Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “operational reliability”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,009 records · Page 56

OR-AGENT framework – Architecting electrified heavy-duty drayage applications

The widespread adoption of zero-emission vehicles in heavy-duty (HD) commercial freight transportation faces considerable technoeconomic challenges. For heavy-duty trucks, ensuring high uptime, cost parity with diesel, and safety standards is especially critical as these vehicles operate over long distances with heavy loads, where any downtime or off-nominal behaviors significantly impacts logistics, productivity, and the total cost of ownership. Unlike traditional diesel refueling, BEV charging infrastructure must be co-optimized with vehicle deployment, operational demands, and grid capacity to ensure cost-effective and reliable freight operations. However, the lack of a standardized ownership and service model has led to a fragmented approach—where commercial vehicle operators may invest in, own, and maintain both vehicle/batteries and charging/energy infrastructure. This disconnect may exclude energy service providers from the equation, forcing fleet operators to explore ‘behind-the-fence’ energy solutions that increase capital investment, operational downtime, overhead costs, and, in some cases, net carbon emissions. To address these issues, this study introduces OR-AGENT (Optimal Regional Architecture Generation for Efficient National Transport), a comprehensive modeling framework that integrates powertrain architectures, charging infrastructures, and energy backbone systems into a cohesive strategy. In this paper, OR-AGENT is applied to develop an interconnected systems architecture for energy efficiency and resiliency enhancement of heavy-duty drayage vehicles at the Port of Savannah, GA. This framework showcases an interconnected systems approach to electrifying heavy-duty drayage vehicles at the Port of Savannah, GA. The study assessed BEVs with 400–1200 kWh battery capacities, accounting for seasonal variations in weather and freight routing. A diverse charging mix (150 kW–1250 kW) was evaluated alongside grid capacity constraints, cost, and carbon intensity analysis, leading to the development of a strategic microgrid/Distributed Energy Resources (DER) deployment architecture to ensure a reliable and sustainable transition. However, the findings also highlight the need for alternative zero-emission solutions for remaining trips, such as larger batteries, electrified roadways, hydrogen powertrains, or net-zero emission fuels. In conclusion, the findings are incorporated into a Total Cost of Ownership (TCO) model to identify optimal architectures for an interconnected electrified ecosystem.

Commercial vehicles↗

Deep Analysis Net with Causal Embedding for Coal-fired Power Plant Fault Detection and Diagnosis (DANCE4CFDD)

Fault detection and diagnosis is critical to power plant operation to ensure attaining high reliability while reducing operation cost. As more renewable power is introduced to the power grid, traditional fossil power plants take on the extra burden of excessive load cycling to compensate the generation variability from renewable power. Such load cycling will pose more reliability challenges to power plant operation. There are a number of challenges faced by today’s asset health management system in coal- fired (or gas) power plants: 1) high-dimensional nonlinear interaction among multiple time series measurements; 2) high measurement variance induced by operational conditions/modes; 3) variation among asset types and plant configurations; and 4) a small number of faulty events to learn from. To cope with these challenges, today’s fielded asset health management systems rely heavily on manual efforts from domain experts and hand-crafted features or rules based on domain knowledge. Despite its role in plant reliability, such a practice is costly and hinders its scalability and sustainability, particularly when a plant undergoes modifications. The objective of this project is to develop a novel end-to-end AI learning system that is trainable (i.e., the AI representation of a complex system behavior can be directly learned from properly labeled data) for accurate fault detection and root cause analysis. The ability to create a fault detection model directly from time series could alleviate the efforts associated with today’s asset management solution development. In the course of this project, we have achieved the following: Created an AI model development environment incorporating state-of-the-art neural network architectures for rapid model development and evaluation; Developed novel learning strategies for training of fault detection model; Developed special-purpose neural network architecture embedded with variable association graph aiming for better interpretability; Developed a learning strategy to leverage a small number of faulty events for enhanced fault detection capability; Conducted detailed experimental study based on public benchmark datasets and demonstrated the effectiveness of the proposed solution; and Validated the developed system with data from both a coal-fired plant boiler dynamic simulation model and real-world coal-fired power plant covering multiple asset and fault types. Overall, the project attained a technology readiness level of TRL 5 from TRL 2 at the beginning of the project.

