Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “data requests”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,009 records · Page 56

Parallel storage system with burst buffer appliance for storage of partitioned key-value store across a plurality of storage tiers

Parallel storage systems are provided with a burst buffer appliance for storage of a partitioned key-value store across a plurality of storage tiers. The burst buffer appliance is configured to store key-value data on first and second storage tiers comprising respective disjoint subsets of storage. One or more servers in the partitioned key-value store provide (i) an interface between one or more local key-value stores and one or more additional storage architectures, and/or (ii) a key value interface that provides access to at least one hardware key-value store. The local key-values are optionally sorted both locally by the local store and globally by the overall MDHIM framework. The local and global sorting can be leveraged to provide batch input/output (IO) operations that aggregate multiple requests into batch operations on one or more sorted ranges.

Bent, John M.↗

Total Dissolved Gas Effects on Incubating Chum Salmon Below Bonneville Dam

At the request of the U.S. Army Corps of Engineers (USACE; Portland District), Pacific Northwest National Laboratory (PNNL) undertook a project in 2006 to look further into issues of total dissolved gas (TDG) supersaturation in the lower Columbia River downstream of Bonneville Dam. In FY 2008, the third year of the project, PNNL conducted field monitoring and laboratory toxicity testing to both verify results from 2007 and answer some additional questions about how salmonid sac fry respond to elevated TDG in the field and the laboratory. For FY 2008, three objectives were 1) to repeat the 2006-2007 field effort to collect empirical data on TDG from the Ives Island and Multnomah Falls study sites; 2) to repeat the static laboratory toxicity tests on hatchery chum salmon fry to verify 2007 results and to expose wild chum salmon fry to incremental increases in TDG, above those of the static test, until external symptoms of gas bubble disease were clearly present; and 3) to assess physiological responses to TDG levels in wild chum salmon sac fry incubating below Bonneville Dam during spill operations. This report summarizes the tasks conducted and results obtained in pursuit of the three objectives. Chapter 1 discusses the field monitoring, Chapter 2 reports the findings of the laboratory toxicity tests, and Chapter 3 describes the field-sampling task. Each chapter contains an objective-specific introduction, description of the study site and methods, results of research, and discussion of findings. Literature cited throughout this report is listed in Chapter 4. Additional details on the monitoring methodology and results are provided in Appendices A and B included on the compact disc bound inside the back cover of the printed version of this report.

13 HYDRO ENERGY↗

2013 Community Earth System Model (CESM) Tutorial-Proposal to DOE

THE SAME REQUEST WILL BE SENT TO BOTH NSF AND DOE TO EACH SUPPORT $35K. The third annual Community Earth System Model (CESM) tutorial for students and early career scientists was held from 30 July to 3 August, 2012. This event was extremely successful and, as for the tutorials in previous years, there was a greater demand than could be met. This indicates a continuing need for a tutorial of this type and we anticipate that the 2013 tutorial will be well received. The tutorial will include lectures on simulating the climate system and practical sessions on running CESM, modifying components, and analyzing data. These will be targeted to the graduate student level. Attendance will be limited to a maximum of 80 students with financial support for up to 40 students. Attendees will be balanced across institutions.

Holland, Marika↗

Final Design for Thermal/Epithermal eXperiments (TEX) with Chloride Absorbers to Provide Validation Benchmarks for Y-12 Electrorefining Facility

