Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “continuous operation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,009 records · Page 56

Development and performance of a laser heterodyne spectrometer using tunable semiconductor lasers as local oscillators

A diode laser based IR heterodyne spectrometer for laboratory and field use was developed for high efficiency operation between 7.5 and 8.5 microns. The local oscillator is a PbSSe tunable diode laser kept continuously at operating temperatures of 12-60 K using a closed cycle cooler. The laser output frequency is controlled and stabilized using a high precision diode current supply, constant temperature controller, and a shock isolator mounted between the refrigerator cold tip and the diode mount. Single laser modes are selected by a grating placed in the local oscillator beam. The system employs reflecting optics throughout to minimize losses from internal reflection and absorption, and to eliminate chromatic effects. Spectral analysis of the diode laser output between 0 and 1 GHz reveals excess noise at many diode current settings, which limits the infrared spectral regions over which useful heterodyne operation can be achieved. System performance has been studied by making heterodyne measurements of etalon fringes and several Freon 13 (CF3Cl) absorption lines against a laboratory blackbody source. Preliminary field tests have also been performed using the Sun as a source.

Glenar, D.↗

Tunable diode-laser heterodyne spectrometer for remote observations near 8 microns

A diode-laser-based, ultrahigh resolution IR heterodyne spectrometer for laboratory and field use has been developed for operation between 7.5 and 8.5 microns. The local oscillator is a PbSe tunable diode laser kept continuously at operating temperatures of 12-60 K using a closed-cycle cooler. The laser output frequency is controlled and stabilized using a high-precision diode current supply, constant temperature controller, and a shock isolator mounted between the refrigerator cold tip and the diode mount. The system largely employs reflecting optics to minimize losses from internal reflection and absorption and to eliminate chromatic effects. Spectral analysis of the diode-laser output between 0 and 1 GHz reveals excess noise at many diode current settings, which limits the IR spectral regions over which useful heterodyne operation can be achieved. Observations have been made of atmospheric N2O, O3, and CH4 between 1170 and 1200/cm, using both a single-frequency swept IF channel and a 64-channel RF spectral line receiver with a total IF coverage of 1600 MHz.

Glenar, D.↗

The Advanced Tracking and Data Relay Satellite System (ATDRSS) - The next generation

The Tracking and Data Relay Satellite System (TDRSS) is currently in operation and is providing support to users. This paper describes a candidate satellite configuration which will continue system operation when the current satellite fleet is expended in the 1996 to 1997 time frame. The new system is intended to meet the growth in space network user population and service needs expected through approximately 2010. It is believed that the candidate architecture described will lead to a low-risk evolution from the TDRS architecture used prior to implementation of the ATDRS. NASA is using the architecture described herein as a reference, but has not selected an implementation architecture for the ATDRS system. This selection will be made when an implementing contractor is chosen and will be based on reducing life cycle costs and the ability to meet mission needs.

Brandel, Daniel↗

NASA's Space Launch System: Developing the World's Most Powerful Solid Booster

NASA's Journey to Mars has begun. Indicative of that challenge, this will be a multi-decadal effort requiring the development of technology, operational capability, and experience. The first steps are under way with more than 15 years of continuous human operations aboard the International Space Station (ISS) and development of commercial cargo and crew transportation capabilities. NASA is making progress on the transportation required for deep space exploration - the Orion crew spacecraft and the Space Launch System (SLS) heavy-lift rocket that will launch Orion and large components such as in-space stages, habitat modules, landers, and other hardware necessary for deep-space operations. SLS is a key enabling capability and is designed to evolve with mission requirements. The initial configuration of SLS - Block 1 - will be capable of launching more than 70 metric tons (t) of payload into low Earth orbit, greater mass than any other launch vehicle in existence. By enhancing the propulsion elements and larger payload fairings, future SLS variants will launch 130 t into space, an unprecedented capability that simplifies hardware design and in-space operations, reduces travel times, and enhances the odds of mission success. SLS will be powered by four liquid fuel RS-25 engines and two solid propellant five-segment boosters, both based on space shuttle technologies. This paper will focus on development of the booster, which will provide more than 75 percent of total vehicle thrust at liftoff. Each booster is more than 17 stories tall, 3.6 meters (m) in diameter and weighs 725,000 kilograms (kg). While the SLS booster appears similar to the shuttle booster, it incorporates several changes. The additional propellant segment provides additional booster performance. Parachutes and other hardware associated with recovery operations have been deleted and the booster designated as expendable for affordability reasons. The new motor incorporates new avionics, new propellant grain, asbestos-free case insulation, a redesigned nozzle, streamlined manufacturing processes, and new inspection techniques. New materials and processes provide improved performance, safety, and affordability but also have led to challenges for the government/industry development team. The team completed its first full-size qualification motor test firing in early 2015. The second is scheduled for mid-2016. This paper will discuss booster accomplishments to date, as well as challenges and milestones ahead.

