Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “conceptual”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,009 records · Page 56

Conceptual Design of Forced Convection Molten Salt Heat Transfer Testing Loop

This report develops a proposal to design and construct a forced convection test loop. A detailed test plan will then be conducted to obtain data on heat transfer, thermodynamic, and corrosion characteristics of the molten salts and fluid-solid interaction. In particular, this report outlines an experimental research and development test plan. The most important initial requirement for heat transfer test of molten salt systems is the establishment of reference coolant materials to use in the experiments. An earlier report produced within the same project highlighted how thermophysical properties of the materials that directly impact the heat transfer behavior are strongly correlated to the composition and impurities concentration of the melt. It is therefore essential to establish laboratory techniques that can measure the melt composition, and to develop purification methods that would allow the production of large quantities of coolant with the desired purity. A companion report describes the options available to reach such objectives. In particular, that report outlines an experimental research and development test plan that would include following steps: •Molten Salts: The candidate molten salts for investigation will be selected. •Materials of Construction: Materials of construction for the test loop, heat exchangers, and fluid-solid corrosion tests in the test loop will also be selected. •Scaling Analysis: Scaling analysis to design the test loop will be performed. •Test Plan: A comprehensive test plan to include all the tests that are being planned in the short and long term time frame will be developed. •Design the Test Loop: The forced convection test loop will be designed including extensive mechanical design, instrument selection, data acquisition system, safety requirements, and related precautionary measures. •Fabricate the Test Loop. •Perform the Tests. •Uncertainty Analysis: As a part of the data collection, uncertainty analysis will be performed to develop probability of confidence in what is measured in the test loop. Overall, the testing loop will allow development of needed heat transfer related thermophysical parameters for all the salts, validate existing correlations, validate measuring instruments under harsh environment, and have extensive corrosion testing of materials of construction.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Feasibility and conceptual design of a C.W. positron source at CEBAF

A feasibility study of a CW positron source for the 12 GeV upgrade at Jefferson Lab (JLAB) is provided. The proposed ≥ 100 nA Continuous Wave (CW) positron source at JLAB has several unique and challenging characteristics: high current incident electron beam at 126 MeV with a high beam power (up to a MW); CW e - beam and CW e + production. The multiple scattering is a dominant process when creating e + in a target, which results a large phase space area of the emitted positrons. An admittance study was done at CEBAF to find the maximum phase space area, which is tolerated in the machine. The measured geometrical transverse admittance (A) were A x =10 and A y = 5 mm∙mrad at the injector. Energy spread measurement was also done at the ARC1. The fractional spread limit in the ARC1 was measured as δ = 3×10 -3 at 653 MeV. By using the optimized results and the CEBAF parameters, three positron injector configurations are proposed; Combined Function Magnet, Two-Dipole and Microtron Dipole configurations. With the assumptions made, by using 126 MeV Ⓧ10 mA e - beam impinging on a 2 mm W target with a 100 μm spot size, we can get up to 3 μA useful e + current at the North Linac connection. One of the biggest challenges is the target design, which the deposited power is about 60 kW. ILC designs project power deposition up to 13 kW, which would allow the creation of a e + beam of up to 650 nA otherwise. The results of analytic and monte carlo simulations of the positron production, capture and acceleration are presented. For the target design, a review is presented of solutions for the high power production target. Portions of this dissertation work have been published in two conference proceedings.

43 PARTICLE ACCELERATORS↗

Pre-Conceptual Design of a Fluoride-Salt-Cooled Small Modular Advanced High Temperature Reactor (SmAHTR)

This document presents the results of a study conducted at Oak Ridge National Laboratory during 2010 to explore the feasibility of small modular fluoride salt-cooled high temperature reactors (FHRs). A preliminary reactor system concept, SmATHR (for Small modular Advanced High Temperature Reactor) is described, along with an integrated high-temperature thermal energy storage or salt vault system. The SmAHTR is a 125 MWt, integral primary, liquid salt cooled, coated particle-graphite fueled, low-pressure system operating at 700 C. The system employs passive decay heat removal and two-out-of-three , 50% capacity, subsystem redundancy for critical functions. The reactor vessel is sufficiently small to be transportable on standard commercial tractor-trailer transport vehicles. Initial transient analyses indicated the transition from normal reactor operations to passive decay heat removal is accomplished in a manner that preserves robust safety margins at all times during the transient. Numerous trade studies and trade-space considerations are discussed, along with the resultant initial system concept. The current concept is not optimized. Work remains to more completely define the overall system with particular emphasis on refining the final fuel/core configuration, salt vault configuration, and integrated system dynamics and safety behavior.