Uranium electrorefining operations at Y-12 require validation for chlorine absorption and reflection. Plutonium chloride solution operations at Los Alamos National Laboratory require chlorine absorption validation. The growing need for chlorine validation is evident to the wider criticality safety community, with multiple attendees at the recent TEX 2.0 meeting at Lawrence Livermore National Laboratory (May 2023) requesting validation for chlorine (Idaho National Laboratory (INL), Institute de radioprotection et de surete nucleaire (IRSN), Savannah River Nuclear Site (SRNS), LANL, and Y-12). Los Alamos National Laboratory has recently performed, and benchmarked, an experiment titled Chlorine Worth Study (CWS) for the internal operations at the lab, but due to the difficulties in precisely characterizing the material compositions of the chlorine absorbers it is advantageous to perform a complimentary study with a different chlorine-based absorber material. Furthermore, having a uranium-based vs plutonium-based experiment provides a separate and important validation basis for criticality safety and nuclear data evaluation. The original final design report for the study of chlorine absorption using the TEX-HEU experimental base was presented in 2022, but used the same chlorine-bearing materials that were found to be difficult to characterize in the LANL benchmark. A complete redesign of the experiment has been performed looking at alternative absorber materials in various forms to produce an experiment that is fully characterizable. This report presents five novel chlorine experiments using the TEX-HEU test bed which provides direct comparison to the Y-12 and INL/Terrapower application needs, utilizing sodium chloride (NaCl) absorber plates. The absorber plates will consist of granulated NaCl (≥99.5% pure), which will be fully encapsulated in aluminum tins, providing a simple but effective chlorine-based absorber material that can be completely characterized. Of the five configurations presented in this report, it is expected that two or three configurations will be down selected for the actual experiment, with the other configurations being alternates. Three of the configurations are in the standard configuration, where the absorber is placed directly on the HEU fuel plates, and two in the sandwich configuration, where the absorber is surrounded by polyethylene moderators to force additional neutron thermalization prior to reaching the absorber. There are two thicknesses of NaCl absorber plates: 3/16” and 1/4” active thicknesses (i.e. not including the encapsulation). Both variations of the absorbers have an active absorber radius of 6” and a total radius of 7.5” to match the diameter of the HEU plates, with the outer 1.5” being aluminum encapsulation. The high-density polyethylene (HDPE) moderators are of the thicknesses: 27/16”, 7/4”, 1/8”, 11/16”, and 3/4”. The final configurations have six (one sandwich and one standard configuration), eight (one sandwich and one standard configuration), and 18 total fuel layers (standard configuration). The standard and sandwich configurations were designed such that the differences in moderator thicknesses are 1” HDPE, which were already procured for the original CED-2. The proposed configurations were precisely tuned to closely match the sensitivity profiles and neutron spectra of the Y-12 upset cases and were also compared to the INL/Terrapower upset cases. The assessment of experimental uncertainties of the non-absorber components was predicted to be 0.00114 Δk eff . The assessment of uncertainties resulting from the absorbers was predicted to be 0.00029 Δk eff . This results in a total uncertainty of 0.00118 Δk eff . Many of the largest uncertainties, namely the moderator densities, may be reduced with precision dimensional inspection of the components. The 1” HDPE moderators as well as the HDPE reflectors from the original CED-2 were incorporated in the final designs presented here. Additional HDPE moderator plates must be fabricated to complete the configurations. NaCl absorber plates will by fabricated at LLNL. The total additional cost is expected to be $\$$54,250 for the remaining components. Precise inspection, including dimensional, mass, density, and impurity, is recommended for all components. LLNL estimates that these costs are around $\$$12,000. It is expected, based on previous TEX-HEU experiments, that three weeks of experimental facility time is needed to complete the experiments.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Restart File Improvements for MPACT

This report documents the work performed to address several defects and features request related to the restart capability in MPACT. The following defects were fixed as a part of this milestone: • #3616 (Defect) Error in MPACT Restart Files with BPRs, • #3637 (Defect) Restart with Semi-PC Yields Inconsistent Results, • #3652 (Defect) Fix Incorrect Exposure Value on HDF File After Restart, • #3777 (Defect) Fix State Point Number when Using Restart File, • #3986 (Defect) Pin Exposures are Incorrect, • #4106 (Defect) Pin Exposures Equal to Zero After Restart, and • #4288 (Defect) Core Average Exposure Wrong when Reading Restart Files. The new features that were added are: • Axial Re-meshing capability, • Incorporation of MAMBA-1D data necessary to restart coupled MPACT/CTF/MAMBA calculations, and • Addition of state variables to the restart file. Numerous tests were also implemented to verify and protect these features and this report was prepared to document the work performed.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Independent Review of AFC 2A, 2B, and 2E ATR Irradiation Tests

