site-level emission rate estimates, only 11% were within ±2.5 kg/h of the study team’s best estimate of site-level emissions at the time of the releases.

42 ENGINEERING↗

Synthetic ozone deposition and stomatal uptake at flux tower sites

Abstract. We develop and evaluate a method to estimate O 3 deposition and stomatal O 3 uptake across networks of eddy covariance flux tower sites where O 3 concentrations and O 3 fluxes have not been measured. The method combines standard micrometeorological flux measurements, which constrain O 3 deposition velocity and stomatal conductance, with a gridded dataset of observed surface O 3 concentrations. Measurement errors are propagated through all calculations to quantify O 3 flux uncertainties. We evaluate the method at three sites with O 3 flux measurements: Harvard Forest, Blodgett Forest, and Hyytiälä Forest. The method reproduces 83 % or more of the variability in daily stomatal uptake at these sites with modest mean bias (21 % or less). At least 95 % of daily average values agree with measurements within a factor of 2 and, according to the error analysis, the residual differences from measured O 3 fluxes are consistent with the uncertainty in the underlying measurements. The product, called synthetic O 3 flux or SynFlux, includes 43 FLUXNET sites in the United States and 60 sites in Europe, totaling 926 site years of data. This dataset, which is now public, dramatically expands the number and types of sites where O 3 fluxes can be used for ecosystem impact studies and evaluation of air quality and climate models. Across these sites, the mean stomatal conductance and O 3 deposition velocity is 0.03–1.0 cm s -1 . The stomatal O 3 flux during the growing season (typically April–September) is 0.5–11.0 nmol O 3 m -2 s -1 with a mean of 4.5 nmol O 3 m -2 s -1 and the largest fluxes generally occur where stomatal conductance is high, rather than where O 3 concentrations are high. The conductance differences across sites can be explained by atmospheric humidity, soil moisture, vegetation type, irrigation, and land management. These stomatal fluxes suggest that ambient O 3 degrades biomass production and CO 2 sequestration by 20 %–24 % at crop sites, 6 %–29 % at deciduous broadleaf forests, and 4 %–20 % at evergreen needleleaf forests in the United States and Europe.

59 BASIC BIOLOGICAL SCIENCES↗

Lunar shear velocity structure at Apollo sites 12, 14, and 15

Spectral amplitude ratios of horizontal-to-vertical motion produced on seismograms of meteoroid impacts at the Apollo 12, 14, and 15 sites, the Apollo 14 and 15 lunar-module impacts, and the Apollo 15 S4B impact show consistent differences among the recording sites. On the assumption that the motion represents predominantly fundamental-mode Reyleigh waves and that the compressional-wave velocity structure is similar to that derived in other investigations involving the Apollo seismic experiments, estimates are made of the shear-wave velocity structure under the three sites. Near-surface velocities are about 35 m/s at the three sites. The results for site 14 indicate an increase to about 100 m/s near the 8-m depth and to 200 m/s at the 38-m depth. Results for sites 12 and 15 show a smoother gradient and generally a greater velocity at a given depth than that indicated at site 14, reaching velocities of about 400 m/s near the 120-m depth. If the assumed P velocity structures are correct and if changes in S velocity coincide with changes in P velocity, then the ratio of these velocities decreases from 2.9 to 2.0 in the upper 19 meters at site 12, in the upper 38 meters at site 14, and in the upper 21 meters at site 15.