small modular fluoride salt high temperature react↗

Commentary on A Conceptual Design of Transport Lines for a Heavy-Ion Inertial-Fusion Power Plant

Some major system features are not stated but can be inferred. For example this is probably an engineering test facility, not a power plant driver, because the standoff from target to final magnet is only 5.0 m. The fusion target takes two-sided illumination with indirect drive using a total of 60 beam pulses: 10 pre-pulses (3.0 GeV) + 20 main pulses (4.0 GeV) from each side. On page 12 it's stated that the charge per beam pulse is 26.8 {micro}C, so we calculate pre-pulse: 20 x 3 GeV x 26.8 {micro}C = 1.608MJ, main pulse: 40 x 4 GeV x 26.8 {micro}C = 4.288MJ, total beam energy 5.896MJ. The beam ion mass ks 200 amu, so the species is Hg{sup +}. Therefore the mid-pulse velocities are: pre-pulse v = .1773c = 5.316 x 10{sup 7} m/s, main pulse v = .2040c = 6.114 x 10{sup 7} m/s, On page 12 it is stated that the pre-compression pulse length is L{sub 0} = 10.0m, and compression is by a 'factor of order 20'. They infer a final pulse length of about .5 m and final durations pre-pulse {tau} {approx} .5/5.316 x 10{sup 7} = 9.4 ns; main pulse {tau} {approx} .5/6.114 x 10{sup 7} = 8.2 ms. The magnetic rigidity of the beam ions is [B{rho}] = {gamma}m v/e = {l_brace} 112.0 T-m - prepulse/129.5 T-m - mainpulse{r_brace}.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Linac Coherent Light Source II (LCLS-II) Conceptual Design Report

The LCLS-II Project is designed to support the DOE Office of Science mission, as described in the 22 April 2010 Mission Need Statement. The scope of the Project was chosen to provide an increase in capabilities and capacity for the facility both at project completion in 2017 and in the subsequent decade. The Project is designed to address all points of the Mission Need Statement (MNS): (1) Expanded spectral reach; (2) Capability to provide x-ray beams with controllable polarization; (3) Capability to provide 'pump' pulses over a vastly extended range of photon energies to a sample, synchronized to LCLS-II x-ray probe pulses with controllable inter-pulse time delay; and (4) Increase of user access through parallel rather than serial x-ray beam use within the constraint of a $300M-$400M Total Project Cost (TPC) range. The LCLS-II Project will construct: (1) A hard x-ray undulator source (2-13 keV); (2) A soft x-ray undulator source (250-2,000 eV); (3) A dedicated, independent electron source for these new undulators, using sectors 10-20 of the SLAC linac; (4) Modifications to existing SLAC facilities for the injector and new shielded enclosures for the undulator sources, beam dumps and x-ray front ends; (5) A new experiment hall capable of accommodating four experiment stations; and (6) Relocation of the two soft x-ray instruments in the existing Near Experiment Hall (NEH) to the new experiment hall (Experiment Hall-II). A key objective of LCLS-II is to maintain near-term international leadership in the study of matter on the fundamental atomic length scale and the associated ultrafast time scales of atomic motion and electronic transformation. Clearly, such studies promise scientific breakthroughs in key areas of societal needs like energy, environment, health and technology, and they are uniquely enabled by forefront X-ray Free Electron Laser (X-FEL) facilities. While the implementation of LCLS-II extends to about 2017, it is important to realize that LCLS-II only constitutes a stepping stone to what we believe is needed over a longer time scale. At present, a practical time horizon for planning is about 15 years into the future, matching that of worldwide planning activities for competitive X-FEL facilities in Europe and Asia. We therefore envision LCLS-II as an important stage in development to what is required by about 2025, tentatively called LCLS-2025, for continued US leadership even as new facilities around the world are being completed. We envision LCLS primarily as a hard x-ray FEL facility with some soft x-ray capabilities. A survey of planned X-FEL facilities around the world suggests that US planning to 2025 needs to include an internationally competitive soft x-ray FEL facility which complements the LCLS plans outlined in this document.

