Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Test Readiness”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,009 records · Page 56

A New Process for Carbon Dioxide Conversion to Fuel

In this project, TDA developed a new mixed metal oxide-based sorbent that converts CO 2 (captured from coal fired power plant) to CO, which can then be combined with renewable H 2 generated by water electrolysis to produce different liquid fuels. TDA’s absorbent-based CO 2 conversion process uses a redox process, which splits the reverse water gas shift reaction steps into two stages: CO 2 reduction to CO and H 2 oxidation to H 2 O and eliminates the equilibrium limitations. The CO produced in the two-stage reactor system can then be further reacted with renewable H 2 to produce methanol, naphtha, diesel, or gasoline. We worked with the Gas Technology Institute (GTI) and Advanced Power & Energy Program (APEP) of University of California, Irvine (UCI) to design and develop the liquid fuel synthesis process that is built around this new material. We demonstrated the techno-economic viability of the new sorbent based redox process to convert CO 2 into synthesis gas by: 1) demonstrating continuous carbon dioxide reduction in a prototype test system for over 500 hours while converting up to 0.4 kg CO 2 /day. With the successful completion of the R&D effort, the technology is now ready for a larger pilot-scale demonstration and the technology readiness has been raised from TRL 3 to TRL 5. In collaboration UCI, we also completed a high-fidelity process design and economic analysis. The required selling price (RSP) for methanol (Case 1 H2-MeOH) is $\$$3.06/gal, naphtha and diesel (Case 2 H2-FT) are $\$$6.21/gal and $\$$8.91/gal, and for gasoline (Case 3 H2-MTG) is $\$$6.96/gal on a 2011 dollar basis. To put these costs in perspective, the recent (June 2020) U.S. price for methanol made from natural gas is about $\$$1.19/gal according to Methanex, a major methanol producer in North America. The recent (June 2, 2020) California prices for gasoline and diesel with California’s strict specifications are $\$$3.35/gal and $\$$3.73/gal according to the U.S. Energy Information Agency. On the other hand, it should be noted that the gasoline and diesel produced by the designs of Case 2 and Case 3 would be both nitrogen and sulfur free. These RSPs are based on a cost of imported electricity of $\$$64/MWh based on the low-end current wind generated electricity cost (Genevieve and Ramsden, Wind Electrolysis: Hydrogen Cost Optimization, Technical Report, June 2011, NREL/TP-5600-50408). This cost is by far the largest component of the variable costs used in computing the RSPs. The cost of the imported electricity has to approach zero for the RSP to be competitive for methanol produced in Case 1 and naphtha and diesel produced in Case 2 while the cost of electricity has to be less than $\$$10/MWh for gasoline produced in Case 3.

01 COAL, LIGNITE, AND PEAT↗

Integrate Latimer Controls' Solution into RTAC (CRADA Final Report, CRD-23-24672)

Latimer Controls, Inc. was awarded two vouchers under the Department of Energy's American-Made Solar Prize Round 6 to conduct collaborative research at a national laboratory. The National Renewable Energy Laboratory (NREL) was selected as a partner to assist Latimer Controls in the performance evaluation of its photovoltaic (PV) control software. This collaboration focuses on developing a hardware-in-the-loop (HIL) testbed at NREL, which will be used to test and validate the Latimer PV control technology in a realistic yet de-risked environment. Both Latimer and NREL teams will work together to analyze the collected test data, derive insights, and disseminate the scientific findings. Recent studies underscore the potential of solar energy as a zero-marginal-cost and zero-emission flexibility resource within the bulk power system, particularly when integrated with advanced control systems. To enhance the performance of such systems, Latimer Controls has developed leading-edge technologies, including machine learning (ML) algorithms and hierarchical inverter set-point allocation methods. These innovations are designed to estimate the operational headroom of large PV plants for grid integration and control. However, comprehensive validation under real-world conditions remains necessary. To address this gap, the concurrent CRADA project proposes the real-world application and validation of the Latimer Control solution within a HIL environment. Initially, the Latimer algorithm was developed and tested within MATLAB Simulink, a platform suitable for research-level simulations and iterative development. However, transitioning this technology to a real solar site as an industry-ready solution necessitates implementation in a format compatible with widely used solar power plant controllers. In this additional CRADA work, the MATLAB Simulink-based logic will be translated into Structured Text, a programming language compliant with IEC 61131 standards, which is commonly used for custom logic implementations in industry-leading programmable logic controllers (PLCs), such as the Schweitzer SEL real-time automation controller (RTAC). This transition will facilitate the deployment of the Latimer Control solution in real-world solar power plants, thereby advancing the technology towards commercialization.

