Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “integer”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,009 records · Page 56

Environmental and economic optima of solar home systems design: A combined LCA and LCC approach

Here, we compare the economic and environmental optimal design of Solar Home Systems (SHSs) and explore the role of economic incentives (such as tariffs and technology costs) in approximating the two optima. To achieve that, we present a methodology for the environmental and economic evaluation of grid-connected SHSs: user-scale electric systems involving a photovoltaic (PV) power system and a battery energy storage system. The proposed methodology is based on a mixed integer linear programming (MILP) optimization, life cycle assessment and life cycle costing. This methodological framework is applied to a case study involving a typical SHS installation in Italy. The results of the environmental optimal design brought to the evaluation of a 3.25 kW PV assisted by 8.66 kWh of nickel cobalt manganese batteries, whereas the costs of the SHS are minimized by a small PV system (less than 1 kW). Results underline that the environmental optimal configurations rely on battery technologies, which entails a significant cost compared to the grid connection. In contrast, the economic optimal design solutions is less impactful than the grid mix both from an environmental and economic points of view. Thanks to a reduction of batteries and PV costs, the environmental impact of the economic optimal design is expected to decrease in the future.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

A systems engineering framework for the optimization of food supply chains under circular economy considerations

The current linear “take-make-waste-extractive” model leads to the depletion of natural resources and environmental degradation. Circular Economy (CE) aims to address these impacts by building supply chains that are restorative, regenerative, and environmentally benign. This can be achieved through the re-utilization of products and materials, the extensive usage of renewable energy sources, and ultimately by closing any open material loops. Such a transition towards environmental, economic and social advancements requires analytical tools for quantitative evaluation of the alternative pathways. Here, in this work, we present a novel CE system engineering framework and decision-making tool for the modeling and optimization of food supply chains. First, the alternative pathways for the production of the desired product and the valorization of wastes and by-products are identified. Then, a Resource-Task-Network representation that captures all these pathways is utilized, based on which a mixed-integer linear programming model is developed. This approach allows the holistic modeling and optimization of the entire food supply chain, taking into account any of its special characteristics, potential constraints as well as different objectives. Considering that typically CE introduces multiple, often conflicting objectives, we deploy here a multi-objective optimization strategy for trade-off analysis. A representative case study for the supply chain of coffee is discussed, illustrating the steps and the applicability of the framework. Single and multi-objective optimization formulations under five different coffee-product demand scenarios are presented. The production of instant coffee as the only final product is shown to be the least energy and environmental efficient scenario. On the contrary, the production solely of whole beans sets a hypothetical upper bound on the optimal energy and environmental utilization. In both problems presented, the amount of energy generated is significant due to the utilization of waste generated for the production of excess energy.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

POINT: Partially Observable Imitation Network for Traffic Signal Control

Smart traffic signals bring together transportation infrastructure and advance technologies to improve the mobility and efficiency of urban transportation network. Adaptive traffic signal control studies can be categorized into modeling-based approaches and learning-based approaches. In order to take advantages of these two systems, this study developed an offline-online combined Partial Observable Imitation Network for Traffic signal control (POINT). In the offline system, the traffic signal timing optimization problem was formulated as a Mixed Integer Nonlinear Programming (MINLP) given complete traffic information, i.e., second-by-second speeds and locations of all vehicles. Furthermore, the objective of MINLP is to minimize total travel delays considering individual vehicle trajectories under Connected Vehicle (CV) environment. The calculated optimal solutions under various traffic conditions were considered as the ”expert” decisions. In the online system, an imitation neural network model was developed to learn the ”expert” signal plans generated from offline system. Given partial observable traffic conditions in real time, e.g., the aggregate-level of traffic volume, the POINT model can compute the signal timing parameters in the online system. The numerical results demonstrated that the proposed method outperformed other state-of-the-art signal control method under high and unbalanced traffic demand levels in terms of reducing travel delays and queue length.