Mark, N.↗

Selection of the Mars Pathfinder Landing Site

The Mars Pathfinder spacecraft will land on a depositional fan near the mouth of the catastrophic outflow channel, Ares Vallis (19.5 deg N, 32.8 deg W). This site offers the prospect of analyzing a variety of rock types from the ancient cratered highlands, intermediate-age ridged plains, and reworked channel deposits. Analyses of these rocks by Pathfinder instruments will enable first-order scientific questions to be addressed, such as differentiation of the crust, the development of weathering products, and the nature of the early environment, as well as their subsequent evolution on Mars. Constraints imposed by: (1) spacecraft and rover designs (which are robust), (2) entry, descent, and landing, (3) scientific potential at various sites, and (4) safety were important considerations in site selection. Engineering constraints require a 70 km by 200 km smooth, flat (low slopes) area located between 10 deg and 20 deg N that is below 0 km elevation, with average radar reflectivity, little dust, and moderate rock abundance. Three regions on Mars are between 10 deg and 20 deg N and below 0 km elevation: Chryse, Amazonis, and Isidis-Elysitun. Science considerations favor sites at the mouths of outflow channels (grab bag sites offer an assay of rock types on Mars), highland sites (early crustal differentiation and climate), and sites covered with dark (unoxidized) material. Sites are considered safe if they are clearly below 0 km elevation, appear acceptably free of hazards in high-resolution (less than 50 m/pixel) Viking orbiter images and have acceptable reflectivity and roughness at radar wavelengths, thermal inertia, rock abundance, red to violet ratio, and albedo. Recent 3.5-cm wavelength radar observations were used to verify elevation, reflectivity, and roughness within the landing ellipses. Three sites meet all of these criteria: Ares Vallis, Tritonis Lacus, and Isidis. Although Isidis appears to be safer than Tritonis and Ares, the greater scientific potential at Ares Vallis resulted in its selection. Comparisons of the Grand Coulee (channel) and the depositional Ephrata Fan of the Channeled Scabland in eastern Washington, with Ar-es Vallis and its depositional fan also suggest the Ares Vallis landing site is safe and scientifically interesting.

Golombek, M. P.↗

Preliminary Assessment of Mars Exploration Rover Landing Site Predictions

Selection of the Mars Exploration Rover (MER) landing sites took place over a three year period in which engineering constraints were identified, 155 possible sites were downselected to the final two, surface environments and safety considerations were developed, and the potential science return at the sites was considered. Landing sites in Gusev crater and Meridiani Planum were selected because they appeared acceptably safe for MER landing and roving and had strong morphologic and mineralogical indicators of liquid water in their past and thus appeared capable of addressing the science objectives of the MER missions, which are to determine the aqueous, climatic, and geologic history of sites on Mars where conditions may have been favorable to the preservation of evidence of possible pre-biotic or biotic processes. Engineering constraints important to the selection included: latitude (10 N-15 S) for maximum solar power; elevation (<-1.3 km) for sufficient atmosphere to slow the lander; low horizontal winds, shear and turbulence in the last few kilometers to minimize horizontal velocity; low 10-m scale slopes to reduce airbag spinup and bounce; moderate rock abundance to reduce abrasion or stroke-out of the airbags; and a radar-reflective, load-bearing and trafficable surface safe for landing and roving that is not dominated by fine-grained dust. In selecting the MER landing sites these engineering constraints were addressed via comprehensive evaluation of surface and atmospheric characteristics from existing remote sensing data and models as well as targeted orbital information acquired from Mars Global Surveyor and Mars Odyssey. This evaluation resulted in a number of predictions of the surface characteristics of the sites, which are tested in this abstract. Relating remote sensing signatures to surface characteristics at landing sites allows these sites to be used as ground truth for the orbital data, is essential for selecting and validating landing sites for future missions, and is required for correctly interpreting the surfaces and materials globally present on Mars.

Golombek, M.↗

Giving Back: Collaborations with Others in Ecological Studies on the Nevada National Security Site

Formerly named the Nevada Test Site, the Nevada National Security Site (NNSS) was the historical site for nuclear weapons testing from the 1950s to the early 1990s. The site was renamed in 2010 to reflect the diversity of nuclear, energy, and homeland security activities now conducted at the site. Biological and ecological programs and research have been conducted on the site for decades to address the impacts of radiation and to take advantage of the relatively undisturbed and isolated lands for gathering basic information on the occurrence and distribution of native plants and animals. Currently, the Office of the Assistant Manager for Environmental Management of the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) oversees the radiological biota monitoring and ecological compliance programs on the NNSS. The top priority of these programs are compliance with federal and state regulations. They focus on performing radiological dose assessments for the public who reside near the NNSS and for populations of plants and animals on the NNSS and in protecting important species and habitat from direct impacts of mission activities. The NNSS serves as an invaluable outdoor laboratory. The geographic and ecological diversity of the site offers researchers many opportunities to study human influences on ecosystems. NNSA/NSO has pursued collaborations with outside agencies and organizations to be able to conduct programs and studies that enhance radiological biota monitoring and ecosystem preservation when budgets are restrictive, as well as to provide valuable scientific information to the human health and natural resource communities at large. NNSA/NSO is using one current collaborative study to better assess the potential dose to the off-site public from the ingestion of game animals, the most realistic pathway for off-site public exposure at this time from radionuclide contamination on the NNSS. A second collaborative study is furthering desert tortoise conservation measures onsite. It is the goal of NNSA/NSO to continue to develop such collaborations in the sharing of resources, such as personnel, equipment, expertise, and NNSS land access, with outside entities to meet mutually beneficial goals cost effectively.