14 SOLAR ENERGY↗

Aircraft wake turbulence avoidance

Analytical studies and flight tests are used to describe the formation and severity of trailing vortices and the spatial extent of their influence. This information is then used to outline procedures for ready application by pilots, tower operators, and others concerned with the flow of traffic. The procedures provide the necessary appreciation of the physical attributes of trailing vortices, the potential hazards involved when encountering them, and how best to avoid the dangerous portions of the wake during flight operations.

Mcgowan, W. A.↗

Army-NASA aircrew/aircraft integration program. Phase 5: A3I Man-Machine Integration Design and Analysis System (MIDAS) software concept document

This is the Software Concept Document for the Man-machine Integration Design and Analysis System (MIDAS) being developed as part of Phase V of the Army-NASA Aircrew/Aircraft Integration (A3I) Progam. The approach taken in this program since its inception in 1984 is that of incremental development with clearly defined phases. Phase 1 began in 1984 and subsequent phases have progressed at approximately 10-16 month intervals. Each phase of development consists of planning, setting requirements, preliminary design, detailed design, implementation, testing, demonstration and documentation. Phase 5 began with an off-site planning meeting in November, 1990. It is expected that Phase 5 development will be complete and ready for demonstration to invited visitors from industry, government and academia in May, 1992. This document, produced during the preliminary design period of Phase 5, is intended to record the top level design concept for MIDAS as it is currently conceived. This document has two main objectives: (1) to inform interested readers of the goals of the MIDAS Phase 5 development period, and (2) to serve as the initial version of the MIDAS design document which will be continuously updated as the design evolves. Since this document is written fairly early in the design period, many design issues still remain unresolved. Some of the unresolved issues are mentioned later in this document in the sections on specific components. Readers are cautioned that this is not a final design document and that, as the design of MIDAS matures, some of the design ideas recorded in this document will change. The final design will be documented in a detailed design document published after the demonstrations.

Banda, Carolyn↗

Spectroscopic Determination of the Physical Conditions in Hot Optically Thin Sources

The Astrophysics Plasma Emission Code and Database (APEC/APED), developed in part under this grant, have been upgraded to Version 1.3.0 and are now beginning to find widespread applications to X-ray spectral data from Chandra and XMM-Newton. These models represent the best theoretical data currently available and are reasonably complete below about 30 A. We are making significant progress in improving the spectral models between 30 and 90 A, by the addition of HULLAC calculations and NIST wavelengths for L-shell ions of Ne, Mg, Si, S, Ar, and Ca. While the output models are now public, the code itself is not ready for public release. We have made significant progress toward this goal through programming improvements, including optimized error codes, a major (elusive) bug fix, and additions to our testing protocols. Secondarily, we are beginning to investigate limited uses of APEC for X-ray photoionized plasma, as for opacity modeling. Stellar coronae are being used to benchmark the atomic data in APED as part of the Emission Line Project. The models appear to be in good agreement with the observations for most of the strong lines; however, we have identified significant discrepancies in the 3s/3d line ratios not only for Fe XVII, but also for Fe XVIII and XIX. The careful analysis of these high quality X-ray spectra has also shown that there are serious problems with some of the analysis techniques in widespread use. There are several manifestations of the problem, but the main problem is that line-to-continuum ratios may be seriously mismeasured. We continue to collaborate widely with atomic physicists in order to find the best atomic data, and to solicit calculations and measurements that are needed.

Brickhouse, Nancy↗

The Development of Solar Sail Propulsion for NASA Science Missions to the Inner Solar System

This paper examines recent assessments of the technology challenges facing solar sails, identifies the systems and technologies needing development, and the approach employed by NASA's In-space Propulsion Program in NASA to achieve near term products that move this important technology from low technology readiness level (TRL) toward the goal of application to science missions in near earth space and beyond. The status of on-going efforts to design, build, and test ground demonstrators of alternate approaches to structures (inflatable versus rigid), membrane materials, optical shape sensing, and attitude control will be presented along with planned future investments.