As part of the Department of Energy Advanced Fuel Cycle program, a series of fuels development irradiation tests have been performed in the Advanced Test Reactor (ATR) at the Idaho National Laboratory. These tests are providing excellent data for advanced fuels development. The program is focused on the transmutation of higher actinides which best can be accomplished in a sodium-cooled fast reactor. Because a fast test reactor is no longer available in the US, a special test vehicle is used to achieve near-prototypic fast reactor conditions (neutron spectra and temperature) for use in ATR (a water-cooled thermal reactor). As part of the testing program, there were many successful tests of advanced fuels including metals and ceramics. Recently however, there have been three experimental campaigns using metal fuels that experienced failure during irradiation. At the request of the program, an independent review committee was convened to review the post-test analyses performed by the fuels development team, to assess the conclusions of the team for the cause of the failures, to assess the adequacy and completeness of the analyses, to identify issues that were missed, and to make recommendations for improvements in the design and operation of future tests. Although there is some difference of opinion, the review committee largely agreed with the conclusions of the fuel development team regarding the cause of the failures. For the most part, the analyses that support the conclusions are sufficient.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Studies of $\Lambda n$ interaction through polarization observables for final-state interactions in exclusive $\Lambda$ photoproduction off the deuteron

Theoretical studies suggest that experimental observables for hyperon production reactions can place stringent constraints on the free parameters of hyperon-nucleon potentials, which are critical for the understanding of hypernuclear matter and neutron stars. Here we present preliminary experimental results for the polarization observables S, Py, Ox, Oz, Cx, and Cz for final-state interactions (FSI) in exclusive L photoproduction off the deuteron. The observables were obtained from data collected during the E06-103 (g13) experiment with the CEBAF Large Acceptance Spectrometer (CLAS) in Hall B at Jefferson Lab. The g13 experiment ran with unpolarized deuteron target and circularly- and linearly-polarized photon beams with energies between 0.5 GeV and 2.5 GeV and collected about 51010 events with multiple charged particles in the final state. To select the reaction of interest, the K+ and the L decay products, a proton and a negative pion, were detected in the CLAS. The missing-mass technique was used to identify exclusive hyperon photoproduction events. Final-state interaction events were selected by requesting that the reconstructed neutron has a momentum larger than 200 MeV/c. The large statistics of E06-103 provided statistically meaningful FSI event samples, which allow for the extraction of one- and two-fold differential single- and double-polarization observables. Here we present preliminary results for a set of six observables for photon energies between 0.9 GeV and 2.3 GeV and for several kinematic variables in the Ln center-of-mass frame. Our results are the very first estimates of polarization observables for FSI in hyperon photoproduction and will be used to constrain the free parameters of hyperon-nucleon potentials.