Priskos, Alex↗

How to Build a Rover: An Overview of the Mars 2020 Mission’s Vehicle System Testbed

While NASA’s Mars rover Perseverance continues to make groundbreaking achievements on the Red Planet, its twin is hard at work here on Earth. The Operational Perseverance Twin for the Integration of Mechanisms and Instruments Sent to Mars, or OPTIMISM, is the Mars 2020 Vehicle System Testbed (VSTB) rover operated by NASA Jet Propulsion Laboratory (JPL) in Pasadena, California. OPTIMISM’s home is the JPL Mars Yard; an outdoor field with red soil that simulates the terrain encountered by Perseverance. The VSTB is a full-scale engineering model of the flight rover, serving a number of functions to ensure mission operations can continue smoothly and on schedule. The VSTB possesses instrumentation, computers, mechanisms, cameras, and a Mobility subsystem that are nearly identical to its extraterrestrial twin. Its high fidelity allows the rover to be a highly effective tool to fully test system functionality and performance prior to commanding the flight rover. The early stages of building OPTIMISM began a few months prior to Perseverance departing JPL for Cape Canaveral, FL in early 2020. Electrical integration of the flight system avionics, and compatibility checkouts of the electrical ground support equipment ensured that the foundation of the electrical system was operational and in place. Next, the internal harnessing was installed and compatibility checks of the rover instrumentation and mechanisms were performed to confirm the system was prepared for full buildup. Finally, mechanical assembly of the rover chassis with its external components completed the integration of the system before it was moved to the Mars Yard for its initial phase of testing to perform verification & validation (V&V) of the Mobility subsystem requirements. By the time Perseverance landed at Jezero Crater in February 2021, the first phase of VSTB operations was underway. Surface guidance, navigation, and control (SGNC) testing for the Mobility subsystem ensured functionality and performance requirements were met for various capabilities such as visual odometry (VO), mapping, and automatic navigation (AutoNav). Subsequent integration of the robotic arm (RA) onto the VSTB enabled the V&V campaign for surface sampling operations (SSO) to commence. As the mission’s engineering operations (EO) have gotten underway, the VSTB has been utilized for an array of purposes including troubleshooting software anomalies, and performing dry-runs for first time activities (FTAs) prior to sending the commands to Perseverance. OPTIMISM will continue to serve mission critical functions as long as Perseverance is roving the Red Planet.

Rojas, Jose Trujillo↗

Optimal Trajectories and Control Strategies for the Helicopter in One-Engine-Inoperative Terminal-Area Operations

Engine failure represents a major safety concern to helicopter operations, especially in the critical flight phases of takeoff and landing from/to small, confined areas. As a result, the JAA and FAA both certificate a transport helicopter as either Category-A or Category-B according to the ability to continue its operations following engine failures. A Category-B helicopter must be able to land safely in the event of one or all engine failures. There is no requirement, however, for continued flight capability. In contrast, Category-A certification, which applies to multi-engine transport helicopters with independent engine systems, requires that they continue the flight with one engine inoperative (OEI). These stringent requirements, while permitting its operations from rooftops and oil rigs and flight to areas where no emergency landing sites are available, restrict the payload of a Category-A transport helicopter to a value safe for continued flight as well as for landing with one engine inoperative. The current certification process involves extensive flight tests, which are potentially dangerous, costly, and time consuming. These tests require the pilot to simulate engine failures at increasingly critical conditions, Flight manuals based on these tests tend to provide very conservative recommendations with regard to maximum takeoff weight or required runway length. There are very few theoretical studies on this subject to identify the fundamental parameters and tradeoff factors involved. Furthermore, a capability for real-time generation of OEI optimal trajectories is very desirable for providing timely cockpit display guidance to assist the pilot in reducing his workload and to increase safety in a consistent and reliable manner. A joint research program involving NASA Ames Research Center, the FAA, and the University of Minnesota is being conducted to determine OEI optimal control strategies and the associated optimal,trajectories for continued takeoff (CTO), rejected takeoff (RTO), balked landing (BL), and continued landing (CL) for a twin engine helicopter in both VTOL and STOL terminal-area operations. This proposed paper will present the problem formulation, the optimal control solution methods, and the key results of the trajectory optimization studies for both STOL and VTOL OEI operations. In addition, new results concerning the recently developed methodology, which enable a real-time generation of optimal OEI trajectories, will be presented in the paper. This new real-time capability was developed to support the second piloted simulator investigation on cockpit displays for Category-A operations being scheduled for the NASA Ames Vertical Motion Simulator in June-August of 1995. The first VMS simulation was conducted in 1994 and reported.