33 ADVANCED PROPULSION SYSTEMS↗

Feasible region-based heuristics for optimal transmission switching

In this paper, we develop a optimal transmission switching (OTS) heuristic based on DC optimal power flow (OPF) and assess the efficacy of the approach when implemented within AC OPF. Traditional formulations of the OTS problem can result in hundreds or thousands of binary variables for large networks, making the OTS problem challenging to solve on fast timescales even for relatively small networks. Here, we identify which constraints and therefore which variables are constraining the DC OPF feasible region, and rank them based on their impact on the cost function. We develop a heuristic algorithm which iteratively removes these constraints and solves a series of standard DC OPF problems. The heuristic is tested on a variety of PGlib networks and the results show that the algorithm can provide substantial cost decreases without having to solve any mixed integer programs. Additionally, we provide insights about the OTS problem, including identifying scenarios outside congestion where OTS can prove useful. Lastly, the performance of the DC-based heuristic is shown when the line switching decisions are implemented within AC OPF.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Decentralised optimisation of cogeneration in virtual power plants

Within several projects we investigated grid structures and management strategies for active grids with high penetration of renewable energy resources and distributed generation (RES and DG). Those ''smart grids'' should be designed and managed by model based methods, which are elaborated within these projects. Cogeneration plants (CHP) can reduce the greenhouse gas emissions by locally producing heat and electricity. The integration of thermal storage devices is suitable to get more flexibility for the cogeneration operation. If several power plants are bound to centrally managed clusters, it is called ''virtual power plant''. To operate smart grids optimally, new optimisation and model reduction techniques are necessary to get rid with the complexity. There is a great potential for the optimised management of CHPs, which is not yet used. Due to the fact that electrical and thermal demands do not occur simultaneously, a thermally driven CHP cannot supply electrical peak loads when needed. With the usage of thermal storage systems it is possible to decouple electric and thermal production. We developed an optimisation method based on mixed integer linear programming (MILP) for the management of local heat supply systems with CHPs, heating boilers and thermal storages. The algorithm allows the production of thermal and electric energy with a maximal benefit. In addition to fuel and maintenance costs it is assumed that the produced electricity of the CHP is sold at dynamic prices. This developed optimisation algorithm was used for an existing local heat system with 5 CHP units of the same type. An analysis of the potential showed that about 10% increase in benefit is possible compared to a typical thermally driven CHP system under current German boundary conditions. The quality of the optimisation result depends on an accurate prognosis of the thermal load which is realised with an empiric formula fitted with measured data by a multiple regression method. The key functionality of a virtual power plant is to increase the value of the produced power by clustering different plants. The first step of the optimisation concerns the local operation of the individual power generator, the second step is to calculate the contribution to the virtual power plant. With small extensions the suggested MILP algorithm can be used for an overall EEX (European Energy Exchange) optimised management of clustered CHP systems in form of the virtual power plant. This algorithm has been used to control cogeneration plants within a distribution grid. (author)

20 FOSSIL-FUELED POWER PLANTS↗

t 1 -noise elimination by continuous chemical shift anisotropy refocusing

We report that due to their high gyromagnetic ratio, there is considerable interest in measuring distances and correlations involving protons, but such measurements are compounded by the simultaneous recoupling of chemical shift anisotropy (CSA). This secondary recoupling adds additional modulations to the signal intensities that ultimately lead to t 1 -noise and signal decay. Recently, Venkatesh et al. demonstrated that the addition of CSA refocusing periods during 1 H-X dipolar recoupling led to sequences with far higher stability and performance. Herein, we describe a related effort and develop a symmetry-based recoupling sequence that continually refocuses the 1 H CSA. This sequence shows superior performance to the regular and t1-noise eliminated D-HMQC sequences in the case of spin-1/2 nuclei and comparable performance to the later for half-integer quadrupoles.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Automatic fitting of multiple-field solid-state NMR spectra

