Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “doe”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,009 records · Page 56

DOE-ID-INL-20-219 R1

DOE-ID-INL-20-219 R1 for INL-21-219 R1.

(EBR)-II Modifications to Support National Reactor↗

Project PARETO – DOE’s Produced Water Optimization Initiative

The data will take the form of a poster communicating DOE’s progress on Project PARETO, including recent developments in the PARETO framework, updates to efforts in water treatment modelling, and a new water sharing extension that facilitates water reuse.

Susarla, Naresh↗

DOE Advanced Gas Reactor Fuel Development and Qualification Program Overview

Slides discussing the DOE Advanced Gas Reactor Fuel Development and Qualification Program Overview to include focus on LEU UCO TRISO fuel in cylindrical compacts, with data for fuel qualification in support of reactor licensing and a path to establish a domestic commercial TRISO fuel fabrication capability. Timelines from 2004 through 2029. Major program highlights include: Developed fuel performance models based on past observed behavior, Study to understand differences between US and German (“good”) fuel, Developed and improved fuel fabrication and characterization methods, Fabricated lab-scale fuel (AGR-1) with very high quality; excellent in-pile and post-irradiation high-temperature fuel performance, Scale-up coating fabrication (AGR-2) with excellent in-pile performance, AGR-3/4 fuel fabrication and irradiation experiment to assess FP transport behavior, Scale-up matrix fabrication (AGR-5/6/7); & fuel performance evaluation in progress.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Environmental Impact of Capture Technology A Review of DOE-Sponsored FEED Studies

The slides were presented at the USEA and FECM organized “Workshop on Measurement, Monitoring and Controlling Potential Environmental Impacts from the Installation of Point Source Capture”. The slides discuss insight regarding the environmental impact of capture system implementation gained from reviewing public FEED reports completed under FOA 2058. The slides were edited to add language requested by DOE and will published on the workshop website.

Homsy, Sally↗

Ten Years of Legacy Management: U.S. DOE Office of Legacy Management Accomplishments - 13246

The U.S. Department of Energy (DOE) established the Office of Legacy Management (LM) to provide a long-term, sustainable solution to environmental impacts that remain from nuclear weapons production during World War II and the Cold War. The production activities created adverse environmental conditions at over 100 sites. When LM was established on December 15, 2003, it became responsible for 33 sites where active environmental remediation was complete. Currently, LM is responsible for long-term surveillance and maintenance of environmental remedies, promotion of beneficial reuse of land and buildings, and management of records and information at 89 sites in 29 states and Puerto Rico. LM is also responsible for meeting contractual obligations associated with former contractor workers' pensions and post-retirement benefits. Effectively addressing this environmental and human legacy will continue to require a focused and well-managed effort. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

River Corridor Closure at DOE's Hanford Site - 12503

The discussion of Hanford's River Corridor will cover work that has already been completed plus the work remaining to be done. This includes the buildings, waste sites, and groundwater plumes in the 300 Area; large-scale burial ground remediation in the 600 Area; plutonium production reactor dismantling and 'cocooning' along the river; preservation of the world's first full-scale plutonium production reactor; removal of more than 14 million tons of contaminated soil and debris along the Columbia River shoreline and throughout the River Corridor; and the excavation of buried waste sites in the river shore area. It also includes operating an EPA-permitted low-level waste disposal facility in the central portion of the site. At the completions of cleanup in 2015, Hanford's River Corridor will be the largest closure project ever completed by the Department of Energy. Cleanup of the River Corridor has been one of Hanford's top priorities since the early 1990's. This urgency has been due to the proximity of hundreds of waste sites to the Columbia River. In addition, removal of the sludge from K West Basin, near the river, remains a high priority. This 220-square-mile area of the Hanford Site sits on the edge of the last free-flowing stretch of the Columbia River. The River Corridor portion of the Hanford Site includes the 100 and 300 Areas along the south shore of the Columbia River. The 100 Areas contain nine retired plutonium production reactors. These areas are also the location of numerous support facilities and solid and liquid waste disposal sites that have contaminated groundwater and soil. The 300 Area, located just north of the city of Richland, contains fuel fabrication facilities, nuclear research and development facilities, and their associated solid and liquid waste disposal sites that have contaminated groundwater and soil. In order to ensure that cleanup actions address all threats to human health and the environment, the River Corridor includes the adjacent areas that extend from the 100 Area and 300 Area to the Central Plateau. For sites in the River Corridor, remedial actions are expected to restore groundwater to drinking water standards and ensure that aquatic life in the Columbia River is protected by achieving ambient water quality standards. It is intended that these objectives be achieved, unless technically impracticable, within a reasonable timeframe. In those instances where remedial action objectives are not achievable in a reasonable time frame, or are determined to be technically impracticable, programs are being implemented to contain the plume, prevent exposure to contaminated groundwater, and evaluate further risk reduction opportunities as new technologies become available. River Corridor cleanup work also removes potential sources of contamination, which are close to the Columbia River, and places them on the Central Plateau for final disposal. The intent is to shrink the footprint of active cleanup to within the 75-square- mile area of the Central Plateau by removing excess facilities and remediating waste sites. Cleanup actions are supporting anticipated future land uses consistent with the Hanford Reach National Monument, where applicable, and the Hanford Comprehensive Land- Use Plan (DOE 1999). The River Corridor has been divided into six geographic decision areas to achieve source and groundwater remedy decisions. These decisions will provide comprehensive coverage for all areas within the River Corridor and will incorporate ongoing interim action cleanup activities. Cleanup levels will be achieved in order to support anticipated future land uses of conservation and preservation for most of this area and industrial use for the 300 Area. At the conclusion of cleanup actions, the federal government will implement long-term stewardship activities to ensure protection of human health and the environment. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