20 FOSSIL-FUELED POWER PLANTS↗

Light Water Reactor Sustainability Program: Use of Time Distributions to Predict Operator Procedure Performance in Dynamic Human Reliability Analysis

The Human Unimodel for Nuclear Technology to Enhance Reliability (HUNTER) framework affords software capable of conducting human reliability analysis (HRA) using a dynamic approach built around operating procedures (OPs) from nuclear power plants (NPPs). Previous HUNTER reports document the development of this software tool, the coupling of HUNTER to the simulator code, the collection of operator performance data by using simulators to calibrate HUNTER models, and linking HUNTER to probabilistic risk assessment (PRA) software. The present report largely addresses two topics. The first is a new function in HUNTER called the HUNTER Procedure Performance Predictor (P3). HUNTER P3 uses HUNTER’s built in Monte Carlo tools featuring human performance variability to identify potential error traps in procedures. The second topic is time distribution analysis to generate time inputs for dynamic HRA. The current analysis was performed to investigate time distributions for task primitives, which are the minimum task unit of analysis used in dynamic HRA modeling. Using the time distribution data, the elapsed time for human actions in an extended loss of AC power (ELAP) scenario is then investigated. Time data and prediction are essential for modeling procedure performance.

99 GENERAL AND MISCELLANEOUS↗

Port Impedance Measurement and Current Injection Response Analysis for PLCs

Programmable Logic Controllers (PLCs) are used to control devices throughout the power system since they have fast control capabilities and can utilize multiple types of communication interfaces. Therefore, studying and mitigating their vulnerabilities to electromagnetic pulse is important for the reliability of PLC operations. Here, in this paper, an effective impedance measurement scheme is proposed and demonstrated for three PLCs to estimate their susceptibility to an electromagnetic pulse. The equivalent non-uniform transmission line model is established to eliminate the impact of the fixture in the de-embedding process. Then different parameters of the impedance measurement setup are explored. Based on the measured impedance, the equivalent circuit is established to calculate the response of the device when subjected to the electromagnetic pulse. The voltage and current responses of different interfaces are compared utilizing the developed pulsed Current Injection (CI) method. Finally, the impedance measurement scheme is verified through testing using three measuring instruments. And the CI simulation experiments reveal the characteristics and susceptibilities of different PLCs interfaces, indicating that some protection measures are required for the reliable operation of the PLC.

42 ENGINEERING↗

Dynamic Line Rating Oncor Electric Delivery Smart Grid Program

Electric transmission lines are the lifeline of the electric utility industry, delivering its product from source to consumer. This critical infrastructure is often constrained such that there is inadequate capacity on existing transmission lines to efficiently deliver the power to meet demand in certain areas or to transport energy from high-generation areas to high-consumption regions. When this happens, the cost of the energy rises; more costly sources of power are used to meet the demand or the system operates less reliably. These economic impacts are known as congestion, and they can amount to substantial dollars for any time frame of reference: hour, day or year. There are several solutions to the transmission constraint problem, including: construction of new generation, construction of new transmission facilities, rebuilding and reconductoring of existing transmission assets, and Dynamic Line Rating (DLR). All of these options except DLR are capital intensive, have long lead times and often experience strong public and regulatory opposition. The Smart Grid Demonstration Program (SGDP) project co-funded by the Department of Energy (DOE) and Oncor Electric Delivery Company developed and deployed the most extensive and advanced DLR installation to demonstrate that DLR technology is capable of resolving many transmission capacity constraint problems with a system that is reliable, safe and very cost competitive. The SGDP DLR deployment is the first application of DLR technology to feed transmission line real-time dynamic ratings directly into the system operation’s State Estimator and load dispatch program, which optimizes the matching of generation with load demand on a security, reliability and economic basis. The integrated Dynamic Line Rating (iDLR)1 collects transmission line parameters at remote locations on the lines, calculates the real-time line rating based on the equivalent conductor temperature, ambient temperature and influence of wind and solar radiation on the stringing section, transmits the data to the Transmission Energy Management System, validates its integrity and passes it on to Oncor and ERCOT (Electric Reliability Council of Texas) respective system operations. The iDLR system is automatic and transparent to ERCOT System Operations, i.e., it operates in parallel with all other system status telemetry collected through Supervisory Control and Data Acquisition (SCADA) employed across the company.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Effects of shifts in the level of automation on operator performance

The results of two experiments examining the effects of shifts in the type and level of automation on operator performance are presented. The first examines the costs and benefits of adaptive-automation shifts on operator performance, while the second experiment examines the effects of variations in automation reliability on operator detection of automation failures. Performance consequences of complacency in system monitoring are shown to be related to characteristics of the monitoring task automation, i.e., automation reliability and consistency.