The NMR lineshapes produced by half-integer quadrupolar nuclei are sensitive to 11 distinct fit parameters per inequivalent site. To date, automatic fitting routines have failed to replace manual parameter insertion and evaluation due to the importance of local minima and the need for fitting multiple-field magic-angle spinning (MAS) and static spectra simultaneously. Herein we introduce a new tool, AMES-Fit (Automatic Multiple Experiment Simulation and Fitting), to automatically find the global best-fit simulation parameters for a series of multiple-field NMR lineshapes. AMES-Fit uses an adaptive step size random search algorithm to dynamically probe parameter space and requires minimal human input. Importantly, the best fits are obtained in a few minutes of computation time that would otherwise have required several person-hours of work. The program is freely available and open-source.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

An optimization framework for workplace charging strategies

The workplace charging (WPC) has been recently recognized as the most important secondary charging point next to residential charging for plug-in electric vehicles (PEVs). The current WPC practice is spontaneous and grants every PEV a designated charger, which may not be practical or economic when there are a large number of PEVs present at workplace. This study is the first research undertaken that develops an optimization framework for WPC strategies to satisfy all charging demand while explicitly addressing different eligible levels of charging technology and employees’ demographic distributions. The optimization model is to minimize the lifetime cost of equipment, installations, and operations, and is formulated as an integer program. We demonstrate the applicability of the model using numerical examples based on national average data. The results indicate that the proposed optimization model can reduce the total cost of running a WPC system by up to 70% compared to the current practice. The WPC strategies are sensitive to the time windows and installation costs, and dominated by the PEV population size. The WPC has also been identified as an alternative sustainable transportation program to the public transit subsidy programs for both economic and environmental advantages.

Optimization↗

Refueling infrastructure planning in intercity networks considering route choice and travel time delay for mixed fleet of electric and conventional vehicles

The range anxiety has been a major factor that affects the market acceptance of electric vehicles. Even with the recent development of battery technologies, a lack of charging stations and range anxiety are still significant concerns, specifically for intercity trips. This calls for more investments in building charging stations and advancing battery technologies to increase the market share of electric vehicles and improve sustainability. This study suggests a configuration for plug-in electric vehicle charging infrastructure to support long-distance intercity trips of electric vehicles at the network level. A model is proposed to minimize the total system cost including infrastructure investment (building charging stations/spots) and travel time delays (charging time, waiting time in the queue, and detour time to access charging stations). This study fills existing gaps in the literature by capturing realistic patterns of travel demand and considering flow-dependent charging delays at charging stations. Furthermore, the proposed model, which is formulated as a mixed-integer program with nonlinear constraints, solves the optimization problem at the network level. At the network level, impacts of charging station locations on the traffic assignment problem with a mixed fleet of electric and conventional vehicles need to be considered. To this end, a traffic assignment module is integrated with a simulated annealing algorithm. The numerical experiments show a satisfactory application of the model for a full-scale case study (intercity network in Michigan). The solution quality and efficiency of the proposed solution algorithm are evaluated against those of an enumeration approach for a small case study. The results suggest that even for the current market share and charging stations’ setting, a significant investment is needed to support intercity trips without range anxiety issues and with acceptable delays. Additionally, through sensitivity analyses, the required infrastructure and battery investments to support intercity trips with acceptable delays are established for hypothetical increased market shares and battery size in the future.

42 ENGINEERING↗

Real time operation of high-capacity electric vehicle ridesharing fleets

We study the feasibility of using electric vehicles in online, high-capacity ridepooling systems. Prior work has shown that online algorithms perform well for centrally-controlled, high-capacity ridepool systems. First, we propose a mixed integer linear program to expand past algorithms on ridepooling to electric vehicle fleets with the objective of scheduling vehicle charging to maintain sufficient fleet sizes at various times of day. Then we show a faster, scalable algorithm with similar performance that is practical for full-scale systems. Furthermore, our contributions reinforce the importance of having knowledge and estimates of future demand even when operating in the online setting.