Ilieva, Yordanka↗

Long-Term Stewardship Optimization for a Decommissioned Nuclear Reactor - 19579

The decommissioned Hallam Nuclear Power Facility (Hallam), located in Lancaster County, Nebraska, approximately 19 miles south of Lincoln, was developed as a prototype to investigate the technical and economic feasibility of a sodium-cooled, graphite-moderated nuclear reactor. As part of its Power Demonstration Program, the US Atomic Energy Commission (US AEC), a predecessor agency of the US Department of Energy (US DOE), operated the Hallam reactor from 1962 to 1964. The radiological surveillance of the Hallam site was established when the operating agreement between AEC and the Nebraska Public Power District was terminated. The US DOE Chicago Operations Office and the Nebraska Department of Health (NDH) agreed to install a shallow groundwater monitoring system as part of the environmental surveillance program. Surveillance at the site was scheduled to end in fiscal year 2005, with no further activities planned after that. At that time, the plan was to transition the site to the Nebraska Public Power District with future use of the facility to remain restricted. US DOE has title to and responsibility for the entombed radioactive materials. A surveillance and monitoring program was initiated in 1970 by NDH and was funded by US AEC. It included the analysis of samples from deep production wells (groundwater from the regional aquifer at depths greater than 55 meters [180 feet]) at the Sheldon Station. NDH was concerned in 1990 about the possibility of shallow groundwater coming in contact with the buried radiological materials along the buried walls of the reactor. Subsequently, DOE and NDH agreed to further characterize hydrologic conditions and establish a monitoring program in the shallow, perched groundwater zones. The current monitoring program focuses on the shallow, perched groundwater. Today, decades since facility decommissioning, site inspections and groundwater monitoring continue at this Cold War-era legacy site. The US DOE Office of Legacy Management (LM) monitors groundwater as a best management practice in response to a request from the Nebraska Department of Health and Human Services (DHHS). In 2006, LM recommended discontinuing groundwater monitoring because analytical results since 1970 demonstrated there had been no impact to shallow, perched groundwater and no current or anticipated unacceptable risk to human health and the environment. The State of Nebraska did not concur with the recommendation to stop monitoring but did agree to a reduction in sampling and analysis from once a year to once every 2 years--a schedule that began in 2008. An updated assessment of the groundwater monitoring effort was issued in 2016. The entire body of water-quality data continues to demonstrate that there have been no negative impacts to the shallow, perched groundwater from radioactive materials entombed at the site 46 years ago. LM, with concurrence from Nebraska DHHS, changed the sampling frequency, effective in 2018, as follows: once every 5 years from 2021 to 2041 and once every 10 years from 2041 to 2071. In summary, LM remains committed to its primary mission to protect human health and the environment at each of its 92 legacy sites. With results from groundwater sampling events demonstrating compliance for 48 years, the Hallam site was able to set an LM benchmark to optimize long-term stewardship and define an end-state strategy for other decommissioned reactor facilities across the DOE complex. Continued collaboration with local communities, stakeholder, and regulators often leads to outcomes of sound protectiveness without compromise to safety or compliance, as demonstrated by the optimization of the long-term stewardship at the Hallam site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A method of searching LDAP directories using XQuery

A method by which an LDAP directory can be searched using XQuery is described. The strategy behind the tool consists of four steps. First the XQuery script is examined and relevant XPath expressions are extracted, determined to be sufficient to define all information needed to perform the query. Then the XPath expressions are converted into their equivalent LDAP search filters by use of the published LDAP schema of the service, and search requests are made to the LDAP host. The search results are then merged and converted to an XML document that conforms to the hierarchy of the LDAP schema. Finally, the XQuery script is executed on the working XML document by conventional means. Examples are given of application of the tool in the Open Science Grid, which for discovery purposes operates an LDAP server that contains Glue schema-based information on site configuration and authorization policies. The XQuery scripts compactly replace hundreds of lines of custom python code that relied on the unix ldapsearch utility. Installation of the tool is available through the Virtual Data Toolkit.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Preparing Oregon State University to Meet the Research Challenges of the Global Nuclear Energy Partnership Final Scientific/Technical Report

The OSU Radiation Center requested $100,000 under the Global Nuclear Energy Partnership University Readiness program to provide for graduate student support, reactor equipment upgrades, and irradiation support. A portion of the funds requested were used to support the graduate education of a graduate student for a period of one year. The remaining funds were utilized to enhance the irradiation facilities of the Oregon State TRIGA® Reactor as well as to offset the costs of irradiations for initial investigations where grant funding is not available. The focus of this effort was to create an environment that would enhance facilities and equipment at Oregon State University which emphasize GNEP related themes, specifically material science analytical capabilities for the next generation of nuclear reactors. These enhancements included development of a prompt gamma neutron activation analysis analytical capability, digital reactor data logging, electronic dosimetry for researchers, replacement of sample grapples, and irradiation/analytical services.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

A collaborative network middleware project by Lambda Station, TeraPaths, and Phoebus