Parasuraman, Raja↗

Design optimization for cost and quality: The robust design approach

Designing reliable, low cost, and operable space systems has become the key to future space operations. Designing high quality space systems at low cost is an economic and technological challenge to the designer. A systematic and efficient way to meet this challenge is a new method of design optimization for performance, quality, and cost, called Robust Design. Robust Design is an approach for design optimization. It consists of: making system performance insensitive to material and subsystem variation, thus allowing the use of less costly materials and components; making designs less sensitive to the variations in the operating environment, thus improving reliability and reducing operating costs; and using a new structured development process so that engineering time is used most productively. The objective in Robust Design is to select the best combination of controllable design parameters so that the system is most robust to uncontrollable noise factors. The robust design methodology uses a mathematical tool called an orthogonal array, from design of experiments theory, to study a large number of decision variables with a significantly small number of experiments. Robust design also uses a statistical measure of performance, called a signal-to-noise ratio, from electrical control theory, to evaluate the level of performance and the effect of noise factors. The purpose is to investigate the Robust Design methodology for improving quality and cost, demonstrate its application by the use of an example, and suggest its use as an integral part of space system design process.

Unal, Resit↗

Early implementation of digital upgrades on simulators - 347

An important aspect of successful Nuclear Power Plant (NPP) digital control system upgrade projects is to upgrade the Operator Training Simulator (OTS) or a related Engineering Simulator (ES), prior to installation of the Distributed Control System (DCS) on the plant allowing for early testing of the digital controls/HMI and for early training of the plant operators while maintaining OTS configuration management (i.e. OTS in sync with the plant's current design). Experience has shown that early implementation of digital upgrades on the OTS and/or an ES can reduce plant startup duration (related to digital systems commissioning) and ensure operators are proficient with the new digital systems to ensure safe and reliable plant operation. Including simulators in the design process offers many benefits including early identification of design deficiencies, testing deficiency fixes, developing and validating plant procedures and supporting human factors engineering, to name a few. Implementing digital upgrades on the OTS is also a regulatory requirement driven by the ANSI/ANS-3.5-2009 standard (Nuclear Power Plant Simulators for Use in Operator Training and Examination) if the new DCS affects actions to be taken by the plant operator in the main control room. This paper presents the benefits of implementing digital upgrades on the OTS and/or ES prior to plant implementation. The various simulator implementation strategies (stimulation, emulation, simulation or a hybrid solution) and selection factors are discussed. The paper also covers four (4) case studies demonstrating how digital upgrades can be implemented on simulators. The first case study covers the implementation of a Siemens offgas Programmable Logic Controller (PLC) system on the Enrico Fermi OTS (Michigan). The second case study covers the implementation of a GE main generator excitation system on the Cernavoda OTS (Romania). The third case study covers the implementation of a Siemens main feedwater control system on the Callaway OTS and ES (Missouri). The final case study covers the implementation of the non-safety related and safety related DCS on the Nuclear New Build (NNB) Hongyanhe Phase I dual-purpose OTS/ES (China). (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Simplified Phased-Mission System Analysis for Systems with Independent Component Repairs

Accurate analysis of reliability of system requires that it accounts for all major variations in system's operation. Most reliability analyses assume that the system configuration, success criteria, and component behavior remain the same. However, multiple phases are natural. We present a new computationally efficient technique for analysis of phased-mission systems where the operational states of a system can be described by combinations of components states (such as fault trees or assertions). Moreover, individual components may be repaired, if failed, as part of system operation but repairs are independent of the system state. For repairable systems Markov analysis techniques are used but they suffer from state space explosion. That limits the size of system that can be analyzed and it is expensive in computation. We avoid the state space explosion. The phase algebra is used to account for the effects of variable configurations, repairs, and success criteria from phase to phase. Our technique yields exact (as opposed to approximate) results. We demonstrate our technique by means of several examples and present numerical results to show the effects of phases and repairs on the system reliability/availability.