Chen, Robert T. N.↗

Principles and Guidelines for Duty and Rest Scheduling in Commercial Aviation

The aviation industry requires 24-hour activities to meet operational demands. Growth in global long-haul, regional, overnight cargo, and short-haul domestic operations will continue to increase these round-the-clock requirements. Flight crews must be available to support 24-hour-a-day operations to meet these industry demands. Both domestic and international aviation can also require crossing multiple time zones. Therefore, shift work, night work, irregular work schedules, unpredictable work schedules, and dm zone changes will continue to be commonplace components of the aviation industry. These factors pose known challenges to human physiology, and because they result in performance-impairing fatigue, they pose a risk to safety. It is critical to acknowledge and, whenever possible, incorporate scientific information on fatigue, human sleep, and circadian physiology into 24-hour aviation operations. Utilization of such scientific information can help promote crew performance and alertness during flight operations and thereby maintain and improve the safety margin.

Dinges, David F.↗

Discrete and Integrated Solutions for Hybrid PV Plants Without Momentary Cessation in Low SCR and High Penetration PE Grids

With the increased penetration of power electronic (PE) based loads and sources, advanced solutions may be required for the enhancement of grid stability in regions with low short circuit ratio (SCR) and high penetration PE grids. The requirement of advanced solutions arises from the gradual paradigm shift of the electric grid from the traditional electric machine dominant system to a high penetration of PE-based system. One of the major challenges with such systems in recent times is the momentary cessation during alternating current (ac) grid transmission faults. During momentary cessation, PE-based resources cease to operate, thus creating probable reliability challenges for the grid. In this paper, potential feasible options to provide continuity of operation during such scenarios are presented. The options are considered through identifying upgrades in existing and upcoming discrete development of photovoltaic (PV) and energy storage systems (ESS) termed as discrete hybrid PV plants. Additionally, an advanced concept of integrated development of PV and ESS connecting to ac transmission grid links called multi-port autonomous reconfigurable solar power plant (MARS) is evaluated. The developed new solutions are evaluated for different grid use cases and scenarios in PSCAD.

Marthi, Phani Ratna Vanamali↗

Overview of Solar Panel Recycling for Indigenous Communities

In recent years, Native tribes across the country have embraced solar energy to power their communities. However, in approximately 25-30 years after installation, the solar panels will enter end-of-life (EOL) status, meaning that they will begin to operate less efficiently than upon initial implementation. At this point, tribes can determine the outcome: they can continue to operate the array, or they can dispose of the panels. Recycling is an option that promotes the use of high-value recyclable materials in solar panels in the circular economy. There are several companies across the US that offer recycling of solar panels, but at various costs. It is important that a hazardous waste expert makes an initial assessment of the solar array to identify any solar panels that cannot be recycled. Currently, recycling solar panels is not cost-effective or environmentally sustainable, but significant research into improving the cost and carbon footprint is ongoing.