Montgomery, Edward E, IV↗

New Compressor Added to Glenn's 450- psig Combustion Air System

In September 1999, the Central Process Systems Engineering Branch and the Maintenance and the Central Process Systems Operations Branch, released for service a new high pressure compressor to supplement the 450-psig Combustion Air System at the NASA Glenn Research Center at Lewis Field. The new compressor, designated C-18, is located in Glenn s Central Air Equipment Building and is remotely operated from the Central Control Building. C-18 can provide 40 pounds per second (pps) of airflow at pressure to our research customers. This capability augments our existing system capacity (compressors C 4 at 38 pps and C-5 at 32 pps), which is generated from Glenn's Engine Research Building. The C-18 compressor was originally part of Glenn's 21-Inch Hypersonic Tunnel, which was transferred from the Jet Propulsion Laboratory to Glenn in the mid-1980's. With the investment of construction of facilities funding, the compressor was modified, new mechanical and electrical support equipment were purchased, and the unit was installed in the basement of the Central Air Equipment Building. After several weeks of checkout and troubleshooting, the new compressor was ready for long-term, reliable operations. With a total of 110 pps in airflow now available, Glenn is well positioned to support the high-pressure air test requirements of our research customers.

Swan, Jeffrey A.↗

Definition and Development of Habitation Readiness Levels (HRLs) for Planetary Surface Habitats

One could argue that NASA has never developed a true habitat for a planetary surface, with only the Lunar Module from the 1960's-era Apollo Program providing for a sparse 2 person, 3 day capability. An integral part of NASA's current National Vision for Space Exploration is missions back to the moon and eventually to Mars. One of the largest leaps i11 lunar surface exploration beyond the Apollo lunar missions will be the conduct of these extended duration human missions. These missions could range from 30 to 90 days in length initially and may eventually range up to 500 days in length. To enable these extended duration human missions, probably the single-most important lunar surface element is the Surface Habitat. The requirements that must be met by the Surface Habitat will go far beyond the safety, performance and operational requirements of the Lunar Module, and NASA needs to develop a basis for making intelligent, technically correct habitat design decisions. This paper will discuss the possibilities of the definition and development of a Habitation Readiness Level (HRL) scale that might be mapped to current Technology Readiness Levels (TRLs) for technology development. HRLs could help measure how well a particular technology thrust is advanced by a proposed planetary habitat concept. The readiness level would have to be measured differently than TRLs, and may include such milestones as habitat design performance under simulated mission operations and constraints (including relevant field testing), functional allocation demonstrations, crew interface evaluation and post-occupancy evaluation. With many concepts for planetary habitats proposed over the past 20 years, there are many strategic technical challenges facing designers of planetary habitats that will support NASA's exploration of the moon and Mars. The systematic assessment of a variety of planetary habitat options will be an important approach and will influence the associated requirements for human design, volumetrics, functionality, systems hardware and operations.

Connolly, Janis H.↗

Ares I and Ares V First Stage - Powering Exploration

The National Aeronautics and Space Administration (NASA) Ares Projects Office (APO) is continuing to make progress toward the final design of the first stage propulsion system for the Ares I crew launch vehicle and the Ares V cargo launch vehicle. Ares I and Ares V will provide the space launch capabilities needed to fulfill NASA' s exploration strategy of sending human beings to the Moon, Mars, and beyond. As primary propulsion for the Ares launch vehicles, the Space Shuttle-derived Reusable Solid Rocket Motor (RSRM) is one of the first and most important components to be tested. The first flight of Ares I, called Ares I-X, will occur in April 2009, with booster integration to begin at Kennedy Space Center (KSC) by autumn 2008. The Ares I-X flight will use a combination of flight and simulation hardware to obtain data on controlling the long and narrow crew launch vehicle configuration. The test will use a four-segment RSRM from the Shuttle inventory and a fifth spacer segment to simulate the size and weight of the operational five-segment motor to be used on later flights. The upper stage, Orion crew exploration vehicle, and launch abort system will all be replaced with simulator hardware. Manufacturing work has begun on the spacer segment, as well as the new forward hardware for the booster. Atlas V avionics will be adapted to control Ares I-X' s first stage. That hardware is undergoing hardware-in-the-loop testing in a contractor-provided systems integration laboratory (SIL); a critical design review (CDR) was completed in December 2007. Drogue and main parachute drop tests have also been conducted successfully at Yuma Proving Grounds, allowing the First Stage team to begin fabricating parachutes for Ares I-X. The Ares I-X flight test will be the first flight test for the parachutes. A series of preliminary design technical interchange meetings is being conducted prior to the Ares I-X CDR in January 2007 to ensure readiness for the flight. Much of the First Stage activity in 2007 has focused on a series of preliminary design (PDR) activities associated with each booster subsystem. These events will culminate in a formal preliminary design review in 2008, where subsystems and component specifications will be developed and associated analyses and drawings will be evaluated for technical adequacy. The first stage also has been undergoing a series of trade studies to determine means for upgrading booster performance and reducing operational costs. Performance improvement studies have included changing from polybutadiene acrylonitrile (PBAN) propellant to hydroxyl-terminated polybutadiene (HTPB); replacing aluminum with composite motor casings; and optimizing or upgrading the propellant grain and nozzle structures. Some or all of these changes could result in a block upgrade to the Ares I first stage, after becoming the standard configuration for the Ares V. The cost reduction studies included a change from reusable or recoverable boosters to completely expendable boosters; changing from hydrazine-powered to more environmentally friendly electrohydrostatic actuators (EHAs) on the thrust vector control (TVC) system; and changing the location of the separation plane to reduce the likelihood of recontact upon booster separation. The expendability trade study resulted in a decision to keep the recoverable boosters, as the new hardware costs significantly outweighed the potential operational cost savings due to reduced ground operations. Likewise, due to cost considerations, the team continued using existing hydrazine-powered actuators for the TVC system. The separation plane location for Ares I is still being studied, with results to be announced in 2008. In short, the Ares launch vehicles' first stage is building upon NASA's close familiarity with this Shuttle-derived system, while continuing to seek out improvements for long-term exploration.