Somani, Arun K.↗

Designing monitoring networks for local earthquakes

Abstract Seismic networks are essential for monitoring local earthquakes in connection to industrial activities, including wastewater injection and CO2 sequestration. Because these networks are typically deployed for short periods of time at specific sites, it is beneficial to develop best practices for efficient and effective installation and monitoring. Such standards are available for regional earthquake and microseismic monitoring, but not readily available for local scale (tens of kilometer scale) monitoring. Once the region of interest has been determined, the key parameters for establishing a network are available monitoring station locations, site noise, and site utility. Networks should be designed based on the project monitoring goals for earthquake magnitude and density. Herein, a network was established at the Patterson and Hartland Oil Fields in western Kansas in association with a US Department of Energy CarbonSAFE carbon capture and sequestration research project. We employed observations from an analog local network, the Wellington Earthquake Monitoring Network in south-central Kansas, to assess site noise and estimate earthquake detection thresholds for the Patterson and Hartland fields. Noise from oil production facilities was evaluated, concluding that oil lease sites are suitable for monitoring small local earthquakes (M1-M3). The network was designed to have a magnitude of completeness of M1 while using station locations on existing field operator leases. Fifteen months of continuous network operation demonstrates reliable and efficient local earthquake monitoring and provides best practices recommendations for similar operations.

58 GEOSCIENCES↗

Informing Plant Asset Reliability and Availability Through AI-Driven Analysis of Operator Logs

The availability and reliability of nuclear power plant (NPP) structures, systems, and components (SSCs) are critical parameters for NPP safety. Tracking these parameters is necessary but costly and labor-intensive, requiring the collection and evaluation of SSC event data such as shutdowns, startups, and failures. To show how these events are needed for the parameters an example is given: one measure of reliability is based on the number of equipment failure events and the number of run hours (i.e., the time from a startup event to a shutdown event). Here, this work investigates using artificial intelligence (AI) to mine NPP operator log entry texts for SSC event data. Four AI approaches were explored for identifying these events, including natural language processing (NLP) methods, generative AI, generative AI combined with NLP, and topic modeling. A key challenge addressed with all four approaches is the brevity of operator log entries. Among these four a neural network–based NLP method was shown to be the most promising for this application, achieving F1 scores of 86.0% for shutdowns, 92.2% for startups, and 80.4% for failures on a subject-matter-expert-curated dataset from NPP operator logs, compared to a baseline of 66.6% for a random classifier. This shows that NLP methods can perform better than generative AI. Additionally, the NLP methods combined with generative AI were shown to perform better than generative AI alone. Generative AI was most successful at providing the background information for the NLP methods to use. This work demonstrates the potential to use AI to automate parameter collection from NPP operator log entries and other records.

97 - MATHEMATICS AND COMPUTING↗

AlGaAs heterojunction lasers

The characterization of 8300 A lasers was broadened, especially in the area of beam quality. Modulation rates up to 2 Gbit/sec at output powers of 20 mW were observed, waveform fidelity was fully adequate for low BER data transmission, and wavefront measurements showed that phase aberrations were less than lamda/50. Also, individually addressable arrays of up to ten contiguous diode lasers were fabricated and tested. Each laser operates at powers up to 30 mW CW in single spatial mode. Shifting the operating wavelength of the basic CSP laser from 8300 A to 8650 A was accomplished by the addition of Si to the active region. Output power has reached 100 mW single mode, with excellent far field wave front properties. Operating life is currently approx. 1000 hrs at 35 mW CW. In addition, laser reliability, for operation at both 8300 A and 8650 A, has profited significantly from several developments in the processing procedures.