54 ENVIRONMENTAL SCIENCES↗

Closure End States for Facilities, Waste Sites, and Subsurface Contamination

The United States (U.S.) Department of Energy (DOE) manages the largest groundwater and soil cleanup effort in the world. DOE’s Office of Environmental Management (EM) has made significant progress in its restoration efforts at sites such as Fernald and Rocky Flats. However, remaining sites, such as Savannah River Site, Oak Ridge Site, Hanford Site, Los Alamos, Paducah Gaseous Diffusion Plant, Portsmouth Gaseous Diffusion Plant, and West Valley Demonstration Project possess the most complex challenges ever encountered by the technical community and represent a challenge that will face DOE for the next decade. Closure of the remaining 18 sites in the DOE EM Program requires remediation of 75 million cubic yards of contaminated soil and 1.7 trillion gallons of contaminated groundwater, deactivation & decommissioning (D&D) of over 3000 contaminated facilities and thousands of miles of contaminated piping, removal and disposition of millions of cubic yards of legacy materials, treatment of millions of gallons of high level tank waste and disposition of hundreds of contaminated tanks. The financial obligation required to remediate this volume of contaminated environment is estimated to cost more than 7% of the to-go life-cycle cost. Critical in meeting this goal within the current life-cycle cost projections is defining technically achievable end states that formally acknowledge that remedial goals will not be achieved for a long time and that residual contamination will be managed in the interim in ways that are protective of human health and environment. Formally acknowledging the long timeframe needed for remediation can be a basis for establishing common expectations for remedy performance, thereby minimizing the risk of re-evaluating the selected remedy at a later time. Once the expectations for long-term management are in place, remedial efforts can be directed towards near-term objectives (e.g., reducing the risk of exposure to residual contamination) instead of focusing on long-term cleanup requirements. An acknowledgement of the long timeframe for complete restoration and the need for long-term management can also help a site transition from the process of pilot testing different remedial strategies to selecting a final remedy and establishing a long-term management and monitoring approach. This approach has led to cost savings and the more efficient use of resources across the Department of Defense complex and at numerous industrial sites across the U.S. Defensible end states provide numerous benefits for the DOE environmental remediation programs including cost-effective, sustainable long-term monitoring strategies, remediation and site transition decision support, and long-term management of closure sites.

environmental remediation↗

Post-Closure Challenges of U.S. Department of Energy Sites in Desert Environments of the Southwestern United States - 12095

U.S. Department of Energy (DOE) sites located in harsh desert environments of the Four Corners region of the southwestern United States require diligence and continual maintenance to ensure the remediation systems function as designed to protect human health and the environment. The geology and climate of this area create issues that are unique to these sites. Geologic formations contain naturally occurring constituents that are often the same as the residual contaminants remaining from historical milling activities at the sites. Although annual precipitation is low, when precipitation events occur they can be of extreme intensity, resulting in erosion and flooding that can quickly destroy infrastructure and rapidly change site conditions. Winds can cause sand storms and sand mounding that effect site features. These challenging environmental conditions, along with the remote locations of the sites, require active management beyond what was originally envisioned for uranium disposal sites to address concerns in a safe and cost-effective manner. The unique environment of the Four Corners region creates many challenges to the LTSM of LM sites in southwestern United States. The remediation efforts and approaches to infrastructure have to be specifically structured to work in this environment. Often, the systems and structures have to be modified based on lessons learned on how to best adapt to these difficult conditions and remote locations. These sites require continual maintenance and additional efforts compared to many other LM sites. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Contaminated Soil Volume Estimation at the Maywood Site - 12292