Priskos, Alex S.↗

Ultraspectral Infrared Measurements from the Atmospheric Infrared Sounder (AIRS) on the EOS Aqua Spacecraft

Aqua measures the Earth's water cycle, energy fluxes, vegetation and temperatures. The Atmospheric Infrared Sounder (AIRS), Advanced Microwave Sounding Unit (AMSU) and Humidity Sounder for Brazil (HSB) were launched on the EOS Aqua spacecraft in May 2002. AIRS has had good radiometric and spectral sensitivity, stability, and accuracy and is suitable for climate studies. Temperature products compare well with radiosondes and models over the limited test range (|LAT| less than 40 degrees). Early trace gas products demonstrate the potential of AIRS. NASA is developing the next generation of hyperspectral IR imagers. JPL is ready to participate with US government agencies and US industry to transfer AIRS technology and science experience.

infrared↗

Gravity and Extreme Magnetism SMEX

The Gravity and Extreme Magnetism SMEX mission will be the first mission to catalogue the X-ray polarisation of many astrophysical objects including black-holes and pulsars. This first of its kind mission is enabled by the novel use of a time projection chamber as an X-ray polarimeter. The detector has been developed over the last 5 years, with the current effort charged toward a demonstration of it's technical readiness to be at level 6 prior to the preliminary design review. This talk will describe the design GEMS polarimeter and the results to date from the engineering test unit.

Source record↗

NASA's Gravitational-Wave Mission Concept Study

With the conclusion of the NASA/ESA partnership on the Laser interferometer Space Antenna (LISA) Project, NASA initiated a study to explore mission concepts that will accomplish some or all of the LISA science objectives at lower cost. The Gravitational-Wave Mission Concept Study consists of a public Request for Information (RFI), a Core Team of NASA engineers and scientists, a Community Science Team, a Science Task Force, and an open workshop. The RFI yielded 12 mission concepts, 3 instrument concepts and 2 technologies. The responses ranged from concepts that eliminated the drag-free test mass of LISA to concepts that replace the test mass with an atom interferometer. The Core Team reviewed the noise budgets and sensitivity curves, the payload and spacecraft designs and requirements, orbits and trajectories and technical readiness and risk. The Science Task Force assessed the science performance. Three mission concepts have been studied by Team-X, JPL's concurrent design facility, to refine the conceptual design, evaluate key performance parameters, assess risk and estimate cost and schedule. The status of the Study are reported.