33 ADVANCED PROPULSION SYSTEMS↗

Redesigning large-scale multimodal transit networks with shared autonomous mobility services

Here, this study addresses a large-scale multimodal transit network design problem, with Shared Autonomous Mobility Services (SAMS) as both transit feeders and an origin-to-destination mode. The framework captures spatial demand and modal characteristics, considers intermodal transfers and express services, determines transit infrastructure investment and path flows, and generates transit routes. A system-optimal multimodal transit network is designed with minimum total door-to-door generalized costs of users and operators, satisfying transit origin-destination demand within a pre-set infrastructure budget. Firstly, the geography, demand, and modes in each zone are characterized with continuous approximation. The decisions of network link investment and multimodal path flows in zonal connection optimization are formulated as a minimum-cost multi-commodity network flow (MCNF) problem and solved efficiently with a mixed-integer linear programming (MILP) solver. Subsequently, the route generation problem is solved by expanding the MCNF formulation to minimize intramodal transfers. The model is illustrated through a set of experiments with the Chicago network comprised of 50 zones and seven modes, under three scenarios. The computational results present savings in traveler journey time and operator cost demonstrating the potential benefits of collaboration between multimodal transit systems and SAMS.

Autonomous vehicles↗

Heuristic solutions to the single depot electric vehicle scheduling problem with next day operability constraints

This study focuses on the single depot electric vehicle scheduling problem (SDEVSP) within the broader context of the vehicle scheduling problem (VSP). By developing an effective scheduling model using mixed-integer linear programming, we generate bus blocks that accommodate electric vehicles (EVs), ensuring successful completion of each block while considering recharging requirements between blocks and during off-hours. Next day operability constraints are also incorporated, allowing for seamless repetition of blocks on subsequent days. The SDEVSP is known to be computationally complex, deriving optimal solutions unattainable for large-scale problems within reasonable timeframes. To address this, we propose a two-step solution approach: first solving the single depot VSP, and then addressing the block chaining problem (BCP) using the blocks generated in the first step. The BCP focuses on optimizing block combinations to facilitate recharging between consecutive blocks, considering operational constraints. Further, a case study conducted reveals that nearly 100% electrification for Chicago, IL and Austin, TX transit buses is viable yet requires 1.6 EVs at 150-mile range per diesel vehicle.

33 ADVANCED PROPULSION SYSTEMS↗

Electric vehicle fast charging infrastructure planning in urban networks considering daily travel and charging behavior

Electric vehicles are a sustainable substitution to conventional vehicles. This work introduces an integrated framework for urban fast charging infrastructure to address the range anxiety issue. A mesoscopic simulation tool is developed to generate trip trajectories, and simulate charging behavior based on various trip attributes. The resulting charging demand is the key input to a mixed-integer nonlinear program that seeks charging station configuration. The model minimizes the total system cost including charging station and charger installation costs, and charging, queuing, and detouring delays. The problem is solved using a decomposition technique incorporating a commercial solver for small networks, and a heuristic algorithm for large-scale networks, in addition to the Golden Section method. The solution quality and significant superiority in the computational efficiency of the decomposition approach are confirmed in comparison with the implicit enumeration approach. Furthermore, the required infrastructure to support urban trips is explored for future market shares and technologies.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Joint optimization of electric bus charging infrastructure, vehicle scheduling, and charging management

High upfront costs of vehicles and charging infrastructure as well as the lack of knowledge related to infrastructure planning and electric bus system operation are major obstacles to the implementation of battery electric buses (BEBs). To tackle the obstacles and promote BEB adoption, a comprehensive optimization framework was developed to address the combined charging infrastructure planning, vehicle scheduling, and charging management problem for BEB systems, with the goal to minimize the total cost of ownership. The problem was formulated as a mixed-integer non-linear problem. A genetic algorithm-based approach was then proposed to solve the problem. Last, three alternative scenarios based on a sub-transit network in Salt Lake City, Utah, were analyzed and compared with the optimal scenario results in the numerical experiments. Our comparison results demonstrate the effectiveness of the proposed model and solution algorithm in determining a cost-efficient planning strategy for BEB systems.