43 PARTICLE ACCELERATORS↗

Conceptual Ideas for New Nondestructive UF 6 Cylinder Assay Techniques

Nondestructive assay (NDA) measurements of uranium cylinders play an important role in helping the International Atomic Energy Agency (IAEA) safeguard uranium enrichment plants. Traditionally, these measurements have consisted of a scale or load cell to determine the mass of UF{sub 6} in the cylinder combined with a gamma-ray measurement of the 186 keV peak from 235 U to determine enrichment. More recently, Los Alamos National Laboratory (LANL) and Pacific Northwest National Laboratory (PNNL) have developed systems that exploit the passive neutron signal from UF 6 to determine uranium mass and/or enrichment. These include the Uranium Cylinder Assay System (UCAS), the Passive Neutron Enrichment Meter (PNEM), and the Hybrid Enrichment Verification Array (HEVA). The purpose of this report is to provide the IAEA with new ideas on technologies that may or may not be under active development but could be useful for UF 6 cylinder assay.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Conceptual Design of Optimized Fossil Energy Systems with Capture and Sequestration of Carbon Dioxide

In this final report, we describe research results from Phase 2 of a technical/economic study of fossil hydrogen energy systems with carbon dioxide (CO 2 ) capture and storage (CCS). CO 2 capture and storage, or alternatively, CO 2 capture and sequestration, involves capturing CO 2 from large point sources and then injecting it into deep underground reservoirs for long-term storage. By preventing CO 2 emissions into the atmosphere, this technology has significant potential to reduce greenhouse gas (GHG) emissions from fossil-based facilities in the power and industrial sectors. Furthermore, the application of CCS to power plants and hydrogen production facilities can reduce CO 2 emissions associated with electric vehicles (EVs) and hydrogen fuel cell vehicles (HFCVs) and, thus, can also improve GHG emissions in the transportation sector. This research specifically examines strategies for transitioning to large-scale coal-derived energy systems with CCS for both hydrogen fuel production and electricity generation.

01 COAL, LIGNITE, AND PEAT↗

Irradiation experiment conceptual design parameters for MURR LEU U-Mo fuel conversion

This report contains the results of reactor design and performance calculations for conversion of the University of Missouri Research Reactor (MURR) from the use of highly-enriched uranium (HEU) fuel to the use of low-enriched uranium (LEU) fuel. The analyses were performed by staff members of the Global Threat Reduction Initiative (GTRI) Reactor Conversion Program at the Argonne National Laboratory (ANL) and the MURR Facility. The core conversion to LEU is being performed with financial support from the U. S. government.

Stillman, J.↗

Irradiation Experiment Conceptual Design Parameters for NBSR Fuel Conversion

It has been proposed to convert the National Institute of Standards and Technology (NIST) research reactor, known as the NBSR, from high-enriched uranium (HEU) fuel to low-enriched uranium (LEU) fuel. The motivation to convert the NBSR to LEU fuel is to reduce the risk of proliferation of special nuclear material. This report is a compilation of relevant information from recent studies related to the proposed conversion using a metal alloy of LEU with 10 w/o molybdenum. The objective is to inform the design of the mini-plate and full-size plate irradiation experiments that are being planned. This report provides relevant dimensions of the fuel elements, and the following parameters at steady state: average and maximum fission rate density and fission density, fuel temperature distribution for the plate with maximum local temperature, and two-dimensional heat flux profiles of fuel plates with high power densities. The latter profiles are given for plates in both the inner and outer core zones and for cores with both fresh and depleted shim arms (reactivity control devices). In addition, a summary of the methodology to obtain these results is presented.

42 ENGINEERING↗

Irradiation Experiment Conceptual Design Parameters for MURR LEU U-Mo Fuel Conversion Revision

This report contains the results of reactor design and performance calculations for conversion of the University of Missouri Research Reactor (MURR) from the use of highly-enriched uranium (HEU) fuel to the use of low-enriched uranium (LEU) fuel. The analyses were performed by staff members of the Global Threat Reduction Initiative (GTRI) Reactor Conversion Program at the Argonne National Laboratory (ANL) and the MURR Facility. The core conversion to LEU is being performed with financial support from the U. S. government. In the framework of its non-proliferation policies, the international community presently aims to minimize the amount of nuclear material available that could be used for nuclear weapons. In this geopolitical context most research and test reactors, both domestic and international, have started a program of conversion to the use of LEU fuel. A new type of LEU fuel based on an alloy of uranium and molybdenum (U-Mo) is expected to allow the conversion of U.S. domestic high performance reactors like MURR. This report presents the nominal steady-state irradiation conditions of a key set of plates containing peak irradiation parameters found in MURR cores fueled with the LEU monolithic U-Mo alloy fuel with 10 wt% Mo. Manufacturing tolerances and other uncertainties in reactor geometry and materials are also presented and used to estimate the uncertainties in these irradiation parameters above nominal steady-state conditions.