Stebbins, Robin↗

NASA's Gravitational - Wave Mission Concept Study

With the conclusion of the NASA/ESA partnership on the Laser Interferometer Space Antenna (LISA) Project, NASA initiated a study to explore mission concepts that will accomplish some or all of the LISA science objectives at lower cost. The Gravitational-Wave Mission Concept Study consisted of a public Request for Information (RFI), a Core Team of NASA engineers and scientists, a Community Science Team, a Science Task Force, and an open workshop. The RFI yielded were 12 mission concepts, 3 instrument concepts and 2 technologies. The responses ranged from concepts that eliminated the drag-free test mass of LISA to concepts that replace the test mass with an atom interferometer. The Core Team reviewed the noise budgets and sensitivity curves, the payload and spacecraft designs and requirements, orbits and trajectories and technical readiness and risk. The Science Task Force assessed the science performance by calculating the horizons. the detection rates and the accuracy of astrophysical parameter estimation for massive black hole mergers, stellar-mass compact objects inspiraling into central engines. and close compact binary systems. Three mission concepts have been studied by Team-X, JPL's concurrent design facility. to define a conceptual design evaluate kt,y performance parameters. assess risk and estimate cost and schedule. The Study results are summarized.

Stebbins, Robin↗

Affordable Development and Qualification Strategy for Nuclear Thermal Propulsion

Nuclear Thermal Propulsion (NTP) is a concept which uses a nuclear reactor to heat a propellant to high temperatures without combustion and can achieve significantly greater specific impulse than chemical engines. NTP has been considered many times for human and cargo missions beyond low earth orbit. A lot of development and technical maturation of NTP components took place during the Rover/NERVA program of the 60's and early 70's. Other NTP programs and studies followed attempting to further mature the NTP concept and identify a champion customer willing to devote the funds and support the development schedule to a demonstration mission. Budgetary constraints require the use of an affordable development and qualification strategy that takes into account all the previous work performed on NTP to construct an existing database, and include lessons learned and past guidelines followed. Current guidelines and standards NASA uses for human rating chemical rocket engines is referenced. The long lead items for NTP development involve the fuel elements of the reactor and ground testing the engine system, subsystem, and components. Other considerations which greatly impact the development plans includes the National Space Policy, National Environmental Policy Act, Presidential Directive/National Security Council Memorandum #25 (Scientific or Technological Experiments with Possible Large-Scale Adverse Environmental Effects and Launch of Nuclear Systems into Space), and Safeguards and Security. Ground testing will utilize non-nuclear test capabilities to help down select components and subsystems before testing in a nuclear environment to save time and cost. Existing test facilities with minor modifications will be considered to the maximum extent practical. New facilities will be designed to meet minimum requirements. Engine and test facility requirements are based on the driving mission requirements with added factors of safety for better assurance and reliability. Emphasis will be placed on small engines, since the smaller the NTP engine, the easier it is to transport, assemble/disassemble, and filter the exhaust during tests. A new ground test concept using underground bore holes (modeled after the underground nuclear test program) to filter the NTP engine exhaust is being considered. The NTP engine system design, development, test, and evaluation plan includes many engine components and subsystems, which are very similar to those used in chemical engines, and can be developed in conjunction with them Other less mature NTP engine components and subsystems (e.g., reactor) will be thoroughly analyzed and tested to acceptable levels recommended by the referenced standards and guidelines. The affordable development strategy also considers a prototype flight test, as a final step in the development process. Preliminary development schedule estimates show that an aggressive development schedule (without much margin) will be required to be flight ready for a 2033 human mission to Mars.

Gerrish, Harold P., Jr.↗

Affordable Development and Qualification Strategy for Nuclear Thermal Propulsion

Nuclear Thermal Propulsion (NTP) is a concept which uses a nuclear reactor to heat a propellant to high temperatures without combustion and can achieve significantly greater specific impulse than chemical engines. NTP has been considered many times for human and cargo missions beyond low earth orbit. A lot of development and technical maturation of NTP components took place during the Rover/NERVA program of the 60's and early 70's. Other NTP programs and studies followed attempting to further mature the NTP concept and identify a champion customer willing to devote the funds and support the development schedule to a demonstration mission. Budgetary constraints require the use of an affordable development and qualification strategy that takes into account all the previous work performed on NTP to construct an existing database, and include lessons learned and past guidelines followed. Current guidelines and standards NASA uses for human rating chemical rocket engines is referenced. The long lead items for NTP development involve the fuel elements of the reactor and ground testing the engine system, subsystem, and components. Other considerations which greatly impact the development plans includes the National Space Policy, National Environmental Policy Act, Presidential Directive/National Security Council Memorandum #25 (Scientific or Technological Experiments with Possible Large-Scale Adverse Environmental Effects and Launch of Nuclear Systems into Space), and Safeguards and Security. Ground testing will utilize non-nuclear test capabilities to help down select components and subsystems before testing in a nuclear environment to save time and cost. Existing test facilities with minor modifications will be considered to the maximum extent practical. New facilities will be designed to meet minimum requirements. Engine and test facility requirements are based on the driving mission requirements with added factors of safety for better assurance and reliability. Emphasis will be placed on small engines, since the smaller the NTP engine, the easier it is to transport, assemble/disassemble, and filter the exhaust during tests. A new ground test concept using underground bore holes (modeled after the underground nuclear test program) to filter the NTP engine exhaust is being considered. The NTP engine system design, development, test, and evaluation plan includes many engine components and subsystems, which are very similar to those used in chemical engines, and can be developed in conjunction with them Other less mature NTP engine components and subsystems (e.g., reactor) will be thoroughly analyzed and tested to acceptable levels recommended by the referenced standards and guidelines. The affordable development strategy also considers a prototype flight test, as a final step in the development process. Preliminary development schedule estimates show that an aggressive development schedule (without much margin) will be required to be flight ready for a 2033 human mission to Mars.