As part of the ongoing remediation process at the Maywood Formerly Utilized Sites Remedial Action Program properties, Argonne National Laboratory assisted the U.S. Army Corps of Engineers (USACE) New York District in revising contaminated soil volume estimates for the remaining areas of the Stepan/Sears properties that require soil remediation. As part of the volume estimation process, an initial conceptual site model (ICSM) was prepared for the entire site that captured existing information (with the exception of soil sampling results) pertinent to the possible location of surface and subsurface contamination above cleanup requirements. This ICSM was based on historical anecdotal information, aerial photographs, and the logs from several hundred soil cores that identified the depth of fill material and the depth to bedrock under the site. Specialized geostatistical software developed by Argonne was used to update the ICSM with historical sampling results and down-hole gamma survey information for hundreds of soil core locations; both sampling results and down-hole gamma data were coded to identify whether the results indicated the presence of contamination above site cleanup requirements. Significant effort was invested in developing complete electronic data sets for the site by incorporating data contained in various scanned documents, maps, etc. The updating process yielded both a best guess estimate of contamination volumes and upper and lower bounds on the volume estimate that reflected the estimate's uncertainty. The site-wide contaminated volume estimate (with associated uncertainty) was adjusted to reflect areas where remediation was complete; the result was a revised estimate of the remaining soil volumes requiring remediation that the USACE could use for planning. Other environmental projects may benefit from this process for estimating the volume of contaminated soil. A comparison of sample and DHG results for various stations with the site ICSM provides one measure of the quality of site understanding relative to the presence of contamination and its likely extent. A second measure of the quality of a contaminated soil volume estimate, in the case of BAASS, is a comparison of the best guess volume estimate with the conservative volume estimate. For Maywood, the conservative volume estimate is more than double the best guess. The data available for the site indicate that the preponderance of this difference is attributable to uncertainty about the exact depth of known contamination. The observed depth of contamination based on sample results and DHG data often varied significantly among adjacent soil cores. In the case of Maywood, where a significant amount of remediation has already taken place, a third measure of the quality of the volume estimates is the retrospective estimate of contaminated soil volumes for areas that have already been remediated [2]. The USACE is currently comparing the latest BAASS volume estimates for those areas with records indicating what was actually removed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Progress on Footprint Reduction at the Hanford Site - 12406

The Department of Energy (DOE) Office of Environmental Management (EM) continues to reduce the footprint of legacy sites throughout the EM complex. Footprint reduction is being accomplished by focusing cleanup activities on decontamination and demolition of excess contaminated facilities, soil and groundwater remediation, and solid waste disposition. All of these initiatives are being accomplished with established technologies in proven regulatory frameworks. Ultimately, completion of these environmental cleanup activities will reduce the monitoring and maintenance costs associated with managing large federal facilities, allowing EM to place more focus on other high priority cleanup efforts and facilitate a successful transition to land-term stewardship of these sites. Through the American Recovery and Reinvestment Act (ARRA) investment, the Department's cleanup footprint has been reduced by 45 percent to date, from 2411 km{sup 2} (931 mi{sup 2}) to 1336 km{sup 2} (516 mi{sup 2}s). With this significant progress on footprint reduction, the Department is on track towards their goal to reduce its overall footprint by approximately 90 percent by 2015. In addition, some areas cleaned up may become available for alternate uses (i.e. recreation, conservation, preservation, industrialization or development). Much of the work to reduce the complex's footprint occurred at the Savannah River Site in South Carolina and the Hanford Site in Washington, but cleanup continues across the complex. Footprint reduction is progressing well at the Hanford Site, supported predominantly through ARRA investment. To date, 994 km{sup 2} (384 mi{sup 2}) (65%) of footprint reduction have been achieved at Hanford, with a goal to achieve a 90% reduction by Fiscal Year 2015. The DOE EM and DOE Richland Operations Office, continue to make great progress to reduce the legacy footprint of the Hanford Site. Footprint reduction is being accomplished by focusing cleanup activities on decontamination and demolition of excess facilities, both contaminated and uncontaminated, waste site cleanup activities, and debris pile removal. All of these activities can be accomplished with proven technologies and within established regulatory frameworks. Footprint reduction goals for Fiscal Year 2011 were exceeded, largely with the help of ARRA funding. As cleanup projects are completed and the total area requiring cleanup shrinks, overall costs for surveillance and maintenance operations and infrastructure services decrease. This work completion and decrease in funding requirements to maintain waste sites and antiquated facilities allows more focus on high priority site missions (i.e. groundwater remediation, tank waste disposition, etc.) and moves Site areas closer to transition from EM to the Legacy Management program. The progress in the Hanford footprint reduction effort will help achieve success in these other important mission areas. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