Stillman, J.↗

Irradiation Experiment Conceptual Design Parameters for MITR LEU U-Mo Fuel Conversion

This report contains the results of reactor design and performance calculations for conversion of the Massachusetts Institute of Technology Reactor (MITR) from the use of highly-enriched uranium (HEU) fuel to the use of low-enriched uranium (LEU) fuel. The analyses were performed by staff members of the Global Threat Reduction Initiative (GTRI) Reactor Conversion Program at the Argonne National Laboratory (ANL) and the MITR Facility. The core conversion to LEU is being performed with financial support from the U. S. government. In the framework of its non-proliferation policies, the international community presently aims to minimize the amount of nuclear material available that could be used for nuclear weapons. In this geopolitical context most research and test reactors, both domestic and international, have started a program of conversion to the use of LEU fuel. A new type of LEU fuel based on an alloy of uranium and molybdenum (U-Mo) is expected to allow the conversion of U.S. domestic high performance reactors like MITR. This report presents the nominal steady-state irradiation conditions of plates containing peak irradiation parameters found in MITR cores fueled with the LEU monolithic U-Mo alloy fuel with 10 wt% Mo. Manufacturing tolerances and other uncertainties in reactor geometry and materials are also presented and used to estimate the uncertainties in these irradiation parameters above nominal steady-state conditions.

Wilson, Erik H.↗

A Multi-TeV Linear Collider Based on CLIC Technology : CLIC Conceptual Design Report

This report describes the accelerator studies for a future multi-TeV e + e - collider based on the Compact Linear Collider (CLIC) technology. The CLIC concept as described in the report is based on high gradient normal-conducting accelerating structures where the RF power for the acceleration of the colliding beams is extracted from a high-current Drive Beam that runs parallel with the main linac. The focus of CLIC R&D over the last years has been on addressing a set of key feasibility issues that are essential for proving the fundamental validity of the CLIC concept. The status of these feasibility studies are described and summarized. The report also includes a technical description of the accelerator components and R&D to develop the most important parts and methods, as well as a description of the civil engineering and technical services associated with the installation. Several larger system tests have been performed to validate the two-beam scheme, and of particular importance are the results from the CLIC test facility at CERN (CTF3). Both the machine and detector/physics studies for CLIC have primarily focused on the 3 TeV implementation of CLIC as a benchmark for the CLIC feasibility. This report also includes specific studies for an initial 500 GeV machine, and some discussion of possible intermediate energy stages. The performance and operation issues related to operation at reduced energy compared to the nominal, and considerations of a staged construction program are included in the final part of the report. The CLIC accelerator study is organized as an international collaboration with 43 partners in 22 countries. An associated report describes the physics potential and experiments at CLIC and a shorter report in preparation will focus on the CLIC implementation strategy, together with a plan for the CLIC R&D studies 2012–2016. Critical and important implementation issues such as cost, power and schedule will be addressed there.

43 PARTICLE ACCELERATORS↗

An in-situ ZnS(Ag) UCN detector: conceptual studies

This report characterized ZnS(Ag) substrates using alpha-particle measurements; showed how PSD could be explained by particle stopping and straggling; and continued progress on prototype fabrication.

74 ATOMIC AND MOLECULAR PHYSICS↗

Conceptual Process and Facility Design to Produce Low-Enriched Uranium Targets for the Production of 99 Mo Medical Radioisotopes

The Global Threat Reduction—Conversion Program, which is part of the National Nuclear Security Agency, aims to minimize the use of high-enriched uranium (HEU) worldwide by substituting low-enriched uranium (LEU) in processes that currently use HEU. A significant amount of HEU is processed to make medical isotopes, especially 99 Mo. Argonne National Laboratory has developed a process using LEU foil and an annular target design to produce 99 Mo without the need for HEU. A high-level study was conducted to find the unit operations and considerations that would be required in a facility designed to meet the next decade of U.S. demand for 99 Mo using this LEU target. This study should give a commercial enterprise interested in pursuing production of targets enough information to (1) understand what is required in the facility and (2) perform a high-level cost estimate to build and operate the facility.

Wiencek, T. C.↗

Preliminary Conceptual Design of a Thick Concrete Nondestructive Evaluation Specimen

Many important safety structures in a nuclear power plant (NPP) are constructed using concrete. The purpose of the U.S. Department of Energy Office of Nuclear Energy’s Light Water Reactor Sustainability (LWRS) Program is to develop technologies and other solutions that can improve the reliability, sustain the safety, and extend the operating lifetimes of NPPs beyond 60 years. In order to evaluate the current status of NPP structures, concrete inspection techniques must be developed and tested. Since in-service containment structures do not allow for destructive measures necessary to validate the accuracy of these inspection techniques, comparative testing of the various nondestructive evaluation (NDE) concrete measurement techniques will require concrete specimens with known material properties, voids, internal microstructure flaws, and reinforcement locations. This report examines the need and availability of large concrete specimens to allow comparative testing of various NDE techniques, and the structural characteristics necessary for the specimens to serve as relevant representations of actual concrete structures in commercial NPPs.

concrete NDE↗