The TeraPaths, Lambda Station, and Phoebus projects, funded by the US Department of Energy, have successfully developed network middleware services that establish on-demand and manage true end-to-end, Quality-of-Service (QoS) aware, virtual network paths across multiple administrative network domains, select network paths and gracefully reroute traffic over these dynamic paths, and streamline traffic between packet and circuit networks using transparent gateways. These services improve network QoS and performance for applications, playing a critical role in the effective use of emerging dynamic circuit network services. They provide interfaces to applications, such as dCache SRM, translate network service requests into network device configurations, and coordinate with each other to setup up end-to-end network paths. The End Site Control Plane Subsystem (ESCPS) builds upon the success of the three projects by combining their individual capabilities into the next generation of network middleware. ESCPS addresses challenges such as cross-domain control plane signalling and interoperability, authentication and authorization in a Grid environment, topology discovery, and dynamic status tracking. The new network middleware will take full advantage of the perfSONAR monitoring infrastructure and the Inter-Domain Control plane efforts and will be deployed and fully vetted in the Large Hadron Collider data movement environment.

99 GENERAL AND MISCELLANEOUS↗

Independent Confirmatory Survey Summary and Results for the Ford Nuclear Reactor, Ann Arbor, Michigan

At the NRC's request, ORAU conducted confirmatory surveys of the FNR during the period of December 4 through 6, 2012. The survey activities included visual inspections and measurement and sampling activities. Confirmatory activities also included the review and assessment of UM's project documentation and methodologies. Surface scans identified elevated activity in two areas. The first area was on a wall outside of Room 3103 and the second area was in the southwest section on the first floor. The first area was remediated to background levels. However, the second area was due to gamma shine from a neighboring source storage area. A retrospective analysis of UM's FSS data shows that for the SUs investigated by the ORAU survey team, UM met the survey requirements set forth in the FSSP. The total mean surface activity values were directly compared with the mean total surface activity reported by UM. Mean surface activity values determined by UM were within two standard deviations of the mean determined by ORAU. Additionally, all surface activity values were less than the corresponding gross beta DCGLW. Laboratory analysis of the soil showed that COC concentrations were less than the respective DCGLW values. For the inter-lab comparison, the DER was above 3 for only one sample. However, since the sum of fractions for each of the soil samples was below 1, thus none of the samples would fail to meet release guidelines. Based on the findings of the side-by-side direct measurements, and after discussion with the NRC and ORAU, UM decided to use a more appropriate source efficiency in their direct measurement calculations and changed their source efficiency from 0.37 to 0.25.

54 ENVIRONMENTAL SCIENCES↗

Independent Confirmatory Survey Summary and Results for the Ford Nuclear Reactor, Revision 1, Ann Arbor, Michigan

At the NRC's request, ORAU conducted confirmatory surveys of the FNR during the period of December 4 through 6, 2012. The survey activities included visual inspections and measurement and sampling activities. Confirmatory activities also included the review and assessment of UM's project documentation and methodologies. Surface scans identified elevated activity in two areas. The first area was on a wall outside of Room 3103 and the second area was in the southwest section on the first floor. The first area was remediated to background levels. However, the second area was due to gamma shine from a neighboring source storage area. A retrospective analysis of UM's FSS data shows that for the SUs investigated by the ORAU survey team, UM met the survey requirements set forth in the FSSP. The total mean surface activity values were directly compared with the mean total surface activity reported by UM. Mean surface activity values determined by UM were within two standard deviations of the mean determined by ORAU. Additionally, all surface activity values were less than the corresponding gross beta DCGL W . Laboratory analysis of the soil showed that COC concentrations were less than the respective DCGL W values. For the inter-lab comparison, the DER was above 3 for only one sample. However, since the sum of fractions for each of the soil samples was below 1, thus none of the samples would fail to meet release guidelines. Based on the findings of the side-by-side direct measurements, and after discussion with the NRC and ORAU, UM decided to use a more appropriate source efficiency in their direct measurement calculations and changed their source efficiency from 0.37 to 0.25.