14 SOLAR ENERGY↗

CATS Version 2 Aerosol Feature Detection and Applications for Data Assimilation

The Cloud Aerosol Transport System (CATS) lidar has been operating onboard the International Space Station (ISS) since February 2015 and provides vertical observations of clouds and aerosols using total attenuated backscatter and depolarization measurements. From February March 2015, CATS operated in Mode 1, providing backscatter and depolarization measurements at 532 and 1064 nm. CATS began operation in Mode 2 in March 2015, providing backscatter and depolarization measurements at 1064 nm and has continued to operate to the present in this mode. CATS level 2 products are derived from these measurements, including feature detection, cloud aerosol discrimination, cloud and aerosol typing, and optical properties of cloud and aerosol layers. Here, we present changes to our level 2 algorithms, which were aimed at reducing several biases in our version 1 level 2 data products. These changes will be incorporated into our upcoming version 2 level 2 data release in summer 2017. Additionally, owing to the near real time (NRT) data downlinking capabilities of the ISS, CATS provides expedited NRT data products within 6 hours of observation time. This capability provides a unique opportunity for supporting field campaigns and for developing data assimilation techniques to improve simulated cloud and aerosol vertical distributions in models. We additionally present preliminary work toward assimilating CATS observations into the NASA Goddard Earth Observing System version 5 (GEOS-5) global atmospheric model and data assimilation system.

data assimilation↗

Cryogenically-Operable Electronics for Surviving the Lunar Night

Current solar-powered robotic lunar landers and rovers have not demonstrated survivability of the extreme cold temperatures seen during the 354-hour lunar night. To address this capability gap, we have been investigating the feasibility of a passive hibernation approach to enable low-cost solar- and battery-powered missions to operate over multiple lunar cycles. This strategy relies on isolating the batteries from the main bus during the lunar night and allowing cells to freeze as temperatures descend as low as 50K. The entire power architecture remains in a hibernation state with no electrical activity until lunar dawn. When the sun returns over the horizon, the now-illuminated solar arrays begin generating power. In order to manage the array power, architecture consisting of cryogenically-operable COTS electronics must be utilized. This architecture will distribute and control power to subsystems - importantly controlling heaters to bring the frozen lithium-ion battery cells to normal operating conditions. This alternative approach to lunar operations will enable low-cost commercial lunar landers and payloads to passively survive the night and continue to operate over multiple lunar cycles without a significant impact to cost or payload mass. Research last year focused on creating a power supply that was capable of operation at cryogenic temperatures. At the end of FY23, our team successfully designed and manufactured a Sequential Switching Shunt Regulator (S3R) that is operational in a cryogenic vacuum chamber. It is capable of full operation down to the coldest lunar night temperatures (~50K). Our presentation will provide an overview of the Lunar Hibernation strategy but will focus mainly on the technical details of this cryogenically-operable shunt regulator and test results.

Cryogenic↗

Recommendations Emerging from an Analysis of NASA's Deep Space Communications Capacity

During 2016-2017, NASA’s Space Communications and Navigation (SCaN) Office chartered a study of Deep Space Network (DSN) communications capacity relative to projected future-mission demand over the next 30 years. In this paper, we briefly describe the methodology used to analyze capacity vs. demand over such a broad timeframe, summarize key findings emerging from the analysis, and discuss the associated recommendations. Performing the analysis entailed: identifying key factors shaping the anticipated future mission set, identifying several alternative future mission set scenarios consistent with these factors, and then analyzing each mission set scenario in terms of required antenna capacity, downlink and uplink capabilities, and spectrum as a function of time. On the basis of these aggregate requirements, DSN loading simulations were then conducted that examined how well each of the postulated mission sets could load up onto the the DSN’s “in-plan” architecture. To the extent that capacity shortfalls emerged during these baseline simulations, architectural solutions to the shortfalls were then postulated and tested via additional simulations. In general, the trend analyses and baseline loading simulations indicated a significant progression in challenges over the next three decades. In the current decade, the DSN appeared to be operating very close to capacity. The first human exploration mission and its secondary payload launch opportunities for cubesats traveling beyond GEO contributed to this loading. As a consequence, the main challenge appeared to be managing peak assetcontention periods. In the next decade, the DSN continued to operate close to capacity but also began transitioning to more frequent human mission support. Upgrading for, and operating, a human-rated system while continuing to meet robotic mission customer requirements emerged as the key challenge. In the 2030’s and beyond, simulations suggested a need for fundamentally new capability and capacity. The high data rates and long link distances characteristic of human Mars exploration drove requirements far beyond what is currently “in plan.” The key challenge then became determining the most cost-effective combination of RF and optical assets for communicating with the postulated human Mars assets while still providing for the needs of all the other missions across the solar system. Various link budget, visibility, and loading analyses ultimately suggested that the human Mars exploration demands of the 2030’s could best be addressed with two cross-linked RF-optical areostationary relays (or an areostationary relay and deep space habitat) providing a dual “trunk link” to an array of 2-to-3 additional 34m beam waveguide antennas and an ~8.5m optical antenna at each DSN Complex. The dual “trunk link” would enable the same amount of total data return to Earth as a single trunk link at twice the data rate, but with only half the required array size on the ground, assuming use of Multiple Spacecraft Per Antenna (MSPA) techniques. MSPA techniques, including a Multiple Uplink Per Antenna (MUPA) technique currently under investigation, also showed promise for reducing asset contention in the decades prior to human Mars exploration.