Goldstein, B.↗

Reliability of Digital Communications in Nuclear Facilities and Operations

A comprehensive evaluation of methods to compare the reliability of wired and wireless digital communication networks for use in nuclear power plants. The study underscores the critical role of communication reliability in ensuring operational safety in nuclear power plants. Key objectives include developing a methodology to assess communication technologies’ reliability, particularly for comparing wireless and wired networks, for nuclear facility applications. The framework focuses on technology-agnostic evaluations and emphasizes the importance of reliability metrics spanning safety, security, and monitoring functions. The framework emphasizes that the key performance indicators are application dependent and provides a hierarchy of different network types that will have different reliability requirements. The report considers both existing plants and advanced reactors, including small modular reactors.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Commercial Building Loads Providing Ancillary Services in PJM

The adoption of low carbon energy technologies such as variable renewable energy and electric vehicles, coupled with the efficacy of energy efficiency to reduce traditional base load has increased the uncertainty inherent in the net load shape. Handling this variability with slower, traditional resources leads to inefficient system dispatch, and in some cases may compromise reliability. Grid operators are looking to future energy technologies, such as automated demand response (DR), to provide capacity-based reliability services as the need for these services increase. While DR resources are expected to have the flexibility characteristics operators are looking for, demonstrations are necessary to build confidence in their capabilities. Additionally, building owners are uncertain of the monetary value and operational burden of providing these services. To address this, the present study demonstrates the ability of demand response resources providing two ancillary services in the PJM territory, synchronous reserve and regulation, using an OpenADR 2.0b signaling architecture. The loads under control include HVAC and lighting at a big box retail store and variable frequency fan loads. The study examines performance characteristics of the resource: the speed of response, communications latencies in the architecture, and accuracy of response. It also examines the frequency and duration of events and the value in the marketplace which can be used to examine if the opportunity is sufficient to entice building owners to participate.

54 ENVIRONMENTAL SCIENCES↗

Commercial building loads providing ancillary services In PJM

The adoption of low carbon energy technologies such as variable renewable energy and electric vehicles, coupled with the efficacy of energy efficiency to reduce traditional base load has increased the uncertainty inherent in the net load shape. Handling this variability with slower, traditional resources leads to inefficient system dispatch, and in some cases may compromise reliability. Grid operators are looking to future energy technologies, such as automated demand response (DR), to provide capacity-based reliability services as the need for these services increase. While DR resources are expected to have the flexibility characteristics operators are looking for, demonstrations are necessary to build confidence in their capabilities. Additionally, building owners are uncertain of the monetary value and operational burden of providing these services. To address this, the present study demonstrates the ability of demand response resources providing two ancillary services in the PJM territory, synchronous reserve and regulation, using an OpenADR 2.0b signaling architecture. The loads under control include HVAC and lighting at a big box retail store and variable frequency fan loads. The study examines performance characteristics of the resource: the speed of response, communications latencies in the architecture, and accuracy of response. It also examines the frequency and duration of events and the value in the marketplace which can be used to examine if the opportunity is sufficient to entice building owners to participate.

MacDonald, Jason↗

Machine Learning in Power System Operations: Training Data

Reliability and stability of the electric grid today has depended upon operations of the grid which include the protective relay. Today, the electricity sector faces new challenges with the shift of generation resource characteristics away from the traditional “big iron” generation to inverter-based resources (IBR) which shift the physics and assumption used in grid operation and protection. These changing conditions represent new challenges for protective relays (identification of faults) and increased challenges for protection engineers (correct settings and configuration, reduction of mis-operations), both issues recognized in research and industry. Finding new approaches to reduce mis-operations in relaying and new approaches to fault identification is critical to grid operations. Using today’s modern technology of embedded systems, edge computing, machine learning (ML), and communications we can help address challenges and augment and improve on existing power system operations methodologies.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A fault-tolerant intelligent robotic control system

This paper describes the concept, design, and features of a fault-tolerant intelligent robotic control system being developed for space and commercial applications that require high dependability. The comprehensive strategy integrates system level hardware/software fault tolerance with task level handling of uncertainties and unexpected events for robotic control. The underlying architecture for system level fault tolerance is the distributed recovery block which protects against application software, system software, hardware, and network failures. Task level fault tolerance provisions are implemented in a knowledge-based system which utilizes advanced automation techniques such as rule-based and model-based reasoning to monitor, diagnose, and recover from unexpected events. The two level design provides tolerance of two or more faults occurring serially at any level of command, control, sensing, or actuation. The potential benefits of such a fault tolerant robotic control system include: (1) a minimized potential for damage to humans, the work site, and the robot itself; (2) continuous operation with a minimum of uncommanded motion in the presence of failures; and (3) more reliable autonomous operation providing increased efficiency in the execution of robotic tasks and decreased demand on human operators for controlling and monitoring the robotic servicing routines.

Marzwell, Neville I.↗