54 ENVIRONMENTAL SCIENCES↗

Better Buildings Workforce Accelerator – Technical Assistance Project: Northwest Energy Efficiency Council – A Replicable Analysis for Building Operator Certification Diversity, Equity, and Inclusion Objectives

The Northwest Energy Efficiency Council (NEEC) requested technical assistance through the U.S. Department of Energy (DOE) Better Buildings Workforce Accelerator (BBWA) program, with the objective of developing a replicable analytical approach to understanding Building Operator Certification (BOC) program participants and measure progress towards diversity, equity, and inclusion objectives. The technical assistance advances NEEC’s progress towards their goal of recruiting more diverse students to the BOC training and certification program. This report develops a replicable geospatial analysis of BOC program participants based on DEI indicators that can be applied at a national level, provides a step-by-step guide on repeating and updating the analysis, and presents recommendations for future data collection and analysis.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Investigation of Microphysics and Precipitation for Atlantic Coast-Threatening Snowstorms (IMPACTS) Field Campaign Report

The scientific focus here is interagency collaboration to support a National Aeronautics and Space Administration (NASA)-sponsored 2023 field campaign: Investigation of Microphysics and Precipitation for Atlantic Coast-Threatening Snowstorms (IMPACTS). IMPACTS objectives are to provide observations critical to understanding the mechanisms of snowband formation, organization, and evolution; study how the microphysical characteristics and likely growth mechanisms of snow particles vary across snowbands; and improve snowfall remote-sensing interpretation and modeling to significantly advance predictive capabilities. The relevance to The U.S. Department of Energy Atmospheric Radiation Measurement (ARM) user facility's mission was to support the Interagency Council for Advancing Meteorological Services (ICAMS)’ objectives to enhance communication and coordination, and promote sharing, within and across agencies. NASA therefore requested to borrow ARM’s two-dimensional stereo probe (2DS) for possible use during the 2023 IMPACTS project. Additionally, this use of the 2DS could improve understanding of ARM 2DS measurements collected on previous field campaigns. The plan was to have the 2DS available for possible backup deployment on the NASA Lockheed Orion P-3 aircraft during the 2023 IMPACTS field project. NASA has a 2DS probe and the ARM 2DS is a hot swappable probe in case the project's 2DS fails. The 2DS is a critical probe and we had issues during a 2022 field project that prevented us from obtaining 2DS data on several flights. Hence, we wanted a hot swappable 2DS on stand-by. We have a data acquisition system, along with a backup data acquisition system for the 2DS, so we only needed the 2DS probe. David Delene was responsible for the use of the 2DS on the NASA P-3 aircraft. He has experience deploying the 2DS on several aircraft, including previously on the NASA P-3 in 2022. The team ensured that the aircraft wiring and deployment of the 2DS were completed correctly for the ARM 2DS.

54 ENVIRONMENTAL SCIENCES↗

Zero power experiment for molten salt reactor - code verification and validation request

Molten Salt Reactors (MSRs) are one of the six perspective Generation IV nuclear technologies that should fulfil sustainability, economics, safety, and proliferation resistance goals. In recent years these concepts have attracted increased interest in research as well as in industry. In the context of developing new, innovative technology, a zero-power experiment would be an ideal option for improving the understanding of MSR systems under low-risk and low-cost conditions. The given research was focused on cross-verification of the nuclear codes for MSR modelling and simulations as required for the development of the first design of a potential facility and a draft of an experimental programme. The analysis included the evaluation of lattice and Monte Carlo codes. The study showed that all considered nuclear tools were in good agreement with each other. Although this does not mean the results will match the real experimental data, which is essential for the regulatory approval of a novel technology. Currently, experimental data is almost absent for MSR technology. Hence, a zero power experiment is needed to assure we can rely on modelling and simulation studies for further development of MSR technology and deliver real-world experiments to support the licensing of future MSRs. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Oak Ridge National Laboratory Roane and Anderson Counties, Tennessee Historic Architectural Resource Survey June 2018