33 ADVANCED PROPULSION SYSTEMS↗

A supply chain network design model for biomass co-firing in coal-fired power plants

We propose a framework for designing the supply chain network for biomass co-firing in coal-fired power plants. This framework is inspired by existing practices with products with similar physical characteristics to biomass. We present a hub-and-spoke supply chain network design model for long-haul delivery of biomass. This model is a mixed integer linear program solved using benders decomposition algorithm. Numerical analysis indicates that 100 million tons of biomass are located within 75 miles from a coal plant and could be delivered at $8.53/dry-ton; 60 million tons of biomass are located beyond 75 miles and could be delivered at $36/dry-ton.

09 BIOMASS FUELS↗

Long-term strategic planning of inter-city fast charging infrastructure for battery electric vehicles

Here, this study introduces a multistage mixed integer modeling framework for long-term strategic planning of the battery electric vehicle (BEV) inter-city fast charging infrastructure. In response to the growing BEV inter-city travel demand, the framework integrates both an optimization model for decisions on where and when to build charging stations and a stochastic queuing model to determine how many chargers are needed for each station. A genetic algorithm based heuristic method is developed to efficiently solve the problem. The model is applied to investigate the long-term infrastructure requirement in the state of California where significant growth in BEV demand is expected in coming decades. Our findings indicate that the charging infrastructure is expanded in both network coverage (number of stations) and service capacity (number of chargers per station) as the BEV demand grows. We also found that the infrastructure requirement is dependent on many factors, such as the BEV electrified range, the required level of service at charging stations, and the range anxiety cost. For most simulated scenarios, the results show that it is beneficial to invest in the inter-city fast charging infrastructure, even though the range anxiety cost is at its low end.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A multistage stochastic programming model for a multi-period strategic expansion of biofuel supply chain under evolving uncertainties

Here, we develop a multistage, stochastic mixed-integer model to support biofuel supply chain expansion under evolving uncertainties. By utilizing the block-separable recourse property, we reformulate the multistage program in an equivalent two-stage program and solve it using an enhanced nested decomposition method with maximal non-dominated cuts. We conduct extensive numerical experiments and demonstrate the application of the model and algorithm in a case study based on the South Carolina settings. The value of multistage stochastic programming method is also explored by comparing the model solution with the counterparts of an expected value based deterministic model and a two-stage stochastic model.

09 BIOMASS FUELS↗

Integrated assessment of a new Waste-to-Energy facility in Central Greece in the context of regional perspectives

The main aim of this study is the integrated assessment of a proposed Waste-to-Energy facility that could contribute in the Municipal Solid Waste Management system of the Region of Central Greece. In the context of this paper alternative transfer schemes for supplying the candidate facility were assessed considering local conditions and economical criteria. A mixed-integer linear programming model was applied for the determination of optimum locations of Transfer Stations for an efficient supplying chain between the waste producers and the Waste-to-Energy facility. Moreover different Regional Waste Management Scenarios were assessed against multiple criteria, via the Multi Criteria Decision Making method ELECTRE III. The chosen criteria were total cost, Biodegradable Municipal Waste diversion from landfill, energy recovery and Greenhouse Gas emissions and the analysis demonstrated that a Waste Management Scenario based on a Waste-to-Energy plant with an adjacent landfill for disposal of the residues would be the best performing option for the Region, depending however on the priorities of the decision makers. In addition the study demonstrated that efficient planning is necessary and the case of three sanitary landfills operating in parallel with the WtE plant in the study area should be avoided. Moreover alternative cases of energy recovery of the candidate Waste-to-Energy facility were evaluated against the requirements of the new European Commission Directive on waste in order for the facility to be recognized as recovery operation. The latter issue is of high significance and the decision makers in European Union countries should take it into account from now on, in order to plan and implement facilities that recover energy efficiently. Finally a sensitivity check was performed in order to evaluate the effects of increased recycling rate, on the calorific value of treated Municipal Solid Waste and the gate fee of the candidate plant and found that increased recycling efforts would not diminish the potential for incineration with energy recovery from waste and neither would have adverse impacts on the gate fee of the Waste-to-Energy plant. In general, the study highlighted the need for efficient planning in solid waste management, by taking into account multiple criteria and parameters and utilizing relevant tools and methodologies into this context.

09 BIOMASS FUELS↗