Gerrish, Harold P., Jr.↗

Starling Swarm Mission – Technology Objectives, Status and Future Applications

NASA’s Starling mission is advancing the readiness of technologies for cooperative groups of space craft referred to as swarms. The Starling swarm of four 6U spacecraft launched in July 2023, and is completing its tests in Low Earth Orbit (LEO) of four key technologies that will enable future swarm missions: onboard maneuver planning and execution to adjust the swarm formation; establishing and maintaining an adhoc network in space; relative and absolute orbit determination using optical sensors; autonomous collaboration between spacecraft for establishing and conducting a science observation plan. A mission extension is also being prepared to demonstrate a space traffic management architecture to address the large and rapidly growing number of space craft in LEO. In this presentation, the objectives of the Starling mission and its extension will be reviewed along with the latest status and mission outcomes. The presentation will also look at the revolutionary potential for swarms in future science and exploration missions and the impact to operations.

SpaceOps Starling Swarm Distributed Spacecraft Net↗

X-57 Traction Power and Command Systems Development

This paper describes the final, as-built design of the X‑57 Maxwell aircraft power and command system architecture that implements the electrified propulsion capability. The development of the traction power, command, and avionics power subsystems proceeded as planned at the initial project critical design review, but improvements to the design were identified following the development of detailed operations concepts and integrated subsystem and system testing. The redundant architecture with A‑side and B‑side buses provided a robust framework for a developmental system that would turn out to have a lower technology readiness than had been assumed upon project formulation. As the project team identified reliability or performance gaps in the electrified propulsion powertrain components and their interactions with the other vehicle systems, the traction power, command, and avionics architectures were modified to accommodate the modified systems. Following the publication of the planned design approach at the critical design review milestone [1], the project team developed the flight hardware and software, integrated the systems, and adjusted the design and qualification activities to address gaps in the components, system architecture, and requirements as the gaps were realized. In addition to inherent challenges in development of these subsystems, the integration of this new technology with adjacent critical systems in an aircraft configuration posed additional challenges that drove design considerations across the subsystem development and the other vehicle systems. Integration complications included electromagnetic compatibility, thermal performance, and tolerance of single-point failures internal and external to the powerplant. Development of a qualification program was required for the new motors, inverters, and batteries, and hardware performance during component qualification fed back into the development process and led lessons learned and redesign of key elements.

distributed propulsion↗

Automated Rendezvous and Docking Sensor Testing at the Flight Robotics Laboratory

The Exploration Systems Architecture defines missions that require rendezvous, proximity operations, and docking (RPOD) of two spacecraft both in Low Earth Orbit (LEO) and in Low Lunar Orbit (LLO). Uncrewed spacecraft must perform automated and/or autonomous rendezvous, proximity operations and docking operations (commonly known as Automated Rendezvous and Docking, AR&D). The crewed versions may also perform AR&D, possibly with a different level of automation and/or autonomy, and must also provide the crew with relative navigation information for manual piloting. The capabilities of the RPOD sensors are critical to the success of the Exploration Program. NASA has the responsibility to determine whether the Crew Exploration Vehicle (CEV) contractor-proposed relative navigation sensor suite will meet the CEV requirements. The relatively low technology readiness of relative navigation sensors for AR&D has been carried as one of the CEV Projects top risks. The AR&D Sensor Technology Project seeks to reduce this risk by increasing technology maturation of selected relative navigation sensor technologies through testing and simulation, and to allow the CEV Project to assess the relative navigation sensors.

Mitchell, J.↗