From February through September 2017, Cultural Resource Analysts, Inc. personnel completed a historic architectural resource survey of the Oak Ridge National Laboratory in Roane and Anderson Counties, Tennessee. The survey was completed at the request of UT-Battelle, LLC, the private not-for-profit company that manages and operates Oak Ridge National Laboratory for the U.S. Department of Energy. The purpose of the survey was to assist the Department of Energy in complying with the National Historic Preservation Act of 1966, as amended, by providing updated recommendations regarding the National Register of Historic Places eligibility of historic architectural resources at Oak Ridge National Laboratory. The survey included the entirety of Oak Ridge National Laboratory’s main campus that occupies approximately 1,100 acres in Bethel and Melton Valleys and on Chestnut Ridge. Based on Facilities Information Management System data and guidance provided by UT-Battelle, LLC, preservation and modernization staff, the survey team developed a list of resources for inclusion in the survey. The list included all substantial buildings constructed in or before 1980 in order to provide sufficient coverage of buildings that will turn 50 years of age within the next decade. Only those buildings with recorded area over 100 sq ft were included in the survey. Additionally, the UT-Battelle team identified 15 buildings for more intensive survey because such buildings are central to Oak Ridge National Laboratory’s future mission needs and are expected to undergo renovations in the foreseeable future. These building were subject to both exterior and interior documentation with particular focus on identifying character-defining features, and thus were subject to more detailed analysis than the other resources included in the survey. The findings of this historic resource survey build on the conclusions of the 1994 survey by DuVall & Associates, Inc., as well as the survey updates completed by Thomason and Associates in 2004 and 2015 in support of the Oak Ridge National Laboratory Historic Preservation Plan. Within 12 distinct areas of Oak Ridge National Laboratory, as well as outlying areas, the survey recorded 195 buildings and structures constructed in or before 1980. In consideration of the role and significance of each area and each individual resource within the context of Oak Ridge National Laboratory, and in light of their current integrity and condition, each recorded resource was evaluated to determine if it is eligible for listing in the National Register of Historic Places.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Thermal Hydraulic Experimental Test Article (FY21 Final Report)

The Thermal Hydraulic Experimental Test Article (THETA) is a facility that will be used to develop sodium components and instrumentation as well as acquire experimental data for validation of reactor thermal hydraulic and safety analysis codes. The facility will simulate nominal conditions as well as protected/unprotected loss of flow accidents in a sodium-cooled fast reactor (SFR). High fidelity distributed temperature profiles of the developed flow field will be acquired with Rayleigh backscatter based optical fiber temperature sensors. The facility is being designed in partnership with systems code experts to tailor the experiment to ensure the most relevant and highest quality data for code validation. THETA is comprised of a traditional primary and secondary system. The primary system is submerged in the pool of sodium and consists of a pump, electrically heated core, intermediate heat exchanger, and connected piping and thermal barriers (redan). The secondary system, located outside of the sodium pool, consists of a pump, sodium to air heat exchanger, and connected piping and valves. Figure 1 illustrates the main components of the primary system. THETA has been installed in the Mechanisms Engineering Test Loop (METL) with the primary system in the 28 inch Test Vessel #4, Figure 2 and Figure 3. Since the FY20 THETA status report, further water shakedown testing was performed, some final welding modifications were performed, all system components were sanitized, dry assembled, and commissioned. The THETA submersible electromagnetic flowmeter was welded closed to hermetically seal internal components from sodium followed by a helium leak check for the final time. Following installation of THETA into vessel #4, all data acquisition and control systems were brought online and commissioned at room temperature in the argon gas space of the empty vessel. The vessel zone 1 heaters were reinstalled and the flange was then insulated. The vessel 4 heaters were brought to a temperature of 100 °C and the THETA pump was jogged at 600 RPM to ensure it was functioning correctly. The secondary, AC Conduction based electromagnetic pump from CMI Novacast (product number CA-15) was ordered and will be delivered in late calendar year 2021. The custom designed permanent magnet based secondary flowmeter was designed, a drawing package and manufacturing specification created and quote requested from a machine shop. The intermediate heat exchanger design was completed and a drawing package is currently in progress. During the middle of calendar year 2021 the Building 308 sodium scrubber system was shut down in order to replaced some corroded piping and facilitate improvements on the system, thus requiring the sodium in METL to remain frozen. This has imposed a delay in filling vessel 4 with sodium to begin THETA testing. Sodium testing is expected to begin in early fiscal year 2022 as all THETA primary systems are operational.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