Lee, Carlyn-Ann↗

STS-79 Flight Day 6

On this sixth day of the STS-79 mission, the flight crew, Cmdr. William F. Readdy, Pilot Terrence W. Wilcutt, Mission Specialists, Thomas D. Akers, Shannon Lucid, Jay Apt, and Carl E. Walz, continue activities aboard Atlantis/Mir as the nine astronauts and cosmonauts work in their second full day of docked operations. The continuing transfer of logistical supplies and scientific hardware can be seen proceeding smoothly. Apt and Walz once again worked with the Active Rack Isolation System experiment to replace a broken pushrod. With that complete, Apt monitors the ARIS experiment as Readdy and Korzun fire small maneuvering jets on their spacecraft to test the ability of ARIS to damp out any disturbances created by the firings. Walz also is continuing his work with the Mechanics of Granular Materials experiment in Atlantis' double Spacehab module. The astronauts used the large format IMAX camera to conduct a photographic survey of Mir from the Shuttle's flight deck windows while Akers shot IMAX movie scenes of Readdy, Wilcutt, and Korzun in the Spektr module.

Source record↗

Results and Lessons from a Decade of Terra MODIS On-Orbit Spectral Characterization

Since its launch in December 1999, the NASA EOS Terra MODIS has successfully operated for more than a decade. MODIS makes observations in 36 spectral bands from visible (VIS) to longwave infrared (LWIR) and at three nadir spatial resolutions: 250m (2 bands), 500m (5 bands), and 1km (29 bands). In addition to its on-board calibrators designed for the radiometric calibration, MODIS was built with a unique device, called the spectro-radiometric calibration assembly (SRCA). It can be configured in three different modes: radiometric, spatial, and spectral. When it is operated in the spectral modes, the SRCA can monitor changes in Sensor spectral performance for the VIS and near-infrared (NIR) spectral bands. For more than 10 years, the SRCA operation has continued to provide valuable information for MODIS on-orbit spectral performance. This paper briefly describes SRCA on-orbit operation and calibration activities; it presents decade-long spectral characterization results for Terra MODIS VIS and NIR spectral bands in terms of chances in their center wavelengths (CW) and bandwidths (BW). It is shown that the SRCA on-orbit wavelength calibration capability remains satisfactory. For most spectral bands, the changes in CW and BW are less than 0.5 and 1 nm, respectively. Results and lessons from Terra MODIS on-orbit spectral characterization have and will continue to benefit its successor, Aqua MODIS, and other future missions.

Xiong, X.↗

Research Reactors Division Infrastructure Investment Plan for the High Flux Isotope Reactor

The High Flux Isotope Reactor (HFIR) is a unique national asset. Operational for nearly 60 years, continued investment into the aging infrastructure is necessary to ensure operation for another 6 decades. Additionally, growing missions require HFIR as well as important upgrades. Consequently, carefully integrated planning is required to ensure that infrastructure investments are timely executed to ensure long-term, reliable operation of HFIR. Concerns about challenges to the operational reliability of HFIR resulted in a recommendation from the 2023 Operations Review by the US Department of Energy (DOE) Office of Basic Energy Sciences that a HFIR management strategy be developed to address the infrastructure needs. This report defines the investment needs, which are evolving as new upgrade efforts are better defined. HFIR is part of the three-source strategy within the Neutron Sciences Directorate (NScD) and contributes to the five strategic science areas outlined in the NScD 10 Year Strategic Science Plan: quantum materials, soft matter, materials and engineering, chemistry, and biosciences. Fundamental to this strategy are three core values: operational excellence, responsible stewardship, and servant leadership. These values guide our mission of safe and reliable operation of the reactor and require a strong and just nuclear safety culture, a solemn respect for responsible care of the facility, good workforce development, robust procedures and processes, an effective communication strategy, world-class asset management, a determined customer focus, and a commitment to protecting the environment, the safety and health of the public and our people, and the quality of work performed within our facility. These principles are all essential to operate HFIR at a world-class level. The Research Reactors Division (RRD) will lead a new era of neutron science and isotope production at HFIR through responsible and purposeful leadership and unwavering support of the science community. The approach outlined in this plan highlights the direction leadership is taking to ensure that HFIR is ready to support the science challenges and national needs of the future and that the United States maintains world leadership in neutron sciences. The plan is in alignment with the DOE’s desire to continue operating HFIR and with the NScD strategic science goals for the future. HFIR is an aging facility with numerous infrastructure challenges and needs. It has an aging workforce in relation to the general population of Oak Ridge National Laboratory (ORNL), with many expected retirements over the next 5–10 years. With an increase in work scope caused by changing national priorities and science goals, several critical hires have been identified. To manage HFIR’s infrastructure needs, a prioritized list of equipment upgrades has been identified along with an analysis of future staffing requirements. A desire to operate HFIR at eight cycles per year will necessarily require some significant changes to procedures and processes currently in place as well as targeted staffing additions. Many of the equipment upgrades identified in this plan will significantly increase the reliability of the plant, thus contributing to the effort to reach the goal of safely operating eight cycles per year. A plan to attain eight-cycle operation is being prepared in parallel with the activities identified in this plan, although the actions identified to satisfy both plans will overlap. This plan identifies new infrastructure needs—for both plant equipment and staffing—thus necessitating formulation of future budget requests to fund the increased work scope and improvement activities. Some activities are currently being scheduled with the expectation that funding will be received. Any delays to funding or reductions of funding from the identified cost estimations will directly and negatively affect the plan’s implementation.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Aqua MODIS Thermal Emissive Band On-Orbit Calibration, Characterization, and Performance

The NASA's Earth Observing System Aqua Moderate Resolution Imaging Spectroradiometer (MODIS) has continued to operate with satisfactory performance since its launch in May 2002, exceeding its nominal six-year design lifetime. Its continuous Earth observations have been used to generate many science data products for studies of the Earth's, system. MODIS has 36 spectral bands; 20 reflective solar bands and 16 thermal emissive bands (TEBs). All TEB observations are made at 1-km nadir spatial resolution with spectral wavelengths from 3.7 to 14.4 pm. Primary applications of MODIS TEB 'include surface, cloud, and atmospheric temperatures, water vapor, and cloud top altitude. MODIS TEB on-orbit calibration uses a quadratic algorithm with its calibration coefficients derived using an onboard blackbody (BB). This paper will present Aqua MODIS TEB on-orbit calibration, characterization, and performance over its six-year mission. Examples of instrument thermal behavior, BB temperature stability, detector short-term stability, and changes in long-term response (or system gain) will be presented. Comparisons will also be made with Terra MODIS, launched in December 1999. On-orbit results show that Aqua MODIS and its focal plane temperatures have behaved normally. BB temperature has remained extremely stable with typical scan -to-scan variations of less than +/-0.15 mK. Most TEB detectors continue to exceed their specified signal-to-noise ratio requirements, exhibiting excellent short-term stability and calibration accuracy. Excluding a few noisy detectors, either identified prelaunch or occurring postlaunch, on-orbit changes in TEB responses have been less than 0.5% on an annual basis. By comparison; the overall Aqua TEB performance has been better than that of Terra MODIS,

Xiong, Xiaoxiong↗

Operational Intelligence in the ATLAS Continuous Integration System

Describes the role of the ATLAS Continuous Integration (CI) System in the ATLAS offline software development infrastructure • Outlines the CI system components and processes • Details Operational Intelligence techniques to accelerate CI jobs and lower operating costs • Explains the Directed Acyclic Graph (DAG) approach in CI pipelines • Reports achieved improvements

97 MATHEMATICS AND COMPUTING↗